CN208982877U - Glue injection jig - Google Patents

Glue injection jig Download PDF

Info

Publication number
CN208982877U
CN208982877U CN201821690492.1U CN201821690492U CN208982877U CN 208982877 U CN208982877 U CN 208982877U CN 201821690492 U CN201821690492 U CN 201821690492U CN 208982877 U CN208982877 U CN 208982877U
Authority
CN
China
Prior art keywords
plate body
clamp plate
lower clamp
upper clamp
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821690492.1U
Other languages
Chinese (zh)
Inventor
庞平
李平
王鹏程
王宇
杨宝根
孙长龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Lianhai Petrochemical Group Co.,Ltd.
Original Assignee
Liaoning Lian Hai Petrochemical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Lian Hai Petrochemical Engineering Co Ltd filed Critical Liaoning Lian Hai Petrochemical Engineering Co Ltd
Priority to CN201821690492.1U priority Critical patent/CN208982877U/en
Application granted granted Critical
Publication of CN208982877U publication Critical patent/CN208982877U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to pipe technology field, more particularly to a kind of glue injection jig, for the special equipment of damaged pipeline reparation.Upper clamp plate body and lower clamp plate body fastening surround pipeline, and upper clamp plate body and lower clamp plate body both ends are sealed with band;The section of upper clamp plate body and lower clamp plate body is semicircle, flange is respectively set in the junction of upper clamp plate body and lower clamp plate body, open row's screw hole respectively on flange, gasket seal is set among the flange on the flange and lower clamp plate body on upper clamp plate body, to form closed greasing chamber by the way that conjunction bolt and nut is fastened.The utility model has the beneficial effects that avoiding the weld job on pipeline maintainance, maintenance activity risk is reduced;It is permanent to repair;Safe and simple method for maintaining is proposed for Special Corrosion point, breakdown point.

Description

Glue injection jig
Technical field
The utility model belongs to pipe technology field, more particularly to a kind of glue injection jig, for damaged pipeline reparation Special equipment.
Background technique
Country's petroleum pipeline mileage is long at present, and the pipeline performance time limit is long, runs in the pipeline performance of many years in this way Have found that there are many hot spots, breakdown point on pipeline in monitoring checking process, and some hot spots are by pipeline itself, pipeline week The influences such as side geological conditions can not carry out welding maintenance using routine maintenance method or conventional soldering method maintenance risk is big, to this Especially develop glue injection jig.
Utility model content
In order to solve above-mentioned technical problem, the utility model provides a kind of novel glue injection jig, can be effective Solving pipeline is influenced to use routine maintenance method that can not be welded by pipeline itself, pipeline periphery geological conditions etc. there are hot spot It connects maintenance or conventional soldering method safeguards the big problem of risk.
The technical solution adopted in the utility model is as follows:
A kind of glue injection jig, upper clamp plate body and lower clamp plate body fastening surround pipeline, upper clamp plate body and lower clamp plate body both ends It is sealed with band;The section of upper clamp plate body and lower clamp plate body is semicircle, is punished in the connection of upper clamp plate body and lower clamp plate body Not She Zhi flange, open row's screw hole respectively on flange, setting among flange on the flange and lower clamp plate body on upper clamp plate body Gasket seal to form closed greasing chamber by the way that conjunction bolt and nut is fastened.
Further, the top setting hanging ring of the upper clamp plate body and peep hole, hanging ring and upper clamp plate body pass through screw thread Connection, upper clamp plate body are realized by hanging ring and are lifted, screw down hanging ring after the completion of lifting than heavier;Peep hole is for observing Resin fills;Spaced set gap adjustment bolt on upper clamp plate body, gap adjustment bolt is for adjusting upper clamp plate body and pipeline Between gap.
Further, injected hole is arranged in the two sides setting lifting lug of the lower clamp plate body, bottom;It is equidistant on lower clamp plate body Gap adjustment bolt is set, and gap adjustment bolt is used to adjust the gap between lower clamp plate body and pipeline.
The following pipeline for having corrosion default is found in pipe-line maintenance maintenance process, for these corrosion default pipelines, we Pipe work is changed without large-scale Pipe Cutting, but proposes that, to pipeline rehabilitation reinforcement, glue injection jig uses steel sleeve, upper clamp plate body It surrounds the rear bolt nut on pipeline with lower clamp plate body to connect, two end side surfaces are sealed with band, gap adjustment bolt adjustment pipe The space in road and fixture, being screwed into back-out and adjust the gap of upper clamp plate body and lower clamp plate body by bolt, guarantees this gap Size is the same;Upper clamp plate body and lower clamp plate body realize lifting than heavier, by hanging ring and lifting lug;Fixture, pipeline, band Between cavity injection epoxy resin, ultimately form glue injection jig.
This epoxy resin have high toughness and bonding force, integral reinforcement structure can with pipeline cooperative transformation, together When can be fabulous transmitting defect point mechanical stress.
Non-solder reinforcement is carried out to in-service heavy caliber long range oil transportation gas corrosion pipeline, main cause is pipe pressurized state It is lower that using weld reinforcement, there are biggish risk for natural gas line.
The utility model has the beneficial effects that
1. avoiding the weld job on pipeline maintainance, maintenance activity risk is reduced;
2. permanent repair;
3. proposing safe and simple method for maintaining for Special Corrosion point, breakdown point.
Detailed description of the invention
Fig. 1 is the utility model glue injection jig main view.
Fig. 2 is the utility model glue injection jig left view.
In figure, 1 is hanging ring;2 be upper clamp plate body;3 is conjunction bolt and nuts;4 be gap adjustment bolt;5 be gasket seal; 6 be lifting lug;7 be lower clamp plate body;8 be band;9 be peep hole;10 be injected hole;11 be pipeline;12 be greasing chamber;13 be method It is blue.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings and examples.
Embodiment
A kind of glue injection jig, upper clamp plate body 2 and the fastening of lower clamp plate body 7 surround pipeline 11, upper clamp plate body 2 and lower clamp plate body 7 both ends are sealed with band 8;The section of upper clamp plate body 2 and lower clamp plate body 7 is semicircle, in upper clamp plate body 2 and lower clamp plate body 7 Junction flange 13 is respectively set, open row's screw hole, flange 13 and lower clamp plate body on upper clamp plate body 2 respectively on flange 13 Gasket seal 5 is set among the flange 13 on 7, by the way that the fastening of conjunction bolt and nut 3 is formed closed greasing chamber 12.
The top setting hanging ring 1 and peep hole 9, hanging ring 1 of the upper clamp plate body 2 are connected through a screw thread with upper clamp plate body 2, Upper clamp plate body 2 is realized by hanging ring 1 and is lifted, screw down hanging ring 1 after the completion of lifting than heavier;Peep hole 9 is for observing tree Rouge fills;Spaced set gap adjustment bolt 4 on upper clamp plate body 2, gap adjustment bolt 4 is for adjusting upper clamp plate body 2 and pipe Gap between road 11.
Injected hole 10 is arranged in the two sides setting lifting lug 6 of the lower clamp plate body 7, bottom;Lower clamp plate body 7 by lifting lug 6 into Row lifting, injected hole 10 carry out slip casting;Spaced set gap adjustment bolt 4 on lower clamp plate body 7, gap adjustment bolt 4 is used for Adjust the gap between lower clamp plate body 7 and pipeline 11.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and Retouching also should be regarded as the protection scope of the utility model.

Claims (3)

1. a kind of glue injection jig, it is characterised in that: upper clamp plate body (2) and lower clamp plate body (7) fasten and surround pipeline (11), upper folder Plate body (2) and lower clamp plate body (7) both ends are sealed with band (8);The section of upper clamp plate body (2) and lower clamp plate body (7) is semicircle Shape is respectively set flange (13) in the junction of upper clamp plate body (2) and lower clamp plate body (7), opens a row respectively on flange (13) Screw hole is arranged gasket seal (5) among the flange (13) on flange (13) and lower clamp plate body (7) on upper clamp plate body (2), passes through Conjunction bolt and nut (3) fastening is formed closed greasing chamber (12).
2. a kind of glue injection jig according to claim 1, it is characterised in that: the top of the upper clamp plate body (2) is arranged Hanging ring (1) and peep hole (9);Hanging ring (1) is connected through a screw thread with upper clamp plate body (2), detachably;First-class of upper clamp plate body (2) Away from setting gap adjustment bolt (4), gap adjustment bolt (4) is used to adjust the gap between upper clamp plate body (2) and pipeline (11).
3. a kind of glue injection jig according to claim 1, it is characterised in that: the two sides of the lower clamp plate body (7) are arranged Lifting lug (6), bottom setting injected hole (10);Spaced set gap adjustment bolt (4) on lower clamp plate body (7), gap adjust spiral shell Bolt (4) is used to adjust the gap between lower clamp plate body (7) and pipeline (11).
CN201821690492.1U 2018-10-18 2018-10-18 Glue injection jig Active CN208982877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821690492.1U CN208982877U (en) 2018-10-18 2018-10-18 Glue injection jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821690492.1U CN208982877U (en) 2018-10-18 2018-10-18 Glue injection jig

Publications (1)

Publication Number Publication Date
CN208982877U true CN208982877U (en) 2019-06-14

Family

ID=66787983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821690492.1U Active CN208982877U (en) 2018-10-18 2018-10-18 Glue injection jig

Country Status (1)

Country Link
CN (1) CN208982877U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109027510A (en) * 2018-10-18 2018-12-18 辽宁联海石油化工工程有限公司 Glue injection jig

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109027510A (en) * 2018-10-18 2018-12-18 辽宁联海石油化工工程有限公司 Glue injection jig

Similar Documents

Publication Publication Date Title
CN204183172U (en) A kind of hood type round steel pipe docking adjustment fixture
CN204677934U (en) A kind of novel alloy flange
CN205393883U (en) H shaped steel equipment fixture
CN201828463U (en) Hydraulic testing device of pipeline
CN109027510A (en) Glue injection jig
CN208982877U (en) Glue injection jig
CN203756982U (en) Triangular ring sealing gasket and loose joint adopting triangular ring sealing gasket
CN205908918U (en) Self compensating sealing connection pipe connects
CN205684968U (en) A kind of pipeline assembly welding docking aid
CN206592702U (en) A kind of sealing device of the nitrogen charging mouth of pipe
CN208847417U (en) A kind of portable pipe package seal checker
CN204717172U (en) Valve and pipeline connecting head
CN203948826U (en) A kind of prefabricated direct-buried thermal insulation pipe being connected by connection pipe fitting
CN109604923A (en) Spot welding contra-aperture device and counterpart method for pipe aligning welding
CN206130393U (en) Bend for oil drilling and oil exploitation
CN201680113U (en) Metal coated compensator
CN108087657A (en) A kind of sea-bottom oil-gas pipeline fixture
CN203992977U (en) A kind of pipe butt joint apparatus that improves pipe string quality
CN201517668U (en) Pipe connecting structure
CN209688342U (en) Insulating joint plugging device
CN103115220A (en) 3PE antiseptic steel pipe flange connection method
CN208322566U (en) A kind of flange welding centering clamp
CN208831927U (en) High-temperature high-pressure corrosion resisting cartridge connection flange
CN205424248U (en) Removable bellows safety cover
CN204010895U (en) A kind of novel transformer heat radiator fixing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 110141 No.2 Yongxing street, Yuhong District, Shenyang City, Liaoning Province

Patentee after: Liaoning Lianhai Petrochemical Group Co.,Ltd.

Address before: 110141 No.2 Yongxing street, Yuhong District, Shenyang City, Liaoning Province

Patentee before: LIAONING LIANHAI PETROCHEMICAL ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder