A kind of armored concrete foot plank evacuation platform for tunnel Download PDF

Info

Publication number
CN208885341U
CN208885341U CN201821588683.7U CN201821588683U CN208885341U CN 208885341 U CN208885341 U CN 208885341U CN 201821588683 U CN201821588683 U CN 201821588683U CN 208885341 U CN208885341 U CN 208885341U
Authority
CN
China
Prior art keywords
bracket
horizontal shore
foot plank
concrete foot
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821588683.7U
Other languages
Chinese (zh)
Inventor
曹勇
赵旭伟
张海东
周萌
周军海
张晓宾
陈伟明
薛昊博
曹佳伟
师宏耀
邹飞虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Shanghai Design Institute Group Co Ltd
Original Assignee
China Railway Shanghai Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Shanghai Design Institute Group Co Ltd filed Critical China Railway Shanghai Design Institute Group Co Ltd
Priority to CN201821588683.7U priority Critical patent/CN208885341U/en
Application granted granted Critical
Publication of CN208885341U publication Critical patent/CN208885341U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of armored concrete foot plank evacuation platforms for tunnel comprising concrete foot plank and several brackets;Bracket is mounted on the inside of shield tunnel;Concrete foot plank is erected on bracket;The surface of bracket is followed successively by galvanizing film and intumescent fire-resistant coating from inside to outside;Each bracket includes horizontal shore and raker beam;Horizontal shore is horizontally disposed, and one end is connect with the pre-buried channel flow of shield tunnel inner wall, and the other end is hanging;The lower section of horizontal shore is arranged in raker beam, and one end is connect with the pre-buried channel flow of shield tunnel inner wall, and the other end is connected to the bottom surface of horizontal shore.The utility model has the advantages that: refractory coating is used, the fire resistance of bracket can be significantly increased, even if fire occurs, bracket still can keep enough bearing capacitys.It using galvanizing film, can prevent bracket from corroding, enhance the durability of bracket.

Description

A kind of armored concrete foot plank evacuation platform for tunnel
Technical field
The utility model relates to the evacuation platforms of shield tunnel, and in particular to a kind of armored concrete walking for tunnel Plate evacuation platform.
Background technique
Shield construction has fast speed of application, with small vibration, low noise, the safe and reliable, spy small to surrounding environment influence Point, it has also become urban track traffic underground section is built using most one of construction technologies, but the circle that shield duct piece is formed Cavern's sectional dimension is limited, meet limit require while, carry out the reasonable Arrangement of large number of equipment pipeline and with section of jurisdiction can It is particularly significant by connecting.Evacuation platform is responsible for daily operation maintenance in subterranean tunnel and passenger safety is quickly dredged in special circumstances Scattered important function is the critical facility that must be provided in tunnel.
Shield tunnel evacuation platform in the prior art generallys use more light polymer composite as walking Plate, however polymer composite foot plank durability is poor, usually only 20 to 30 years service life, and macromolecule is compound Material foot plank fire resistance is general, and polymer composite foot plank is easily deformed collapsing when meeting with fire.
Summary of the invention
The purpose of this utility model is mixed according to a kind of reinforcing bar for tunnel in place of above-mentioned the deficiencies in the prior art, is provided Solidifying soil foot plank evacuation platform, the armored concrete foot plank evacuation platform improve evacuation platform by using the component of fire resisting Fire resistance.
The utility model aim realization is completed by following technical scheme:
A kind of armored concrete foot plank evacuation platform for tunnel comprising concrete foot plank and several branch Frame;The bracket is mounted on the inside of shield tunnel;The concrete foot plank is set up on the bracket;The table of the bracket Face is followed successively by galvanizing film and intumescent fire-resistant coating from inside to outside;Each bracket include horizontal shore and tiltedly Support beam;The horizontal shore is horizontally disposed, and one end is connect with the pre-buried channel flow of the shield tunnel inner wall, another One end is hanging;The lower section of the horizontal shore is arranged in the raker beam, and one end is pre-buried with the shield tunnel inner wall Conduit connection, the other end are connected to the bottom surface of the horizontal shore.
It is attached by welding between the horizontal shore described in the bracket and the raker beam;It is described Angle between horizontal shore and the raker beam is 45 °.
The concrete foot plank extends along the axis direction of the shield tunnel;Several brackets are along the shield tunnel The axis direction in road is spaced apart;The distance between adjacent described bracket is 1m to 1.4m.
The horizontal shore is I-steel, and the horizontal shore includes web, top plate and bottom plate;The web edge Vertical direction setting, is connected between the top plate and the bottom plate;If being provided between the top plate and the bottom plate Dry stiffening plate, the stiffening plate are connected between the top plate and the bottom plate.
The utility model has the advantages that: by using refractory coating, the fire resistance of bracket can be significantly increased, even if shield Fire occurs for tunnel internal, and bracket still can keep enough bearing capacitys;By using galvanizing film, bracket can be prevented It is corroded during long-time service, enhances the durability of bracket;Prefabricated concrete foot plank has fire resistance The advantages that good, non-aging and at low cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Specific embodiment
The feature of the utility model and other correlated characteristics are made further specifically by embodiment below in conjunction with attached drawing It is bright, in order to the understanding of technical staff of the same trade:
As shown in Figure 1, marking 1-10 to be respectively as follows: concrete foot plank 1, bracket 2, shield tunnel 3, horizontal shore in figure 4, raker beam 5, junction steel plate 6, web 7, top plate 8, bottom plate 9, stiffening plate 10.
Embodiment: as shown in Figure 1, the present embodiment is flat more particularly to a kind of armored concrete foot plank evacuation for tunnel Platform comprising concrete foot plank 1 and several brackets 2.Bracket 2 is mounted on the inside of shield tunnel 3;Concrete foot plank 1 is erected on bracket 2.Concrete foot plank 1 extends along the axis direction of shield tunnel 3.Several brackets 2 are along shield tunnel 3 Axis direction is spaced apart;The distance between adjacent stent 2 is 1m to 1.4m.
In the present embodiment, concrete foot plank 1 is precast reinforced concrete structure, with a thickness of 50mm, the length is 1190mm.Each bracket 2 includes horizontal shore 4 and raker beam 5.Horizontal shore 4 is horizontally disposed, one end with The pre-buried channel flow of 3 inner wall of shield tunnel connects, and the other end is hanging.The lower section of horizontal shore 4, one is arranged in raker beam 5 End is connect with the pre-buried channel flow of 3 inner wall of shield tunnel, and the other end is connected to the bottom surface of horizontal shore 4.
It is being attached by welding between horizontal shore 4 and raker beam 5 in bracket 2;Horizontal shore 4 with Angle between raker beam 5 is 45 °.Horizontal shore 4 and the end that raker beam 5 is used for and shield tunnel 3 connects are respectively provided with There is one piece of junction steel plate 6.The size of junction steel plate 6 is 350 × 350 × 20mm.Bolt hole is offered on junction steel plate 6.Connection Steel plate 6 is connect with horizontal shore 4 and raker beam 5 by welding, and passes through the pre- of bolt and 3 inner wall of shield tunnel Conduit is buried to be fixedly connected.
In the present embodiment, horizontal shore 4 is I-steel, and horizontal shore 4 includes web 7, top plate 8 and bottom plate 9;Abdomen Plate 7 is arranged along the vertical direction, is connected between top plate 8 and bottom plate 9.Top plate 8 is contacted for direct with concrete foot plank 1, The upper surface of top plate 8 is bonded with the lower surface of concrete foot plank 1.Due to concrete foot plank 1 be self-possessed it is larger, top plate 8 and Four stiffening plates 10 are provided between bottom plate 9.Stiffening plate 10 is vertical with web, is connected between top plate 8 and bottom plate 9.Four Stiffening plate 10 is symmetrically dispersed in the two of web 7.Stiffening plate 10 can effectively enhance the rigidity and carrying energy of horizontal shore 4 Power.
The horizontal shore 4 and raker beam 5 of bracket 2 are made of H125 fashioned iron, and the steel of the fashioned iron are Q235B steel Material.Horizontal shore 4 and raker beam 5 are welded using E43 type welding rod.All weld bead heights are not less than 8mm.Bracket 2 After completing, after carrying out derusting by sandblasting (Sa3 grades of derusting grade) to its surface, then using whole galvanizing by dipping processing, shape At galvanizing film thickness be not less than 85 μm.It is swollen in the surface spraying of the galvanizing film of bracket 2 after the completion of galvanizing by dipping Swollen type refractory coating.By spraying intumescent fire-resistant coating, it may make the fire endurance of bracket 2 not less than 1.5h.By using Refractory coating can significantly increase the fire resistance of bracket 2, even if fire occurs inside shield tunnel, bracket 2 still can be kept Enough bearing capacitys.It by using galvanizing film, can prevent bracket 2 from corroding during long-time service, enhance The durability of bracket 2.Prefabricated concrete foot plank 1 has many advantages, such as that fire resistance is good, non-aging and at low cost.
Although above embodiments are elaborated referring to conception and embodiment of the attached drawing to the utility model aim, But those skilled in the art will realize that still may be used in the case where no disengaging claim limits the precondition of range To make various modifications and variations to the utility model, therefore will not repeat them here.

Claims (4)

1. a kind of armored concrete foot plank evacuation platform for tunnel, it is characterised in that: including concrete foot plank and Several brackets;The bracket is mounted on the inside of shield tunnel;The concrete foot plank is set up on the bracket;It is described The surface of bracket is followed successively by galvanizing film and intumescent fire-resistant coating from inside to outside;Each bracket includes horizontally-supported Beam and raker beam;The horizontal shore is horizontally disposed, the pre-buried channel flow of one end and the shield tunnel inner wall Connection, the other end are hanging;The raker beam is arranged in the lower section of the horizontal shore, in one end and the shield tunnel The pre-buried channel flow of wall connects, and the other end is connected to the bottom surface of the horizontal shore.
2. a kind of armored concrete foot plank evacuation platform for tunnel according to claim 1, it is characterised in that: It is attached by welding between horizontal shore described in the bracket and the raker beam;The horizontal shore Angle between the raker beam is 45 °.
3. a kind of armored concrete foot plank evacuation platform for tunnel according to claim 1, it is characterised in that: institute The axis direction that concrete foot plank is stated along the shield tunnel extends;Several brackets are along the axis side of the shield tunnel To being spaced apart;The distance between adjacent described bracket is 1m to 1.4m.
4. a kind of armored concrete foot plank evacuation platform for tunnel according to claim 1, it is characterised in that: institute Stating horizontal shore is I-steel, and the horizontal shore includes web, top plate and bottom plate;The web is set along the vertical direction It sets, is connected between the top plate and the bottom plate;Several stiffening plates are provided between the top plate and the bottom plate, The stiffening plate is connected between the top plate and the bottom plate.
CN201821588683.7U 2018-09-28 2018-09-28 A kind of armored concrete foot plank evacuation platform for tunnel Active CN208885341U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821588683.7U CN208885341U (en) 2018-09-28 2018-09-28 A kind of armored concrete foot plank evacuation platform for tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821588683.7U CN208885341U (en) 2018-09-28 2018-09-28 A kind of armored concrete foot plank evacuation platform for tunnel

Publications (1)

Publication Number Publication Date
CN208885341U true CN208885341U (en) 2019-05-21

Family

ID=66514326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821588683.7U Active CN208885341U (en) 2018-09-28 2018-09-28 A kind of armored concrete foot plank evacuation platform for tunnel

Country Status (1)

Country Link
CN (1) CN208885341U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111605566A (en) * 2020-05-21 2020-09-01 中铁二院工程集团有限责任公司 Rail transit evacuation platform capable of resisting high wind pressure
CN112127942A (en) * 2020-08-24 2020-12-25 中铁第四勘察设计院集团有限公司 Connection structure of evacuation platform in shield zone at interconnection channel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111605566A (en) * 2020-05-21 2020-09-01 中铁二院工程集团有限责任公司 Rail transit evacuation platform capable of resisting high wind pressure
CN111605566B (en) * 2020-05-21 2021-04-27 中铁二院工程集团有限责任公司 Rail transit evacuation platform capable of resisting high wind pressure
CN112127942A (en) * 2020-08-24 2020-12-25 中铁第四勘察设计院集团有限公司 Connection structure of evacuation platform in shield zone at interconnection channel

Similar Documents

Publication Publication Date Title
CN208885341U (en) A kind of armored concrete foot plank evacuation platform for tunnel
CN103123016B (en) Construction method for laying gas pipelines along bridge
CN105804091A (en) Cooperative construction method of prestress combined profile steel support and earth excavation in deep foundation pit
CN206616184U (en) Coke oven loss flue dust dust gathering arrester supporting construction
CN214573967U (en) Large-volume concrete pouring chute device for ultra-thick bottom plate of deep foundation pit in narrow field
CN208933841U (en) A kind of fast spreading platform slab
CN113931073A (en) Asymmetric ultra-wide cable-stayed bridge steel box girder large cantilever flange construction method
CN207659983U (en) A kind of steel-pipe pile steel construction cushion cap tower crane foundation structure
CN108867351A (en) A kind of steel structure bridge damping base and preparation method thereof
CN111675111A (en) Boiler hoisting sling in closed plant area and construction method
CN106284688A (en) Deformed steel tubing string reinforced concrete circle beam construction method
CN105569375A (en) Large complex steel structure tank protective demolition and installation method
CN206753105U (en) A kind of skyscraper tears building machine open
CN206784393U (en) T-piece and underground pipe gallery foundation pit support system
CN110777666A (en) Steel box girder construction platform and use method
CN210238259U (en) Pipeline transportation device in pipe bridge
CN104060838A (en) Grouping and air-pairing installation method for corridor
CN208884949U (en) A kind of slope retaining mobile device
CN207566725U (en) Integral riser erecting device in a kind of high stove pipe well
CN110371699A (en) A kind of major diameter single tube trestle
CN112761072A (en) Construction method of deep foundation pit steel trestle ramp
CN207194414U (en) A kind of foundation-free steel platform for temporary support
CN212359062U (en) Overhead mounting is with hanging platform device upside down
CN208415292U (en) For the novel foundation structure of charging pile
CN221150891U (en) Existing electric power pipe ditch suspension protection device for pipe gallery engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant