CN208859643U - Big bellows accumulatingdust baffle plate device - Google Patents

Big bellows accumulatingdust baffle plate device Download PDF

Info

Publication number
CN208859643U
CN208859643U CN201821328934.8U CN201821328934U CN208859643U CN 208859643 U CN208859643 U CN 208859643U CN 201821328934 U CN201821328934 U CN 201821328934U CN 208859643 U CN208859643 U CN 208859643U
Authority
CN
China
Prior art keywords
bellows
big
back wall
accumulatingdust
walls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821328934.8U
Other languages
Chinese (zh)
Inventor
李文华
虞上长
杨建国
王杰
赵虹
陈国权
黄永杰
叶丽宇
杨威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZHENENG WENZHOU ELECTRICITY GENERATION CO Ltd
Zhejiang University ZJU
Original Assignee
ZHEJIANG ZHENENG WENZHOU ELECTRICITY GENERATION CO Ltd
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZHENENG WENZHOU ELECTRICITY GENERATION CO Ltd, Zhejiang University ZJU filed Critical ZHEJIANG ZHENENG WENZHOU ELECTRICITY GENERATION CO Ltd
Priority to CN201821328934.8U priority Critical patent/CN208859643U/en
Application granted granted Critical
Publication of CN208859643U publication Critical patent/CN208859643U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gas Burners (AREA)

Abstract

The utility model discloses a kind of big bellows accumulatingdust baffle plate devices.The utility model includes both walls horizontal baffle, front-back wall inclined-plane partition.Both walls horizontal baffle is laid in the big bellows of both walls of big bellows air inlet lower edge, extends to the edge of the big bellows of front-back wall, and absolute altitude and big bellows air inlet lower edge are concordant or slightly lower.Front-back wall inclined-plane partition is aligned close to both walls end with both walls horizontal baffle, it is tilted upward by two sides to preceding (rear) wall and is centrally formed triangular ramp, it is 2-5 ° of tilt angle, specific to need to be determined according to the spacing of both walls horizontal baffle and burner base.The utility model eliminates strong wind bottom portion low velocity eddy by big bellows accumulatingdust baffle plate device come pre- accumulatingdust, and purging certainly for a small amount of dust stratification is realized according to the flowing of the wind in front-back wall bellows and Distribution dynamics.

Description

Big bellows accumulatingdust baffle plate device
Technical field
The utility model belongs to power equipment system regions, is related to a kind of big bellows accumulatingdust baffle plate device.
Background technique
As Thermal generation unit large capacity develops, Opposite Firing Boiler occupies significant proportion.Front-back wall pair The Secondary Air of punching burning is all made of big bellows structure, and big bellows are enclosed around on the outside of furnace wall cooling one, Secondary Air by both walls into Enter big bellows, then flows to front-back wall, and enter the burner being arranged in big bellows.Longtime running shows most boilers Big bellows memory is in serious fouling phenomenon, and dust stratification thickness can reach tens centimetres or more, or even from big bellows floor product to combustion Burner bottom, dust stratification amount seriously affect the safety of boiler operatiopn up to tens of tons to hundreds of tons, including bellows load metamorphism, Bellows bottom leakage, burner fire inspection signal momentary loss etc..In most cases, the method that power plant generally uses periodic cleaning is come Ash disposal, not only heavy workload, but also deashing process also influence environmental and human health impacts to a certain degree, or even influence the normal of boiler Operation.Boiler strong wind bottom plate is lower than air inlet bottom, is theoretically conducive to the effective use of burner hearth heat dissipation, and in balanced bellows Pressure distribution, but cannot not only reach corresponding purpose often because of serious dust stratification problem in practice, bring instead certain Security risk.
Summary of the invention
To solve the problems, such as that serious dust stratification, the utility model existing for the big bellows of existing boiler provide a kind of anti-product of big bellows Grey baffle plate device.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
The utility model includes both walls horizontal baffle, front-back wall inclined-plane partition.
The both walls horizontal baffle, is welded to form using steel plate, is laid in the two sides of big bellows air inlet lower edge In the big bellows of wall, extend to the edge of the big bellows of front-back wall, absolute altitude it is concordant or slightly lower with big bellows air inlet lower edge (≤ 300mm).As spacing≤300mm of big bellows air inlet lower edge and strong wind bottom plate, it is not necessary to install both walls level every Plate.
The front-back wall inclined-plane partition, is welded to form using steel plate, close to both walls end and both walls horizontal baffle pair Together (when spacing≤300mm of big bellows air inlet lower edge and strong wind bottom plate is without installing both walls horizontal baffle, then directly Connect and strong wind bottom plate weld), it is tilted upward by two sides to preceding (rear) wall and is centrally formed triangular ramp, 2-5 ° of tilt angle, It is specific to need to be determined according to the spacing of both walls horizontal baffle and burner base.
The both walls horizontal baffle, front-back wall inclined-plane partition, are fixed by big inner bellows girder steel.
The both walls horizontal baffle, front-back wall inclined-plane partition, steel plate thickness 1-6mm, specific thickness can be according to scene The supporting condition of installation determines, can carry service personnel's standing and not occur obviously to deform.
The both walls horizontal baffle, front-back wall inclined-plane partition, installation need to have certain leakproofness, to avoid secondary Dust in wind deposits at gap to be fallen.
The utility model has the beneficial effect that:
The utility model people has carried out numerical simulation study to the flow field of the gas-solid multiphase flow in big bellows, obtain due to It is more that big bellows both walls air inlet bottom is higher than strong wind bottom plate, and burner absolute altitude is generally within air inlet middle position, And the overall air flow velocity in big bellows is lower, therefore the air velocity in strong wind lower box part region is very low, and forms low Fast vortex.Contain certain dust in the Secondary Air of air preheater, dust strong wind lower box part low velocity eddy just very It is easy to happen deposition.The purpose of this utility model is exactly to eliminate strong wind bottom portion low speed whirlpool by big bellows accumulatingdust baffle plate device It flows area and carrys out pre- accumulatingdust, and realize purging certainly for a small amount of dust stratification according to the flowing of the wind in front-back wall bellows and Distribution dynamics.
Detailed description of the invention
Fig. 1 is the principle schematic diagram of the utility model.
In figure: 1, both walls horizontal baffle;2, front-back wall inclined-plane partition;3, strong wind bottom plate;4, big bellows air inlet;5, Burner.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
As shown in Figure 1, big bellows accumulatingdust baffle plate device, including both walls horizontal baffle 1, front-back wall inclined-plane partition 2.
The both walls horizontal baffle 1, is welded to form using steel plate, is laid in the two of big 4 lower edge of bellows air inlet In the big bellows of side wall, extend to the edge of the big bellows of front-back wall, absolute altitude it is concordant or slightly lower with big 4 lower edge of bellows air inlet (≤ 300mm).As spacing≤300mm of big 4 lower edge of bellows air inlet and strong wind bottom plate 3, it is not necessary to which both walls level is installed Partition 1.
The front-back wall inclined-plane partition 2, is welded to form using steel plate, close to both walls end and both walls horizontal baffle 1 Alignment is (when spacing≤300mm of big 4 lower edge of bellows air inlet and strong wind bottom plate 3 is without installing both walls horizontal baffle 1 When, then directly welded with strong wind bottom plate), it is tilted upward by two sides to preceding (rear) wall and is centrally formed triangular ramp, inclination angle 2-5 ° of degree, it is specific to need to be determined according to the spacing of both walls horizontal baffle 1 and 5 bottom of burner.
The both walls horizontal baffle 1, front-back wall inclined-plane partition 2, are fixed by big inner bellows girder steel.
The both walls horizontal baffle 1, front-back wall inclined-plane partition 2, steel plate thickness 1-6mm, specific thickness can be according to existing The supporting condition of field installation determines, can carry service personnel's standing and obviously deformation does not occur.
The both walls horizontal baffle 1, front-back wall inclined-plane partition 2, installation need to have certain leakproofness, to avoid two Dust in secondary wind deposits at gap to be fallen.

Claims (9)

1. big bellows accumulatingdust baffle plate device, it is characterised in that including both walls horizontal baffle, front-back wall inclined-plane partition;
The both walls horizontal baffle, is welded to form using steel plate, and the both walls for being laid in big bellows air inlet lower edge are big In bellows, the edge of the big bellows of front-back wall is extended to, absolute altitude and big bellows air inlet lower edge are concordant or slightly lower;
The front-back wall inclined-plane partition, is welded to form using steel plate, is aligned close to both walls end with both walls horizontal baffle;By Two sides tilt upward to front wall and rear wall and are centrally formed triangular ramp, and 2-5 ° of tilt angle.
2. big bellows accumulatingdust baffle plate device according to claim 1, it is characterised in that it is described it is slightly lower refer to less than etc. In 300mm.
3. big bellows accumulatingdust baffle plate device according to claim 2, it is characterised in that the both walls horizontal baffle, Front-back wall inclined-plane partition is fixed by big inner bellows girder steel.
4. big bellows accumulatingdust baffle plate device according to claim 3, it is characterised in that the both walls horizontal baffle, Front-back wall inclined-plane partition, steel plate thickness 1-6mm.
5. big bellows accumulatingdust baffle plate device according to claim 4, it is characterised in that the both walls horizontal baffle, Front-back wall inclined-plane partition need to seal installation and deposit and fall at gap to avoid the dust in Secondary Air.
6. big bellows accumulatingdust baffle plate device according to claim 5, it is characterised in that when big bellows air inlet lower edge When with spacing≤300mm of strong wind bottom plate, it is not necessary to both walls horizontal baffle be installed, front-back wall inclined-plane partition need to be only installed; And the front-back wall inclined-plane partition, be welded to form using steel plate, directly with strong wind bottom plate weld, by two sides tilt upward to Front wall and rear wall are centrally formed triangular ramp, and 2-5 ° of tilt angle.
7. big bellows accumulatingdust baffle plate device according to claim 6, it is characterised in that the front-back wall inclined-plane partition It is fixed by big inner bellows girder steel.
8. big bellows accumulatingdust baffle plate device according to claim 7, it is characterised in that the front-back wall inclined-plane partition, Steel plate thickness 1-6mm.
9. big bellows accumulatingdust baffle plate device according to claim 8, it is characterised in that the front-back wall inclined-plane partition, It need to seal to install to deposit at gap to avoid the dust in Secondary Air and fall.
CN201821328934.8U 2018-08-17 2018-08-17 Big bellows accumulatingdust baffle plate device Withdrawn - After Issue CN208859643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821328934.8U CN208859643U (en) 2018-08-17 2018-08-17 Big bellows accumulatingdust baffle plate device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821328934.8U CN208859643U (en) 2018-08-17 2018-08-17 Big bellows accumulatingdust baffle plate device

Publications (1)

Publication Number Publication Date
CN208859643U true CN208859643U (en) 2019-05-14

Family

ID=66414963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821328934.8U Withdrawn - After Issue CN208859643U (en) 2018-08-17 2018-08-17 Big bellows accumulatingdust baffle plate device

Country Status (1)

Country Link
CN (1) CN208859643U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109084323A (en) * 2018-08-17 2018-12-25 浙江浙能温州发电有限公司 A kind of big bellows accumulatingdust baffle plate device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109084323A (en) * 2018-08-17 2018-12-25 浙江浙能温州发电有限公司 A kind of big bellows accumulatingdust baffle plate device
CN109084323B (en) * 2018-08-17 2023-09-26 浙江浙能温州发电有限公司 Dust deposit baffle device is prevented to big bellows

Similar Documents

Publication Publication Date Title
CN202012930U (en) Local soot blowing device of W-shaped flame boiler
KR101728273B1 (en) A fluidized bed boiler
CN109084323A (en) A kind of big bellows accumulatingdust baffle plate device
CN208859643U (en) Big bellows accumulatingdust baffle plate device
CN202253611U (en) Air distributor and fluidized bed rubbish boiler provided with same
CN102401563B (en) Water-cooling furnace cover of ladle refining furnace with high-temperature camera shooting function
CN101929672A (en) U-shaped water-cooling material returner
CN101476716B (en) Slag residual heat utilization apparatus for industrial boiler
CN110081457A (en) A kind of Secondary Air air pipe device preventing boiler water wall booster and its control method
CN106152116B (en) A kind of wear-resistance circulation fluidized bed boiler combustion chamber water-cooling wall
CN213930861U (en) Angle tube boiler with tail quenching heating surface
CN112283681A (en) Angle tube boiler with tail quenching heating surface
CN209054552U (en) A kind of Fluidized Bed Boiler abrasionproof structure-improved
CN203010587U (en) Boiler returning device
CN207831370U (en) A kind of small-sized rubbish incineration experiment platform incinerator
CN201344546Y (en) Slag discharge and waste heat utilization equipment for industrial boiler
RU151478U1 (en) WATER BOILER RECTANGULAR CROSS-SECTION
CN211290084U (en) Water cooling device of waste liquid incineration boiler
CN206724211U (en) Blast cap on burner hearth
CN203687064U (en) Biomass boiler water-cooling slag hole structure
CA2105602A1 (en) Steam boiler
CN207230530U (en) A kind of circulating fluidized bed boiler with boiler tail afterheat energy-saving environmental protecting device
CN206269100U (en) Vertical exhaust-heat boiler
CN218566201U (en) Nested formula ash discharge structure in high temperature dust collecting equipment
CN113268847B (en) Heat exchange calculation method for flue distributor with combination of heat pipe and guide plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20190514

Effective date of abandoning: 20230926

AV01 Patent right actively abandoned

Granted publication date: 20190514

Effective date of abandoning: 20230926