CN209040198U CN201821507704.8U CN201821507704U CN209040198U CN 209040198 U CN209040198 U CN 209040198U CN 201821507704 U CN201821507704 U CN 201821507704U CN 209040198 U CN209040198 U CN 209040198U
Authority
CN
China
Prior art keywords
reservoir
sedimentation basin
fixedly connected
filter plate
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821507704.8U
Other languages
Chinese (zh)
Inventor
许一峰
孙登松
程新
卞海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Sijian Construction Group Co Ltd
Original Assignee
Nantong Sijian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Sijian Construction Group Co Ltd filed Critical Nantong Sijian Construction Group Co Ltd
Priority to CN201821507704.8U priority Critical patent/CN209040198U/en
Application granted granted Critical
Publication of CN209040198U publication Critical patent/CN209040198U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of building engineering construction scene Rainwater collection systems, including sedimentation basin, reservoir and electrical equipment, sedimentation basin is located at the left side of reservoir and middle part and is equipped with dividing wall, the surface of dividing wall is equipped with water hole, the top of sedimentation basin and reservoir is equipped with top cover, is fixedly connected with electrical equipment in reservoir;The top of sedimentation basin is equipped with water inlet pipe, and water inlet pipe is fixedly connected through top cover and with top cover, and the left side wall bottom of sedimentation basin is equipped with discharge gate, and the left side of discharge gate is equipped with baffle;The inside of reservoir is equipped with filter plate, and filter plate is horizontally set in the lower section of water hole, and filter plate is detachably connected with reservoir;Electrical equipment includes control cabinet, solenoid valve and immersible pump.The utility model is collected and stores convenient for the rainwater to construction site, facilitate in construction and use, improve the utilization rate to rainwater, lower the waste of water resource, reduce the cost of construction by being equipped with sedimentation basin and reservoir.

Description

A kind of building engineering construction scene Rainwater collection system
Technical field
The utility model relates to technical field of building construction, specially a kind of building engineering construction scene rainwater catchment system System.
Background technique
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also be with It says it is various lines on design drawing, in specified place, becomes process in kind, it includes basic engineering construction, master Body structure construction, roof construction, decorative engineering construction etc., the place of construction operation is known as " construction site " or cries " construction site ", is also named building site.
Currently, rainwater is directly discharged into sewer by the drainage system of the building in market, it can not be adequately sharp to rainwater With especially being needed in construction using a large amount of water sources, such as add water and stir into concrete, conserved to building surface Continue to rinse with to construction vehicle, result in waste of resources, increases the cost of construction.For this reason, it may be necessary to design a kind of new Technical solution, which is given, to be solved.
Utility model content
The purpose of this utility model is to provide a kind of building engineering construction scene Rainwater collection systems, by setting There are sedimentation basin and reservoir, is collected and stores convenient for the rainwater to construction site, facilitate in construction and use, mention Height lowers the waste of water resource to the utilization rate of rainwater, reduces the cost of construction.
To achieve the above object, the utility model provides the following technical solutions: a kind of building engineering construction scene rainwater collection Collection utilizes system, including sedimentation basin, reservoir and electrical equipment, and the sedimentation basin is located at the left side of reservoir and middle part is equipped with and divides Partition wall wall, the surface of the dividing wall are equipped with water hole, and the top of the sedimentation basin and reservoir is equipped with top cover, the water storage Electrical equipment is fixedly connected in pond;The top of the sedimentation basin is equipped with water inlet pipe, and the water inlet pipe runs through top cover and and top cover It is fixedly connected, the left side wall bottom of the sedimentation basin is equipped with discharge gate, and the left side of the discharge gate is equipped with baffle;The reservoir Inside be equipped with filter plate, the filter plate is horizontally set in the lower section of water hole, and the filter plate is detachably connected with reservoir; The electrical equipment includes control cabinet, solenoid valve and immersible pump, and the control cabinet is fixedly connected on the right end face of top cover, described Solenoid valve is fixedly connected in water hole, and the immersible pump is located at the lower section of filter plate and is fixedly connected with the bottom of reservoir.
As an improvement of the above technical solution, the bottom of the sedimentation basin is fixedly connected with wedge block, the wedge block position In the right side of discharge gate.
As an improvement of the above technical solution, the right side wall of the dividing wall is equipped with groove, and the filter plate is embedded in It is slidably connected in groove and with groove.
As an improvement of the above technical solution, the right sidewall surface of the reservoir is equipped with rectangular channel, in the rectangular channel Equipped with the fixed plate that bolt is fixedly connected, the fixed plate is vertical with filter plate to be fixedly connected.
As an improvement of the above technical solution, the inner wall surface of the reservoir is equipped with strip-shaped clamp groove, the strip-shaped clamp groove It is inside fixedly connected with water pipe, the water pipe is connected with immersible pump.
Compared with prior art, the beneficial effects of the utility model are as follows:
1, the utility model is collected by being equipped with sedimentation basin and reservoir convenient for the rainwater to construction site And storage, facilitate in construction and use, improves the utilization rate to rainwater, lower the waste of water resource, reduce construction Cost.
2, the utility model is fast by being equipped with wedge shape in the bottom of sedimentation basin, convenient for for the silt to precipitate in water into Row cleaning;By being equipped with solenoid valve in water hole, controls, avoided not convenient for the connected state to sedimentation basin and reservoir The rainwater precipitated is directly entered reservoir;By being equipped with removable filter plate in reservoir, convenient for rainwater into one Step filtering, improves the service life of immersible pump.
Detailed description of the invention
Fig. 1 is building engineering construction scene Rainwater collection system structural schematic diagram described in the utility model;
Fig. 2 is partial enlargement structural representation described in the utility model.
In figure: sedimentation basin -1, reservoir -2, electrical equipment -3, dividing wall -4, water hole -5, top cover -6, water inlet pipe - 7, discharge gate -8, baffle -9, filter plate -10, control cabinet -11, solenoid valve -12, immersible pump -13, wedge block -14, groove -15, Rectangular channel -16, bolt -17, fixed plate -18, strip-shaped clamp groove -19, water pipe -20.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe.
It please refers to Fig. 1-2 the utility model and a kind of technical solution is provided: a kind of building engineering construction scene rainwater-collecting benefit With system, including sedimentation basin 1, reservoir 2 and electrical equipment 3, the sedimentation basin 1 is located at the left side of reservoir 2 and middle part is equipped with Dividing wall 4, the surface of the dividing wall 4 are equipped with water hole 5, and the top of the sedimentation basin 1 and reservoir 2 is equipped with top cover 6, Electrical equipment 3 is fixedly connected in the reservoir 2;The top of the sedimentation basin 1 is equipped with water inlet pipe 207, the water inlet pipe 207 It is fixedly connected through top cover 6 and with top cover 6, the left side wall bottom of the sedimentation basin 1 is equipped with discharge gate 8, a left side for the discharge gate 8 Side is equipped with baffle 9;The inside of the reservoir 2 is equipped with filter plate 10, and the filter plate 10 is horizontally set in the lower section of water hole 5, The filter plate 10 is detachably connected with reservoir 2;The electrical equipment 3 includes control cabinet 11, solenoid valve 12 and immersible pump 13, The control cabinet 11 is fixedly connected on the right end face of top cover 6, and the solenoid valve 12 is fixedly connected in water hole 5, described latent Water pump 13 is located at the lower section of filter plate 10 and is fixedly connected with the bottom of reservoir 2, by being equipped with sedimentation basin 1 and reservoir 2, It is collected and stores convenient for the rainwater to construction site, facilitate in construction and use, improve the utilization rate to rainwater, The waste for lowering water resource, reduces the cost of construction.
It is further improved ground, the bottom of the sedimentation basin 1 is fixedly connected with wedge block 14, the wedge block as shown in Figure 1: 14 are located at the right side of discharge gate 8, by being fixedly connected with wedge block 14 in the bottom of sedimentation basin 1, convenient for containing in rainwater Silt carries out concentration sedimentation, convenient quickly to remove from discharge gate 8.
It is further improved ground, the right side wall of the dividing wall 4 is equipped with groove 15 as shown in Figure 1:, in the filter plate 10 It is slidably connected in groove 15 and with groove 15, groove 15 is equipped with by the right side wall in dividing wall 4, convenient for filter plate 10 end is fixed, and improves the connective stability of filter plate 10.
Specifically with improvement, as shown in Figure 2: the right sidewall surface of the reservoir 2 is equipped with rectangular channel 16, the rectangular channel 16 The interior fixed plate 18 being fixedly connected equipped with bolt 17, the fixed plate 18 is vertical with filter plate 10 to be fixedly connected, by rectangle The fixed plate 18 being fixedly connected in slot 16 equipped with bolt 17, convenient for being dismounted to filter plate 10, the convenient table to filter plate 10 It is cleaned in face.
More specifically with improvement, the inner wall surface of the reservoir 2 is equipped with strip-shaped clamp groove 19, the bar shaped card as shown in Figure 1: Water pipe 20 is fixedly connected in slot 19, the water pipe 20 is connected with immersible pump 13, by being equipped in the inner wall surface of reservoir 2 Strip-shaped clamp groove 19, convenient in inner wall, the dismounting to filter plate 10 being avoided to make troubles 20 phase of water pipe.
The sedimentation basin -1 of the utility model, reservoir -2, electrical equipment -3, dividing wall -4, water hole -5, top cover -6, It is water inlet pipe -7, discharge gate -8, baffle -9, filter plate -10, control cabinet -11, solenoid valve -12, immersible pump -13, wedge block -14, recessed Slot -15, rectangular channel -16, bolt -17, fixed plate -18, strip-shaped clamp groove -19, water pipe -20, component are universal standard part or sheet Component, its structure and the principle that field technical staff knows all are that this technology personnel can be learnt by technical manual or by normal Rule experimental method knows, wedge shape is fast by being equipped in the bottom of sedimentation basin 1 for the utility model, convenient for for precipitating in water Silt is cleared up;By being equipped with solenoid valve 12 in water hole 5, carried out convenient for the connected state to sedimentation basin 1 and reservoir 2 Control, avoids the rainwater not precipitated from being directly entered reservoir 2;By being equipped with removable filter plate 10 in reservoir 2, Convenient for further filtering to rainwater, the service life of immersible pump 13 is improved.
When the utility model is used, the rainwater on building yard surface is focused at water inlet pipe 7, it is then introduced into sedimentation basin In 1, rainwater staticly settles in sedimentation basin 1, makes the sediment deposition in rainwater to the bottom of sedimentation basin 1, and transports along wedge block 14 It moves at discharge gate 8, solenoid valve 12 is then controlled by control cabinet 11 and opens water hole 5, enters the rainwater on 1 upper layer of sedimentation basin In reservoir 2, rainwater is stored in reservoir 2 after first passing around the filtering of filter plate 10, when needing using water source, passes through control Case 11 processed controls immersible pump 13 and works, and rainwater is sprayed by water pipe 20;It is needed after long-time service to sedimentation basin 1 and reservoir 2 It is cleared up, opens the baffle 9 of 1 left bottom of sedimentation basin, the silt of 1 bottom of sedimentation basin is discharged along discharge gate 8 using tool, Then the bolt 17 in 2 right sidewall surface rectangular channel 16 of reservoir is removed, filter plate 10 is taken out and cleaned, finally again It installs.
Actual production and application, the application especially in construction has been put into the product that this programme is protected at present Achieve certain success, it is clear that confirmed the product technical solution be it is beneficial, meet society need, be also suitable for Batch production and popularization and use.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above, for For those skilled in the art, it is clear that the present invention is not limited to the details of the above exemplary embodiments, and without departing substantially from this In the case where the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the utility model is by institute Attached claim rather than above description limit, it is intended that will fall within the meaning and scope of the equivalent elements of the claims All changes are embraced therein.It should not treat any reference in the claims as limiting related right It is required that.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (5)

1. a kind of building engineering construction scene Rainwater collection system, including sedimentation basin (1), reservoir (2) and electrical equipment (3), it is characterised in that: the sedimentation basin (1) is located at the left side of reservoir (2) and middle part and is equipped with dividing wall (4), the separation The surface of wall (4) is equipped with water hole (5), and the top of the sedimentation basin (1) and reservoir (2) is equipped with top cover (6), the water storage Electrical equipment (3) are fixedly connected in pond (2);
The top of the sedimentation basin (1) be equipped with water inlet pipe (207), the water inlet pipe (207) through top cover (6) and with top cover (6) It is fixedly connected, the left side wall bottom of the sedimentation basin (1) is equipped with discharge gate (8), and the left side of the discharge gate (8) is equipped with baffle (9);The inside of the reservoir (2) is equipped with filter plate (10), and the filter plate (10) is horizontally set in the lower section of water hole (5), The filter plate (10) is detachably connected with reservoir (2);
The electrical equipment (3) includes control cabinet (11), solenoid valve (12) and immersible pump (13), and the control cabinet (11) is fixed to be connected The right end face in top cover (6) is connect, the solenoid valve (12) is fixedly connected in water hole (5), and the immersible pump (13) is located at It the lower section of filter plate (10) and is fixedly connected with the bottom of reservoir (2).
2. a kind of building engineering construction scene Rainwater collection system according to claim 1, it is characterised in that: described The bottom of sedimentation basin (1) is fixedly connected with wedge block (14), and the wedge block (14) is located at the right side of discharge gate (8).
3. a kind of building engineering construction scene Rainwater collection system according to claim 1, it is characterised in that: described The right side wall of dividing wall (4) is equipped with groove (15), and the filter plate (10) is embedded in groove (15) and slides with groove (15) Dynamic connection.
4. a kind of building engineering construction scene Rainwater collection system according to claim 1, it is characterised in that: described The right sidewall surface of reservoir (2) is equipped with rectangular channel (16), consolidates in the rectangular channel (16) equipped with what bolt (17) were fixedly connected Fixed board (18), the fixed plate (18) is vertical with filter plate (10) to be fixedly connected.
5. a kind of building engineering construction scene Rainwater collection system according to claim 4, it is characterised in that: described The inner wall surface of reservoir (2) is equipped with strip-shaped clamp groove (19), is fixedly connected with water pipe (20) in the strip-shaped clamp groove (19), described Water pipe (20) is connected with immersible pump (13).
CN201821507704.8U 2018-09-14 2018-09-14 A kind of building engineering construction scene Rainwater collection system Active CN209040198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821507704.8U CN209040198U (en) 2018-09-14 2018-09-14 A kind of building engineering construction scene Rainwater collection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821507704.8U CN209040198U (en) 2018-09-14 2018-09-14 A kind of building engineering construction scene Rainwater collection system

Publications (1)

Publication Number Publication Date
CN209040198U true CN209040198U (en) 2019-06-28

Family

ID=67033268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821507704.8U Active CN209040198U (en) 2018-09-14 2018-09-14 A kind of building engineering construction scene Rainwater collection system

Country Status (1)

Country Link
CN (1) CN209040198U (en)

Similar Documents

Publication Publication Date Title
CN102505728A (en) Complete technology for resource utilization of rainwater
CN204356173U (en) Intelligent rainwater treater
CN203935647U (en) Precipitation cleaning mechanism for cesspool
CN105070972A (en) Recycling method and device for waste diachylon of lead-acid storage battery
CN204608867U (en) Rainwater collecting and treating system
CN105254065A (en) Multi-path low-energy-consumption recycling system for steel wastewater
CN203256063U (en) Hydraulic loom wastewater treatment and reuse combination apparatus
CN103030237A (en) Treatment device and treatment method for recycling coal slurry sewage
CN209040198U (en) A kind of building engineering construction scene Rainwater collection system
CN211143169U (en) Construction site water cyclic utilization system
CN206368078U (en) A kind of coal yard wastewater recycling system with oil interceptor
CN104003553B (en) For the deleading equipment of lead storage battery waste water
CN109956574A (en) A kind of bulk cement carrier carwash waste liquid synthesization utilizes method and system
CN103121741A (en) Treatment method of filter backwash wastewater
CN203976527U (en) Deleading equipment for lead storage battery waste water
CN204905377U (en) Recycle device of lead acid battery scrap lead cream
CN208632260U (en) A kind of sewage disposal system of mixing plant automatic spraying flocculant
CN204139243U (en) A kind of device for recycling rainwater
CN1262492C (en) Method and apparatus for treating and reusing domestic wastewater
CN208959386U (en) A kind of efficient fast precipitating separator for high
CN206368079U (en) A kind of coal yard wastewater recycling system
CN205892947U (en) Coal water treatment electricity flocculation system
CN109607848A (en) Wetland waste water reuse system
CN105664588B (en) Concrete plant area sewage disposal system and its method for treating water
CN202529950U (en) Rainwater filtering system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant