CN208949833U - Combined integrated slope protection - Google Patents

Combined integrated slope protection Download PDF

Info

Publication number
CN208949833U
CN208949833U CN201821468551.0U CN201821468551U CN208949833U CN 208949833 U CN208949833 U CN 208949833U CN 201821468551 U CN201821468551 U CN 201821468551U CN 208949833 U CN208949833 U CN 208949833U
Authority
CN
China
Prior art keywords
brick body
fixing seat
cuboid
brick
slope protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821468551.0U
Other languages
Chinese (zh)
Inventor
褚春播
华元帅
谭伟杰
高远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yuheyuan Water Construction Co ltd
Original Assignee
Beijing Mentougou Water Conservancy Project Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Mentougou Water Conservancy Project Co Ltd filed Critical Beijing Mentougou Water Conservancy Project Co Ltd
Priority to CN201821468551.0U priority Critical patent/CN208949833U/en
Application granted granted Critical
Publication of CN208949833U publication Critical patent/CN208949833U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of combined integrated slope protections, belong to side slope protection field, technical points include being formed by slope protection by several brick bodies piled up in length and breadth, brick body is domed, the arc both ends of brick body are respectively arranged with outwardly directed cuboid fixing seat, the both ends of the length direction of cuboid fixing seat are located at the centerline parallel of the center line of the rear and front end of brick body and cuboid fixing seat and the left and right ends of brick body, it is connected between adjacent brick body by cuboid fixing seat, opposite cuboid fixing seat upper surface and lower surface fit and are fixed between cuboid fixing seat by fixing bolt in adjacent brick body, the through-hole passed through for fixing bolt is offered in cuboid fixing seat, a guiding gutter is formed between adjacent two transversely arranged brick bodies.It mutually overlaps between its brick body, and is fixed by fixing bolt, improve the globality and stability of slope protection, while self-assembling formation guiding gutter, flow down water from guiding gutter.

Description

Combined integrated slope protection
Technical field
The utility model relates to side slope protection field, in particular to a kind of combined integrated slope protection.
Background technique
The protecting slope of dam such as safety in reservoir dam slope protection or river, lake bank-protection works is directly related to the flood control peace of engineering Entirely, it is the major issue of national economy, is always highly valued.In hydraulic engineering, especially earth and rockfill dam reservoir upstream side slope revetment, Special slope protection should be set when according to design specification requirement dam surface being the materials such as soil, sand, sand gravel.Currently, common both at home and abroad protect Shelving formula has jackstone, loose stone, stone masonry, concrete slab, bituminous concrete plate etc..No matter technically must using which kind of form The technical security of the shock of wave scour, longitudinal dike current scour, floating material and ice sheet must be met and frozen extruding, freeze thawing resistance is wanted It asks.
Past common loose stone, stone masonry slope protection have the disadvantage in that (1) block stone material is restricted (especially flat Original area), investment is big;(2) construction quality is not easily controlled;(3) presentation quality is poor.European and American developed countries are from the 1980s Start, uses slop protection material of the concrete segment as dykes and dams and shore protection more and more.
Compared with traditional pitched work, concrete segment is beautiful, small to environmental disruption with shape rule, is easy to mechanical The advantages that change is constructed, construction quality is easy to control.Meanwhile the adaptability that concrete segment deforms levee body is also superior to concrete slab. Therefore, building stones source it is deficient or because environmental grounds cannot be exploited, ground may have obvious deformation in the case where, using concrete Building block is a kind of preferable selection as bank slope pavement structure.But when concrete segment is as bank slope bank protection structure, concrete is built Block is easy to slide, therefore causes bank slope bank protection structure unstable.
Utility model content
It the purpose of this utility model is to provide a kind of combined integrated slope protection, is mutually overlapped between brick body, and by solid Determine bolt to fix, improves the globality and stability of slope protection, while self-assembling formation guiding gutter, flow down water from guiding gutter.
The above-mentioned technical purpose of the utility model has the technical scheme that
A kind of combined integrated slope protection, including being formed by slope protection by several brick bodies piled up in length and breadth, brick body is domed, brick body Arc both ends be respectively arranged with it is outwardly directed and with the integrally formed cuboid fixing seat of brick body, the length of cuboid fixing seat The both ends in degree direction are located in the rear and front end and the center line of cuboid fixing seat and the left and right ends of brick body of brick body Heart line is parallel, is connected between adjacent brick body by cuboid fixing seat, in adjacent brick body in opposite cuboid fixing seat Surface and lower surface fit to form a cuboid, are fixed between cuboid fixing seat by fixing bolt, rectangular The through-hole passed through for fixing bolt is offered in body fixing seat, and a guiding gutter is formed between adjacent two transversely arranged brick bodies.
By using above-mentioned technical proposal, adjacent two pieces of cuboid fixing seat is fixed by fixing bolt, thus Improve slope protection entirety globality and stability, by forming guiding gutter between adjacent brick body, thus make water along guiding gutter from It is flowed down on slope protection.
The utility model is further arranged to: brick body includes in the arc section of arc-shaped and positioned at the perpendicular of arc section both ends Straight downward vertical section, cuboid fixing seat are arranged in vertical section.
By using above-mentioned technical proposal, by being arranged cuboid fixing seat in vertical section, so that cuboid be made to consolidate When docking, vertical section limits the cuboid fixing seat in adjacent brick body, to make at adjacent two pieces for reservation Brick body can be aligned when overlap joint, and brick body is avoided the situation of skew occur.
The utility model is further arranged to: cuboid fixed seating is in one end of vertical section connection arc section, cuboid The height with a thickness of vertical section half, in transversely arranged brick body, between any two adjacent brick bodies, one of brick body Upward, downward, to make two pieces of adjacent brick bodies are positive and negative to be staggered, guiding gutter is upper for the upper surface of another piece of brick body for upper surface Arc section in the brick body of table placed face down is formed.
By using above-mentioned technical proposal, by being staggered adjacent brick body is positive and negative, to make oppositely positioned brick The arc section of body forms guiding gutter, flows down water along guiding gutter.
The utility model is further arranged to: the cuboid fixing seat at brick body arc both ends, one of to be located therein one One end that a vertical section is connected with arc section, the other end is located at the one end of another vertical section far from arc section, transversely arranged In brick body, two pieces of adjacent equal upper surfaces of brick body upward, are located at the upper rectangular of cuboid fixing seat between adjacent brick body At guiding gutter.
By using above-mentioned technical proposal, placed by two pieces of adjacent brick body forward directions, to make the circle of adjacent two brick body A guiding gutter is formed between segmental arc, flows down water along guiding gutter.
The utility model is further arranged to: the end positioned at brick body rear and front end of cuboid fixing seat, wherein one end Upper surface offer concave station, other end end is provided with outwardly directed boss, the shape and size phase of boss and concave station Match.
By using above-mentioned technical proposal, by the cooperation of boss and boss, so that the brick body of tandem docking be made to carry out The limitation of position is less prone to dislocation movement to guarantee the brick body front and back alignment of longitudinal arrangement.
The utility model is further arranged to: the shape of boss and concave station is rectangle.
By using above-mentioned technical proposal, by the way that boss and concave station are designed as rectangle, to cooperate in boss and concave station When, it will not shake between boss and concave station, to guarantee concordant between the brick body of front and back.
The utility model is further arranged to: through-hole is located at the center position of the table top of boss and the bottom end of concave station.
By using above-mentioned technical proposal, by the way that through-hole to be provided on concave station and boss, so that a fixing bolt be made Four pieces of brick bodies are fixed, guarantee the globality and stability of slope protection.
The utility model is further arranged to: the thickness of boss and the depth of concave station are cuboid fixing seat thickness Half.
By using above-mentioned technical proposal, the thickness of boss and concave station is the half of cuboid fixing seat thickness, is avoided Concave station or boss occurs when in use in slope protection, and one of them because of excessively thin causes fragmentation.
In conclusion the utility model has the following beneficial effects:
1, adjacent arch brick body is fixed by cuboid fixing seat, to guarantee the stability of slope protection, simultaneously Water is flowed down along guiding gutter by the guiding gutter of formation;
2, by be arranged boss and concave station cooperation, thus guarantee file arrangement brick body between can be aligned;
3, by the way that through-hole to be provided on boss and concave station, to make a bolt while fix four pieces of brick bodies, further Guarantee the stability and globality of slope protection.
Detailed description of the invention:
Fig. 1 is the isometric view of embodiment 1;
Fig. 2 is that overlapped the front and back of embodiment 1 schematic diagram;
Fig. 3 is overlapped the schematic diagram of embodiment 1 or so;
Fig. 4 is that overlapped 1 front, rear, left and right of embodiment schematic diagram;
Fig. 5 is the isometric view of embodiment 2;
Fig. 6 is that overlapped 2 front, rear, left and right of embodiment schematic diagram.
In figure, 1, brick body;11, arc section;12, vertical section;13, brick body front end face;14, brick body rear end face;2, cuboid Fixing seat;21, concave station;22, boss;23, first through hole;24, the second through-hole.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.The wherein identical attached drawing of identical components Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to It is the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and "outside" are referred respectively to towards or away from particular elements geometry The direction at center.
Embodiment 1, a kind of combined integrated slope protection, as shown in Figure 1, slope protection is made of several brick bodies 1 piled up in length and breadth.Brick body 1 is domed, forms including the arc section 11 in arc-shaped and the vertical section 12 straight down positioned at 11 both ends of arc section, Middle arc section 11 is integrally formed with vertical section 12.Arch end face positioned at 1 two sides of brick body is respectively the brick body front end face 13 of brick body 1 With brick body rear end face 14.The outer surface of 1 protrusion of brick body is the upper surface of brick body 1, and interior surface is the lower surface of brick body 1.? Be respectively arranged with the outwardly directed cuboid fixing seat 2 being laterally arranged in the vertical section 12 of brick body 1, cuboid fixing seat 2 with Vertical section 12 is integrally formed.The both ends of 2 length direction of cuboid fixing seat are located at the rear and front end of brick body 1 and cuboid is solid The centerline parallel of the left and right ends of the center line and brick body of reservation 2.
Cuboid fixing seat 2 be located at vertical section 12 connect arc section 11 one end, wherein cuboid fixing seat 2 with a thickness of The half of the height of vertical section 12.It is provided in cuboid fixing seat 2 close to one end upper surface of the brick body front end face 13 of brick body 1 The concave station 21 of rectangle, wherein the depth of concave station 21 is the half of the height of cuboid fixing seat 2.At the center of the bottom surface of concave station 21 The first through hole 23 through 21 bottom end of concave station is offered at position.
One end in cuboid fixing seat 2 close to brick body rear end face 14 is provided with 14 table of brick body rear end face from brick body 1 The boss 22 that face is stretched out, wherein boss 22 and the shape of cuboid fixing seat 2 match.And the height of boss 22 is solid for cuboid The half of the height of reservation 2.The second through-hole 24 through table top is provided on the table top of boss 22, the second through-hole 24 is located at convex The center of the table top of platform 22.
As shown in Fig. 2, adjacent 1 file of brick body is arranged when stacking, before the wherein brick body of underlying brick body 1 End face 13 and the brick body rear end face 14 for the brick body 1 being located above fit.The boss 22 being located above in brick body 1, which is extend into, to be located at On concave station 21 in lower section brick body 1, and the axis for the second through-hole 24 being located on concave station 21 and first on boss 22 are logical The axis in hole 23 is located along the same line.
As shown in Figure 3, Figure 4, when adjacent brick body 1 is piled up side by side.It is one of in two pieces of adjacent brick bodies 1 Upward, the upper surface of another piece of brick body 1 is downward to make two pieces of adjacent 1 reciprocal crosss of brick body for the upper surface of brick body 1 Mistake setting.The brick body front end face 13 of two pieces of adjacent brick bodies 1 is in the same side and the coincidence of place plane.In two adjacent brick bodies 1 The upper and lower surfaces of opposite cuboid fixing seat 2 fit to form cuboid, and when docking, cuboid is solid The end surface of reservation 2 towards opposite brick body 1 fits in opposite brick body 1 on the outer surface of vertical section 12.Concave station 21 It is overlapped with the first through hole 23 of 22 opposite position of boss and the axis of the second through-hole 24.
As shown in figure 4, four pieces of brick bodies 1 are located at four pieces of brick bodies when the part that constitutes that overlapped for function front, rear, left and right is whole The concave station 21 and boss 22 of 1 opposite four corners are stacked, to make to be provided on concave station 21 and boss 22 The axis of one through-hole 23 and the second through-hole 24 is respectively positioned on same straight line.By the way that a fixing bolt to be passed through to the first through hole at this 23 and second through-hole 24, so that four pieces of brick bodies 1 are fixed by a fixing bolt.And so on, using this form from And form a complete slope protection.
Embodiment 2, a kind of combined integrated slope protection, as shown in figure 5, the difference from embodiment 1 is that wherein side it is rectangular Body fixing seat 2 is located at the vertical section 12 of brick body 1 far from one end of arc section 11, the cuboid fixing seat 2 and vertical section of the other side One end of 12 connection arc sections 11.The thickness of boss 22 and the thickness of concave station 21 are the half of the height of vertical section 12.
It does not need two brick bodies 1 directly to be overlapped to positive and negative be staggered of brick body 1, brick body 1 when laterally piling up with reference to Fig. 6 It is connected positioned at vertical section 12 and is located at vertical section 12 on the lower surface and another piece of brick body 1 of the cuboid fixing seat 2 at arc section 11 The upper surface contact of cuboid fixing seat 2 far from 11 one end of arc section.After overlap joint, on concave station 21 and boss 22 first The axis of through-hole 23 and the second through-hole 24 is still overlapped.Meanwhile by brick body 1 to make the space between brick body 1 arranged side by side be formed Guiding gutter.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (8)

1. a kind of combined integrated slope protection, including being formed by slope protection by several brick bodies (1) piled up in length and breadth, it is characterised in that: institute State that brick body (1) is domed, the arc both ends of brick body (1) are respectively arranged with outwardly directed and are integrally formed with brick body (1) Cuboid fixing seat (2), the both ends of the length direction of the cuboid fixing seat (2) are located at the front and back two of brick body (1) The centerline parallel at end and the left and right ends of the center line and brick body (1) of cuboid fixing seat (2), between adjacent brick body (1) It is connected by cuboid fixing seat (2), opposite cuboid fixing seat (2) upper surface and lower surface phase in adjacent brick body (1) Fitting is fixed between the cuboid fixing seat (2) by fixing bolt, the cuboid is solid to form a cuboid The through-hole passed through for fixing bolt is offered in reservation (2), is formed with a water guide between adjacent two transversely arranged brick bodies (1) Slot.
2. combined integrated slope protection according to claim 1, it is characterised in that: brick body (1) includes the circle in arc-shaped Segmental arc (11) and the vertical section (12) straight down for being located at arc section (11) both ends, cuboid fixing seat (2) setting On vertical section (12).
3. combined integrated slope protection according to claim 2, it is characterised in that: the cuboid fixing seat (2) is located at vertical One end of section (12) connection arc section (11), the half of the height with a thickness of vertical section (12) of the cuboid are transversely arranged Brick body (1) in, between any two adjacent brick bodies (1), one of brick body (1) upper surface upward, another piece of brick body (1) Downward, to make two pieces of adjacent brick bodies (1) are positive and negative to be staggered, the guiding gutter is the brick that upper surface is placed downward for upper surface Arc section (11) on body (1) is formed.
4. combined integrated slope protection according to claim 2, it is characterised in that: the cuboid at brick body (1) arc both ends Fixing seat (2), one of one end for being located in one of vertical section (12) and being connected with arc section (11), the other end are located at another The one end of a vertical section (12) far from arc section (11), in transversely arranged brick body (1), the upper table of two pieces of adjacent brick bodies (1) Facing towards top, the top between adjacent brick body (1) positioned at cuboid fixing seat (2) forms guiding gutter.
5. combined integrated slope protection according to claim 2, it is characterised in that: the cuboid fixing seat (2) is located at brick The end of body (1) rear and front end, wherein the upper surface of one end offers concave station (21), and other end end is provided with outwardly directed The shape and size of boss (22), the boss (22) and concave station (21) match.
6. combined integrated slope protection according to claim 5, it is characterised in that: the shape of the boss (22) and concave station (21) For rectangle.
7. combined integrated slope protection according to claim 6, it is characterised in that: the through-hole be located at boss (22) table top and The center position of the bottom end of concave station (21).
8. combined integrated slope protection according to claim 7, it is characterised in that: the thickness of the boss (22) and described recessed The depth of platform (21) is the half of cuboid fixing seat (2) thickness.
CN201821468551.0U 2018-09-08 2018-09-08 Combined integrated slope protection Expired - Fee Related CN208949833U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821468551.0U CN208949833U (en) 2018-09-08 2018-09-08 Combined integrated slope protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821468551.0U CN208949833U (en) 2018-09-08 2018-09-08 Combined integrated slope protection

Publications (1)

Publication Number Publication Date
CN208949833U true CN208949833U (en) 2019-06-07

Family

ID=66737312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821468551.0U Expired - Fee Related CN208949833U (en) 2018-09-08 2018-09-08 Combined integrated slope protection

Country Status (1)

Country Link
CN (1) CN208949833U (en)

Similar Documents

Publication Publication Date Title
US3252287A (en) T-shaped concrete block
KR101934342B1 (en) Articulated embankment block for preventing from coastal erosion and wave overtopping
CN208949833U (en) Combined integrated slope protection
CN202450491U (en) Open type flood discharge structure at dam crest
CN203755240U (en) Wave dissipation type revetment component and wave dissipation revetment
CN211142966U (en) Expansion joint structure for taking and draining quay wall
CN207228053U (en) One kind is prefabricated, is easy to extend and increases, assembled sand preventing dyke levee body structure
CN214460116U (en) Ecological bank protection component of economical and ecological bank protection
CN206477308U (en) A kind of compatible ready-package river levee in dike road
CN202787235U (en) Reinforced concrete variable cross-section buttressed type prefabricated pile plank
CN202359724U (en) Building block and multifunctional wall body
CN209568466U (en) A kind of multi-joint compound landscape retaining wall block
CN204185819U (en) Honeycomb dykes and dams shore protection component
KR200422445Y1 (en) Vegetation block structure for slope protection
CN210797428U (en) Novel ecological bank protection structure
CN203668882U (en) Mixed pile foundation upright breakwater
CN207812470U (en) A kind of plastic sheet pile with injected hole
KR20230012351A (en) Wave dissipating block and oceanaic structure using the same
KR101294664B1 (en) Permeability tetrapod
CN203334245U (en) Chain type wave resistant block
KR102500560B1 (en) Hydrophilic shore block system capable of preventing coastal erosion and sea waves, hydrophilic shore block formwork, and hydrophilic shore block
CN214116488U (en) Water conservancy ecological slope protection block and water conservancy ecological slope protection structure
CN204418102U (en) Curve bank protection structure
CN219315663U (en) Water stopping and seepage preventing system suitable for hinge gate hydraulic structure
CN2276516Y (en) Compound wave-protection slope plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 102300 No. 4, seshufen grain depot, Mentougou District, Beijing

Patentee after: Beijing yuheyuan Water Construction Co.,Ltd.

Address before: 102301 Beijing Mentougou district color tree graves grain depot 4

Patentee before: BEIJING MENTOUGOU WATER CONSERVANCY ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190607