CN209006735U - A kind of boring auxiliary stand of decoration - Google Patents

A kind of boring auxiliary stand of decoration Download PDF

Info

Publication number
CN209006735U
CN209006735U CN201821219428.5U CN201821219428U CN209006735U CN 209006735 U CN209006735 U CN 209006735U CN 201821219428 U CN201821219428 U CN 201821219428U CN 209006735 U CN209006735 U CN 209006735U
Authority
CN
China
Prior art keywords
bar
sleeve
fixedly installed
electric drill
auxiliary stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821219428.5U
Other languages
Chinese (zh)
Inventor
项少平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Lianfeng Decoration Design Engineering Co Ltd
Original Assignee
Shenzhen Lianfeng Decoration Design Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Lianfeng Decoration Design Engineering Co Ltd filed Critical Shenzhen Lianfeng Decoration Design Engineering Co Ltd
Priority to CN201821219428.5U priority Critical patent/CN209006735U/en
Application granted granted Critical
Publication of CN209006735U publication Critical patent/CN209006735U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model discloses a kind of boring auxiliary stands of decoration, including bearing plate, the upper surface of the bearing plate is fixedly installed with altimetric compensation component, the upper end of the altimetric compensation component is fixedly installed with workbench, fixed offer in the upper surface of the workbench opens up a hole, and the upper surface of workbench is fixedly installed with lifting device at the outer fix for opening up a hole.Auxiliary stand drills commonly instead of house roof by the mode of double ladder compensation height, when the roof to house carries out decoration drilling, the height of electric drill is adjusted using auxiliary stand, and the height of electric drill can by altimetric compensation component and lifting device two in terms of be adjusted, even and if then meeting in the house of different height, auxiliary stand still can be used, auxiliary stand utilizes the principle of lever, it can easily realize and send drill bit to the position for touching roof, operator can directly carry out drilling operation on the supporting surface in house, safe and efficient effective.

Description

A kind of boring auxiliary stand of decoration
Technical field
The utility model relates to field of constructional ornament, specially a kind of boring auxiliary stand of decoration.
Background technique
Bracket is exactly the framework to play a supportive role, and during household decoration, pre-buried electricity is either opened up on roof The groove body of cable, or connection suspended ceiling framework, or when installation pendent lamp, require to carry out tapping on roof by electric drill Reason, since distance is larger (minimum altitude in house is 2.8 meters) between roof and supporting surface, operator is unable to reach the height of drilling Degree, it is therefore desirable to carry out the height that compensating operation person reaches drilling by double ladder, but due to the operating space at the top of double ladder Limited, it is very difficult that operator wants the progress drilling operation on double ladder, and needs to lift electric drill for a long time and carry out drill hole Reason, certain sense of aching is brought to the arm of operator, during drilling, concrete dust or sawdust are fallen, and can be fascinated The eyes of operator so that operator's itself center of gravity on double ladder cannot keep balance, and then lead to dropping for operator, nothing Certain economic loss can be all brought by owner or operator itself, for this purpose, we have proposed a kind of decoration is boring auxiliary Help bracket.
Utility model content
The technical problems to be solved in the utility model is to overcome existing defect, provides a kind of boring auxiliary branch of decoration Frame, can effectively solve operator in background technique want to carry out drilling operation on double ladder it is very difficult, and when needing long Between lift electric drill and carry out drilling processing, certain sense of aching is brought to the arm of operator, during drilling, concrete ash Dirt or sawdust are fallen, and can fascinate the eyes of operator, so that operator's itself center of gravity on double ladder cannot keep balance, in turn The problem of leading to dropping for operator, no matter all bringing certain economic loss to owner or operator itself.
To achieve the above object, the utility model provides the following technical solutions: a kind of boring auxiliary stand of decoration, including Bearing plate, the upper surface of the bearing plate are fixedly installed with altimetric compensation component, the fixed peace in the upper end of the altimetric compensation component Equipped with workbench, fixed offer in the upper surface of the workbench opens up a hole, and the upper surface of workbench is close to opening up position Lifting device is fixedly installed at the outer fix in hole.
As a kind of optimal technical scheme of the utility model, the altimetric compensation component includes first support bar, described The top two sides of first support bar, which are embedded in, is equipped with the first adjusting bolt, and the inside top of first support bar slidably connects Second support bar, the front surface of the first adjusting bolt is fixed to offer graduation mark, the first support bar and bearing plate it Between be bolted to connection.
As a kind of optimal technical scheme of the utility model, the lifting device includes guide rail, the inside of the guide rail Bindiny mechanism is slidably connected, and the upper surface of guide rail is fixedly installed with switch triggering mechanism, the side of the bindiny mechanism is solid Dingan County is equipped with electric drill fixed plate, and the upper surface of the workbench is fixedly installed at a side position of guide rail actively to be adjusted Mechanism, is rotatablely connected between the bottom of the bindiny mechanism and the bottom of active regulating mechanism by shaft, and the electric drill is fixed One side surface of plate is connected with electric drill, and electric drill is placed longitudinally, and the drill bit of electric drill is upward, the electric drill fixed plate and electric drill it Between be clamped and connected by clip.
As a kind of optimal technical scheme of the utility model, the bindiny mechanism includes first sleeve, the first set The inside of cylinder is provided through X bar, and the both ends of the X bar are rotatably connected to idler wheel, the fixed weldering in the side of the first sleeve One end of Y bar is connect, the other end of the Y bar is fixedly connected with gasket plate, and the lower surface of the first sleeve is fixedly welded with Z Bar is fixedly connected between the first sleeve and X bar by threaded hole and bolt, and threaded hole is divided into the first threaded hole and the second spiral shell Pit, the first threaded hole are located at another side surface of first sleeve, and the second threaded hole is located at a side surface of X bar, the first screw thread Hole is identical as the second threaded hole internal diameter, and position is in one-to-one relationship.
As a kind of optimal technical scheme of the utility model, the switch triggering mechanism includes U-shaped bar, the U-shaped bar Two sides of the bottom be embedded in the second adjusting bolt be installed, and the bottom inside of U-shaped bar slidably connects drive rod, the transmission The lower end of bar is fixedly installed with triggering convex block, and the lower surface fixation of the triggering convex block offers groove body, and the width of groove body is greater than The width of drill switch.
As a kind of optimal technical scheme of the utility model, the active regulating mechanism includes limit plate, the limit The inner rotation of plate is connected with gag lever post, and the center outer surface movable sleeve of the gag lever post is connected to second sleeve, and described second set One side surface of cylinder is fixedly welded with the first arm bar, and another side surface of second sleeve is fixedly welded with the second arm bar, There are two the quantity of the limit plate is arranged altogether, and to be symmetrically set, it is fixedly installed between the limit plate and gag lever post There is bearing.
As a kind of optimal technical scheme of the utility model, the lower surface of the bearing plate is fixedly installed with universal wheel, The quantity of the altimetric compensation component and universal wheel is four, and is in distributed rectangular, and the outside of universal wheel is fixedly installed with Brake.
It is commonly used compared with prior art, the utility model has the beneficial effects that auxiliary stand drills instead of house roof By double ladder compensation height mode, the roof to house carry out decoration drilling when, adjust electricity using auxiliary stand The height of brill, and the height of electric drill can by altimetric compensation component and lifting device two in terms of be adjusted, even and if then meet In the house of different height, auxiliary stand still be can be used, and auxiliary stand utilizes the principle of lever, and can easily realize will bore Head is sent to the position for touching roof, and laborsaving effectively operator can directly carry out drilling operation on the supporting surface in house, and safety is fast Prompt effectively the operating space avoided at the top of because of double ladder is limited, and operator wants to carry out drilling operation very on double ladder Difficulty, and need long-time to lift electric drill and carry out drilling processing, certain sense of aching is brought to the arm of operator, in drilling In the process, concrete dust or sawdust are fallen, and can fascinate the eyes of operator so that operator on double ladder itself center of gravity without Method keeps balance, and then leads to dropping for operator, and certain economic damage no matter can be all brought to owner or operator itself The problem of mistake.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model altimetric compensation component;
Fig. 3 be the utility model open up a hole open up structural schematic diagram;
Fig. 4 is the structural schematic diagram of the utility model lifting device;
Fig. 5 is the structural schematic diagram of the utility model bindiny mechanism;
Fig. 6 is the mounting structure schematic diagram of the utility model idler wheel;
Fig. 7 is the structural schematic diagram of the utility model switch triggering mechanism;
Fig. 8 is the structural schematic diagram of the utility model active regulating mechanism.
In figure: 1, bearing plate;2, altimetric compensation component;21, first support bar;22, first bolt is adjusted;23, second Strut;3, workbench;4, a hole is opened up;5, lifting device;51, guide rail;52, bindiny mechanism;521, first sleeve;522, X bar; 523, idler wheel;524, Y bar;525, gasket plate;526, Z bar;53, switch triggering mechanism;531, U-shaped bar;532, second spiral shell is adjusted Bolt;533, drive rod;534, convex block is triggered;54, electric drill fixed plate;55, shaft;56, active regulating mechanism;561, limit plate; 562, gag lever post;563, second sleeve;564, the first arm bar;565, the second arm bar.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-8 is please referred to, the utility model provides a kind of technical solution: a kind of boring auxiliary stand of decoration, including hold Pressing plate 1, the upper surface of bearing plate 1 are fixedly installed with altimetric compensation component 2, and altimetric compensation component 2 includes first support bar 21, the The top two sides of one support rod 21, which are embedded in, is equipped with the first adjusting bolt 22, and the inside top of first support bar 21 is slided and connected It is connected to second support bar 23, the front surface of the first adjusting bolt 22 is fixed to offer graduation mark, first support bar 21 and bearing plate 1 Between be bolted to connection, the upper end of altimetric compensation component 2 is fixedly installed with workbench 3, the upper surface of workbench 3 Fixed offer opens up a hole 4, and the upper surface of workbench 3 is fixedly installed with lifting dress at the outer fix for opening up a hole 4 5 are set, lifting device 5 includes guide rail 51, and the internal slide of guide rail 51 is connected with bindiny mechanism 52, and bindiny mechanism 52 includes first set Cylinder 521, the inside of first sleeve 521 are provided through X bar 522, and the both ends of X bar 522 are rotatably connected to idler wheel 523, and first The side of sleeve 521 is fixedly welded one end of Y bar 524, and the other end of Y bar 524 is fixedly connected with gasket plate 525, first sleeve 521 lower surface is fixedly welded with Z bar 526, is fixedly connected between first sleeve 521 and X bar 522 by threaded hole and bolt, Threaded hole is divided into the first threaded hole and the second threaded hole, and the first threaded hole is located at another side surface of first sleeve 521, the second spiral shell Pit is located at a side surface of X bar 522, and the first threaded hole is identical as the second threaded hole internal diameter, and position is in one-to-one relationship, The upper surface of guide rail 51 is fixedly installed with switch triggering mechanism 53, and switch triggering mechanism 53 includes U-shaped bar 531, U-shaped bar 531 Two sides of the bottom, which are embedded in, is equipped with the second adjusting bolt 532, and the bottom inside of U-shaped bar 531 slidably connects drive rod 533, The lower end of drive rod 533 is fixedly installed with triggering convex block 534, and the lower surface fixation of triggering convex block 534 offers groove body, groove body Width is greater than the width of drill switch, and the side of bindiny mechanism 52 is fixedly installed with electric drill fixed plate 54, the upper table of workbench 3 Face is fixedly installed with active regulating mechanism 56 at a side position of guide rail 51, and active regulating mechanism 56 includes limit plate 561, The inner rotation of limit plate 561 is connected with gag lever post 562, and the center outer surface movable sleeve of gag lever post 562 is connected to second sleeve 563, a side surface of second sleeve 563 is fixedly welded with the first arm bar 564, and another side surface of second sleeve 563 is solid Surely it is welded with the second arm bar 565, there are two the quantity of limit plate 561 is arranged altogether, and to be symmetrically set, limit plate 561 It is fixedly installed bearing between gag lever post 562, passes through between the bottom of bindiny mechanism 52 and the bottom of active regulating mechanism 56 Shaft 55 is rotatablely connected, and a side surface of electric drill fixed plate 54 is connected with electric drill, and electric drill is placed longitudinally, and the drill bit court of electric drill On, it is clamped and connected between electric drill fixed plate 54 and electric drill by clip, the lower surface of bearing plate 1 is fixedly installed with universal wheel, high The quantity for spending compensation component 2 and universal wheel is four, and is in distributed rectangular, and the outside of universal wheel is fixedly installed with braking Device.
The working principle and process for using of the utility model: before drilling to roof, first electric drill is indulged by clip To and drill bit be mounted in electric drill fixed plate 54 upward, after being installed, 1), utilize the principle of lever, operator's pressable One arm bar 564, under the action of limit plate 561, gag lever post 562 and second sleeve 563, the first arm bar 564 can be driven Second arm bar 565 is that the center of circle rotates clockwise with second sleeve 563, at this point, 565 lower end of the second arm bar raises up, is being turned Under the action of axis 55, bindiny mechanism 52 is pushed to move up, so that idler wheel 523 moves up in guide rail 51, and then drives electric drill fixed plate 54 move up, and realize moving up for electric drill;When the top last bit that idler wheel 523 is moved to guide rail 51 is set, the drill bit of electric drill can not be touched When carrying out boring work to roof, at this point, altimetric compensation component 2, the whole height of Lai Tisheng lifting device 5,2 can be passed through), it is high It spends compensation component 2 when in use, unscrews the first adjusting bolt 22, release first and adjust clamping of the bolt 22 to second support bar 23 Effect, so as to adjust the distance between second support bar 23 and first support bar 21, consequently facilitating integrally-regulated lifting fills The whole height for setting 5 can allow four altimetric compensation components 2 to reach sustained height, tighten the first adjusting bolt 22 referring to graduation mark Position of 23 lower end of second support bar inside first support bar 21 can be limited again, after the completion of compensating height adjustment, repeated 1) operation, if the height of electric drill obtains the demand of operator, can directly work, drive electric drill to move up in electric drill fixed plate 54 To bit contact to the moment on roof, the triggering convex block 534 of switch triggering mechanism 53 can be to the switch application one on electric drill handle The active force of a pressing, so as to allow electric drill to work normally, if electric drill fixed plate 54, which drives, moves to bit contact to room on electric drill The moment on top, triggering convex block 534 are not exposed to drill switch or touch drill switch in advance, adjust bolt using second 532 are adjusted, and Principles of Regulation are identical as the principle of altimetric compensation component 2, and after the completion of adjusting, operator can stand in house Drilling processing is carried out to roof on supporting surface, since operator can mark boring point on roof in advance, is drilling through next mark When note point, can directly it move, whole process is laborsaving convenient and efficient, without double ladder, it is ensured that the person of operator Safety.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of boring auxiliary stand of decoration, including bearing plate (1), it is characterised in that: the upper surface of the bearing plate (1) is solid Dingan County is equipped with altimetric compensation component (2), and the upper end of the altimetric compensation component (2) is fixedly installed with workbench (3), the work Fixed offer in upper surface for making platform (3) is opened up a hole (4), and the upper surface of workbench (3) is close to the outside for opening up a hole (4) Lifting device (5) are fixedly installed at position.
2. a kind of boring auxiliary stand of decoration according to claim 1, it is characterised in that: the altimetric compensation component It (2) include first support bar (21), the top two sides of the first support bar (21), which are embedded in, is equipped with the first adjusting bolt (22), and the inside top of first support bar (21) slidably connects second support bar (23), and described first adjusts bolt (22) Front surface fixation offer graduation mark, be bolted to connection between the first support bar (21) and bearing plate (1).
3. a kind of boring auxiliary stand of decoration according to claim 1, it is characterised in that: lifting device (5) packet It includes guide rail (51), the internal slide of the guide rail (51) is connected with bindiny mechanism (52), and the fixed peace in upper surface of guide rail (51) Equipped with switch triggering mechanism (53), the side of the bindiny mechanism (52) is fixedly installed with electric drill fixed plate (54), the work The upper surface of platform (3) is fixedly installed with active regulating mechanism (56) at a side position of guide rail (51), the connection machine It is rotatablely connected between the bottom of structure (52) and the bottom of active regulating mechanism (56) by shaft (55), the electric drill fixed plate (54) a side surface is connected with electric drill, and electric drill is placed longitudinally, and the drill bit of electric drill is upward, the electric drill fixed plate (54) with It is clamped and connected between electric drill by clip.
4. a kind of boring auxiliary stand of decoration according to claim 3, it is characterised in that: bindiny mechanism (52) packet It includes first sleeve (521), the inside of the first sleeve (521) is provided through X bar (522), the both ends of the X bar (522) It is rotatably connected to idler wheel (523), the side of the first sleeve (521) is fixedly welded one end of Y bar (524), the Y bar (524) the other end is fixedly connected with gasket plate (525), and the lower surface of the first sleeve (521) is fixedly welded with Z bar (526), it is fixedly connected between the first sleeve (521) and X bar (522) by threaded hole and bolt, threaded hole is divided into first Threaded hole and the second threaded hole, the first threaded hole are located at another side surface of first sleeve (521), and the second threaded hole is located at X bar (522) a side surface, the first threaded hole is identical as the second threaded hole internal diameter, and position is in one-to-one relationship.
5. a kind of boring auxiliary stand of decoration according to claim 3, it is characterised in that: the switch triggering mechanism It (53) include U-shaped bar (531), the two sides of the bottom of the U-shaped bar (531), which are embedded in, is equipped with the second adjusting bolt (532), and U The bottom inside of type bar (531) slidably connects drive rod (533), and the lower end of the drive rod (533) is fixedly installed with triggering Convex block (534), the lower surface of triggering convex block (534) is fixed to offer groove body, and the width of groove body is greater than the width of drill switch Degree.
6. a kind of boring auxiliary stand of decoration according to claim 3, it is characterised in that: the active regulating mechanism It (56) include limit plate (561), the inner rotation of the limit plate (561) is connected with gag lever post (562), the gag lever post (562) center outer surface movable sleeve is connected to second sleeve (563), and a side surface of the second sleeve (563) is fixedly welded Have the first arm bar (564), and another side surface of second sleeve (563) is fixedly welded with the second arm bar (565), the limit There are two the quantity of position plate (561) is arranged altogether, and to be symmetrically set, between the limit plate (561) and gag lever post (562) It is fixedly installed bearing.
7. a kind of boring auxiliary stand of decoration according to claim 1, it is characterised in that: under the bearing plate (1) Surface is fixedly installed with universal wheel, and the altimetric compensation component (2) and the quantity of universal wheel are four, and in rectangle point The outside of cloth, universal wheel is fixedly installed with brake.
CN201821219428.5U 2018-07-31 2018-07-31 A kind of boring auxiliary stand of decoration Expired - Fee Related CN209006735U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821219428.5U CN209006735U (en) 2018-07-31 2018-07-31 A kind of boring auxiliary stand of decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821219428.5U CN209006735U (en) 2018-07-31 2018-07-31 A kind of boring auxiliary stand of decoration

Publications (1)

Publication Number Publication Date
CN209006735U true CN209006735U (en) 2019-06-21

Family

ID=66830527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821219428.5U Expired - Fee Related CN209006735U (en) 2018-07-31 2018-07-31 A kind of boring auxiliary stand of decoration

Country Status (1)

Country Link
CN (1) CN209006735U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113232102A (en) * 2021-04-29 2021-08-10 程琦 A automatic puncher of over-and-under type for housing construction fitment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113232102A (en) * 2021-04-29 2021-08-10 程琦 A automatic puncher of over-and-under type for housing construction fitment

Similar Documents

Publication Publication Date Title
CN210704910U (en) A fixing device for industrial robot
CN209006735U (en) A kind of boring auxiliary stand of decoration
CN111671237A (en) Clutch type rotary telescopic electric dining table
CN210133513U (en) Protection tool for electric pole transportation
CN207502332U (en) A kind of display screen component processing shell rigidity detection device
CN208408634U (en) Indoor ceiling exempts from scaffold drilling equipment
CN108687384A (en) A kind of boring auxiliary stand of decoration
CN104879641B (en) The automatic brush fat device of cable pulley type automobile glass lifter slideway
CN217394348U (en) Positioning device for processing stainless steel doors and windows
CN106141541A (en) A kind of welder for garbage truck sizer side plate
CN215806846U (en) Hanging frame hanging mechanism for building electromechanical installation
CN213418430U (en) Auxiliary mounting tool for gypsum board
CN209647283U (en) A kind of bending machine steel plate commutation platform
CN206173378U (en) Clamping device and furnace gate formula sublance system
CN216414590U (en) Detection debugging device of commercial stereo set
CN208342264U (en) A kind of torsion shaft auxiliary machining device
CN219451265U (en) Steel structure beam capable of being positioned rapidly
CN114512942B (en) Just move formula construction wiring arrangement of quick different diameter cable solidus
CN219975618U (en) Leveling butt joint device for water conservancy pipeline
CN219074682U (en) Special manufacturing table for elevator component drilling
CN209207325U (en) A kind of Work fixing device
CN103028964A (en) Swinging pressing device
CN216839356U (en) Assemble simple and easy sounding equipment
CN221275083U (en) Installation and fixation of hydropower station cantilever crane device
CN219608077U (en) Fire control detection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190621

Termination date: 20210731