CN209062975U - Instrument assembly and disassembly tools - Google Patents
Instrument assembly and disassembly tools Download PDFInfo
- Publication number
- CN209062975U CN209062975U CN201821346653.5U CN201821346653U CN209062975U CN 209062975 U CN209062975 U CN 209062975U CN 201821346653 U CN201821346653 U CN 201821346653U CN 209062975 U CN209062975 U CN 209062975U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- clamp assemblies
- screw rod
- clamp plate
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000000712 assembly Effects 0.000 claims abstract description 123
- 238000000429 assembly Methods 0.000 claims abstract description 123
- 238000009434 installation Methods 0.000 abstract description 5
- 239000000243 solution Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000001788 irregular Effects 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 235000020681 well water Nutrition 0.000 description 2
- 239000002349 well water Substances 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model provides an instrument assembly and disassembly tools. The utility model discloses instrument assembly and disassembly tools, include: the pipeline clamping device comprises a first pipeline clamping assembly, a second pipeline clamping assembly and a first telescopic assembly, wherein the first pipeline clamping assembly and the second pipeline clamping assembly are oppositely arranged at intervals; the first pipeline clamping assembly is provided with a first pipeline clamping hole, the second pipeline clamping assembly is provided with a second pipeline clamping hole, and the second pipeline clamping hole is coaxial with the first pipeline clamping hole; the first telescoping assembly is retractable to adjust the distance between the first and second line clamping assemblies. The utility model provides an instrument assembly and disassembly tools makes things convenient for the installation or the dismantlement of instruments such as flowmeter, pressure gauge, need not many operating personnel cooperation work, and the instrument is dismantled simply, labour saving and time saving, and work efficiency is high.
Description
Technical field
The utility model relates to components dismounting technical field more particularly to a kind of instrument dismantling devices.
Background technique
In petrochemical industry, the instrument such as flowmeter, pressure gauge are widely used, in order to guarantee the accurate of instrument side measurement
Property, it usually needs the disassembly of the instrument such as flowmeter, pressure gauge is subjected to maintenance verification.For example, during oil exploitation, water injection pipe
The flow of flowmeter monitoring note well water is installed in road.In order to guarantee the accuracy of monitoring note well water flow, regular dismounting is needed
Dirty meter is verified.
The instrument such as flowmeter, pressure gauge generally pass through clip and are fixedly connected with pipeline, in instrument such as disassembly flowmeter, pressure gauges
When table, the pipeline of instrument two sides will appear phenomena such as dislocation, jam-packed perhaps open need two bit manipulation personnel pull open or with sled
Thick stick pries open pipeline, and in addition two bit manipulation personnel dismantle clamp bolt, nut.When installing the instrument such as flowmeter, pressure gauge, also need
It wants two bit manipulation personnel to tense pipeline, then needs two bit manipulation personnel's fixing hoops, and since pipeline misplaces, centering installation card
It binds round particularly difficult.
The instrument installing and dismounting such as existing flowmeter, pressure gauge needs multidigit operator to cooperate, complicated for operation, time-consuming to take
Power, working efficiency are low.
Utility model content
The utility model provides a kind of instrument dismantling device, to solve the instrument installing and dismounting such as existing flowmeter, pressure gauge
Multidigit operator is needed to cooperate, complicated for operation, time-consuming and laborious, ineffective technical problem.
The utility model provides a kind of instrument dismantling device comprising: the first pipeline clamp assemblies of relative spacing setting,
Second pipeline clamp assemblies and between the first pipeline clamp assemblies and the second pipeline clamp assemblies first
Telescopic component;The first pipeline clamp assemblies are equipped with the first pipeline holding holes, and the second pipeline clamp assemblies are equipped with second
Pipeline holding holes, and the second pipeline holding holes and the first pipeline holding holes are coaxial;First telescopic component can
It stretches to adjust the distance between the first pipeline clamp assemblies and the second pipeline clamp assemblies.
Instrument dismantling device as described above, wherein the first pipeline clamp assemblies include being equipped with the first upper groove
First upper clamp plate and the first lower clamp plate equipped with the first lower groove, first upper clamp plate and first lower clamp plate are fixed to be connected
It connects, and first upper groove and first lower groove form the first pipeline holding holes.
Instrument dismantling device as described above, wherein along the central axis direction perpendicular to first upper groove, described the
One upper clamp plate is respectively equipped with the first fixation hole in the two sides of first upper groove;Along the center perpendicular to first lower groove
Axis direction, first lower clamp plate are respectively equipped with the second fixation hole in the two sides of first lower groove;Fastening bolt passes through institute
It states the first fixation hole and second fixation hole is connect with nut thread, so that first upper clamp plate and first lower clamp plate
It is fixedly connected.
Instrument dismantling device as described above, wherein the second pipeline clamp assemblies include being equipped with the second upper groove
Second upper clamp plate and the second lower clamp plate equipped with the second lower groove, second upper clamp plate and second lower clamp plate are fixed to be connected
It connects, and second upper groove and second lower groove form the second pipeline holding holes.
Instrument dismantling device as described above, wherein along the central axis direction perpendicular to second upper groove, described the
Two upper clamp plates are respectively equipped with third fixation hole in the two sides of second upper groove;Along the center perpendicular to second lower groove
Axis direction, second lower clamp plate are respectively equipped with the 4th fixation hole in the two sides of second lower groove;Fastening bolt passes through institute
The threaded connection of third fixation hole and the 4th fixation hole and nut is stated, so that second upper clamp plate and the described second lower folder
Plate is fixedly connected.
Instrument dismantling device as described above, wherein first telescopic component include the first screw rod, the second screw rod and
First swivel nut;One end of first screw rod is fixedly connected with the first pipeline clamp assemblies, first screw rod it is another
End is connect with the threaded one end of first swivel nut;The other end screw thread of one end of second screw rod and first swivel nut connects
It connects, the other end of second screw rod is fixedly connected with the second pipeline clamp assemblies, and second screw flight
Rotation direction and first screw flight are oppositely oriented.
Instrument dismantling device as described above, wherein one end of first screw rod is equipped with the first connecting hole, and described first
Pipeline clamp assemblies are equipped with the second connecting hole, and fastening bolt passes through first connecting hole and second connecting hole and nut spiral shell
Line connection, so that one end of first screw rod is fixedly connected with the first pipeline clamp assemblies.
Instrument dismantling device as described above, wherein the other end of second screw rod is equipped with third connecting hole, and described the
Two pipeline clamp assemblies are equipped with the 4th connecting hole, and fastening bolt passes through the third connecting hole and the 4th connecting hole and nut
It is threadedly coupled, so that the other end of second screw rod is fixedly connected with the second pipeline clamp assemblies.
Instrument dismantling device as described above further includes being located at the first pipeline clamp assemblies and second Pipeline clip
The second telescopic component between component is held, and second telescopic component and first telescopic component are located at described first
The two sides of pipeline holding holes central axis and the second pipeline holding holes central axis line.
Instrument dismantling device as described above, wherein second telescopic component include third screw rod, the 4th screw rod and
Second swivel nut;One end of the third screw rod is fixedly connected with the first pipeline clamp assemblies, the third screw rod it is another
End is connect with the threaded one end of second swivel nut;One end of 4th screw rod and the other end screw thread of second swivel nut connect
It connects, what the other end of the 4th screw rod was fixedly connected with the second pipeline clamp assemblies, and the 4th screw flight
Rotation direction and the third screw flight are oppositely oriented.
First pipeline is clamped to by instrument dismantling device provided by the utility model using the first pipeline clamp assemblies
In first pipeline holding holes, the second pipeline is clamped in the second pipeline holding holes using the second pipeline clamp assemblies, is made
It obtains the first pipeline and the second pipeline is coaxial;The first telescopic component is recycled to adjust the first pipeline clamp assemblies and the clamping of the second pipeline
The distance between component facilitates the instrument such as flowmeter, pressure gauge to adjust the distance between the first pipeline and the second pipeline
Installation or removal are not necessarily to multidigit operator cooperating, and instrument disassembly is simple, and time saving and energy saving, work efficiency is high.
Detailed description of the invention
By referring to accompanying drawing described in detail below, the above and other purpose of the utility model embodiment, feature and excellent
Point will become more clearly understood from.In the accompanying drawings, by by example and it is unrestricted in a manner of multiple implementations to the utility model
Example is illustrated, in which:
Fig. 1 is the structural schematic diagram of instrument dismantling device provided by the embodiment of the utility model;
Fig. 2 is the top view of the first upper clamp plate in Fig. 1;
Fig. 3 is the cross-sectional view of the first upper clamp plate in Fig. 1;
Fig. 4 is the cross-sectional view of the first lower clamp plate in Fig. 1;
Fig. 5 is the top view of the first telescopic component in Fig. 1.
Description of symbols:
1: the first pipeline clamp assemblies;11: the first pipeline holding holes;
12: the first upper clamp plates;121: the first upper grooves;
122: the first fixation holes;123: the second connecting holes;
13: the first lower clamp plates;131: the first lower grooves;
132: the second fixation holes;2: the second pipeline clamp assemblies;
21: the second pipeline holding holes;22: the second upper clamp plates;
23: the second lower clamp plates;3: the first telescopic components;
31: the first screw rods;311: the first connecting holes;
32: the second screw rods;321: third connecting hole;
33: the first swivel nuts;4: the second telescopic components.
Specific embodiment
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning
Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng
The embodiment for examining attached drawing description is exemplary, it is intended to for explaining the utility model, and should not be understood as to the utility model
Limitation.
Fig. 1 is the structural schematic diagram of instrument dismantling device provided by the embodiment of the utility model.
Referring to Fig.1, the utility model embodiment provides a kind of instrument dismantling device comprising: the of relative spacing setting
One pipeline clamp assemblies 1, the second pipeline clamp assemblies 2 and be located at the first pipeline clamp assemblies 1 and the second pipeline clamp assemblies 2
Between the first telescopic component 3;First pipeline clamp assemblies 1 are equipped with the first pipeline holding holes 11, and the second pipeline clamp assemblies 2 are set
There are the second pipeline holding holes 21, and the second pipeline holding holes 11 and the first pipeline holding holes 21 are coaxial;First telescopic component 3 can
It stretches to adjust the distance between the first pipeline clamp assemblies 1 and the second pipeline clamp assemblies 2.
Specifically, the first pipeline clamp assemblies 1 are equipped with the first pipeline holding holes 11, for clamping flowmeter, pressure gauge etc.
First pipeline of instrument side.First pipeline holding holes 11 are round hole.First pipeline clamp assemblies 1 may include two semicircles
Snap ring, the snap ring of two semicircles is fixedly connected by screw bolt and nut, forms the first pipeline holding holes 11.Alternatively, the first pipe
Line clamp assemblies 1 can also include two grip blocks, and two grip blocks are respectively provided with semicircle orifice, and one end of two grip blocks is hinged,
The other end of two grip blocks is fixedly connected by fasteners such as bolt, screws, so that two semicircle orifices form the first Pipeline clip
Hold hole 11.Certainly, the first pipeline is slided in the first pipeline holding holes 11, is rotated etc. in order to prevent, the first pipeline holding holes 11
It is interior to be equipped with anti-slip layer, for example, pasting one layer of anti-slip layer in the first pipeline holding holes 11, prevent the first pipeline in the first pipe
Sliding, rotation in line holding holes 11.
Second pipeline clamp assemblies 2 and 1 relative spacing of the first pipeline clamp assemblies are arranged, and the first pipeline clamp assemblies 2
It is another for clamping the instrument such as flowmeter, pressure gauge equipped with the second pipeline holding holes 21 coaxial with the first pipeline holding holes 11
Second pipeline of side.Second pipeline holding holes 21 are round hole.Second pipeline clamp assemblies 2 may include the card of two semicircles
The snap ring of ring, two semicircles is fixedly connected by screw bolt and nut, forms the second pipeline holding holes 21.Alternatively, the second Pipeline clip
Holding component 2 can also include two grip blocks, and two grip blocks are respectively provided with semicircle orifice, and two ends of two grip blocks are hinged, and two
Another two end of grip block is fixedly connected by fasteners such as bolt, screws, so that two semicircle orifices form the second pipeline holding holes
21.Certainly, the second pipeline is slided in the second pipeline holding holes 21, is rotated etc. in order to prevent, can in the second pipeline holding holes 21
To be equipped with anti-slip layer, for example, pasting one layer of anti-slip layer in the second pipeline holding holes 21, prevent the second pipeline in the second Pipeline clip
Hold sliding in hole 21, rotation.
First telescopic component 3 is arranged between the first pipeline clamp assemblies 1 and the second pipeline clamp assemblies 2, and first is flexible
Component 3 can be flexible along the line direction of 21 central axis of the second pipeline holding holes 11 and the first pipeline holding holes, to adjust first
The distance between pipeline clamp assemblies 1 and the second pipeline clamp assemblies 2.First telescopic component 3 may include the first bar and second
Bar, one end of the first bar is mounted in the mounting hole of the first pipeline clamp assemblies 1, and the first bar can rotate in mounting hole,
The other end of first bar is connect with the threaded one end of the second bar;The other end of second bar and the fixed company of the second pipeline clamp assemblies 2
It connects.The first bar is rotated, the length that the first bar is threadedly coupled with the second bar is adjusted, to adjust the first pipeline clamp assemblies 1 and second
The distance between pipeline clamp assemblies 2.Alternatively, the first telescopic component 3 can also include the first screw rod, the second screw rod and spiral shell
Set, the first screw rod are fixedly connected with the first pipeline clamp assemblies 1, and the second screw rod is fixedly connected with the second pipeline clamp assemblies 2, and
And first screw rod and the second screw flight it is oppositely oriented, swivel nut is connect with the first screw rod and the second screw flight respectively, is passed through
Rotation swivel nut Adjusting bolt Adjusting screw and the first screw rod and the second screw flight connection length are adjusted, to adjust the first pipeline clamp assemblies
1 and second the distance between the pipeline clamp assemblies 2.
By taking flowmeter as an example, flowmeter disassembly is being carried out using instrument dismantling device provided by the embodiment of the utility model
When, the first pipeline is clamped in the first pipeline holding holes 11 by operator first with the first pipeline clamp assemblies 1, utilizes second
Second pipeline is clamped in the second pipeline holding holes 21 by pipeline clamp assemblies 2, at this point, the first pipeline and the second pipeline are coaxial,
It is not in pipeline dislocation, flowmeter is between the first pipeline clamp assemblies 1 and the second pipeline clamp assemblies 2;Then, it dismantles
Fall the clip at flowmeter both ends;The first telescopic component 3 is adjusted, the first pipeline clamp assemblies 1 and the second pipeline clamp assemblies 2 are increased
The distance between, flowmeter is taken out between the first pipeline and the second pipeline, is overhauled.
When carrying out flowmeter installation using instrument dismantling device provided by the embodiment of the utility model, operator is utilized
First pipeline is clamped in the first pipeline holding holes 11 by the first pipeline clamp assemblies 1, using the second pipeline clamp assemblies 2 by
After two pipelines are clamped in the second pipeline holding holes 21, the first telescopic component 3 is adjusted, increases the first pipeline clamp assemblies 1 and the
The distance between two pipeline clamp assemblies 2, flowmeter is placed between the first pipeline and the second pipeline;It is flexible that first is adjusted again
Component 3 reduces the distance between the first pipeline clamp assemblies 1 and the second pipeline clamp assemblies 2, so that the both ends of flowmeter are distinguished
With the end abutment of the first pipeline, the second pipeline, then front band is installed.
On the one hand instrument dismantling device provided by the embodiment of the utility model reduces operator in operation
Security risk avoids the risk crushed, pipeline swing is hurted sb.'s feelings with pipeline damage, on the other hand improves the work effect of operator
Rate reduces labor intensity.It is to be appreciated that instrument dismantling device provided by the utility model, cannot only be applied to stream
In the disassembling operations of meter, also it can be applied in the disassembling section of other instrument such as pressure gauge.
Instrument dismantling device provided by the embodiment of the utility model is clamped the first pipeline using the first pipeline clamp assemblies
It is fixed in the first pipeline holding holes, the second pipeline is clamped to the second pipeline holding holes using the second pipeline clamp assemblies
It is interior, so that the first pipeline and the second pipeline are coaxial;The first telescopic component is recycled to adjust the first pipeline clamp assemblies and the second pipe
The distance between line clamp assemblies facilitate flowmeter, pressure gauge etc. to adjust the distance between the first pipeline and the second pipeline
The installation or removal of instrument are not necessarily to multidigit operator cooperating, and instrument disassembly is simple, and time saving and energy saving, work efficiency is high.
Fig. 2 is the top view of the first upper clamp plate in Fig. 1;Fig. 3 is the cross-sectional view of the first upper clamp plate in Fig. 1;
Fig. 4 is the cross-sectional view of the first lower clamp plate in Fig. 1.
In some embodiments, referring to figs. 1 to Fig. 4, the first pipeline clamp assemblies 1 include being equipped with the first upper groove 121
First upper clamp plate 12 and the first lower clamp plate 13 equipped with the first lower groove 131, the first upper clamp plate 12 and the first lower clamp plate 13 are fixed
Connection, and the first upper groove 121 and the first lower groove 131 form the first pipeline holding holes 11.
Specifically, the first pipeline clamp assemblies 1 include the first upper clamp plate 12 and the second lower clamp plate 13, wherein the first upper clamp plate
12 towards the first lower clamp plates 13 side be equipped with the first upper groove 121, the first upper groove 121 can be semi-circular recesses, first
Upper groove 121 is also possible to the arc groove of minor arc, and the first upper groove 121 can also be rectangular recess.First upper groove 121
Axial direction and the first pipeline it is axial parallel.First upper clamp plate 12 can be rectangular plate, the axial direction of the first upper groove 121 with
The width direction of first upper clamp plate is parallel.First upper clamp plate 12 can also be the plate of the other shapes such as square plate, the utility model
Embodiment does not limit this.
First lower clamp plate 13 is equipped with the first lower groove 131 towards the side of the first upper clamp plate 12, and the first lower groove 131 can be with
For semi-circular recesses, the first lower groove 131 is also possible to the arc groove of minor arc, and the first lower groove 131 can also be rectangle
Groove.The axial direction of first lower groove 131 and the first upper groove 121 are coaxial.First lower clamp plate 13 can be rectangular plate, the
The axial direction of one lower groove 131 is parallel with the width direction of the first upper clamp plate.First lower clamp plate 13 can also be square plate etc. other
The plate of shape, the utility model embodiment do not limit this.
First upper clamp plate 12 is fixedly connected with third lower clamp plate 13, makes the first upper groove 121 and the formation of the first lower groove 131
Holding holes 11 in first pipeline, to clamp the first pipeline.When the first upper groove 121 and the first lower groove 131 are respectively that semicircle is recessed
When slot, the first pipeline holding holes 11 are round hole;When the arc groove that the first upper groove 121 and the first lower groove 131 are minor arc
When, the first pipeline holding holes 11 are the hole of irregular shape;When the first upper groove 121 and the first lower groove 131 are respectively rectangular
When connected in star, the first pipeline holding holes 11 are square hole, at this point, the outer diameter of the first pipeline is consistent with the side length of square hole.
As a preferred embodiment, the first upper groove 121 is semi-circular recesses, and the first lower groove 131 is also semi-circular recesses,
First upper clamp plate 12 is fixedly connected with the first lower clamp plate 13 so that the first upper groove 121 and the first lower groove 131 formed it is circular
First pipeline holding holes 11 increase the first pipeline at this point, the diameter of the first pipeline holding holes 11 is consistent with the diameter of the first pipeline
With the contact area of the first pipeline holding holes 11, it is beneficial to prevent the first pipeline and rotates, slides in the first pipeline holding holes 11
Deng.
As one, optionally embodiment, the first upper clamp plate 12 and the first lower clamp plate 13 can pass through fastening bolt and nut
It is fixed, specifically, along the central axis direction perpendicular to the first upper groove 121, the first upper clamp plate 12 is in the first upper groove 121
Two sides be respectively equipped with the first fixation hole 122;Along the central axis direction perpendicular to the first lower groove 131, the first lower clamp plate 13 exists
The two sides of first lower groove 131 are respectively equipped with the second fixation hole 132;It is fixed that fastening bolt passes through the first fixation hole 122 and second
Hole 132 is connect with nut thread, so that the first upper clamp plate 12 is fixedly connected with the first lower clamp plate 13.
First upper clamp plate 12 is equipped at least two first fixation holes 122, along the central axis perpendicular to the first upper groove 121
Direction is separately positioned on the two sides of the first upper groove 121.First fixation hole 122 can be circular light hole, axially and on first
Groove 121 it is axially vertical.For example, being set on the first upper clamp plate 12 there are two the first fixation hole 122, along perpendicular to the first upper groove
121 central axis direction is located at the two sides of the first upper groove 121.
First lower clamp plate 13 is equipped at least two second fixation holes 132, along the central axis perpendicular to the first lower groove 131
Direction is separately positioned on the two sides of the first lower groove 131.Second fixation hole 132 can be circular light hole, axially and under first
Groove 131 it is axially vertical, also, the second fixation hole 132 and the first fixation hole 122 are coaxial.For example, being set on the first lower clamp plate 13
There are two the second fixation holes 132 to be located at the first lower groove 131 along the central axis direction perpendicular to the first lower groove 131
Two sides.
Fastening bolt passes through the first fixation hole 122 and the second fixation hole 132 is connect with nut thread, by the first upper clamp plate
12 are fixedly connected with the second lower clamp plate 13, so that the first pipeline is clamped in the first pipeline holding holes 11.
It is understood that the first fixation hole 122 and the second fixation hole 132 can also be threaded hole, screw or bolt
Equal fasteners, are threadedly coupled with the first fixation hole 122 and the second fixation hole 132 respectively, realize under the first upper clamp plate 12 and first
Clamping plate 13 is fixedly connected.
With continued reference to Fig. 1, the second pipeline clamp assemblies 2 include the second upper clamp plate 22 equipped with the second upper groove and are equipped with the
Second lower clamp plate 23 of two lower grooves, the second upper clamp plate 22 is fixedly connected with the second lower clamp plate 23, and the second upper groove and second
Lower groove forms the second pipeline holding holes 21.
Specifically, the second pipeline clamp assemblies 2 include the second upper clamp plate 22 and the second lower clamp plate 23, wherein the second upper clamp plate
22 are equipped with the second upper groove towards the side of the second lower clamp plate 23, and the second upper groove can be semi-circular recesses, the second upper groove
It is also possible to the arc groove of minor arc, the second upper groove can also be rectangular recess.The axial direction of second upper groove and the second pipe
The axial direction of line is parallel.Second upper clamp plate 22 can be rectangular plate, the width of the axial direction of the second upper groove and the second upper clamp plate
Direction is parallel.Second upper clamp plate 22 can also be the plate of the other shapes such as square plate, and the utility model embodiment does not limit this
It is fixed.
Second lower clamp plate 23 is equipped with the second lower groove towards the side of the second upper clamp plate 22, and the second lower groove can be semicircle
Connected in star, the second lower groove are also possible to the arc groove of minor arc, and the second lower groove can also be rectangular groove.Under second
The axial direction of groove and the second upper groove are coaxial.Second lower clamp plate 23 can be rectangular plate, the axial direction of the second lower groove and the
The width direction of two upper clamp plates is parallel.Second lower clamp plate 23 can also be that the plate of the other shapes such as square plate, the utility model are real
Example is applied not limit this.
Second upper clamp plate 22 is fixedly connected with third lower clamp plate 23, and the second upper groove and the second lower groove is made to form the second pipe
Holding holes 21 in line, to clamp the second pipeline.When the second upper groove and the second lower groove are respectively semicircle groove, the second pipeline
Holding holes 21 are round hole;When the second upper groove and the second lower groove are the arc groove of minor arc, the second pipeline holding holes 21
For the hole of irregular shape;When the second upper groove and the second lower groove are respectively rectangular recess, the second pipeline holding holes 21
It is square hole, at this point, the outer diameter of the second pipeline is consistent with the side length of square hole.As a preferred embodiment, second
Upper groove is semi-circular recesses, and the second lower groove is also semi-circular recesses, and the second upper clamp plate 22 and the second lower clamp plate 23 are fixed
Connection, so that the second upper groove and the second lower groove form circular second pipeline holding holes 21, at this point, the second pipeline holding holes
21 diameter is consistent with the diameter of the second pipeline, increases the contact area of the second pipeline and the second pipeline holding holes 21, is conducive to
Prevent the second pipeline from rotating, sliding in the second pipeline holding holes 21 etc..
As a preferred embodiment, the second upper clamp plate 22 and the second lower clamp plate 23 can be with channel fastening bolt and nuts
It is fixed.Specifically, along the central axis direction perpendicular to the second upper groove, the second upper clamp plate 22 is in the two sides of the second upper groove
It is respectively equipped with third fixation hole;Along the central axis direction perpendicular to the second lower groove, the second lower clamp plate 23 is in the second lower groove
Two sides are respectively equipped with the 4th fixation hole;Fastening bolt passes through the threaded connection of third fixation hole and the 4th fixation hole and nut, with
It is fixedly connected with the second upper clamp plate 22 with the second lower clamp plate 23.
Second upper clamp plate 22 be equipped at least two third fixation holes, along perpendicular to the second upper groove central axis direction,
It is separately positioned on the two sides of the second upper groove.Third fixation hole can be circular light hole, the axial axial direction with the second upper groove
Vertically.For example, being set on the second upper clamp plate 22 there are two third fixation hole, along the central axis direction perpendicular to the second upper groove, divide
Not Wei Yu the second upper groove two sides.
Second lower clamp plate 23 be equipped at least two the 4th fixation holes, along perpendicular to the second lower groove central axis direction,
It is separately positioned on the two sides of the second lower groove.4th fixation hole can be circular light hole, the axial axial direction with the second lower groove
Vertically, also, the 4th fixation hole and third fixation hole are coaxial.For example, setting on the second lower clamp plate 23, there are two the 4th fixation hole, edges
Perpendicular to the central axis direction of the second lower groove, it is located at the two sides of the second lower groove.
Fastening bolt passes through third fixation hole and the 4th fixation hole and connect with nut thread, by the second upper clamp plate 22 and the
Two lower clamp plates 23 are fixedly connected, so that the second pipeline is clamped in the second pipeline holding holes 21.
It is understood that third fixation hole and the 4th fixation hole can also be threaded hole, the fastening such as screw or bolt
Part is threadedly coupled with third fixation hole and the 4th fixation hole respectively, realizes the fixation of the second upper clamp plate 22 and the second lower clamp plate 23
Connection.
Fig. 5 is the top view of the first telescopic component in Fig. 1.
Referring to Fig. 5, the first telescopic component 3 includes the first screw rod 31, the second screw rod 32 and the first swivel nut 33;First screw rod
31 one end is fixedly connected with the first pipeline clamp assemblies 1, the threaded one end of the other end of the first screw rod 31 and the first swivel nut 33
Connection;One end of second screw rod 32 is threadedly coupled with the other end of the first swivel nut 33, the other end of the second screw rod 32 and the second pipe
What line clamp assemblies 2 were fixedly connected, and the thread rotary orientation of the thread rotary orientation of the second screw rod 32 and the first screw rod 31 is opposite.
Specifically, the first telescopic component 3 includes the first screw rod 31, the second screw rod 32 and the first swivel nut 33.Wherein, first
Stud can be set in one end of screw rod 31, is threadedly coupled with the threaded hole of the first pipeline clamp assemblies 1 setting, to realize the first spiral shell
Bar 31 is fixedly connected with the first pipeline clamp assemblies 1;Alternatively, one end of the first screw rod 31 is equipped with threaded hole, the first Pipeline clip
Holding component 1 also has threaded hole, the threaded hole and the first pipeline that the fasteners such as screw or bolt are arranged with the first screw rod 31 respectively
The threaded hole that clamp assemblies 1 are arranged is threadedly coupled, and realizes that the first screw rod 31 is fixedly connected with the first pipeline clamp assemblies 1.First
The other end of screw rod 31 is equipped with external screw thread, connect with the threaded one end of the first swivel nut 33.
One end of second screw rod 32 is equipped with external screw thread, is threadedly coupled with the other end of the first swivel nut 33.Second screw rod 32
Stud can be set in the other end, is threadedly coupled with the threaded hole of the second pipeline clamp assemblies 2 setting, with the second screw rod of realization and the
Two pipeline clamp assemblies 2 are fixedly connected;Alternatively, the other end of the second screw rod 32 is equipped with threaded hole, the second pipeline clamp assemblies 2
On also be provided with threaded hole, the fasteners such as screw or bolt are clamped with the threaded hole of the second screw rod 32 setting and the second pipeline respectively
The threaded hole that component 2 is arranged is threadedly coupled, and realizes that the second screw rod 32 is fixedly connected with the second pipeline clamp assemblies 2.
Second screw rod 32 setting externally threaded rotation direction be arranged with the first screw rod 31 it is externally threaded oppositely oriented, certainly,
The internal screw thread of first swivel nut 33 setting includes oppositely oriented two parts screw thread.For example, the external screw thread on the second screw rod 32 is the right side
Screw thread is revolved, the external screw thread on the first screw rod 31 is left hand thread;At this point, the internal screw thread of 33 one end of the first swivel nut is left hand thread,
It is threadedly coupled with the first screw rod 31;The internal screw thread of first swivel nut, 33 other end is right-handed thread, is threadedly coupled with the second screw rod 32.
Alternatively, the external screw thread on the second screw rod 32 is left hand thread, the external screw thread on the first screw rod 31 is right-handed thread, at this point, first
The internal screw thread of one end of swivel nut 33 is right-handed thread, is threadedly coupled with the first screw rod 31;The interior spiral shell of the other end of first swivel nut 33
Line is left hand thread, is threadedly coupled with the second screw rod 32.
Optionally, the middle position of the first swivel nut 33 is equipped with through-hole, the central axis of the central axis of through-hole and the first swivel nut 33
Vertically.
When operator needs to adjust the distance between the first pipeline clamp assemblies 1 and the second pipeline clamp assemblies 2, rotation
Turn the first swivel nut 33, the length that the first swivel nut 33 is threadedly coupled with the first screw rod 31, the second screw rod 32 respectively is adjusted, to adjust
The distance between first pipeline clamp assemblies 1 and the second pipeline clamp assemblies 2.
As an optional embodiment, the first screw rod 31 and the first pipeline clamp assemblies 1 can by fastening bolt and
Nut is attached.Specifically, one end of the first screw rod 31 is equipped with the first connecting hole 311, and the first pipeline clamp assemblies 1 are equipped with the
Two connecting holes 123, fastening bolt passes through the first connecting hole 311 and the second connecting hole 123 is connect with nut thread, so that the first spiral shell
One end of bar 31 is fixedly connected with the first pipeline clamp assemblies 1.
One end of first screw rod 31 be equipped with the first connecting hole 311, the first connecting hole 311 be round hole, center axis thereof with
The central axis upright of the external thread part of first screw rod 31.
Referring to Fig.1, the first upper clamp plate 12 of the first pipeline clamp assemblies 1 can be consistent with the length of the first lower clamp plate 13,
At this point, the first upper clamp plate 12 includes the first upper plate body and the first convex platform that the first upper plate body bottom surface is arranged in, wherein first
Upper groove 121 and the first fixation hole 122 are arranged on biggish first convex platform of plate thickness, and the second connecting hole 123 is arranged in plate thickness
On lesser first upper plate body.First lower clamp plate 13 includes the first lower body and is arranged under the first of the first lower body top surface
Boss, wherein the first lower groove 131 and the second fixation hole 132 are arranged on biggish first lower convex platform of plate thickness, the second connecting hole
123 are arranged on lesser first lower body of plate thickness.
One end of first screw rod 31 is folded under the first upper plate body of the first upper clamp plate 12 and the first of the first lower clamp plate 13
Between plate body, fastening bolt passes through the second connecting hole 123 of the first upper plate body, the first connecting hole 311, the on the first lower body
Two connecting holes 123 are connect with nut thread, so that one end of the first screw rod 31 is fixedly connected with the first pipeline clamp assemblies 1.
Certainly, the length of the first upper clamp plate 12 of the first pipeline clamp assemblies 1 be greater than the first lower clamp plate 13 length, second
Connecting hole 123 is provided only on the first upper clamp plate 12, and the first screw rod 31 and the first upper clamp plate 12 are real by fastening bolt and nut
Now it is fixedly connected.Alternatively, the length of the first lower clamp plate 13 is greater than the length of the first upper clamp plate 12, the second connecting hole 123 is only arranged
On the first lower clamp plate 13, the first screw rod 31 is achieved a fixed connection with the first lower clamp plate 13 by fastening bolt and nut.
As an optional embodiment, the second screw rod 32 and the second pipeline clamp assemblies 2 can by fastening bolt and
Nut is attached.Specifically, the other end of the second screw rod 32 is equipped with third connecting hole 321, and the second pipeline clamp assemblies 2 are equipped with
4th connecting hole, fastening bolt passes through third connecting hole 321 and the 4th connecting hole is connect with nut thread, so that the second screw rod 32
The other end be fixedly connected with the second pipeline clamp assemblies 2.
The other end of second screw rod 32 is equipped with third connecting hole 321, and third connecting hole 321 is round hole, center axis thereof
With the central axis upright of the external thread part of the second screw rod 32.
Referring to Fig.1, the second upper clamp plate 22 of the second pipeline clamp assemblies 2 can be consistent with the length of the second lower clamp plate 13,
At this point, the second upper clamp plate 22 includes the second upper plate body and the second convex platform that the second upper plate body bottom surface is arranged in, wherein second
Upper groove and third fixation hole are arranged on biggish second convex platform of plate thickness, and the 4th connecting hole is arranged in plate thickness lesser second
On upper plate body.Second lower clamp plate 23 includes the second lower body and the second lower convex platform that the second lower body top surface is arranged in, wherein
Second lower groove and the 4th fixation hole are arranged on biggish second lower convex platform of plate thickness, and the setting of the 4th connecting hole is lesser in plate thickness
On second lower body.
The other end of second screw rod 32 be folded in the second upper clamp plate 22 the second upper plate body and the second lower clamp plate 23 second
Between lower body, fastening bolt passes through the 4th connecting hole of the second upper plate body, third connecting hole 321, the on the second lower body
Four connecting holes are connect with nut thread, so that the other end of the second screw rod 32 is fixedly connected with the second pipeline clamp assemblies 2.
Certainly, the length of the second upper clamp plate 22 of the second pipeline clamp assemblies 2 be greater than the second lower clamp plate 23 length, the 4th
Connecting hole is provided only on the second upper clamp plate 22, and the second screw rod 32 and the second upper clamp plate 22 are realized admittedly by fastening bolt and nut
Fixed connection.Alternatively, the length of the second lower clamp plate 13 is greater than the length of the second upper clamp plate 22, the 4th connecting hole is provided only under second
On clamping plate 23, the second screw rod 32 is achieved a fixed connection with the second lower clamp plate 23 by fastening bolt and nut.
With continued reference to Fig. 1, instrument dismantling device provided by the embodiment of the utility model further includes being located at the first pipeline to clamp
The second telescopic component 4 between component 1 and the second pipeline clamp assemblies 2, and the second telescopic component 4 and the first telescopic component 3 divide
Not Wei Yu 21 central axis line of 11 central axis of the first pipeline holding holes and the second pipeline holding holes two sides, at this point, first
Telescopic component 3, the first clamp assemblies 1, the second telescopic component 4 and the second clamp assemblies 2 form square box structure, are conducive to protect
It is stable in operation to hold instrument dismantling device.
Preferably, the second telescopic component 4 is consistent with 3 structure of the first telescopic component.Second telescopic component 4 includes third spiral shell
Bar, the 4th screw rod and the second swivel nut;One end of third screw rod is fixedly connected with the first pipeline clamp assemblies, third screw rod it is another
One end is connect with the threaded one end of the second swivel nut;One end of 4th screw rod is threadedly coupled with the other end of the second swivel nut, the 4th spiral shell
The other end of bar is fixedly connected with the second pipeline clamp assemblies, and the 4th screw flight rotation direction and the rotation of third screw flight
To opposite.Structure, function and the effect of second telescopic component 4 are identical as the first telescopic component 3, and it is flexible to be specifically referred to first
The description of component 3, details are not described herein.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited
System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should
Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of
Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new
The range of each embodiment technical solution of type.
Claims (10)
1. a kind of instrument dismantling device characterized by comprising the first pipeline clamp assemblies of relative spacing setting, the second pipe
Line clamp assemblies and first flexible group between the first pipeline clamp assemblies and the second pipeline clamp assemblies
Part;
The first pipeline clamp assemblies are equipped with the first pipeline holding holes, and the second pipeline clamp assemblies are equipped with the second Pipeline clip
Hole is held, and the second pipeline holding holes and the first pipeline holding holes are coaxial;
First telescopic component can stretch to adjust the first pipeline clamp assemblies and the second pipeline clamp assemblies
The distance between.
2. instrument dismantling device according to claim 1, which is characterized in that the first pipeline clamp assemblies include being equipped with
First upper clamp plate of the first upper groove and the first lower clamp plate equipped with the first lower groove, under first upper clamp plate and described first
Boards wall connection, and first upper groove and first lower groove form the first pipeline holding holes.
3. instrument dismantling device according to claim 2, which is characterized in that along the center perpendicular to first upper groove
Axis direction, first upper clamp plate are respectively equipped with the first fixation hole in the two sides of first upper groove;Along perpendicular to described the
The central axis direction of one lower groove, first lower clamp plate are respectively equipped with the second fixation hole in the two sides of first lower groove;
Fastening bolt passes through first fixation hole and second fixation hole is connect with nut thread, so as to press from both sides on described first
Plate is fixedly connected with first lower clamp plate.
4. instrument dismantling device according to claim 1, which is characterized in that the second pipeline clamp assemblies include being equipped with
Second upper clamp plate of the second upper groove and the second lower clamp plate equipped with the second lower groove, under second upper clamp plate and described second
Boards wall connection, and second upper groove and second lower groove form the second pipeline holding holes.
5. instrument dismantling device according to claim 4, which is characterized in that along the center perpendicular to second upper groove
Axis direction, second upper clamp plate are respectively equipped with third fixation hole in the two sides of second upper groove;Along perpendicular to described the
The central axis direction of two lower grooves, second lower clamp plate are respectively equipped with the 4th fixation hole in the two sides of second lower groove;
Fastening bolt passes through the threaded connection of the third fixation hole and the 4th fixation hole and nut, so that on described second
Clamping plate is fixedly connected with second lower clamp plate.
6. instrument dismantling device according to claim 1-5, which is characterized in that first telescopic component includes
First screw rod, the second screw rod and the first swivel nut;
One end of first screw rod is fixedly connected with the first pipeline clamp assemblies, the other end of first screw rod and institute
State the threaded one end connection of the first swivel nut;
One end of second screw rod is threadedly coupled with the other end of first swivel nut, the other end of second screw rod and institute
State what the second pipeline clamp assemblies were fixedly connected, and the second screw flight rotation direction and the first screw flight rotation direction
On the contrary.
7. instrument dismantling device according to claim 6, which is characterized in that one end of first screw rod is equipped with first and connects
Hole is connect, the first pipeline clamp assemblies are equipped with the second connecting hole, and fastening bolt passes through first connecting hole and described second
Connecting hole is connect with nut thread, so that one end of first screw rod is fixedly connected with the first pipeline clamp assemblies.
8. instrument dismantling device according to claim 7, which is characterized in that the other end of second screw rod is equipped with third
Connecting hole, the second pipeline clamp assemblies are equipped with the 4th connecting hole, and fastening bolt passes through the third connecting hole and described the
Four connecting holes are connect with nut thread, so that the other end of second screw rod and the fixed company of the second pipeline clamp assemblies
It connects.
9. instrument dismantling device according to claim 1-5, which is characterized in that the instrument dismantling device also wraps
Include the second telescopic component between the first pipeline clamp assemblies and the second pipeline clamp assemblies, and described second
Telescopic component and first telescopic component are located at the first pipeline holding holes central axis and second Pipeline clip
Hold the two sides of hole central axis line.
10. instrument dismantling device according to claim 9, which is characterized in that second telescopic component includes third spiral shell
Bar, the 4th screw rod and the second swivel nut;
One end of the third screw rod is fixedly connected with the first pipeline clamp assemblies, the other end of the third screw rod and institute
State the threaded one end connection of the second swivel nut;
One end of 4th screw rod is threadedly coupled with the other end of second swivel nut, the other end of the 4th screw rod and institute
State what the second pipeline clamp assemblies were fixedly connected, and the 4th screw flight rotation direction and the third screw flight rotation direction
On the contrary.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821346653.5U CN209062975U (en) | 2018-08-21 | 2018-08-21 | Instrument assembly and disassembly tools |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821346653.5U CN209062975U (en) | 2018-08-21 | 2018-08-21 | Instrument assembly and disassembly tools |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209062975U true CN209062975U (en) | 2019-07-05 |
Family
ID=67090725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821346653.5U Active CN209062975U (en) | 2018-08-21 | 2018-08-21 | Instrument assembly and disassembly tools |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209062975U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110480572A (en) * | 2019-08-28 | 2019-11-22 | 北京无线电测量研究所 | It is a kind of for combine installation plug-in unit plug-in and pull-off device |
CN112809576A (en) * | 2020-12-30 | 2021-05-18 | 德阳六合能源材料有限公司 | Positioning fixture device of steam turbine blade |
-
2018
- 2018-08-21 CN CN201821346653.5U patent/CN209062975U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110480572A (en) * | 2019-08-28 | 2019-11-22 | 北京无线电测量研究所 | It is a kind of for combine installation plug-in unit plug-in and pull-off device |
CN110480572B (en) * | 2019-08-28 | 2020-10-30 | 北京无线电测量研究所 | Plug-in device for combined installation of plug-in |
CN112809576A (en) * | 2020-12-30 | 2021-05-18 | 德阳六合能源材料有限公司 | Positioning fixture device of steam turbine blade |
CN112809576B (en) * | 2020-12-30 | 2023-05-05 | 德阳六合能源材料有限公司 | Positioning fixture device of turbine blade |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209062975U (en) | Instrument assembly and disassembly tools | |
CN204152349U (en) | A kind of New removable connects hinge fast | |
CN102189528A (en) | Detachable air conditioner bolt mounting device | |
CN207953839U (en) | A kind of novel trepanning lineation device | |
CN209094868U (en) | Symmetrical lug plate holes proper alignment positioning apparatus is adjusted in a kind of multipurpose | |
CN207795222U (en) | protection device for water injection well test hole | |
CN205607308U (en) | Crystallizer of conticaster and fan -shaped section are to measuring tool for arc | |
CN209140726U (en) | A kind of Pipe installing machinery spanner | |
CN205438349U (en) | Dismantlement end cover spanner of adjustable pitch -row | |
CN212998911U (en) | Dust filtering device for movable assembly workshop | |
CN211073429U (en) | Bearing dismounting device | |
CN102407502A (en) | Knocking spanner | |
CN207114393U (en) | Corrosion resistance testing jig | |
CN206588864U (en) | A kind of spanner and tool box | |
CN207522462U (en) | A kind of simple monkey wrench | |
CN202556301U (en) | Adjustable socket wrench | |
CN206601156U (en) | A kind of hand-held fluid flowmeter | |
CN116879600B (en) | But quick assembly disassembly formula electric energy meter and electric energy meter case device | |
CN206399361U (en) | A kind of high-precision device for sensing linear displacement caused by magnetostriction | |
CN203836519U (en) | Foldable supporting device | |
CN203665458U (en) | Oil and water well mouth flange bolt disassembly and assembly spanner dropping prevention device | |
CN213575079U (en) | Quick-connection nut | |
CN220762489U (en) | Open type and semi-open type impeller disassembling tool | |
CN208262242U (en) | A kind of crystallizer maintenance unit | |
CN208930140U (en) | Adjustable ball valve tooth lid dismounts instrument |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |