CN209011843U - A kind of anchor section trolley for the secondary lining-up construction in tunnel - Google Patents

A kind of anchor section trolley for the secondary lining-up construction in tunnel Download PDF

Info

Publication number
CN209011843U
CN209011843U CN201821088959.5U CN201821088959U CN209011843U CN 209011843 U CN209011843 U CN 209011843U CN 201821088959 U CN201821088959 U CN 201821088959U CN 209011843 U CN209011843 U CN 209011843U
Authority
CN
China
Prior art keywords
anchor section
side mode
trolley
platform
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821088959.5U
Other languages
Chinese (zh)
Inventor
王娜
刘伟
马新磊
哈建波
刘兴波
吴相斌
张磊
晋龙凤
任勇
高子谦
陈海建
贾吉春
岳琳琳
段浩鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG, China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN201821088959.5U priority Critical patent/CN209011843U/en
Application granted granted Critical
Publication of CN209011843U publication Critical patent/CN209011843U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of anchor section trolleys for the secondary lining-up construction in tunnel, anchor section trolley is divided into cloth multiple groups portal-framed structure in the longitudinal direction, walking mechanism is equipped with by height adjustment mechanism in door frame bottom end, anchor section trolley is divided into three sections of parts on longitudinal direction, respectively left anchor section region, right anchor section region and standard paragraphs region, internal structure is consistent between three;The translational drive mechanism for driving lower part side mode is provided on the door frame corresponding to the left anchor section, right anchor section and standard paragraphs of anchor section trolley, lead between beam and the logical beam of skeleton in upper mould and is provided with top side mode overturning oil cylinder, quadruple board platform frame is installed in the upper position of door frame, translation platform is installed on quadruple board platform frame;It is disposed with top elevating ram on translation platform, translation and the lifting position of backform entirety are adjusted by translation platform and top elevating ram.This anchor section trolley can pass through the tunnel area of standard section, avoid equipment and frequently disassemble and install, substantially increase construction efficiency.

Description

A kind of anchor section trolley for the secondary lining-up construction in tunnel
Technical field
The utility model relates to tunnel construction technical fields, and in particular to a kind of for the secondary lining-up construction in tunnel Anchor section trolley.
Background technique
Secondary lining-up is a highly important working procedure during constructing tunnel, is that country rock deforms in order to prevent Or collapse and the process of permanent supporting construction built along tunnel trunk periphery with steel reinforcement and concrete material.Constructing tunnel mistake Cheng Zhong, the construction operation of secondary lining-up mainly include being laid with waterproof lamellar, building lining Quan construction joint dabbing, reinforcing bar binding, built-in fitting It positions and buries, formwork jumbo is in place, measure and adjust the positioning of screw rod formwork erection, template release agent spraying, Beng send Quan enter mould and make , Quan firm by ramming The working procedures such as health, demoulding, Quan health.Anchor section trolley is the key equipment for the tunnel double-lining construction for having anchor section in design.It is existing In existing anchor section trolley, due to the limitation of technology and structure, anchor section part can not pass through standard section, it is therefore necessary to by template Dismounting can just move forward, and thereby result in that construction efficiency is lower, develop a kind of anchor section that can be avoided and frequently dismount thus Trolley has become the urgent need work of now tunnel anchorage section construction.
Utility model content
Utility model aims to solve existing equipments as technical deficiency and caused by tunnel anchorage section construction efficiency Low problem, the utility model provide a kind of highly efficient, convenient and fast anchor section trolley equipment for the secondary lining-up construction in tunnel.
The utility model is achieved through the following technical solutions:
A kind of anchor section trolley for the secondary lining-up construction in tunnel, anchor section trolley are distributed multiple groups portal-framed structure in the longitudinal direction, Lead to beam by lock bridge and skeleton between door frame to be connected, door frame bottom end is provided with bottom girder, is provided on bottom girder and plays support And the lower margin lead screw of load-bearing effect;
Walking mechanism is equipped with by height adjustment mechanism in door frame bottom end, height adjustment mechanism includes guide rod, guiding Set and bottom elevating ram, the guide rod lower part are connected by hinged shaft with the walking mechanism, on the outside of guide rod described in installation Guide sleeve, the guide sleeve side are bolted on the end face of the bottom girder, on the guide rod described in installation Bottom elevating ram, the motion end of bottom elevating ram are connect with the guide sleeve, by the movement of bottom elevating ram, make institute It states guide sleeve and is slided up and down in the vertical direction along guide rod, the height and position of anchor section trolley is adjusted with this;
It is divided into three sections of parts, respectively left anchor section region, right anchor section region and standard paragraphs region on anchor section trolley longitudinal direction, three Internal structure is consistent between person;Left anchor pars infrasegmentalis side mode and right anchor pars infrasegmentalis side mode and standard paragraphs lower part side mode are logical by lower part template It is whole that beam constitutes lower part side mode;Left anchor section top side mode and right anchor section top side mode and standard paragraphs top side mode pass through upper mould Logical beam composition top side mode is whole, and top side mode is connected entirely through pin shaft and the lower part side mode;Left anchor Duan Dingmo, Right anchor Duan Dingmo and standard paragraphs backform are whole by longitudinally arranged beam composition backform;
It is provided on the door frame corresponding to the left anchor section, right anchor section and standard paragraphs of anchor section trolley for driving lower part side mode Translational drive mechanism, translational drive mechanism includes side mode telescopic, side mode telescopic core and side mode translation oil cylinder, and the side mode is stretched Contracting set is fixed on the door beam of door frame, and the side mode telescopic core is slidably mounted in side mode telescopic, the outer end of side mode telescopic core Hinged with the logical beam of lower part template of the lower part side mode entirety, side mode translation oil cylinder one end is hinged on lower part template and leads to beam On, the other end is hinged on outside side mode telescopic;
Lead between beam and the logical beam of skeleton in the upper mould and be provided with top side mode overturning oil cylinder, is turned over by top side mode The stretching and contraction for turning oil cylinder, drive the upper mould lead to sill bolt move each top side mode composition top side mode it is whole around Lower part side mode of itself and described each lower part side mode composition is integrally attached to the pin shaft connect and carries out spinning movement, thus reach support and Position adjustment during demoulding etc.;
Quadruple board platform frame is installed in the upper position of door frame, translation platform is installed on quadruple board platform frame;In the backform It is disposed with top elevating ram between whole platform beam and the translation platform, is adjusted by translation platform and top elevating ram The translation of whole backform entirety and lifting position.
In the above-mentioned technical solutions, the door frame is bolted by column, Men Liang and diagonal brace and is formed.
In the above-mentioned technical solutions, the bottom girder is two, symmetrical to be set to anchor section pallet bottom, the bottom It relies on and is bolted with the lower margin lead screw below stringer.
In the above-mentioned technical solutions, the walking mechanism is wheel-track type, including a pair of actively walking and a pair of driven walking.
In the above-mentioned technical solutions, the side mode translation oil cylinder is arranged side by side with the side mode telescopic core.
In the above-mentioned technical solutions, the translation platform is made of platform and translation drive cylinder, and platform is sliding by sliding rail It is dynamic to be mounted on quadruple board platform frame, and platform and driven in translation oil cylinder make moved end connection, the cylinder body of driven in translation oil cylinder is fixed on On quadruple board platform frame, platform is driven to generate translational motion by driven in translation oil cylinder.
In the above-mentioned technical solutions, lead between beam and the logical beam of the template in the skeleton and be provided with screw rod, mainly in anchor Section trolley is installed afterwards in place, is played a supportive role.
In the above-mentioned technical solutions, the lower part of the lower part side mode entirety is provided with the small template in bottom, is one independent Part is contacted by overlapping mode with the lower part side mode overall surface.
In the above-mentioned technical solutions, standard paragraphs longitudinal length is 1.5-2.5 meters, left anchor section longitudinal length is 4-6 meters, right anchor Section longitudinal length is 4-6 meters, and template part is different according to tunnel cross-section difference.
In the above-mentioned technical solutions, there is the place to connect with right anchor section and standard paragraphs in left anchor section, design in side mode structure There is constant slope, is the structure of outer narrow inner width, is easier knockout course.
The construction method of the anchor section trolley for the secondary lining-up construction in tunnel, carries out in accordance with the following steps:
1) movement of anchor section trolley, comprising:
1.1) middle line is marked on tunnel shop fixtures face;
1.2) walking track is laid with for reference with the middle line marked on tunnel shop fixtures face, for the anchor section platform for guaranteeing demoulding state Vehicle passes through the standard section of lining-up, and when track laying, compared with design requirement, error is not more than 5cm;
1.3) referring to the middle line marked on inverted arch basal plane, mobile anchor section trolley;
2) reinforced-bar binding
3) anchor section trolley formwork is in place, comprising:
3.1) it after anchor section trolley reaches specified construction location, lifts, makes on anchor section trolley integral position on the elevating ram of bottom Move on to specified altitude assignment;
3.2) the lower margin lead screw for manually adjusting bottom girder lower part reaches preset length, it is made to play a supporting role;
3.3) side mode translation oil cylinder extends, and position needed for making side mode entirety in lower part is outer to move to construction is simultaneously accurately positioned, It later stretches out top side mode overturning oil cylinder, top side mode is integrally overturn to designated position, and is played a supporting role;
3.4) elevating ram work in top makes backform rise overally, and combination translation platform, adjustment backform are whole to construction Required design position;
3.5) screw rod for installing and adjusting each position enables it play reinforcing, supporting role;
3.6) it according to lower part side mode integral position and construction needs, assembles and supports the small template in bottom;
4) concreting, comprising:
4.1) feeding of Quan from bottom to top, is symmetrically layered from two sides to vault and send according to first middle window, rear both sides window Enter, two sides, which synchronize, uniformly to be poured, and the difference in height of the side Zuo You Quan is not more than 0.6 meter, is inclined and is fallen free height no more than 2 meters;
4.2) operation of vibrating is carried out using operation window using poker vibrator, and layering is vibrated, and lower layer is inserted into when vibrating Quan 5-10CM;
5) after the concrete inspection poured is up to standard, can demould to anchor section trolley: demoulding sequence is as follows:
The each position screw rod that 5.1 manual demolitions play a supportive role;
5.2) the small template in bottom in chain block manual demolition lower part side mode integral bottom portion, and man-handling of materials are utilized;
5.3) top side mode is made to be performed integrally demoulding and to skeleton side using the contractive action of top side mode overturning oil cylinder It overturns to designated position;
5.4) demoulding of lower part side mode entirety is completed using the contraction of side mode translation oil cylinder, and by the lower part of two side positions Side mode is whole to be translated to frame position, is inside reduced to predeterminated position;
5.4) decline top elevating ram, makes backform entire lowering height, the space of enough movements is maintained between tunnel wall;
5.5) bottom elevating ram declines, and moves down anchor section trolley whole height, further increases anchor section trolley and tunnel The spacing of wall reaches the demoulding state of design, and prepares to move forward to next construction section.
It the advantages of the utility model and has the beneficial effect that
(1) the utility model uses the flexibility that the mobile adjustment of anchor section trolley is simplified from walking structure, reduces auxiliary Pull the corollary equipment of walking.
(2) the utility model uses completely new structure and designs, so that the template of anchor section trolley can be under demoulding state It is contracted to the position close to skeleton, so that having a mobile space enough, on this basis, anchor section trolley between template and tunnel wall The tunnel area that standard section can be passed through avoids equipment and frequently disassembles and installs, while reducing workload, Construction efficiency is substantially increased, construction speed is greatly advanced.
(3) compared with existing equipment, the utility model enormously simplifies the support knot of skeleton in the case where meeting the needs of function Structure, so that equipment preferably plays its function.
(4) the utility model design on the two anchor sections in left and right and the excessive position in standard paragraphs face, side mode structure has certain oblique Degree is the structure of outer narrow inner width, is easier knockout course.
Detailed description of the invention
Fig. 1 is the top view of the anchor section trolley for the secondary lining-up construction in tunnel of the utility model.
Fig. 2 is the left anchor section regional structure schematic diagram of anchor section trolley shown in FIG. 1.
Fig. 3 is the right anchor section regional structure schematic diagram of anchor section trolley shown in FIG. 1.
Fig. 4 is the standard paragraphs regional structure schematic diagram of anchor section trolley shown in FIG. 1.
Fig. 5 is before the anchor section trolley for the secondary lining-up construction in tunnel of the utility model is in concrete construction Position schematic diagram.
Fig. 6 is that the anchor section trolley for the secondary lining-up construction in tunnel of the utility model is in the structure of demoulding contraction state Schematic diagram.
Wherein:
1: the left anchor section region of anchor section trolley;2: the right anchor section region of anchor section trolley;3: the standard paragraphs region of anchor section trolley; 101: left anchor pars infrasegmentalis side mode;102: left anchor section top side mode;103: left anchor Duan Dingmo;104: top hoisting guide mechanism; 105: bottom girder;106: lock bridge;107: upper mould leads to beam;201: the small template in bottom;202: skeleton leads to beam;203: under right anchor section Portion's side mode;204: side mode telescopic core;205: lower part template leads to beam;206: side mode telescopic;207: right anchor section top side mode; 208: top side mode overturning oil cylinder;209: platform beam;210: top elevating ram;211: translation platform;212: quadruple board platform frame;214: Side mode translation oil cylinder;215: right anchor Duan Dingmo;216: walking mechanism;301: lower margin lead screw;302: column;303: under standard paragraphs Portion's side mode;304: standard paragraphs top side mode;305: standard paragraphs backform;306 beams;307: diagonal brace;308 bottom elevating rams; 309: guide sleeve;310: guide rod;401: screw rod.
It for those of ordinary skill in the art, without creative efforts, can be according to above attached Figure obtains other relevant drawings.
Specific embodiment
In order to make those skilled in the art better understand the scheme of the utility model, combined with specific embodiments below into one Step illustrates the technical solution of the utility model.
Embodiment one
As shown in Figures 1 to 6, a kind of anchor section trolley for the secondary lining-up construction in tunnel, including walking mechanism 216, bottom are indulged Beam 105, lower margin lead screw 301, guide sleeve 309, guide rod 310, bottom elevating ram 308, column 302, diagonal brace 307, skeleton are logical Beam 202, Men Liang 306, lock bridge 106, quadruple board platform frame 212, side mode telescopic 206, side mode telescopic core 204, side mode translation oil cylinder 214, left anchor pars infrasegmentalis side mode 101, right anchor pars infrasegmentalis side mode 203, standard paragraphs lower part side mode 303, left anchor section top side mode 102, Right anchor section top side mode 207, standard paragraphs top side mode 304, top side mode overturning oil cylinder 208, the small template 201 in bottom, left anchor section Backform 103, right anchor section backform 215, standard paragraphs backform 305, lower part template lead to beam 205, upper mould leads to beam 107, translation platform 211, platform beam 209, top elevating ram 210, top hoisting guide mechanism 104, screw rod 401.
One monoblock type door frame knot of composition is bolted with the door beam 306 and the diagonal brace 307 in the column 302 Structure, anchor section trolley longitudinal direction total length 12m, be evenly equipped with 7 groups on anchor section trolley longitudinal direction as portal-framed structure, door frame passes through to each other The lock bridge 106 and the skeleton lead to beam 202 and are connected.
The bottom girder 105 is installed on along longitudinal direction on the column 302 of the door frame of anchor section trolley, and the lower margin lead screw 301 is It is distributed in 105 bottom of bottom girder, plays the role of support and load-bearing;It is arranged in 302 bottom end of column of the both ends door frame of anchor section trolley The walking mechanism 216, the walking mechanism 216 are wheel-track type, including a pair of actively walking and a pair of driven walking;It is described to lead It is connected to 310 lower part of bar by hinged shaft with the walking mechanism 216, the guide sleeve is installed on the outside of the guide rod 310 309,309 side of guide sleeve is bolted on the end face of the bottom girder 105, forms with the bottom girder 105 One is fixed whole, and the bottom elevating ram 308, the motion end of bottom elevating ram 308 are equipped on the guide rod 310 It is connect with the guide sleeve 309, by the movement of bottom elevating ram 308, the guide sleeve 309 can be made along guide rod 310 It slides up and down in the vertical direction, the height and position of anchor section trolley is adjusted with this.
Be divided into three sections of parts on anchor section trolley longitudinal direction, respectively the left anchor section region 1 of anchor section trolley, anchor section trolley right anchor Section region 2, anchor section trolley standard paragraphs region 3, internal structure is consistent between three, and only template part is according to tunnel cross-section difference And it is different.The left anchor pars infrasegmentalis side mode 101 and the right anchor pars infrasegmentalis side mode 203 and standard paragraphs lower part side mode 303 are logical It crosses lower part template and leads to one lower part side mode entirety of the composition of beam 205;Left anchor section top side mode 102 and right anchor section top side mode 207 and standard paragraphs top side mode 304 by the upper mould to lead to one top side mode of the composition of beam 107 whole, and upper edge (i.e. left anchor section top side mode 102 and left anchor pars infrasegmentalis side mode 101 are logical entirely through pin shaft and lower part side mode integrated connection for mould It is hinged to cross pin shaft, right anchor section top side mode 207 and right anchor pars infrasegmentalis side mode 203 are hinged by pin shaft, standard paragraphs top side mode 304 It is hinged by pin shaft with standard paragraphs lower part side mode 303), the top side mode is whole can integrally to do rotation fortune with lower part side mode around pin shaft It is dynamic;The left anchor section backform 201, the right anchor section backform 215 and the standard paragraphs backform 305 pass through two longitudinally arranged institutes It states platform beam 209 and forms backform entirety.
Both ends door frame (door frame corresponding to door frame corresponding to i.e. left anchor section and standard paragraphs) and centre in anchor section trolley It is provided with translational drive mechanism on door frame (door frame corresponding to i.e. right anchor section), translational drive mechanism includes the side mode telescopic 206, side mode telescopic core 204 and side mode translation oil cylinder 214, the side mode telescopic 206 are fixed on the door beam 306 of door frame, institute It states side mode telescopic core 204 to be slidably mounted in side mode telescopic 206, the outer end of side mode telescopic core 204 and the lower part side mode are whole The lower part template of body leads to beam 205 hingedly, and described 214 one end of side mode translation oil cylinder is hinged on lower part template and leads on beam 205, the other end It is hinged on outside side mode telescopic 206, the side mode translation oil cylinder is arranged side by side with the side mode telescopic core, when the side mode is flat When shifting oil cylinder 214 stretches, it will drive the side mode telescopic core and moved in side mode telescopic, to realize to by each lower part The lower part side mode of side mode composition is integrally moved and is adjusted accordingly, to complete support and the knockout course of lower part side mode.
The both ends of the top side mode overturning oil cylinder 208 are connected to the upper mould respectively with hinge pin and lead to beam 107 and bone Frame leads on beam 202, by the stretching and contraction of top side mode overturning oil cylinder 208, drives the upper mould to lead to beam 107 and drives institute The top side mode entirety for stating each top side mode composition is integrally attached to connect around lower part side mode of itself and each lower part side mode composition Pin shaft carry out spinning movement, thus reach during support and demoulding etc. position adjustment.
The quadruple board platform frame 212 is installed in the upper position of door frame, it is flat that the translation is installed on quadruple board platform frame 212 Platform 211;Top elevating ram described in being disposed with four groups between the platform beam 209 of the backform entirety and the translation platform 211 210 and the top hoisting guide mechanism 104, it is whole that backform is adjusted by translation platform 211 and top elevating ram 210 Translation and lifting position.Specifically, the translation platform 211 is made of platform and translation drive cylinder, and platform passes through sliding rail It is slidably mounted on quadruple board platform frame 212, and platform and driven in translation oil cylinder make moved end connection, the cylinder body of driven in translation oil cylinder is solid It is scheduled on quadruple board platform frame 212, drives platform to generate translational motion, 210 He of top elevating ram by driven in translation oil cylinder Top hoisting guide mechanism 104 is vertically-mounted on the platform, drives backform integral elevating dynamic using top elevating ram 210 Make.
The screw rod 401 is located at the skeleton and leads between beam 202 and the logical beam of the template, mainly after anchor section trolley is in place Installation, plays a supportive role.
The small template 208 in bottom is located at the lower part of the lower part side mode entirety, is an independent sector, passes through overlapping mode It contacts with the lower part side mode overall surface, is positioned convenient for in-site installation, small template needs in-site installation support and man-handling of materials.
Embodiment two
There is the place to connect in left anchor section, right anchor section and standard paragraphs, design has constant slope in side mode structure, is outer narrow The structure of inner width, is easier knockout course.
Embodiment three
On the basis of the above embodiment 1, the anchor section platform according to the present utility model for the secondary lining-up construction in tunnel Vehicle, construction method carry out in accordance with the following steps:
1) movement of anchor section trolley, comprising:
1.1) middle line is marked on tunnel shop fixtures face;
1.2) walking track is laid with for reference with the middle line marked on tunnel shop fixtures face, for the anchor section platform for guaranteeing demoulding state Vehicle passes through the standard section of lining-up, and when track laying, compared with design requirement, error is not greater than 5cm;
1.3) referring to the middle line marked on inverted arch basal plane, mobile anchor section trolley, the anchor section trolley has from walking function;
2) reinforced-bar binding
3) anchor section trolley formwork is in place, comprising:
3.1) it after anchor section trolley reaches specified construction location, is lifted on bottom elevating ram 308, makes anchor section trolley integral position On move on to specified altitude assignment;
3.2) the lower margin lead screw 301 for manually adjusting 105 lower part of bottom girder reaches preset length, so that it is played support and makees With;
3.3) side mode translation oil cylinder 214 extends, and position needed for making side mode entirety in lower part is outer to move to construction simultaneously accurately determine Position later stretches out top side mode overturning oil cylinder 208, top side mode is integrally overturn to designated position, and is played a supporting role;
3.4) elevating ram 210 work in top makes backform rise overally, and combines translation platform 211, and adjustment backform is whole Design position needed for construction;
3.5) screw rod 401 for installing and adjusting each position enables it play reinforcing, supporting role;
3.6) it according to lower part side mode integral position and construction needs, assembles and supports the small template 201 in bottom;
4) concreting, comprising:
4.1) feeding of Quan from bottom to top, is symmetrically layered from two sides to vault and send according to first middle window, rear both sides window Enter, two sides, which synchronize, uniformly to be poured, and the difference in height of the side Zuo You Quan is not more than 0.6 meter, is inclined and is fallen free height no more than 2 meters;
4.2) operation of vibrating is carried out using operation window using poker vibrator, and layering is vibrated, and lower layer is inserted into when vibrating Quan 5-10CM;
5) after the concrete inspection poured is up to standard, can demould to anchor section trolley: demoulding sequence is as follows:
The each position screw rod 401 that 5.1 manual demolitions play a supportive role;
5.2) the small template 201 in bottom in chain block manual demolition lower part side mode integral bottom portion, and man-handling of materials are utilized;
5.3) top side mode is made to be performed integrally demoulding and to skeleton one using the contractive action of top side mode overturning oil cylinder 208 Rollover goes to designated position;
5.4) demoulding of lower part side mode entirety, and being somebody's turn to do two side positions are completed using the contraction of side mode translation oil cylinder 214 Lower part side mode is whole to be translated to frame position, is inside reduced to predeterminated position;
5.4) decline top elevating ram 210, makes backform entire lowering height, the sky of enough movements is maintained between tunnel wall Between;
5.5) bottom elevating ram 308 declines, and moves down anchor section trolley whole height, further increases anchor section trolley and tunnel The spacing of road wall reaches the demoulding state of design, and prepares to move forward to next construction section.
Illustrative description has been done to the utility model above, it should explanation, in the core for not departing from the utility model In the case where the heart, it is any it is simple deformation, modification or other skilled in the art can not spend creative work etc. The protection scope of the utility model is each fallen with replacement.

Claims (10)

1. a kind of anchor section trolley for the secondary lining-up construction in tunnel, it is characterised in that: anchor section trolley is distributed multiple groups in the longitudinal direction Portal-framed structure leads to beam by lock bridge and skeleton between door frame and is connected, door frame bottom end is provided with bottom girder, is provided on bottom girder Play the lower margin lead screw of support and load-bearing effect;
Walking mechanism is equipped with by height adjustment mechanism in door frame bottom end, height adjustment mechanism include guide rod, guide sleeve and Bottom elevating ram, the guide rod lower part are connected by hinged shaft with the walking mechanism, and the guiding is installed on the outside of guide rod Set, the guide sleeve side are bolted on the end face of the bottom girder, and the bottom is installed on the guide rod Elevating ram, the motion end of bottom elevating ram are connect with the guide sleeve, by the movement of bottom elevating ram, make described lead It is slided up and down in the vertical direction to set along guide rod, the height and position of anchor section trolley is adjusted with this;
It is divided into three sections of parts, respectively left anchor section region, right anchor section region and standard paragraphs region on anchor section trolley longitudinal direction, between three Internal structure is consistent;Left anchor pars infrasegmentalis side mode and right anchor pars infrasegmentalis side mode and standard paragraphs lower part side mode pass through the logical beam structure of lower part template At lower part side mode entirety;Left anchor section top side mode and right anchor section top side mode and standard paragraphs top side mode pass through the logical beam of upper mould It is whole to form top side mode, and top side mode is connected entirely through pin shaft and the lower part side mode;Left anchor Duan Dingmo, right anchor Duan Dingmo and standard paragraphs backform are whole by longitudinally arranged beam composition backform;
It is provided on the door frame corresponding to the left anchor section, right anchor section and standard paragraphs of anchor section trolley for driving the flat of lower part side mode Driving mechanism is moved, translational drive mechanism includes side mode telescopic, side mode telescopic core and side mode translation oil cylinder, the side mode telescopic It is fixed on the door beam of door frame, the side mode telescopic core is slidably mounted in side mode telescopic, the outer end of side mode telescopic core and institute The logical beam of lower part template for stating lower part side mode entirety is hinged, and side mode translation oil cylinder one end is hinged on lower part template and leads on beam, separately One end is hinged on outside side mode telescopic;
Lead between beam and the logical beam of skeleton in the upper mould and be provided with top side mode overturning oil cylinder, passes through top side mode and overturn oil The stretching and contraction of cylinder, drive the upper mould lead to sill bolt move each top side mode composition top side mode it is whole around its with The lower part side mode of each lower part side mode composition is integrally attached to the pin shaft connect and carries out spinning movement, to reach support and demoulding Position adjustment Deng during;
Quadruple board platform frame is installed in the upper position of door frame, translation platform is installed on quadruple board platform frame;It is whole in the backform Platform beam and the translation platform between be disposed with top elevating ram, by translation platform and top elevating ram come adjust top The translation of mould entirety and lifting position.
2. a kind of anchor section trolley for the secondary lining-up construction in tunnel according to claim 1, it is characterised in that: the door Frame is bolted by column, Men Liang and diagonal brace and is formed.
3. a kind of anchor section trolley for the secondary lining-up construction in tunnel according to claim 1, it is characterised in that: the bottom Stringer is two, symmetrical to be set to anchor section pallet bottom, relies on bolt with the lower margin lead screw below the bottom girder Connection.
4. a kind of anchor section trolley for the secondary lining-up construction in tunnel according to claim 1, it is characterised in that: the row Walking mechanism is wheel-track type, including a pair of actively walking and a pair of driven walking.
5. a kind of anchor section trolley for the secondary lining-up construction in tunnel according to claim 1, it is characterised in that: the side Mould translation oil cylinder is arranged side by side with the side mode telescopic core.
6. a kind of anchor section trolley for the secondary lining-up construction in tunnel according to claim 1, it is characterised in that: described flat It moves platform to be made of platform and translation drive cylinder, platform is slidably mounted on quadruple board platform frame by sliding rail, and platform and translation Drive cylinder makees moved end connection, and the cylinder body of driven in translation oil cylinder is fixed on quadruple board platform frame, is driven by driven in translation oil cylinder Platform generates translational motion.
7. a kind of anchor section trolley for the secondary lining-up construction in tunnel according to claim 1, it is characterised in that: described Skeleton, which leads between beam and the logical beam of the template, is provided with screw rod, mainly installs, plays a supportive role afterwards in place in anchor section trolley.
8. a kind of anchor section trolley for the secondary lining-up construction in tunnel according to claim 1, it is characterised in that: described The lower part of lower part side mode entirety is provided with the small template in bottom, is an independent sector, passes through overlapping mode and the lower part side mode Overall surface contact.
9. a kind of anchor section trolley for the secondary lining-up construction in tunnel according to claim 1, it is characterised in that: standard paragraphs Longitudinal length is 1.5-2.5 meters, left anchor section longitudinal length is 4-6 meters, right anchor section longitudinal length be 4-6 meters, template part according to Tunnel cross-section difference and it is different.
10. a kind of anchor section trolley for the secondary lining-up construction in tunnel according to claim 1, it is characterised in that: on a left side There is the place to connect with right anchor section and standard paragraphs in anchor section, design has constant slope in side mode structure, be the structure of outer narrow inner width, It is easier knockout course.
CN201821088959.5U 2018-07-10 2018-07-10 A kind of anchor section trolley for the secondary lining-up construction in tunnel Active CN209011843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821088959.5U CN209011843U (en) 2018-07-10 2018-07-10 A kind of anchor section trolley for the secondary lining-up construction in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821088959.5U CN209011843U (en) 2018-07-10 2018-07-10 A kind of anchor section trolley for the secondary lining-up construction in tunnel

Publications (1)

Publication Number Publication Date
CN209011843U true CN209011843U (en) 2019-06-21

Family

ID=66829867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821088959.5U Active CN209011843U (en) 2018-07-10 2018-07-10 A kind of anchor section trolley for the secondary lining-up construction in tunnel

Country Status (1)

Country Link
CN (1) CN209011843U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625883A (en) * 2018-07-10 2018-10-09 中铁隧道集团二处有限公司 A kind of anchor section trolley and construction method for the secondary lining-up construction in tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625883A (en) * 2018-07-10 2018-10-09 中铁隧道集团二处有限公司 A kind of anchor section trolley and construction method for the secondary lining-up construction in tunnel
CN108625883B (en) * 2018-07-10 2023-12-15 中铁隧道集团二处有限公司 Anchor section trolley for secondary lining construction of tunnel and construction method

Similar Documents

Publication Publication Date Title
CN103967050B (en) Construction system of subway station
CN105736016B (en) Tunnel double-lining framework of steel reinforcement construction equipment and its application
CN109681238B (en) Two linings of tunnel side wall are pour and prefabricated section of jurisdiction of vault is forwardded and is used template platform truck
CN106894639B (en) The hanging reverse construction method of installation of steel construction under a kind of
CN105604581B (en) Tunnel ditch cable trench gang form hangs rotatable installation equipment and its construction method
CN109403374A (en) Factorial construction method for open trench tunnel integral tunnel lining
CN207998785U (en) A kind of driving postposition trestle
US20220325541A1 (en) Assembly consisting of a climbing rail and a climbing lift rail for a rail-guided
CN109736840A (en) A kind of Tunnel Second Lining Construction new method
CN104120877B (en) A kind of hydraulic climbing die block system and climbing form method
CN109519197A (en) Dual-purpose trolley for slip form primary lining excavation supporting and application thereof
CN109653771A (en) Tunnel arch two lined steel mould trolley integrated with cable duct side wall
CN108952770A (en) A kind of outer mould trolley of slope open trench tunnel rectangular configuration lining cutting
CN211314235U (en) Tunnel inverted arch and filling concrete paver
CN109537469A (en) Prefabricated box girder cast-in-situ flange supporting formwork and construction method thereof
CN114657884B (en) Construction method of descending movable formwork for bridge abutment assembly and sectional propulsion
JP6966853B2 (en) How to place concrete on an inclined surface and mobile formwork equipment
CN209011843U (en) A kind of anchor section trolley for the secondary lining-up construction in tunnel
CN108625883A (en) A kind of anchor section trolley and construction method for the secondary lining-up construction in tunnel
CN113417219B (en) Hydraulic internal mold asynchronous traveling system and method for bridge suspension casting basket box chamber
CN209669811U (en) Dam body seepage wall trolley and its walling mechanism
JP2005188203A (en) Moving work vehicle for overhang floor slab
CN103603490B (en) Floor slab concrete construction method applying floor slab trolley
CN109763458A (en) Dam body seepage wall trolley, walling mechanism, dam body seepage wall construction method
CN216305944U (en) Template trolley system suitable for construction of small-section double-bin underground excavation tunnel lining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant