CN208996271U - Glass curtain wall assembling structure - Google Patents

Glass curtain wall assembling structure Download PDF

Info

Publication number
CN208996271U
CN208996271U CN201821705149.XU CN201821705149U CN208996271U CN 208996271 U CN208996271 U CN 208996271U CN 201821705149 U CN201821705149 U CN 201821705149U CN 208996271 U CN208996271 U CN 208996271U
Authority
CN
China
Prior art keywords
glass
column
curtain wall
glass curtain
spring catch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821705149.XU
Other languages
Chinese (zh)
Inventor
颜海潘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Ruihe Construction Decoration Co Ltd
Original Assignee
Shenzhen Ruihe Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Ruihe Construction Decoration Co Ltd filed Critical Shenzhen Ruihe Construction Decoration Co Ltd
Priority to CN201821705149.XU priority Critical patent/CN208996271U/en
Application granted granted Critical
Publication of CN208996271U publication Critical patent/CN208996271U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a kind of glass curtain wall assembling structures, including columns assemblies and glass assembly, columns assemblies include column and sealing element, and the two sides of column, which extend outwardly, is provided with extension, sealing element is set to the inside of extension, and uniform intervals are provided with several location holes on column;Glass assembly includes that glass, secondary frame and spring catch glass outer surface are close to the two sides that sealing element is set to column, the inner surface auxiliary connection frame of glass, at least two positioning tubes being laterally arranged, spring catch are set in positioning tube on secondary frame, and the extension end of the spring catch in positioning tube is connected in location hole.This programme is by being divided into two parts for glass curtain wall structure, then is quickly assembled in glass curtain wall by location hole, spring catch and sealing element etc., stable structure;Meanwhile entire assembling process can be completed indoors, without additionally installing crossbeam or installing glass by stainless steel bolt pulling plug, raising site operation efficiency guarantees construction quality, environmentally protective.

Description

Glass curtain wall assembling structure
Technical field
The utility model relates to assemble to glass curtain wall, a kind of glass curtain wall assembling structure is especially related to.
Background technique
With the development of the social economy, architect pursues the appearance of building decoration higher and higher, glass curtain wall work It is decorating outer wall of building using more and more extensive, and increasingly affects people's lives.
Conventional frame formula glass curtain wall installs glass panel after needing to install column and crossbeam again, and installation glass panel uses The method of stainless steel bolt pulling plug, stainless steel bolt is needed by calculating spacing arrangement, and the method is needed in outdoor completion Construction and installation, process is comparatively laborious, site operation efficiency is lower, and construction quality is not easy to control etc..
Utility model content
In order to solve the defect of the above-mentioned prior art, the purpose of the utility model is to provide a kind of assembly of glass curtain wall to tie Structure.
To achieve the above purpose, the technical solution of the present invention is:
A kind of glass curtain wall assembling structure, including columns assemblies and glass assembly,
The columns assemblies include column and sealing element, and the two sides of the column, which extend outwardly, is provided with extension, described Sealing element is set to the inside of the extension, and uniform intervals are provided with several location holes on the column;
The glass assembly includes that glass, glass outer surface described in secondary frame and spring catch are close to the sealing element and are set to institute State the two sides of column, the inner surface connection of the glass secondary frame, at least two positioning tubes being laterally arranged on the pair frame, The spring catch is set in the positioning tube, and the extension end of the spring catch in the positioning tube is connected in the location hole.
Further, the columns assemblies further include corner brace, and the corner brace is set to the column, for positioning simultaneously support The glass assembly
Further, the corner brace is connected through a screw thread, welds or snaps connection affixed with the column.
Further, the glass assembly further includes flexible cushion block, and the flexibility cushion block is set to the secondary frame and stands Between column, the flexibility cushion block is for buffering the secondary frame and column.
Further, the secondary frame is fixed together with the glass by structure gluing part.
Further, the extension is provided with the sealing card for installing the sealing element far from the end of the column Slot, the sealing element are sealing joint strip, and described sealing joint strip one end is limiting section, and the other end is wavy sealing, described Limiting section is arranged in the sealing card slot, and sealing joint strip is arranged on the extension.
Further, one end of column described in the positioning tube face is provided with the limit hole for the spring catch to be arranged, Location hole described in the limit hole face.
Further, the spring catch includes supporting piece, spring and fastener, and the supporting piece includes supporting piece main body and the first guiding Portion, the fastener include fastener main body, card division and the second guide part, and the supporting piece, spring and fastener are set gradually from the inside to surface In in the limit hole, the both ends of the spring is socketed on first guide part and the second guide part respectively and connects fastener and supporting piece It is connected together, the diameter of the card division is less than the diameter of fastener main body.
The beneficial effects of the utility model are: by the way that glass curtain wall structure is divided into columns assemblies and glass assembly, then lead to It crosses location hole, spring catch and sealing element set etc. glass curtain wall is quickly assembled together, stable structure and high-efficient; Meanwhile the assembling process of entire assembling structure can be completed indoors, not need crossbeam to be additionally arranged or by stainless steel spiral shell The method of bolt pulling plug installs glass curtain wall, and simpler convenience improves site operation efficiency, guarantee construction quality and construction Process is more environmentally protective.
Detailed description of the invention
Fig. 1 is a kind of transverse sectional view of glass curtain wall assembling structure of the utility model;
Fig. 2 is a kind of vertical cross-sectional of glass curtain wall assembling structure of the utility model;
Fig. 3 is a kind of structural schematic diagram of columns assemblies of the utility model;
Fig. 4 is a kind of structural schematic diagram of glass assembly of the utility model;
Fig. 5 is a kind of positive structure schematic of glass curtain wall assembling structure of the utility model;
Fig. 6 is a kind of structure schematic diagram of glass curtain wall assembling structure of the utility model;
Fig. 7 is a kind of structural scheme of mechanism of spring catch of the utility model;
Fig. 8 is a kind of method flow diagram of glass curtain wall assembly method of the utility model.
Specific embodiment
For the thought and purpose for illustrating the utility model, the utility model is done below in conjunction with the drawings and specific embodiments Further instruction.
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, fall within the protection scope of the utility model.
It is to be appreciated that the directional instruction (up, down, left, right, before and after etc.) of institute is only in the utility model embodiment For explaining in relative positional relationship, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, if When the particular pose changes, then directionality instruction also correspondingly changes correspondingly, and the connection, which can be, to be directly connected to, It is also possible to be indirectly connected with.
In addition, the description for being such as related to " first ", " second " in the present invention is used for description purposes only, and cannot manage Solution is its relative importance of indication or suggestion or the quantity for implicitly indicating indicated technical characteristic.Define as a result, " the One ", the feature of " second " can explicitly or implicitly include at least one of the features.In addition, the skill between each embodiment Art scheme can be combined with each other, but must be based on can be realized by those of ordinary skill in the art, when technical solution It will be understood that the combination of this technical solution is not present in conjunction with there is conflicting or cannot achieve when, also not in the utility model It is required that protection scope within.
Unless otherwise instructed, "/" herein represents meaning as "or".
Referring to Fig.1-7, one specific embodiment of the utility model proposes a kind of glass curtain wall assembling structure, including column group Part and glass assembly.
Columns assemblies include column 10 and sealing element 12, and the two sides of column 10, which extend outwardly, is provided with extension 11, sealing Part 12 is set to the inside of extension 11, and uniform intervals are provided with several location holes 15 on column 10.
Glass assembly includes that glass 21, secondary frame 26 and 24 glass of spring catch, 21 outer surface abutting sealing element 12 are set to column 10 two sides, the inner surface auxiliary connection frame 26 of glass 21, at least two positioning tubes 23 being laterally arranged on secondary frame 26, spring catch 24 It is set in positioning tube 23, the extension end of the spring catch 24 in positioning tube 23 is connected in location hole 15.
In actual production assembly, columns assemblies and glass assembly can be at the scene or in generation workshop or assembly vehicles Between assemble in advance, form independent mounting structure, further according to field demand, the columns assemblies of specified quantity and glass assembly transported It is defeated to scene, first interval install columns assemblies, then by assembled glass assembly from indoor assembly in two neighboring columns assemblies Between complete glass assembly assembly.
Specifically, columns assemblies further include corner brace 13, the side that corner brace 13 is set to column 10 is located at 15 lower section of location hole, When glass assembly is assembled to 10 side of column, corner brace 13 is used to position and the lower end surface of support glass assembly, guarantees glass Component is bonded on column 10, improves the mechanical strength of 21 curtain wall of glass.With further, corner brace 13 is high duty metal Structure is corner brace 13 made of aluminium alloy in this city embodiment, while column 10 is also for made of aluminium alloy.
Specifically, in the present embodiment, the quantity of 10 side location hole 15 of column is two, and it is corresponding, it is set on secondary frame 26 It sets there are two positioning tube 23, is provided with a spring catch 24 in each positioning tube 23.In another embodiment of the utility model, positioning The quantity in hole 15 is also possible to 3,4 or 5, and overall dimensions and intensity with specific reference to column 10 carry out adaptability setting.
Specifically, corner brace 13 be connected through a screw thread, weld or snap connection it is affixed with column 10.Pass through above-mentioned connection Mode is by the affixed side that column 10 is arranged in of corner brace 13, the corresponding glass assembly of support.In the present embodiment, corner brace 13 passes through spiral shell Nail is fixed on column 10.
With reference to Fig. 1, glass assembly further includes flexible cushion block 25, flexible cushion block 25 be set to secondary frame 26 and column 10 it Between, flexible cushion block 25 avoids secondary frame 26 and 10 rigid contact of column, damages when deformation occurs for buffering secondary frame 26 and column 10 The overall structure of 21 curtain wall of bad glass.
Specifically, secondary frame 26 is fixed together with glass 21 by structure gluing part 22.Structure gluing part 22 can be double Face glue or other structures that can be connected with two sides for connecting the inner surface and secondary frame 26 of glass 21 simultaneously, and pass through in turn Spring catch 24 on secondary frame 26 in positioning tube 23 realizes the location and installation of glass assembly.
Specifically, the extension 11 of the lateral surface of main body is provided with far from the end of column 10 for installing sealing element 12 Card slot 14 is sealed, sealing card slot 14 is arranged inwardly, and sealing element 12 is sealing joint strip, and sealing joint strip one end is limiting section, the other end For wavy sealing, limiting section is arranged in sealing card slot 14, sealing joint strip is arranged on extension 11.Sealing element 12 After being mounted in sealing card slot 14, wavy sealing is arranged inwardly, and after being packed into glass assembly, waveform sealing is tight 21 outer surface of glass is pasted, 21 surface of glass is sealed, wavy sealing forms multiple with 21 appearance face contact of glass Seal cavity guarantees the sealing performance between sealing element 12 and glass 21.
Specifically, one end of the positive column 10 of positioning tube 23 is provided with the limit hole for spring catch 24 to be arranged, limit hole is just To location hole 15.Spring catch 24 is ejected out of positioning tube 23 limit hole under the action of spring power, and is plugged in correspondence Location hole 15 in, the installation of glass assembly and columns assemblies is rapidly completed.
With reference to Fig. 7, spring catch 24 includes supporting piece 241, spring 242 and fastener 243, supporting piece 241 include 241 main body of supporting piece and First guide part, fastener 243 include 243 main body of fastener, card division and the second guide part, supporting piece 241, spring 242 and fastener 243 from In to being set in turn in limit hole outside, 242 both ends of spring are socketed on the first guide part and the second guide part for fastener 243 respectively It links together with supporting piece 241, the diameter of card division is less than the diameter of 243 main body of fastener.In use, the setting of supporting piece 241 is positioning Cylinder 23 most the inside, 241 main body of supporting piece resist the inner bottom surface of the positioning tube 23, and the second of the first guide part face fastener 243 is led It is arranged to portion, 242 both ends of spring are socketed on the first guide part and the second guide part respectively, and card division is arranged outwardly, in use, fastener 243 eject outward under the action of 242 elastic force of spring, and in the location hole 15 in alignment post 10, card division ejection is connected in In location hole 15, installation is completed.
Specifically, 15 diameter of location hole slightly smaller than limits bore dia, card division is connected in location hole 15,243 main body of fastener It is plugged in limit hole, the lateral dimension of card division is less than the lateral dimension of 243 main body of fastener, in this way can be to avoid
This programme by the way that glass curtain wall structure is divided into columns assemblies and glass assembly, then the location hole by setting, Glass curtain wall is quickly assembled together by spring catch and sealing element etc., stable structure and high-efficient;Meanwhile entire assembling structure Assembling process can complete indoors, do not need that crossbeam additionally is arranged or installed by the method for stainless steel bolt pulling plug Glass curtain wall, simpler convenience improve site operation efficiency, guarantee construction quality and work progress is more environmentally protective.
With reference to Fig. 8, the utility model also proposed a kind of assembly method of glass curtain wall assembling structure, based on as above implementation Glass curtain wall assembling structure described in example, comprising the following steps:
S1, sealing element 12 is pre-installed on the extension 11 of column 10 and forms columns assemblies, and columns assemblies are installed.
S2, according to the quantity of location hole 15 and position on column 10, secondary frame 26 is fixed in the inner surface of glass 21, form Glass assembly.
S3, the spring catch 24 in positioning tube 23 is connected on column 10 in corresponding location hole 15, completes 21 acts of glass The assembly of wall.
Columns assemblies are first carried out by the way that glass curtain wall structure is divided into columns assemblies and glass assembly for step S1-S3 It with the independent assembling of glass assembly, can carry out, can also be carried out in erecting bed, then pass through setting after the completion of factory process Good location hole, spring catch and sealing element etc. is by the quick molding assembly of glass curtain wall, stable structure and high-efficient.
Meanwhile the assembling process i.e. step S3 of this programme assembling structure can carry out indoors, without as existing peace Dress scheme is the same in outdoor progress, while also not needing that crossbeam additionally is arranged or being pacified by the method for stainless steel bolt pulling plug Glaze curtain wall, simpler convenience improve site operation efficiency, guarantee construction quality and the more green ring of work progress It protects.
The above is only the preferred embodiment of the present invention, and therefore it does not limit the scope of the patent of the utility model, Equivalent structure or equivalent flow shift made by using the description of the utility model and the drawings, is directly or indirectly transported Used in other related technical areas, it is also included in the patent protection scope of the utility model.

Claims (8)

1. a kind of glass curtain wall assembling structure, which is characterized in that including columns assemblies and glass assembly,
The columns assemblies include column and sealing element, and the two sides of the column, which extend outwardly, is provided with extension, the sealing Part is set to the inside of the extension, and uniform intervals are provided with several location holes on the column;
The glass assembly include glass, glass outer surface described in secondary frame and spring catch be close to the sealing element be set to it is described vertical The two sides of column, the inner surface of the glass connect the secondary frame, and at least two positioning tubes being laterally arranged on the pair frame are described Spring catch is set in the positioning tube, and the extension end of the spring catch in the positioning tube is connected in the location hole.
2. glass curtain wall assembling structure as described in claim 1, which is characterized in that the columns assemblies further include corner brace, institute It states corner brace and is set to the column, for positioning glass assembly described in simultaneously support.
3. glass curtain wall assembling structure as claimed in claim 2, which is characterized in that the corner brace is connected through a screw thread, welds, Or it snaps connection affixed with the column.
4. glass curtain wall assembling structure as described in claim 1, which is characterized in that the glass assembly further includes flexible pad Block, the flexibility cushion block are set between the secondary frame and column, and the flexibility cushion block is for buffering the secondary frame and column.
5. glass curtain wall assembling structure as described in claim 1, which is characterized in that the pair frame and the glass pass through structure Gluing part is fixed together.
6. glass curtain wall assembling structure as claimed in claim 5, which is characterized in that end of the extension far from the column Portion is provided with the sealing card slot for installing the sealing element, and the sealing element is sealing joint strip, and described sealing joint strip one end is Limiting section, the other end are wavy sealing, and the limiting section is arranged in the sealing card slot, and sealing joint strip setting is existed On the extension.
7. glass curtain wall assembling structure as described in claim 1, which is characterized in that one of column described in the positioning tube face End is provided with the limit hole for the spring catch to be arranged, location hole described in the limit hole face.
8. glass curtain wall assembling structure as claimed in claim 7, which is characterized in that the spring catch includes supporting piece, spring and Fastener, the supporting piece include supporting piece main body and the first guide part, and the fastener includes fastener main body, card division and the second guide part, The supporting piece, spring and fastener are set in turn in from the inside to surface in the limit hole, and the both ends of the spring is socketed on described respectively First guide part and the second guide part link together fastener and supporting piece, and the diameter of the card division is less than the straight of fastener main body Diameter.
CN201821705149.XU 2018-10-19 2018-10-19 Glass curtain wall assembling structure Active CN208996271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821705149.XU CN208996271U (en) 2018-10-19 2018-10-19 Glass curtain wall assembling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821705149.XU CN208996271U (en) 2018-10-19 2018-10-19 Glass curtain wall assembling structure

Publications (1)

Publication Number Publication Date
CN208996271U true CN208996271U (en) 2019-06-18

Family

ID=66804279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821705149.XU Active CN208996271U (en) 2018-10-19 2018-10-19 Glass curtain wall assembling structure

Country Status (1)

Country Link
CN (1) CN208996271U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057110A (en) * 2018-10-19 2018-12-21 深圳瑞和建筑装饰股份有限公司 Glass curtain wall assembling structure and assembly method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057110A (en) * 2018-10-19 2018-12-21 深圳瑞和建筑装饰股份有限公司 Glass curtain wall assembling structure and assembly method

Similar Documents

Publication Publication Date Title
CN109057110A (en) Glass curtain wall assembling structure and assembly method
CN206157959U (en) Dislocation type glass stone material combination formula curtain
CN208996271U (en) Glass curtain wall assembling structure
CN202990329U (en) Connection structure for interior decoration top surface expansion joints
CN108643426A (en) bright frame unit curtain wall system
CN206529948U (en) A kind of concealed frame glass curtain wall constructs system
CN218060908U (en) Vertical and horizontal component type unit curtain wall
WO2019137127A1 (en) Modular curtain wall system
CN210238848U (en) Green building energy-saving wall
CN203684471U (en) Upright pole structure in unit body curtain wall
CN202359944U (en) Vertically-hinged inward-tilt window structure of exposed frame glass curtain wall
CN209308243U (en) One kind is aobvious to erect hidden horizontal type frame glass curtain wall system
CN209429343U (en) A kind of plate-jointing structure of concealed frame glass curtain wall
CN212200937U (en) Multi-angle perforated plate with glass flying wings and glass combined curtain wall
CN208884785U (en) A kind of glass curtain wall connection structure
CN113152734A (en) Photovoltaic heat preservation integral type outer wall
CN203499067U (en) Non-uniplanar quadrilateral unit curtain wall
CN208701973U (en) Bright frame unit curtain wall system
CN203347084U (en) Glass auxiliary frame of energy-saving daylighting roof
CN203475735U (en) Seal shell of sunshade decoration plate
CN212200944U (en) Exposed frame upright post and hidden frame upright post general glass curtain wall structure
CN215367910U (en) Building construction outer wall heat preservation installation module frame
CN113605585B (en) Curtain wall composite upright post and installation method thereof
CN211572164U (en) Zigzag-shaped glass curtain wall switching structure
CN216810517U (en) Curtain wall splicing type small unit window installation node

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant