CN208917672U - A kind of prefabricated-cast-in-place combined reinforced bar concrete pier - Google Patents

A kind of prefabricated-cast-in-place combined reinforced bar concrete pier Download PDF

Info

Publication number
CN208917672U
CN208917672U CN201821669673.6U CN201821669673U CN208917672U CN 208917672 U CN208917672 U CN 208917672U CN 201821669673 U CN201821669673 U CN 201821669673U CN 208917672 U CN208917672 U CN 208917672U
Authority
CN
China
Prior art keywords
bridge pier
concrete
cast
prefabricated
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821669673.6U
Other languages
Chinese (zh)
Inventor
魏洋
徐扬
柏佳文
端茂军
李国芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Forestry University
Original Assignee
Nanjing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University filed Critical Nanjing Forestry University
Priority to CN201821669673.6U priority Critical patent/CN208917672U/en
Application granted granted Critical
Publication of CN208917672U publication Critical patent/CN208917672U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of prefabricated-cast-in-place combined reinforced bar concrete pier, including prefabricated reinforced concrete bridge pier piece, framework of steel reinforcement, cast-in-place core concrete, prefabricated reinforced concrete bridge pier piece is the armored concrete thin walled of ultra-high performance concrete preparatory pouring molding of the compression strength greater than 100MPa, multi-disc prefabricated reinforced concrete bridge pier piece overlaps arrangement along the surrounding outer rim circumferential direction of pier section, the lap-joint of prefabricated reinforced concrete bridge pier piece pours overlapping area's concrete and wraps up the adjacent two panels prefabricated reinforced concrete bridge pier piece of pre-buried dowel connection two-by-two after pouring, hollow bridge pier open tubular column is integrally formed in circumferential direction, the inner cavity of cast-in-place core concrete filling bridge pier open tubular column, and become whole with bridge pier hollow cylindrical.The utility model is folded type bridge pier structure, using prefabricated and cast-in-place combination technique, guarantees the globality of armored concrete precast pier, has the advantages of site machinery degree is high, short time limit, good integrity.

Description

A kind of prefabricated-cast-in-place combined reinforced bar concrete pier
Technical field
The utility model relates to a kind of bridge pier structure, especially a kind of prefabricated-cast-in-place combined reinforced bar concrete pier belongs to Civil engineering structure technical field.
Background technique
Currently, the Bridge Pier Construction in Bridges in Our Country construction mostly uses greatly the construction technology of cast in situs, this method, which has, to be applied The advantages that work is simple, construction technology is mature, therefore be widely used in the bridge pier construction of small bridge.However the construction method Long construction period, situ wet operation are more, and the influence to ambient enviroment is big, directly affect the traffic capacity of local road.In addition, Bridge pier cast-in-place construction causes the template of engineering, bracket consumption huge, greatly improves engineering construction cost, has violated current The requirement that building industrialization, green construction, low-carbon are built.In order to cope with the defect of cast-in-place core concrete bridge construction, use Prefabricated assembled bridge has become the development trend of bridge construction.Assembled bridge pier uses the factorial production, on-site consolidation technology, Mechanized construction level is improved to accelerate construction speed while guaranteeing construction quality, be conducive to environmental protection.It is existing Bridge pier precast assembly technology generally using live splicing is arrived by bridge pier entirety segmentation prefabricating again, and the self weight of precast pier segment is to upper It connects and is affected between lower segment.Assembled precast pier segment is connected in addition, stitching using stem grafting, easily leads to bridge pier globality not Foot, construction cost high problem longer there are the period using wet seam connection assembled precast pier segment.
The utility model provides a kind of prefabricated-cast-in-place combined reinforced bar concrete pier, to overcome the whole of traditional precast pier The precast pier segment being vertically connected with is changed to the prefabricated reinforced concrete bridge pier piece of circumferential connection, folded by the problem of body deficiency Close the advantages of arrangement core armored concrete forms entirety, merged prefabricated and cast-in-place two kinds of construction methods.
Summary of the invention
The purpose of the utility model is to provide a kind of reinforced concrete sandwich bridge pier structures, to solve nowadays cast-in-place bridge The shortcomings that pier structure long construction period, highly energy-consuming and the existing insufficient defect of precast pier structure connection integrity, using pre- Reinforced concrete bridge pier piece processed provides form cage for bridge pier cast in situs, and overlapping area is poured after reserved and adds cyclization to splicing, and Folded type structure is formed with cast-in-place core concrete, guarantees the globality of armored concrete precast pier, the structure site machinery Change degree is high, short time limit, good integrity.
For this purpose, the utility model provides a kind of prefabricated-cast-in-place combined reinforced bar concrete pier, including prefabricated reinforced concrete Bridge pier piece, framework of steel reinforcement, cast-in-place core concrete, prefabricated reinforced concrete bridge pier piece are the superelevation that compression strength is greater than 100MPa The armored concrete thin walled of the preparatory pouring molding of performance concrete, the setting of prefabricated reinforced concrete bridge pier plate inner surface are recessed Convex, sandblasting, the bonding construction for drawing hair or peg, several pre-buried companies are arranged in the connecting portion of prefabricated reinforced concrete bridge pier piece two-by-two Muscle is connect, multi-disc prefabricated reinforced concrete bridge pier piece overlaps arrangement, contiguous prefabricated reinforcing bar along the surrounding outer rim circumferential direction of pier section The pre-buried dowel of concrete pier piece staggeredly overlaps, and overlapping is poured by the lap-joint of prefabricated reinforced concrete bridge pier piece two-by-two after pouring Area's concrete wraps up pre-buried dowel and connects adjacent two panels prefabricated reinforced concrete bridge pier piece, and hollow bridge pier is integrally formed in circumferential direction Open tubular column, framework of steel reinforcement are arranged in inside bridge pier open tubular column, and the lower end of framework of steel reinforcement and bridge pier open tubular column is fixed on cushion cap, The inner cavity of cast-in-place core concrete filling bridge pier open tubular column, fully wrapped around framework of steel reinforcement, and become whole with bridge pier hollow cylindrical, Bent cap and cast-in-place core concrete and bridge pier hollow cylindrical at be integrally attached to.
The prefabricated reinforced concrete bridge pier piece is poured in advance by the ultra-high performance concrete of 100~180MPa of compression strength Build molding concrete thin-wall sheet material, thickness≤50cm, cross-sectional shape is any.
The bridge pier open tubular column is circumferential along the surrounding outer rim of pier section by multi-disc prefabricated reinforced concrete bridge pier piece Polygon hollow column, circular hollow column or the special-shaped open tubular column being formed by connecting.
The pre-buried dowel of the contiguous prefabricated reinforced concrete bridge pier piece is inserted using welding, binding, sleeve or pin to be connected Connect, after pour the intensity of overlapping area's concrete and should be greater than the intensity of cast-in-place core concrete.
The utility model overcomes well known cast-in-situ steel reinforced concrete bridge pier structure, traditional prefabricated reinforced concrete bridge pier knot Defect present in structure while guaranteeing structural bearing capacity, light, durability, guarantees the entirety of armored concrete precast pier Property, the Mechanization Level of engineering construction is improved, manpower and material resources are saved, consuming energy, low, environmental pollution is small.Specific beneficial effect is such as Under:
(1) it compared with traditional cast-in-situ steel reinforced concrete bridge pier structure, using prefabricated reinforced concrete bridge pier piece as template, saves Steel or wood template, and the area of prefabricated reinforced concrete bridge pier piece is big, block part quantity is few, and assembled speed is fast.
(2) with armored concrete thin walled prefabricated reinforced concrete bridge pier piece, high-strength concrete characteristic is given full play to, is subtracted Light prefabricated components moiety by weight reduces assembled work difficulty.
(3) bridge pier structure main part is cast-in-place core concrete, ensure that the flexibility of planform size.
(4) prefabricated reinforced concrete bridge pier piece is spliced using the method for circumferential connection, by pouring overlapping area after reserving, added It is connected between strong prefabricated components, guarantees the globality of armored concrete precast pier.
(5) prefabricated reinforced concrete bridge pier piece plays the role of form cage in the construction process, in use with Cast-in-place core concrete congruent form is integral, plays vertical carrying and hoop constraint effect, and prefabricated reinforced concrete bridge pier piece Positioned at section edge, high performance material is more advantageous to bridge pier structure in the carrying stress and deformation for bearing bending load.
Detailed description of the invention:
Fig. 1 is a kind of decomposition diagram of prefabricated-cast-in-place combined reinforced bar concrete pier;
Fig. 2 is a kind of sectional view of prefabricated-cast-in-place combined reinforced bar concrete pier;
Fig. 3 is a kind of bridge pier main body decomposition diagram of prefabricated-cast-in-place combined reinforced bar concrete pier;
Fig. 4 is a kind of bridge pier open tubular column assembly process schematic of prefabricated-cast-in-place combined reinforced bar concrete pier;
Fig. 5 is a kind of bridge pier open tubular column schematic diagram of prefabricated-cast-in-place combined reinforced bar concrete pier;
Fig. 6 is a kind of rectangular pier column cross-sectional view of prefabricated-cast-in-place combined reinforced bar concrete pier;
Fig. 7 is a kind of circular pier column cross-sectional view of prefabricated-cast-in-place combined reinforced bar concrete pier;
Fig. 8 is a kind of special-shaped pier column cross-sectional view of prefabricated-cast-in-place combined reinforced bar concrete pier;
In the accompanying drawings, 1 is prefabricated reinforced concrete bridge pier piece, and 2 be framework of steel reinforcement, and 3 be cast-in-place core concrete, and 4 be to hold Platform, 5 be bent cap, and 11 be pre-buried dowel, 12 be after pour overlapping area's concrete, 13 be bridge pier open tubular column.
Specific embodiment:
For a clearer understanding of the technical features, objectives and effects of the utility model, now compareing Detailed description of the invention Specific embodiment of the present utility model.
As shown in the picture, the utility model provides a kind of prefabricated-cast-in-place combined reinforced bar concrete pier, including pre-manufactured steel Reinforced concrete bridge pier piece 1, framework of steel reinforcement 2, cast-in-place core concrete 3, prefabricated reinforced concrete bridge pier piece 1 are greater than for compression strength The armored concrete thin walled of the preparatory pouring molding of the ultra-high performance concrete of 100MPa, prefabricated reinforced concrete bridge pier piece 1 Bumps, sandblasting, the bonding construction for drawing hair or peg is arranged in inner surface, two-by-two the connecting portion of prefabricated reinforced concrete bridge pier piece 1 Several pre-buried dowels 11 are set, and multi-disc prefabricated reinforced concrete bridge pier piece 1 is overlapped along the surrounding outer rim circumferential direction of pier section The pre-buried dowel 11 of arrangement, contiguous prefabricated reinforced concrete bridge pier piece 1 staggeredly overlaps, two-by-two prefabricated reinforced concrete bridge pier piece 1 lap-joint pours overlapping area's concrete 12 and wraps up pre-buried dowel 11 and connect adjacent two panels prefabricated reinforced concrete bridge pier after pouring Hollow bridge pier open tubular column 13 is integrally formed in piece 1, circumferential direction, and framework of steel reinforcement 2 is arranged in inside bridge pier open tubular column 13, framework of steel reinforcement 2 It is fixed on cushion cap 4 with the lower end of bridge pier open tubular column 13, cast-in-place core concrete 3 inserts the inner cavity of bridge pier open tubular column 13, complete Full package framework of steel reinforcement 2, and be formed as whole with bridge pier open tubular column 13, bent cap 5 and cast-in-place core concrete 3 and bridge pier open tubular column 13 formation are integrally attached to.
The prefabricated reinforced concrete bridge pier piece 1 is preparatory by the ultra-high performance concrete of 100~180MPa of compression strength The concrete thin-wall sheet material of pouring molding, thickness≤50cm, cross-sectional shape are any.
The bridge pier open tubular column 13 is by multi-disc prefabricated reinforced concrete bridge pier piece 1 along the surrounding outer rim ring of pier section To the polygon hollow column, circular hollow column or special-shaped open tubular column being formed by connecting.
The pre-buried dowel 11 of the contiguous prefabricated reinforced concrete bridge pier piece 1 is inserted using welding, binding, sleeve or pin Connection, after pour the intensity of overlapping area's concrete 12 and should be greater than the intensity of cast-in-place core concrete 3.
Embodiment one:
A kind of prefabricated-cast-in-place combined reinforced bar concrete pier, including prefabricated reinforced concrete bridge pier piece 1, framework of steel reinforcement 2, Cast-in-place core concrete 3 when implementation, is first greater than the preparatory pouring molding reinforcing bar of ultra-high performance concrete of 100MPa by compression strength Concrete thin-wall sheet material formation prefabricated reinforced concrete bridge pier piece 1,1 inner surface of prefabricated reinforced concrete bridge pier piece setting bumps, Sandblasting, the bonding construction for drawing hair or peg, several pre-buried connections are arranged in the connecting portion of prefabricated reinforced concrete bridge pier piece 1 two-by-two Muscle 11;By 1 transporting and hoisting of prefabricated reinforced concrete bridge pier piece to scene, by multi-disc prefabricated reinforced concrete bridge pier piece 1 along bridge The surrounding outer rim circumferential direction in pier section overlaps arrangement, and the pre-buried dowel 11 of contiguous prefabricated reinforced concrete bridge pier piece 1 staggeredly overlaps, Pre-buried dowel 11 inserts connection using welding, binding, sleeve or pin;The lap-joint of prefabricated reinforced concrete bridge pier piece 1 pours two-by-two Overlapping area's concrete 12 is poured after building wrap up pre-buried dowel 11 connect adjacent two panels prefabricated reinforced concrete bridge pier piece 1, it is circumferential whole Body forms hollow bridge pier open tubular column 13, and bridge pier open tubular column 13 is polygon hollow column, circular hollow column or special-shaped open tubular column;Most Framework of steel reinforcement 2 is arranged in inside bridge pier open tubular column 13 afterwards, cushion cap 4 is fixed in the lower end of framework of steel reinforcement 2 and bridge pier open tubular column 13 On, it can be by staying slotting reinforcing bar, welding, bolt to connect, cast-in-place core concrete 3 inserts the inner cavity of bridge pier open tubular column 13, complete Full package framework of steel reinforcement 2, and be formed as whole with bridge pier open tubular column 13, bent cap 5 and cast-in-place core concrete 3 and bridge pier open tubular column 13 formation are integrally attached to.

Claims (4)

1. a kind of prefabricated-cast-in-place combined reinforced bar concrete pier, including prefabricated reinforced concrete bridge pier piece (1), framework of steel reinforcement (2), cast-in-place core concrete (3), it is characterised in that: prefabricated reinforced concrete bridge pier piece (1) is that compression strength is greater than 100MPa The preparatory pouring molding of ultra-high performance concrete armored concrete thin walled, prefabricated reinforced concrete bridge pier piece (1) interior table Bumps, sandblasting, the bonding construction for drawing hair or peg is arranged in face, and the connecting portion of prefabricated reinforced concrete bridge pier piece (1) is set two-by-two Several pre-buried dowels (11) are set, multi-disc prefabricated reinforced concrete bridge pier piece (1) is taken along the surrounding outer rim circumferential direction of pier section Arrangement is connect, the pre-buried dowel (11) of contiguous prefabricated reinforced concrete bridge pier piece (1) staggeredly overlaps, two-by-two prefabricated reinforced concrete The lap-joint of bridge pier piece (1) pours overlapping area's concrete (12) and wraps up the adjacent two panels pre-manufactured steel of pre-buried dowel (11) connection after pouring Hollow bridge pier open tubular column (13) is integrally formed in reinforced concrete bridge pier piece (1), circumferential direction, and it is hollow that framework of steel reinforcement (2) is arranged in bridge pier Column (13) is internal, and the lower end of framework of steel reinforcement (2) and bridge pier open tubular column (13) is fixed on cushion cap (4), cast-in-place core concrete (3) inner cavity of bridge pier open tubular column (13), fully wrapped around framework of steel reinforcement (2) are inserted, and is formed as whole with bridge pier open tubular column (13), Bent cap (5) is integrally attached to what cast-in-place core concrete (3) and bridge pier open tubular column (13) were formed.
2. prefabricated-cast-in-place combined reinforced bar concrete pier of one kind according to claim 1, it is characterised in that described is prefabricated Reinforced concrete bridge pier piece (1) by 100~180MPa of compression strength the preparatory pouring molding of ultra-high performance concrete concrete Thin walled, thickness≤50cm, cross-sectional shape are any.
3. prefabricated-cast-in-place combined reinforced bar concrete pier of one kind according to claim 1, it is characterised in that the bridge pier Open tubular column (13) is formed by connecting by multi-disc prefabricated reinforced concrete bridge pier piece (1) along the surrounding outer rim circumferential direction of pier section more Side shape open tubular column, circular hollow column or special-shaped open tubular column.
4. prefabricated-cast-in-place combined reinforced bar concrete pier of one kind according to claim 1, it is characterised in that described is adjacent The pre-buried dowel (11) of prefabricated reinforced concrete bridge pier piece (1) inserts connection using welding, binding, sleeve or pin, after pour overlapping The intensity of area's concrete (12) should be greater than the intensity of cast-in-place core concrete (3).
CN201821669673.6U 2018-10-10 2018-10-10 A kind of prefabricated-cast-in-place combined reinforced bar concrete pier Active CN208917672U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821669673.6U CN208917672U (en) 2018-10-10 2018-10-10 A kind of prefabricated-cast-in-place combined reinforced bar concrete pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821669673.6U CN208917672U (en) 2018-10-10 2018-10-10 A kind of prefabricated-cast-in-place combined reinforced bar concrete pier

Publications (1)

Publication Number Publication Date
CN208917672U true CN208917672U (en) 2019-05-31

Family

ID=66709269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821669673.6U Active CN208917672U (en) 2018-10-10 2018-10-10 A kind of prefabricated-cast-in-place combined reinforced bar concrete pier

Country Status (1)

Country Link
CN (1) CN208917672U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202022A (en) * 2020-03-14 2021-08-03 中国国家铁路集团有限公司 Prefabricated assembled hollow pier with steel-concrete combined vertical splicing seams and construction method
CN113202023A (en) * 2020-03-14 2021-08-03 中国国家铁路集团有限公司 Prefabricated assembled hollow pier with concrete vertical splicing seams and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202022A (en) * 2020-03-14 2021-08-03 中国国家铁路集团有限公司 Prefabricated assembled hollow pier with steel-concrete combined vertical splicing seams and construction method
CN113202023A (en) * 2020-03-14 2021-08-03 中国国家铁路集团有限公司 Prefabricated assembled hollow pier with concrete vertical splicing seams and construction method

Similar Documents

Publication Publication Date Title
CN100501070C (en) Steel reinforced concrete three-dimensional force-bearing structure floorslab
CN105569224B (en) Concrete filled steel tube edge constraint overlaps monoblock type shear wall and preparation and installation method
CN206428872U (en) A kind of close splicing seam superimposed sheet
CN106088330A (en) The assembling frame beam printed based on 3D and the attachment structure of frame column and construction method thereof
CN108149585A (en) A kind of splicing construction and joining method of the pier stud segment of precast assembly bridge pier
CN208917672U (en) A kind of prefabricated-cast-in-place combined reinforced bar concrete pier
CN206844315U (en) A kind of hollow column joint structure of assembly concrete framework
CN109024251A (en) A kind of prefabrication and assembly construction folded type reinforced concrete bridge pier structure
CN100516404C (en) Reinforcing-bar concrete building roof with tree-dimensional bearing structure
CN108468379A (en) A kind of novel precast prestressed continuous beam connecting node of assembly concrete
CN101082241B (en) Formwork for reinforced bar concrete solid load-carrying structural storied building cover
CN207376882U (en) A kind of assembly concrete variable cross-section newel post type shearing wall member and its making mold
CN108999077A (en) The circumferential weld connection structure and its circumferential weld connection method of prefabricated stand column and adjacent members
CN207846762U (en) A kind of assembled integral single side overlapped shear wall structure
CN206844486U (en) A kind of precast concrete open tubular column node connecting structure
CN109208935A (en) A kind of method and device using pre-constructed unit rapid reinforcement damage RC column
CN212153865U (en) Prefabricated component connected node structure
CN212688679U (en) Pier is assembled to dry joint unbonded prestressing force segment
CN108547377A (en) A kind of novel fabricated concrete continuous beam dry type welding node
CN221399534U (en) Novel reinforced concrete rib prestress laminated slab
WO2024036684A1 (en) Fabricated bent cap and pier column combined structure and construction method therefor
CN218345936U (en) Pier is assembled in prefabricated of hybrid connection's multisection section
CN211974016U (en) Prefabricated component connected node structure
CN100412281C (en) Hollow member for concrete
CN100501045C (en) Light die block constructional member for concrete filling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhenjiang Heng An Civil Technology Co., Ltd.

Assignor: Nanjing Forestry University

Contract record no.: X2019320000057

Denomination of utility model: Prefabricated-cast-in-place combined reinforced concrete pier

Granted publication date: 20190531

License type: Common License

Record date: 20190912

Assignee: Hefei Shuang Dao run Highway Engineering Co., Ltd.

Assignor: Nanjing Forestry University

Contract record no.: X2019320000058

Denomination of utility model: Prefabricated-cast-in-place combined reinforced concrete pier

Granted publication date: 20190531

License type: Common License

Record date: 20190912

Assignee: Limited by Share Ltd Beijing nine road detection technology

Assignor: Nanjing Forestry University

Contract record no.: X2019320000056

Denomination of utility model: Prefabricated-cast-in-place combined reinforced concrete pier

Granted publication date: 20190531

License type: Common License

Record date: 20190912

EE01 Entry into force of recordation of patent licensing contract