CN208918561U - A kind of small interval overlapping tunnel folder rock ruggedized construction - Google Patents

A kind of small interval overlapping tunnel folder rock ruggedized construction Download PDF

Info

Publication number
CN208918561U
CN208918561U CN201821498004.7U CN201821498004U CN208918561U CN 208918561 U CN208918561 U CN 208918561U CN 201821498004 U CN201821498004 U CN 201821498004U CN 208918561 U CN208918561 U CN 208918561U
Authority
CN
China
Prior art keywords
tunnel
upper layer
rock
canopy
ruggedized construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821498004.7U
Other languages
Chinese (zh)
Inventor
李金会
苏井高
向明
王勇
王志勇
王国欣
李书渝
苗春阳
赵腾飞
徐强
陈涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN201821498004.7U priority Critical patent/CN208918561U/en
Application granted granted Critical
Publication of CN208918561U publication Critical patent/CN208918561U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a kind of small interval overlapping tunnel folder rock ruggedized construction, including the Counter-pulled bolts of the crown pipe canopy, the inverted arch pipe canopy and abutment wall pipe canopy and drawknot that upper layer tunnel bottom is arranged in of lower layer's tunnel top between upper layer tunnel and lower layer tunnel are arranged in;Counter-pulled bolts arranged for interval in the lap position of upper layer tunnel bottom and lower layer's tunnel top, both ends respectively anchor connection in upper layer, lower layer tunnel, main body be threaded through the folder rock between upper layer, lower layer tunnel;The utility model ruggedized construction forms the effect of clamping and reinforcing to small interval overlapping tunnel folder rock, has effectively shared upper load, and construction method is simple, easily operated.

Description

A kind of small interval overlapping tunnel folder rock ruggedized construction
Technical field
The utility model relates to constructing tunnel field, in particular to a kind of small interval overlapping tunnel presss from both sides rock ruggedized construction.
Background technique
With the fast development of infrastructure construction in china, engineering space constantly extends, and Tunnel Engineering also gradually increases, and In small interval, more caverns, big cross section trend, to Tunnel Design construction bring new challenge.It is built in small interval overlapping tunnel If in, it is to influence that since upper and lower constructing tunnel disturbs repeatedly, folder petrosa position is often the weakest between tunnel, and stress is the most complicated The key link of overlapping tunnel overall stability, therefore often certain technological means need to be taken to carry out at reinforcing it in work progress Reason.Currently, being front pre-grouting to the overlapping tunnel folder most common reinforcing means of rock, but front pre-grouting is suitable for weak broken Rock stratum, and for relatively compact stratum, slip casting relative difficulty, consolidation effect is extremely limited, it is, therefore, desirable to provide a kind of be applicable in In the ruggedized construction of small interval overlapping tunnel folder rock.
Utility model content
The utility model proposes a kind of small interval overlapping tunnel folder rock ruggedized constructions to solve the above problems, specific skill Art scheme are as follows: a kind of small interval overlapping tunnel folder rock ruggedized construction, crown pipe canopy, setting including lower layer's tunnel top is arranged in In the Counter-pulled bolts between upper layer tunnel and lower layer tunnel of inverted arch pipe canopy and abutment wall pipe canopy and drawknot of upper layer tunnel bottom;
The Counter-pulled bolts arranged for interval is in the lap position of upper layer tunnel bottom and lower layer's tunnel top, both ends difference It is connected in upper layer tunnel and lower layer tunnel, in the folder rock that main body is threaded through between upper layer tunnel and lower layer tunnel.
The crown pipe canopy and inverted arch pipe canopy include the pipe fitting of one group of parallel interval distribution;The abutment wall pipe canopy is symmetrically set It is placed in the two sides inverted arch Guan Peng and is installed along tunnel side wall, every side wall coil canopy includes the pipe fitting of one group of parallel interval distribution.
The pipe fitting of the crown pipe canopy, inverted arch pipe canopy and abutment wall pipe canopy is longitudinally therethrough the tunnel not excavated each along tunnel Interior, the pipe fitting is slip casting pipe fitting.
The Counter-pulled bolts are arranged drawing along upper layer tunnel and lower layer's tunnel cross section lap outer profile, along upper layer tunnel Road and lower layer tunnel are longitudinally in the distribution of plum blossom-shaped parallel interval.
Upper layer tunnel bottom excavation contour line or more is protruded into the upper end of the Counter-pulled bolts, and the end of Counter-pulled bolts is cast in In shotcrete layer, at least two layers of the concrete layer.
The concrete layer is to be close to be equipped with reinforced mesh, the reinforcing bar between folder rock bottom concrete and upper layer concrete Mesh sheet is equipped with W steel band of model.
The upper end of the Counter-pulled bolts sequentially passes through reinforced mesh, W steel band of model, backing plate, Counter-pulled bolts end from the bottom to top Bending is connect with backing plate, to be fixed in W steel band of model, and be further cast in concrete.
The lower end of the Counter-pulled bolts passes through concrete layer and reinforced mesh and W steel band of model, and by roof bolt plate and Fixing bolt anchoring.
The W fashioned iron is arranged with one group and along tunnel longitudinal direction parallel interval, and every W steel band of model is correspondingly connected with one Counter-pulled bolts in cross section.
The utility model has the following beneficial effects:
The utility model is to the bimetallic tube canopy by lower layer tunnel and upper layer tunnel and tilts Counter-pulled bolts to small interval folder Rock forms effective clamping action, improves and presss from both sides the bearing capacity of rock and the overall stability of overlapping tunnel in work progress, and " rock beam " the carrying system being consequently formed plays certain supporting role, can effectively share top country rock, structure and operation load; The end of Counter-pulled bolts may make Counter-pulled bolts and small interval to press from both sides the interaction between rock using measures such as W steel band of model and backing plates Reinforce, improves folder rock integral reinforcing effect and bearing capacity;It is more close and loose that the utility model is applicable to folder rock rock mass Type, application range is wider, and sectional branch constructs when construction, and construction technology is simple, effectively saves working hour, improves and applies Work efficiency rate.
Detailed description of the invention
Fig. 1 is small interval overlapping tunnel folder rock ruggedized construction schematic diagram;
Fig. 2 is Counter-pulled bolts schematic diagram.
Appended drawing reference: 1- lower layer tunnel;The upper layer 2- tunnel;3- presss from both sides rock;4- crown pipe canopy;5- inverted arch pipe canopy;6- abutment wall pipe Canopy;7- Counter-pulled bolts;8-W steel band of model;9- reinforced mesh;The first layer concrete of 10-;The second layer concrete of 11-;12- screw-thread steel Pipe;13- snorkel;14- air inlet;15- grouting port;16- grout outlet;17- hollow bolt;18- roof bolt plate;19- backing plate; The gas outlet 20-.
Specific embodiment
As shown in Figure 1, overlapping tunnel is in the distribution of falling isosceles triangle in the present embodiment, it is a lower layer tunnel 1, two upper layer tunnels Road 2 has small interval at two to press from both sides rock 3 respectively between lower layer tunnel 1 and upper layer tunnel 2, crown pipe canopy is arranged at the top of lower layer tunnel 1 4, inverted arch pipe canopy 5 and abutment wall pipe canopy 6 and drawknot are set between upper layer tunnel 2 and lower layer tunnel 1 in 2 bottom of upper layer tunnel Counter-pulled bolts 7;Lap position of 7 arranged for interval of Counter-pulled bolts at the top of 2 bottom of upper layer tunnel and lower layer tunnel 1, two In the folder rock 3 that end is connected in upper layer tunnel 2 and lower layer tunnel 1, main body is threaded through between upper layer tunnel 2 and lower layer tunnel 1.
As shown in Fig. 2, use Counter-pulled bolts 7 for hollow grouting anchor in the present embodiment, comprising threaded steel pipe 12 and hollow Anchor pole 17,12 one end of threaded steel pipe are located at upper layer tunnel, and one end is connected with 17 one end of hollow bolt, and connecting place is located in folder rock, And having grout outlet 16 in junction, 17 other end of hollow bolt is located at lower layer tunnel;Snorkel is provided in Counter-pulled bolts 7 13, the air inlet 14 of snorkel 13 is located on the outside of 12 end of threaded steel pipe, and snorkel 13 passes through threaded steel pipe 12 and hollow bolt Gas outlet 20 is arranged in its end port through 17 body of rod of hollow bolt in 17 junctions.
7 both ends of Counter-pulled bolts are injected with two layer concretes in the present embodiment, are provided with reinforced mesh between two layer concretes 9, the bending of 12 end of threaded steel pipe, bending end sprays in the second layer concrete 11, and backing plate 19 is welded with below bending end, Backing plate 19 is placed in W steel band of model 8;17 lower end of hollow bolt is bolted, and is connected with roof bolt plate 18 in turn above bolt With W steel band of model 8;Grouting port 15 is arranged in 17 lower end of hollow bolt, and mortar passes through hollow bolt 17, injects and bores in grout outlet 16 In hole.
Specific implementation steps are as follows:
Step 1, overlapping tunnel excavate preceding first at lower layer, 1 crown position, tunnel and 2 inverted arch of upper layer tunnel and abutment wall position Apply pipe shed support.In this example, long 45 m of pipe canopy, using the φ mm round steel pipe of 127 mm × 6,40 cm of spacing, lower layer tunnel 1 is pushed up The angle that 4 endpoint of arch tube canopy is formed is 130 °, and the equal stringing canopy in 2 inverted arch position of upper layer tunnel simultaneously extends to 2.5 m of abutment wall.Pass through Upper and lower tunneltron canopy forms clamping to folder rock 3.
Step 2: overlapping tunnel is according to the sequence of construction of " getting on, get off ", first construction lower layer's tunnel after the completion of pipe canopy applies Road 1 is constructed in this example using two side-wall pilot tunnel using Microseismic controlled blasting or mechanical means partial excavation, rock 3 to be pressed from both sides After exposure (excavate 1. or 2. behind part), the construction of the first layer concrete 10 and armature boring are successively carried out, is successively installed after borehole cleaning Reinforced mesh 9, W steel band of model 8, hollow grouting anchor, and bored grouting is carried out, termination point of anchor rod is anchored at by bolt and backing plate 18 In W steel band of model 8, the second layer concrete 11 is sprayed again after the completion of slip casting, so that the Counter-pulled bolts 7 for completing lower layer tunnel 1 are constructed.
Step 3: in construction, 7 length of Counter-pulled bolts should be enough to go deep into upper layer 50 cm of tunnel excavation contour line to be onstructed with On, to guarantee to meet counter brace part.In this example, Counter-pulled bolts 7 use 22 Combined hollow grouted anchor bar of φ, circumferential and longitudinal cloth Setting spacing is respectively 0.8 m and 0.5 m, and circumferentially disposed length is 3 m.
Step 4: continuing to excavate 1 remainder of lower layer tunnel (3.~6. portion) and applying preliminary bracing in time, serves as a contrast and apply to two Switch to the construction of upper layer tunnel 2 after the completion of work.
Step 5: upper layer tunnel 2 carries out branch's construction using Microseismic controlled blasting or mechanical means, this example uses CD method, 8. → 9. from far from folder rock 3 to successively promoting (7. → → 10.) at nearly folder rock 3, construction to it is last close to 3 one, rock of folder (10. Portion) when, hand excavation should be switched to, the integrality of its internal anchor pole is squeezed into protection, and after the folder exposure of rock 3, injection first layer first is mixed Solidifying soil 10 is simultaneously laid with reinforced mesh 9, and W steel band of model 8 and roof bolt plate 19 are successively installed on Counter-pulled bolts 7, cuts off Counter-pulled bolts 7 Excessive portion bends 7 end of Counter-pulled bolts, and is weldingly connected with backing plate 19, sprays the second layer concrete 11 again, thus completes overlapping The construction of tunnel folder rock ruggedized construction.
Obviously, above-described embodiment is only to illustrate explaination made by the outstanding feature of the utility model, and is not to this The restriction of utility model embodiment;For those skilled in the art, still may be used on the basis of above explained use To make other variations or changes in different ways, if not carrying out inventive improvements to it, belong to the protection model of the utility model It encloses.

Claims (9)

1. a kind of small interval overlapping tunnel presss from both sides rock ruggedized construction, it is characterised in that: including the top being arranged at the top of lower layer tunnel (1) Inverted arch pipe canopy (5) and abutment wall pipe canopy (6) and drawknot in upper layer tunnel (2) bottom is arranged in upper layer tunnel in arch tube canopy (4) (2) Counter-pulled bolts (7) between lower layer tunnel (1);
Lap position of Counter-pulled bolts (7) arranged for interval at the top of upper layer tunnel (2) bottom and lower layer tunnel (1), two End is connected in upper layer tunnel (2) and lower layer tunnel (1), main body is threaded through between upper layer tunnel (2) and lower layer tunnel (1) It presss from both sides in rock (3).
2. a kind of small interval overlapping tunnel according to claim 1 presss from both sides rock ruggedized construction, it is characterised in that: the crown pipe The pipe fitting of canopy (4) and inverted arch pipe canopy (5) comprising the distribution of one group of parallel interval;The abutment wall pipe canopy (6) is symmetrically disposed on inverted arch It pipe canopy (5) two sides and is installed along tunnel side wall, every side wall coil canopy (6) includes the pipe fitting of one group of parallel interval distribution.
3. a kind of small interval overlapping tunnel according to claim 2 presss from both sides rock ruggedized construction, it is characterised in that: the crown pipe The pipe fitting of canopy (4), inverted arch pipe canopy (5) and abutment wall pipe canopy (6) is longitudinally therethrough in the tunnel not excavated each along tunnel, the pipe fitting For slip casting pipe fitting.
4. a kind of small interval overlapping tunnel according to claim 1 presss from both sides rock ruggedized construction, it is characterised in that: described pair of drawing anchor Bar (7) along upper layer tunnel (2) and lower layer tunnel (1) cross section lap outer profile to draw be arranged, along upper layer tunnel (2) and under Layer tunnel (1) is longitudinally distributed in plum blossom-shaped parallel interval.
5. a kind of small interval overlapping tunnel according to claim 4 presss from both sides rock ruggedized construction, it is characterised in that: described pair of drawing anchor Upper layer tunnel (2) bottom excavation contour line or more is protruded into the upper end of bar (7), and the end of Counter-pulled bolts (7) is cast in injection coagulation In soil layer, at least two layers of the concrete layer.
6. a kind of small interval overlapping tunnel according to claim 5 presss from both sides rock ruggedized construction, it is characterised in that: the concrete Layer is set on the reinforced mesh (9) to be close to be equipped with reinforced mesh (9) between folder rock (3) bottom concrete and upper layer concrete There are W steel band of model (8).
7. a kind of small interval overlapping tunnel according to claim 6 presss from both sides rock ruggedized construction, it is characterised in that: described pair of drawing anchor The upper end of bar (7) sequentially passes through reinforced mesh (9), W steel band of model (8), backing plate (18), Counter-pulled bolts (7) its end from the bottom to top Bending is connect with backing plate (18), to be fixed on W steel band of model (8), and is further cast in concrete.
8. a kind of small interval overlapping tunnel according to claim 6 presss from both sides rock ruggedized construction, it is characterised in that: described pair of drawing anchor The lower end of bar (7) passes through concrete layer and reinforced mesh (9) and W steel band of model (8), and passes through roof bolt plate (18) and fixed spiral shell Bolt anchoring.
9. a kind of small interval overlapping tunnel according to claim 7 or 8 presss from both sides rock ruggedized construction, it is characterised in that: the W type Steel band (8) has one group and is arranged along tunnel longitudinal direction parallel interval, and every W steel band of model (8) is correspondingly connected in a cross section Counter-pulled bolts (7).
CN201821498004.7U 2018-09-13 2018-09-13 A kind of small interval overlapping tunnel folder rock ruggedized construction Expired - Fee Related CN208918561U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821498004.7U CN208918561U (en) 2018-09-13 2018-09-13 A kind of small interval overlapping tunnel folder rock ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821498004.7U CN208918561U (en) 2018-09-13 2018-09-13 A kind of small interval overlapping tunnel folder rock ruggedized construction

Publications (1)

Publication Number Publication Date
CN208918561U true CN208918561U (en) 2019-05-31

Family

ID=66705452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821498004.7U Expired - Fee Related CN208918561U (en) 2018-09-13 2018-09-13 A kind of small interval overlapping tunnel folder rock ruggedized construction

Country Status (1)

Country Link
CN (1) CN208918561U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979676A (en) * 2018-09-13 2018-12-11 中国建筑土木建设有限公司 A kind of small interval overlapping tunnel folder rock ruggedized construction and its construction method
CN111485914A (en) * 2020-04-13 2020-08-04 中铁二院工程集团有限责任公司 Rock pillar construction method in replacement of high-ground-stress soft rock large-deformation ultra-small clear distance tunnel
CN112539064A (en) * 2020-11-30 2021-03-23 青岛理工大学 Blasting vibration reduction construction method for close tunnel with composite pilot tunnel and preset composite vibration isolation layer

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979676A (en) * 2018-09-13 2018-12-11 中国建筑土木建设有限公司 A kind of small interval overlapping tunnel folder rock ruggedized construction and its construction method
CN108979676B (en) * 2018-09-13 2024-03-26 中国建筑土木建设有限公司 Small-clear-distance overlapped tunnel rock clamping reinforcing structure and construction method thereof
CN111485914A (en) * 2020-04-13 2020-08-04 中铁二院工程集团有限责任公司 Rock pillar construction method in replacement of high-ground-stress soft rock large-deformation ultra-small clear distance tunnel
CN111485914B (en) * 2020-04-13 2021-07-13 中铁二院工程集团有限责任公司 Rock pillar construction method in replacement of high-ground-stress soft rock large-deformation ultra-small clear distance tunnel
CN112539064A (en) * 2020-11-30 2021-03-23 青岛理工大学 Blasting vibration reduction construction method for close tunnel with composite pilot tunnel and preset composite vibration isolation layer
CN112539064B (en) * 2020-11-30 2022-02-11 青岛理工大学 Blasting vibration reduction construction method for close tunnel with composite pilot tunnel and preset composite vibration isolation layer

Similar Documents

Publication Publication Date Title
CN108979676A (en) A kind of small interval overlapping tunnel folder rock ruggedized construction and its construction method
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN101864959B (en) Method for tunneling construction of main structure of underground station
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN102226403B (en) Construction method of large-span subway station main body by using arched cover method and station main body structure
CN208918561U (en) A kind of small interval overlapping tunnel folder rock ruggedized construction
CN204729099U (en) Rock quality layer tunneling three layers of subway station canopy structure
CN102996133A (en) Construction method applicable to intersection between inclined shaft and slant hole of weak surrounding rock tunnel
CN103321653B (en) Method of treating lining after collapse of underground cavern crown
CN108005675A (en) The dynamic superposition coupling supporting method and supporting construction in a kind of fault belt tunnel
CN102606168B (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN101769154A (en) Excavation supporting method for tunnel construction
CN209179761U (en) Pass through that high angle is inverse to rush rich water richness sand tomography supporting and protecting system of tunnel
CN113153308B (en) Construction method for collapse section of double-arch tunnel
WO2022122052A1 (en) Comprehensive construction method for shallow buried section of tunnel using urban railway mine tunneling method
CN108412519A (en) The slight large deformation single-track tunnel suspension device of highlands soft rock and construction method
CN103032080A (en) Support method of weak and broken surrounding rock tunnel
CN107725064A (en) Tunnel partition wall structure and the method that tunnel step excavation is realized using middle-wall method
CN104389612A (en) Treatment method for tunnel local collapse
CN208702421U (en) The tunnel support structure of existing pile foundation building is worn under a kind of
CN205895242U (en) Low -angle crossing tunnel structure
CN110159298A (en) A kind of first branch button arch construction method of Underground Subway Station
CN107965325B (en) A kind of small interval shallow tunnel just branch arch replacement construction method
CN104533451A (en) Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock
CN108678771A (en) Pass through fault belt Tunnel and median septum strengthening supporting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190531