CN208979919U - Finished product bin and the drying materials production line for using the finished product bin - Google Patents

Finished product bin and the drying materials production line for using the finished product bin Download PDF

Info

Publication number
CN208979919U
CN208979919U CN201821614310.2U CN201821614310U CN208979919U CN 208979919 U CN208979919 U CN 208979919U CN 201821614310 U CN201821614310 U CN 201821614310U CN 208979919 U CN208979919 U CN 208979919U
Authority
CN
China
Prior art keywords
dump skip
discharging machine
finished product
machine
discharging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821614310.2U
Other languages
Chinese (zh)
Inventor
崔刘勇
罗刚银
薛艳芳
赵高威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Dingli New Energy Technology Co Ltd
Original Assignee
Zhengzhou Dingli New Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Dingli New Energy Technology Co Ltd filed Critical Zhengzhou Dingli New Energy Technology Co Ltd
Priority to CN201821614310.2U priority Critical patent/CN208979919U/en
Application granted granted Critical
Publication of CN208979919U publication Critical patent/CN208979919U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

The utility model relates to a kind of finished product bin and use the drying materials production line of the finished product bin, finished product bin includes feed bin ontology, first discharging machine, feed bin ontology includes bracket and the warehouse that is arranged on the upside of bracket, warehouse has the cavity of storage material, there is the feeding inlet docked with elevator above warehouse, warehouse lower part is equipped with dump skip, dump skip is connected to cavity, first discharging machine includes the first auger, first discharging machine is pierced by from dump skip, the effective feeding length of first discharging machine being located in dump skip is consistent with dump skip length, dump skip along its length on section be rectangle, the section perpendicular to its length direction of dump skip is V-shaped, the bottom of dump skip is arc panel, the left plate and right side plate of dump skip are excessively connected respectively at the two sides of arc panel, the angle of left plate and right side plate is 55 °~6 5 °.The structure of the finished product bin designs, and discharging efficiency can be improved, and then improve production efficiency.

Description

Finished product bin and the drying materials production line for using the finished product bin
Technical field
The utility model relates to drying materials technical fields, and in particular to a kind of finished product bin and use the finished product bin Drying materials production line.
Background technique
There are a large amount of dregs of a decoction to need to handle every year, it is a worldwide problem that the biomass comprehensives such as dregs of a decoction, which utilize, domestic at present The dregs of a decoction largely do landfill disposal, small part is used as feed and fertilizer, thus the environment such as serious sewage and smell is caused to ask Topic, the other part dregs of a decoction belong to hazardous waste.In view of the secondary hazards to environment and to the corrosion-damaged of equipment and investment etc. Comprehensive aspect, the gasification gas making of the biomass such as dregs of a decoction, heating, power generation are the technique for more reasonably handling the dregs of a decoction.
The economic benefit of Chinese medicine slag recycling processing and utilization is significantly, to be not only only that Chinese medicine slag granular fuel or wet Material, it is equally effective simultaneously for planting industry.Sorted Chinese medicine slag is processed into cultivated soil by crushing the series such as drying fermentation, uses Chinese medicine slag cultivated soil cultivated mushroom, Various Seasonal are planted using different Chinese medicine slags, improve the mouthfeel of mushroom, enhance mushroom Trophism, income are taken on a new look quickly.And the realization plantation of scale needs to realize the machinery of Chinese medicine slag recycling processing It is turned into industry, Chinese medicine slag dryer is exactly the important equipment for realizing the purification mechanization of dregs of a decoction solid matter content.Material first tentatively removes Then water is crushed machine and crushes, after the processes such as drying, dedusting, discharging, into finished product bin, is then packaged or agglomerates again Processing.However, the structure of finished product bin makes discharge low efficiency.
Utility model content
The purpose of the utility model is to provide a kind of finished product bin, the problem of to optimize its structure, improve discharge low efficiency. The utility model also provides a kind of drying materials production line using the finished product bin simultaneously.
To achieve the above objectives, the present invention adopts the following technical solutions: finished product bin, including feed bin ontology, first Discharging machine, feed bin ontology include bracket and the warehouse that is arranged on the upside of bracket, and warehouse has the cavity of storage material, tool above warehouse There is the feeding inlet docked with elevator, warehouse lower part is equipped with dump skip, and dump skip is connected to cavity, and the first discharging machine is auger Formula, the first discharging machine include the first auger, and the first discharging machine is pierced by from dump skip, before the axis direction of the first auger of definition is Rear direction, the length direction of dump skip are also front-rear direction, the effective feeding length of the first discharging machine being located in dump skip with Dump skip length is consistent, dump skip along its length on section be rectangle, dump skip perpendicular to its length direction Section is V-shaped, and the bottom of dump skip is arc panel, and the left plate and right side plate of dump skip excessively connect respectively at the two sides of arc panel It connecing, the angle of left plate and right side plate is 55 °~65 °, and the first discharging machine is close to setting on the inside of the arc panel of dump skip bottom, the The discharge port of one discharging machine is located at the outside of dump skip.
Further, first auger is driven by driving mechanism, and driving mechanism includes motor, transmission chain, the first auger The one end being located at outside dump skip be equipped with sprocket wheel, motor is arranged on the shell of the first discharging machine.
Further, the discharging mouth down setting, discharge port are formed by discharge tube, and discharge tube lower end is used for and cuber Feed inlet docking.
Further, first discharging machine further includes shell, and shell is provided only on the outside of dump skip.
The utility model drying materials production line adopts the following technical scheme that drying materials production line, including roller drying Machine, the second discharging machine, elevator, finished product bin, the second discharging machine are located at the discharge end of roller drying machine with the object after drying Material is delivered at elevator, and for elevator for the material to be delivered in finished product bin, finished product bin includes feed bin ontology, the One discharging machine, feed bin ontology include bracket and the warehouse that is arranged on the upside of bracket, and warehouse has a cavity of storage material, above warehouse With the feeding inlet docked with elevator, warehouse lower part is equipped with dump skip, and dump skip is connected to cavity, and the first discharging machine is auger Formula, the first discharging machine include the first auger, and the first discharging machine is pierced by from dump skip, before the axis direction of the first auger of definition is Rear direction, the length direction of dump skip are also front-rear direction, the effective feeding length of the first discharging machine being located in dump skip with Dump skip length is consistent, dump skip along its length on section be rectangle, dump skip perpendicular to its length direction Section is V-shaped, and the bottom of dump skip is arc panel, and the left plate and right side plate of dump skip excessively connect respectively at the two sides of arc panel It connecing, the angle of left plate and right side plate is 55 °~65 °, and the first discharging machine is close to setting on the inside of the arc panel of dump skip bottom, the The discharge port of one discharging machine is located at the outside of dump skip.
Further, the discharging mouth down setting, discharge port are formed by discharge tube, and discharge tube lower end is used for and cuber Feed inlet docking.
Further, first discharging machine further includes shell, and shell is provided only on the outside of dump skip.
Further, the drying materials production line further includes cyclone dust collectors, the air inlet and roller of cyclone dust collectors The air hose of dryer discharge end connects, and cyclone dust collectors are connected with air-introduced machine, and the feed opening of cyclone dust collectors is located at the second discharging Above machine.
Further, the drying materials production line further includes cuber, belt feeder, and cuber is located at first discharging Below the discharge port of machine, the discharge port of cuber is located at the top of belt feeder one end, and the material that belt feeder is used to be pressed into block is defeated It sees off.
The utility model has the beneficial effects that the finished product bin of the utility model, including warehouse and is arranged in warehouse lower part Dump skip is coated with the first discharging machine in dump skip.The bottom of dump skip is arc panel, the left plate and right side plate point of dump skip It is not connected excessively in the two sides of arc panel, the angle of left plate and right side plate is 55 °~65 °, and the first discharging machine is close to dump skip Setting on the inside of the arc panel of bottom.The left plate of dump skip, right side plate, bottom arc panel, can integrated bending forming, be convenient for Production, has tilt angle, is also convenient for blanking.Dump skip is not only convenient for blanking, and material can more sufficiently with the first discharging machine Auger contact, improve discharging efficiency.Meanwhile first discharging machine be located at dump skip in effective feeding length and dump skip it is long Degree is consistent, also improves discharging efficiency.Further, the production efficiency of production line is improved.
Detailed description of the invention
Fig. 1 is the overlooking structure diagram of the utility model drying materials production line;
Fig. 2 is the side view of the utility model drying materials production line;
Fig. 3 is the structural schematic diagram of the finished product bin in Fig. 1;
Fig. 4 is the schematic diagram of another angle of finished product bin;
Fig. 5 is the enlarged drawing in Fig. 3 at F.
Corresponding title: 1, quirk, 2, charger, 3, roller drying machine, 4, air-introduced machine, the 5, second discharging are respectively marked in figure Machine, 6, cyclone dust collectors, 7, elevator, 8, finished product bin, 9, cuber, 10, belt feeder, 81, warehouse, 82, dump skip, 83, First discharging machine, 84, motor, 831, discharge port, 821, left plate, 822, right side plate.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art's every other embodiment obtained, all belongs to In the range of the utility model protection.
The embodiment of the utility model drying materials production line: as Figure 1-Figure 5, drying materials production line, including rolling Cylinder drier 3, the second discharging machine 5, cyclone dust collectors 6, elevator 7, finished product bin 8, cuber 9, belt feeder 10.Roller drying Machine is the prior art, and drying roller periphery is equipped with gear ring 31, and drying roller is by motor, speed reducer and gear drive band It is dynamic.The front end of roller drying machine 3 is connected with quirk 1, by corresponding hot stove heat supply.The axis direction of drying roller is defined as a left side Right direction.The front end of roller drying machine is additionally provided with the charger 2 of auger type, for material to be dried to be delivered to drying roller It is interior.
Second discharging machine 5 be located at the discharge end of roller drying machine with by drying after material be delivered at elevator 7, second Discharging machine 5 is obliquely installed, and axis is along the longitudinal direction.Second discharging machine 5 is also auger type discharging machine.Elevator 7 is used for object Material is delivered in finished product bin 8.Finished product bin 8 includes feed bin ontology, the first discharging machine, and feed bin ontology includes that bracket and setting exist Warehouse 81 on the upside of bracket, warehouse 81 have the cavity of storage material.Have to enter with what the delivery end of elevator 7 docked above warehouse Material mouth.81 lower part of warehouse is equipped with dump skip 82, and dump skip 82 is connected to cavity.First discharging machine 83 is auger type, the first discharging Machine 83 includes shell, the first auger, and the first discharging machine is pierced by from dump skip, first be located in dump skip shown in Fig. 4 Discharging machine part should can't see, and for ease of understanding, be shown.The axis direction for defining the first auger is front and back To.The length direction of dump skip 82 is also front-rear direction, dump skip 82 along its length on section be rectangle, dump skip The section perpendicular to its length direction it is V-shaped.The effective feeding length being located in dump skip and dump skip of first discharging machine Length is consistent, so that the first auger is contacted with more materials, improves material and transfers efficiency.The bottom of dump skip is arc panel, is unloaded The left plate 821 of hopper is excessively connect with right side plate 822 respectively at the two sides of arc panel, the folder of left plate 821 and right side plate 822 Angle is 60 °.First discharging machine is close to setting, the discharge port of the first discharging machine on the inside of the arc panel of dump skip bottom and is located at dump skip Outside.
The shell of first discharging machine 83 is provided only on the outside of dump skip.Discharge port 831 is located on shell, discharge port 831 It is arranged downward, discharge port is formed by discharge tube, and discharge tube lower end with the feed inlet of cuber for docking.
First auger is driven by driving mechanism, and driving mechanism includes motor 84, transmission chain, and the first auger is located at dump skip External one end is equipped with sprocket wheel, and motor 84 is arranged on the shell of the first discharging machine.
The air inlet of cyclone dust collectors 6 is connect with the air hose of roller drying machine discharge end, the feed opening position of cyclone dust collectors 6 Above the second discharging machine 5.Cyclone dust collectors 6 are connected with air-introduced machine 4, and under the action of air-introduced machine 4, dust and exhaust gas are through overwinding The air outlet of wind deduster is discharged, and a small amount of material filtered down is fallen on the second discharging machine 5.
Cuber 9 is located at below the discharge port of the first discharging machine, and the discharge port of cuber 9 is located at the upper of 10 one end of belt feeder Side, belt feeder 10 is for the material for being pressed into block to be transported away.Cuber is the prior art.
The drying production line of the present embodiment can not only dry dregs of a decoction material, it can also be used to the materials such as sawdust.
In other embodiments, the left plate of dump skip, the angle of right side plate can be 55 ° or 65 °.
The embodiment of the utility model finished product bin, in the structure of finished product bin and above-mentioned drying production line embodiment at Product feed bin is identical, is no longer described in detail.

Claims (9)

1. finished product bin, it is characterised in that: including feed bin ontology, the first discharging machine, feed bin ontology includes that bracket and setting are being propped up Warehouse on the upside of frame, warehouse have the cavity of storage material, have the feeding inlet docked with elevator above warehouse, warehouse lower part is set There is dump skip, dump skip is connected to cavity, and the first discharging machine is auger type, and the first discharging machine includes the first auger, the first discharging Machine is pierced by from dump skip, and the axis direction for defining the first auger is front-rear direction, and the length direction of dump skip is also front and back To the effective feeding length of the first discharging machine being located in dump skip is consistent with dump skip length, the side along its length of dump skip Upward section is rectangle, and the section perpendicular to its length direction of dump skip is V-shaped, and the bottom of dump skip is arc panel, is unloaded The left plate and right side plate of hopper are excessively connected respectively at the two sides of arc panel, and the angle of left plate and right side plate is 55 °~ 65 °, the first discharging machine is close to setting on the inside of the arc panel of dump skip bottom, and the discharge port of the first discharging machine is located at the outer of dump skip Side.
2. finished product bin according to claim 1, it is characterised in that: first auger is driven by driving mechanism, driving Mechanism includes motor, transmission chain, and the one end of the first auger being located at outside dump skip is equipped with sprocket wheel, and motor setting is in the first discharging On the shell of machine.
3. finished product bin according to claim 1, it is characterised in that: the discharging mouth down setting, discharge port is by discharging Cylinder is formed, and discharge tube lower end with the feed inlet of cuber for docking.
4. finished product bin according to claim 1, it is characterised in that: first discharging machine further includes shell, and shell is only The outside of dump skip is set.
5. drying materials production line, it is characterised in that: including roller drying machine, the second discharging machine, elevator, finished product bin, Two discharging machines are located at the discharge end of roller drying machine so that the material after drying to be delivered at elevator, and elevator is used for will be described Material is delivered in finished product bin, and finished product bin includes feed bin ontology, the first discharging machine, and feed bin ontology includes that bracket and setting exist Warehouse on the upside of bracket, warehouse have the cavity of storage material, have the feeding inlet docked with elevator, warehouse lower part above warehouse Equipped with dump skip, dump skip is connected to cavity, and the first discharging machine is auger type, and the first discharging machine includes the first auger, and first goes out Material machine is pierced by from dump skip, and the axis direction for defining the first auger is front-rear direction, and the length direction of dump skip is also front and back The effective feeding length being located in dump skip in direction, the first discharging machine is consistent with dump skip length, and dump skip is along its length Section on direction is rectangle, and the section perpendicular to its length direction of dump skip is V-shaped, and the bottom of dump skip is arc panel, The left plate and right side plate of dump skip are excessively connected respectively at the two sides of arc panel, and the angle of left plate and right side plate is 55 °~ 65 °, the first discharging machine is close to setting on the inside of the arc panel of dump skip bottom, and the discharge port of the first discharging machine is located at the outer of dump skip Side.
6. drying materials production line according to claim 5, it is characterised in that: the discharging mouth down setting, discharge port It is formed by discharge tube, discharge tube lower end with the feed inlet of cuber for docking.
7. drying materials production line according to claim 5, it is characterised in that: first discharging machine further includes shell, Shell is provided only on the outside of dump skip.
8. drying materials production line according to claim 5, it is characterised in that: the drying materials production line further includes rotation The air inlet of wind deduster, cyclone dust collectors is connect with the air hose of roller drying machine discharge end, and cyclone dust collectors are connected with air inducing Machine, the feed opening of cyclone dust collectors are located above the second discharging machine.
9. drying materials production line according to claim 8, it is characterised in that: the drying materials production line further includes pressure Block machine, belt feeder, cuber are located at below the discharge port of first discharging machine, and the discharge port of cuber is located at belt feeder one end Top, belt feeder is for the material for being pressed into block to be transported away.
CN201821614310.2U 2018-09-30 2018-09-30 Finished product bin and the drying materials production line for using the finished product bin Expired - Fee Related CN208979919U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821614310.2U CN208979919U (en) 2018-09-30 2018-09-30 Finished product bin and the drying materials production line for using the finished product bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821614310.2U CN208979919U (en) 2018-09-30 2018-09-30 Finished product bin and the drying materials production line for using the finished product bin

Publications (1)

Publication Number Publication Date
CN208979919U true CN208979919U (en) 2019-06-14

Family

ID=66786344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821614310.2U Expired - Fee Related CN208979919U (en) 2018-09-30 2018-09-30 Finished product bin and the drying materials production line for using the finished product bin

Country Status (1)

Country Link
CN (1) CN208979919U (en)

Similar Documents

Publication Publication Date Title
CN208098207U (en) A kind of crushing device for building waste
CN108702952A (en) A kind of removal of impurities of stalk, broken and drying integral machine
CN203726868U (en) Smashing and forming system for straw-type biomass
CN206747250U (en) A kind of blast furnace dedusting ash recycling system
CN211570430U (en) Domestic sludge dewatering processing system
CN206262971U (en) A kind of waste edible fungus material processing device
CN207013435U (en) Domestic solid garbage integrated treatment screening installation
CN208979919U (en) Finished product bin and the drying materials production line for using the finished product bin
CN211613795U (en) Garbage collection device for multi-use architecture construction
CN209631304U (en) Afforest waste treatment apparatus
CN207138491U (en) Food waste treatment equipment
CN202968336U (en) Multilayer running hot air drying device
CN110918594A (en) Full-automatic biomass renewable fuel forming device
CN216308526U (en) Multipurpose drying device
CN202059965U (en) Band dryer
CN205874182U (en) Sludge drying device
CN111992570B (en) Large kitchen garbage disposer
CN108715509A (en) A kind of hot pump in low temp sludge drier
CN205112471U (en) Biomass fuel briquetting machine
CN206018683U (en) A kind of heating furnace of energy-conservation
CN208832956U (en) Potato high moisture material second drying apparatus
CN208962543U (en) A kind of stalk briquette processing equipment
CN207596804U (en) A kind of sketch plate production and waste utilization production line
CN207002596U (en) A kind of useless dish leaf recycle device
CN106622607A (en) Intelligent movable straw smashing and extrusion-blocking integrated machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190614

Termination date: 20190930

CF01 Termination of patent right due to non-payment of annual fee