CN209011403U - Leveling unit for prefabricated anti-bank - Google Patents
Leveling unit for prefabricated anti-bank Download PDFInfo
- Publication number
- CN209011403U CN209011403U CN201821730456.3U CN201821730456U CN209011403U CN 209011403 U CN209011403 U CN 209011403U CN 201821730456 U CN201821730456 U CN 201821730456U CN 209011403 U CN209011403 U CN 209011403U
- Authority
- CN
- China
- Prior art keywords
- bank
- prefabricated
- fixing piece
- leveling unit
- prefabricated anti
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of leveling units for prefabricated anti-bank, it is characterized in that, including the more than two anti-bank fixing pieces (1) being fixed together, all the lower surface of the anti-bank fixing piece (1) is in the same plane, and the bar shaped fixation hole (2) extended along anti-bank fixing piece (1) length direction is offered on the anti-bank fixing piece (1).The leveling unit structure of the utility model is simple, is easily achieved standardization processing and manufacturing, and manufacture craft is simple, low in cost;It can rapidly ensure that the absolute altitude between prefabricated anti-bank is unified, improve construction efficiency;Reduce the gap between prefabricated anti-bank and prefabricated lining, enhances waterproof effect.
Description
Technical field
The utility model relates to the leveling units for prefabricated anti-bank, belong to technical field of building construction.
Background technique
It, can be in overlapping building in order to allow toilet, prefabricated air-conditioning plate etc. to have better waterproof effect in assembled architecture
The in-situ layer of plate places prefabricated anti-bank before pouring, but due to the influence of construction quality, the ground of anti-Kan Chu is it is possible that recessed
The phenomenon of convex injustice is in non-level state so as to cause prefabricated anti-bank, if contiguous prefabricated anti-bank absolute altitude is inconsistent, anti-
It will appear gap when placing prefabricated lining on bank, and then generate infiltration hidden danger, influence construction quality.
Utility model content
In order to reduce the gap between prefabricated anti-bank and prefabricated lining, enhance waterproof effect.The utility model provides one
Kind is used for the leveling unit of prefabricated anti-bank, and specific technical solution is as follows.
A kind of leveling unit for prefabricated anti-bank, which is characterized in that at least two anti-banks including being fixed together are solid
Determine part, all the lower surface of the anti-bank fixing piece is in the same plane, and is offered on the anti-bank fixing piece along anti-bank
The bar shaped fixation hole that fastener length direction extends.
Using the leveling unit of the utility model, pre-buried tool internal thread sleeve, the sleeve in prefabricated anti-bank are needed
Upper end flushed with the upper surface of prefabricated anti-bank or lower than prefabricated anti-bank upper surface, utilize bolt (or screw rod, screw etc.
Fastener) it is fixedly connected after the bar shaped fixation hole of anti-bank fixing piece with the sleeve of prefabricated anti-bank, it is interconnected pre- in this way
It makes anti-bank to be fixed by corresponding anti-bank fixing piece, fixation of the bar shaped fixation hole convenient for the anti-bank fixing piece of adjusting on prefabricated anti-bank
Position, and the upper surface of prefabricated anti-bank interconnected is all located in same plane, it in this way can be conveniently and efficiently to prefabricated
Anti- bank carry out it is levelling so that passing through cast-in-place one by prefabricated anti-bank in the upper surface of prefabricated anti-bank is all in the same horizontal plane
Divide and be cast in the overlapping layers of laminated floor slab, hereafter remove bolt, remove leveling unit, leveling unit can reuse.
Further, the anti-bank fixing piece is made of channel steel.Channel steel materials are convenient, low in cost, and are made using channel steel
For anti-bank fixing piece, the weight of anti-bank fixing piece is reduced, but still maintains higher rigidity and amount of deflection;In addition, using slot
Steel is also convenient for being fixedly connected for multiple anti-bank fixing pieces, it is only necessary to be welded to each other.
Further, the quantity of the anti-bank fixing piece is two, and two anti-bank fixing pieces are arranged in "-" type or L
Type arrangement.The anti-bank fixing piece of "-" type arrangement or L-type arrangement is used to fix two plots of prefabricated anti-banks of "-" type or L-type connection.
Further, the quantity of the anti-bank fixing piece is three, three anti-T-shaped arrangements of bank fixing piece.T-type cloth
The anti-bank fixing piece set is used to fix two pieces or three plots prefabricated anti-banks of T-type connection.
Further, the quantity of the anti-bank fixing piece is four, and four anti-bank fixing pieces are in cross arrangement.Ten
The anti-bank fixing piece of font arrangement is used for three pieces or four plots prefabricated anti-banks of fixed cross type connection.
Further, the leveling unit further includes the peep hole being provided on the anti-bank fixing piece, the peep hole
For observing the end for the prefabricated anti-bank that the leveling unit is fixed.Prefabricated anti-bank end is able to observe that by the peep hole
Mutual abutting situation, it is ensured that the end of prefabricated anti-bank interconnected mutually closely abuts.The peep hole can be provided with one
In a anti-bank fixing piece;It can also be provided in more than two anti-bank fixing pieces, i.e., each anti-bank fixing piece all has one
Fixed notch, whole notches form the peep hole together.
Further, the peep hole is in I-shaped.I-shaped peep hole can be on the basis of playing the role of observation
Ensure that the size of peep hole is minimum, the structural strength of leveling unit is influenced minimum.
The utility model has the following beneficial effects:
1, leveling unit structure is simple, is easily achieved standardization processing and manufacturing, and manufacture craft is simple, low in cost;
2, it can rapidly ensure that the absolute altitude between prefabricated anti-bank is unified, improve construction efficiency;
3, reduce the gap between prefabricated anti-bank and prefabricated lining, enhance waterproof effect.
Detailed description of the invention
Fig. 1 is the schematic diagram of the leveling unit of the embodiments of the present invention 1;
Fig. 2 (a) is the schematic diagram that the leveling unit of embodiment 1 is fixed on prefabricated anti-bank (before concrete floor slab placement);
Fig. 2 (b) is the diagrammatic cross-section of Fig. 2 (a);
Fig. 2 (c) is the schematic diagram that the leveling unit of embodiment 1 is fixed on prefabricated anti-bank (after concrete floor slab placement)
Fig. 2 (d) is the diagrammatic cross-section of Fig. 2 (c);
Fig. 3 is the schematic diagram of the leveling unit of the embodiments of the present invention 2;
Fig. 4 is the schematic diagram that the leveling unit of embodiment 2 is fixed on prefabricated anti-bank;
Fig. 5 is the schematic diagram of the leveling unit of the embodiments of the present invention 3;
Fig. 6 is the schematic diagram that the leveling unit of embodiment 3 is fixed on prefabricated anti-bank.
In figure: anti-bank fixing piece 1, bar shaped fixation hole 2, prefabricated anti-bank 3, screw rod 4, in-situ layer 5, left side floor 6, the right building
Plate 7, peep hole 8.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
Embodiment 1
Referring to Fig. 1, the leveling unit for prefabricated anti-bank includes a channel steel, opened up on the bottom plate of channel steel there are two along
The bar shaped fixation hole 2 that length direction extends, a channel steel include two anti-bank fixing pieces 1, and the bottom plate of channel steel is located at same flat
In face.
Referring to fig. 2, using the levelling construction method of above-mentioned leveling unit the following steps are included:
1), prefabricated anti-bank 3 is prefabricated: the pre-buried tool internal thread built-in fitting (not shown) in prefabricated anti-bank 3, this is pre-buried
The upper end of part is concordant with the upper surface of the prefabricated anti-bank 3 or the upper end of the built-in fitting is lower than the prefabricated anti-bank 3
Upper surface;
2), fix two prefabricated anti-banks 3 with leveling unit: by bolt 4, (spiral shell is can also be used in the example of fastener
The bonding pads such as bar, screw) it is fixedly connected after the bar shaped fixation hole 2 of the anti-bank fixing piece 1 of leveling unit with built-in fitting, make
It obtains each described prefabricated anti-bank 3 and corresponding anti-bank fixing piece 1 is fixed, the upper surface of the prefabricated anti-bank 3 and the anti-bank
The lower surface of fixing piece 1 mutually abuts;The end face of two prefabricated anti-banks 3 mutually abuts;The abutting of end face can guarantee prefabricated anti-bank 3
It cannot rotate around bolt 4, be fixed together so that two prefabricated anti-banks 3 are reliable and stable;
3), adjusting prefabricated anti-bank 3 makes the upper surface of two prefabricated anti-banks 3 be in same level (absolute altitude is unified),
Casting concrete is located in in-situ layer 5 so that a part of the prefabricated anti-bank is fixed;Due to the injustice of floor (laminated floor slab)
Whole, as shown in Fig. 2 (a), 2 (b), left side floor 6 is higher than the right floor 7, uses leveling unit two prefabricated anti-banks 3 are fixed
Two prefabricated anti-banks can be rapidly adjusted after together simultaneously;
4), after in-situ layer 5 reaches scheduled intensity, the leveling unit is removed.
Preferably, also there is peep hole 8 on the channel steel, by the peep hole 8 can observe simultaneously two it is prefabricated anti-
The end of bank 3, it is ensured that the end of prefabricated anti-bank 3 interconnected mutually closely abuts;The peep hole 8, which may be considered, to be provided with
On one of them anti-bank fixing piece 1, it is also assumed that being started simultaneously on two anti-bank fixing pieces 1.
Although anti-bank fixing piece is not it should be understood that using channel steel in the present embodiment as anti-bank fixing piece
It is limited to channel steel, such as can also be using square steel or other rigid corynebacterium components.In addition, bar shaped fixation hole 2 is also possible to set
It sets on the side plate of channel steel.
Embodiment 2
It referring to Fig. 3-4, is not both that the leveling unit in embodiment 2 includes two channel steels with embodiment 1, two channel steels are logical
Cross and be welded and fixed together, form the anti-bank fixing piece 3 of three T-shaped arrangements, offer on each anti-bank fixing piece 3 along
The bar shaped fixation hole 2 that length direction extends, the leveling unit of the present embodiment can fix simultaneously T-shaped connection two or three are pre-
Anti- bank 3 is made, the end face of any one prefabricated anti-bank 3 is connected to the end face and/or side of other prefabricated anti-bank 3.The present embodiment
Leveling unit other structures and levelling construction method it is identical as embodiment 1.It should be understood that two channel steels can be as
Shown in Fig. 3, wherein the part side plate of a channel steel is removed, so that the groove connection of two channel steels;The portion can not also be cut off
Divide side plate, and the plate-side plate welding of a channel steel and another channel steel is directly fixed into (not shown).Wherein, peep hole 8 can be recognized
To be to be opened up on three anti-bank fixing pieces 1 simultaneously, each anti-bank fixing piece 1 has notch, is grouped together into peep hole
8, it can observe the end of three prefabricated anti-banks 3 simultaneously by peep hole 8.
In addition, two channel steels in the present embodiment L-shaped can also arrange that two for fixing L-shaped distribution are prefabricated
Anti- bank 3, details are not described herein.
Embodiment 3
It referring to Fig. 5-6, is not both that the leveling unit in embodiment 3 includes three channel steels with embodiment 2, three channel steels are logical
It crosses and is welded and fixed together, form four anti-bank fixing pieces 3 in cross arrangement, offered on each anti-bank fixing piece 3
The bar shaped fixation hole 2 alongst extended, the leveling unit of the present embodiment can fix three in cross connection simultaneously
Or four prefabricated anti-banks 3, the end face of any one prefabricated anti-bank 3 are connected to the end face and/or side of other prefabricated anti-bank 3.
Preferably, the peep hole 8 that can observe the end of four prefabricated anti-banks 3 simultaneously is offered on channel steel, which is in I-shaped
Shape.It should be understood that three channel steels can be as shown in figure 5, wherein the part side plate of a channel steel be removed, so that three slots
The groove of steel is connected to;The part side plate can not also be cut off, and two channel steels are symmetrically directly welded on the two of a channel steel
Cross connection (not shown) is formed on a side plate.The other structures of the leveling unit of the present embodiment and levelling construction method and reality
The identical of example 2 is applied, details are not described herein.
The embodiments of the present invention are described above in conjunction with attached drawing, in the absence of conflict, this is practical new
The feature in embodiment and embodiment in type can be combined with each other.For sake of convenience, "upper", the "lower" above occurred
"left", "right" printed words only indicate consistent with the upper and lower direction of attached drawing itself, do not play restriction effect to structure.The utility model
It is not limited to above-mentioned specific embodiment, the above mentioned embodiment is only schematical, rather than limitation,
Those skilled in the art are not departing from the utility model aims and claim is protected under the enlightenment of the utility model
Under the ambit of shield, many forms can be also made, these are belonged within the protection scope of the utility model.
Claims (7)
1. being used for the leveling unit of prefabricated anti-bank, which is characterized in that at least two anti-bank fixing pieces including being fixed together
(1), all the lower surface of the anti-bank fixing pieces (1) is in the same plane, offered on the anti-bank fixing piece (1) along
The bar shaped fixation hole (2) that anti-bank fixing piece (1) length direction extends.
2. the leveling unit according to claim 1 for prefabricated anti-bank, which is characterized in that the anti-bank fixing piece (1)
It is made of channel steel.
3. the leveling unit according to claim 1 for prefabricated anti-bank, which is characterized in that the anti-bank fixing piece (1)
Quantity be two, two anti-bank fixing pieces (1) are arranged in "-" type or L-type arrangement.
4. the leveling unit according to claim 1 for prefabricated anti-bank, which is characterized in that the anti-bank fixing piece (1)
Quantity be three, three T-shaped arrangements of the anti-bank fixing piece (1).
5. the leveling unit according to any one of claims 1-4 for prefabricated anti-bank, which is characterized in that described levelling
Device further includes the peep hole (8) being provided on the anti-bank fixing piece (1), and the peep hole (8) is described levelling for observing
The end for the prefabricated anti-bank (3) that device is fixed.
6. the leveling unit according to claim 1 for prefabricated anti-bank, which is characterized in that the anti-bank fixing piece (1)
Quantity be four, four anti-bank fixing pieces (1) are in cross arrangement.
7. the leveling unit according to claim 6 for prefabricated anti-bank, which is characterized in that the leveling unit further includes
The peep hole (8) being provided on the anti-bank fixing piece (1), the peep hole (8) are fixed for observing the leveling unit
Prefabricated anti-bank (3) end, the peep hole (8) is in I-shaped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821730456.3U CN209011403U (en) | 2018-10-24 | 2018-10-24 | Leveling unit for prefabricated anti-bank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821730456.3U CN209011403U (en) | 2018-10-24 | 2018-10-24 | Leveling unit for prefabricated anti-bank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209011403U true CN209011403U (en) | 2019-06-21 |
Family
ID=66839788
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821730456.3U Active CN209011403U (en) | 2018-10-24 | 2018-10-24 | Leveling unit for prefabricated anti-bank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209011403U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109162399A (en) * | 2018-10-24 | 2019-01-08 | 湖南远大建工股份有限公司 | Leveling unit and its levelling construction method for prefabricated anti-bank |
-
2018
- 2018-10-24 CN CN201821730456.3U patent/CN209011403U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109162399A (en) * | 2018-10-24 | 2019-01-08 | 湖南远大建工股份有限公司 | Leveling unit and its levelling construction method for prefabricated anti-bank |
CN109162399B (en) * | 2018-10-24 | 2024-06-18 | 湖南远大建工股份有限公司 | Leveling device for prefabricated inverted ridge and leveling construction method of leveling device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2019303060B2 (en) | Prefabricated wall and assembly structure for prefabricated building, and construction method therefor | |
CN106284341B (en) | A kind of prestress anchorage cable hillside wall construction technology | |
CN107975176A (en) | Assembly concrete mat formation in advance building cover board H-shaped node connector and connection method | |
CN104947603B (en) | A kind of rc beam bridge girder reinforcing construction and reinforcement means | |
CN108643428B (en) | But height-adjusting's assembled precast concrete coincide floor | |
CN103469806A (en) | Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die | |
CN103526930A (en) | Multi-directional intersection reinforced bare concrete inclined column construction method | |
CN209011403U (en) | Leveling unit for prefabricated anti-bank | |
CN106639196A (en) | Construction method for cast-in-place slab staircase with the lower end provided with steel plate sliding support | |
CN108060789A (en) | A kind of wall support and change method of existing masonry structure base isolation reinforcement | |
CN108643429B (en) | But height-adjusting's assembled coincide floor | |
CN109162399A (en) | Leveling unit and its levelling construction method for prefabricated anti-bank | |
CN108978870A (en) | Fold-line-shaped girder steel and concrete combined structure construction method | |
CN207332350U (en) | The installation constitution of shock isolating pedestal in existing building base isolation reinforcement | |
CN106351245A (en) | Tower crane foundation base and construction method thereof | |
CN205580855U (en) | Hollow slab bridge hinge joint bearing capacity test test piece | |
CN109930710A (en) | Architectural vibration-insulation layer construction method | |
CN105544857B (en) | Close rib composite plate structure system | |
CN205776719U (en) | A kind of basement floor constructions | |
CN104532996B (en) | A kind of precast floor slab and precast floor slab structural member | |
Chunyuk et al. | Performance evaluation of the effectiveness of the use of core drivers in the construction of base plates | |
CN208088325U (en) | A kind of connection structure of steel-bamboo faced wall and basis | |
CN106968359B (en) | A kind of EPS module heat preservation composite wall plate node and the practice with anti-falling construction | |
JP6865511B2 (en) | Honeycomb concrete structure | |
CN206143914U (en) | SC fabricated frame bearing structure system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |