CN208849319U - Transformer safeguards hoisting mechanism - Google Patents
Transformer safeguards hoisting mechanism Download PDFInfo
- Publication number
- CN208849319U CN208849319U CN201821835232.9U CN201821835232U CN208849319U CN 208849319 U CN208849319 U CN 208849319U CN 201821835232 U CN201821835232 U CN 201821835232U CN 208849319 U CN208849319 U CN 208849319U
- Authority
- CN
- China
- Prior art keywords
- arm
- vertical
- movable link
- safeguards
- hoisting mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 125000006850 spacer group Chemical group 0.000 claims abstract description 11
- 230000000694 effects Effects 0.000 claims abstract description 10
- 238000005452 bending Methods 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model provides transformer and safeguards hoisting mechanism, it includes movable link, movable link bottom is fixed with horizontal lifting arms, horizontal lifting arms are rectangle, in movable link bottom is horizontally fixed on, lift arm both ends are equipped with vertical-lifting arm straight down, and the outside bending in vertical-lifting arm bottom forms hook, two vertical-lifting arm lower parts of movable link wherein side are fixed with spacer pin, are movably installed with promotion support arm between two spacer pins.Using after this programme it is structurally reasonable, using effect is good, easy to operate.
Description
Technical field
The utility model relates to transformer technology fields, refer in particular to transformer maintenance hoisting mechanism.
Background technique
For existing electrician when the electrical component on electric pole is installed or repaired, apparatus of repair parts is to hang over electrician mostly
It with it or takes, is stepped on link band branch electric pole by electrician, but some components are larger, it is inconvenient to carry, it is necessary to a hand
Or two hand rests, largely effect on the operability of electrician.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide it is a kind of it is structurally reasonable, using effect is good, behaviour
Make convenient transformer maintenance hoisting mechanism.
To achieve the above object, technical solution provided by the utility model are as follows: transformer safeguards hoisting mechanism, it includes
There is movable link, movable link bottom is fixed with horizontal lifting arms, and horizontal lifting arms are rectangle, in being horizontally fixed on movable extension
Ring bottom, lift arm both ends are equipped with vertical-lifting arm straight down, and the outside bending in vertical-lifting arm bottom forms hook, living
Two vertical-lifting arm lower parts of dynamic link wherein side are fixed with spacer pin, and promotion branch is movably installed between two spacer pins
Arm.
The promotion support arm is made of the steel plate or hollow square tube of strip.
The promotion support arm is rectangle, and both ends are equipped with the limit cotter way of strip, and spacer pin is movably arranged on limit
In the cotter way of position.
Lift arm both ends are movably articulated in by lift arm pin shaft at the top of the vertical-lifting arm.
For the utility model after adopting the above scheme, movable link uses half arc ring of market routine, movable link activity
On electric pole, component up to be hoisted through lifting rope hanging on hook, step on foot-operated link accordingly and rising by electrician's foot
When, right-hand man holds respectively promotes support arm both ends, and right-hand man intersects pop-up and promotes arm end, and alternately increase movable link,
To drive it is to be hoisted up component rise, in place after can decontrol promotion support arm, by movable link will it is to be hoisted get on
Component be fixed on electric pole, to liberate electrician's both hands, operated convenient for electrician, using after this programme it is structurally reasonable, use
Effect is good, easy to operate.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model.
Fig. 2 is the horizontal lifting arms structural schematic diagram of the utility model.
Specific embodiment
Below with reference to all attached drawings, the utility model is described in further detail, the preferred embodiment of the utility model are as follows: ginseng
See that attached drawing 1 and attached drawing 2, transformer described in the present embodiment safeguard that hoisting mechanism includes movable link 1, movable 1 bottom of link
Horizontal lifting arms 2 are fixed with, horizontal lifting arms 2 are rectangle, in being horizontally fixed on movable 1 bottom of link, 2 liang of horizontal lifting arms
End is equipped with vertical-lifting arm 3 straight down, is movably articulated in horizontal promotion by lift arm pin shaft at the top of vertical-lifting arm 3
2 both ends of arm, the outside bending in 3 bottom of vertical-lifting arm form hook 4, and movable link 1 is wherein under two vertical-lifting arms 3 of side
Portion is fixed with spacer pin 5, is movably installed between two spacer pins 5 and promotes support arm 6, promotes support arm 6 using the steel plate of strip
Or hollow square tube is made, and promotes support arm 6 and is rectangle, both ends are equipped with the limit cotter way 7 of strip, 5 activity installation of spacer pin
In limit cotter way 7.The movable link of the present embodiment uses half arc ring of market routine, and movable link activity is embedded on electric pole,
Component up to be hoisted is through lifting rope hanging on hook, and electrician's foot is stepped on rides link when rising accordingly, right-hand man point
It does not hold and promotes support arm both ends, right-hand man intersects pop-up and promotes arm end, alternately increase movable link, to drive wait mention
The component gone up rises, in place after can decontrol promotion support arm, component up to be hoisted is fixed on by movable link
On electric pole, to liberate electrician's both hands, operated convenient for electrician, using after the present embodiment it is structurally reasonable, using effect is good, operation
It is convenient.
The embodiment of the above is only the preferred embodiment of the utility model, and the reality of the utility model is not limited with this
It applies range, therefore all shapes according to the utility model, changes made by principle, should all cover in the protection scope of the utility model
It is interior.
Claims (4)
1. transformer safeguards hoisting mechanism, it includes movable link (1), it is characterised in that: movable link (1) bottom is fixed with
Horizontal lifting arms (2), horizontal lifting arms (2) are rectangle, in being horizontally fixed on movable link (1) bottom, horizontal lifting arms (2)
Both ends are equipped with vertical-lifting arm (3) straight down, and the outside bending in vertical-lifting arm (3) bottom forms hook (4), and activity is hung
Two vertical-lifting arm (3) lower parts of ring (1) wherein side are fixed with spacer pin (5), activity installation between two spacer pins (5)
There are promotion support arm (6).
2. transformer according to claim 1 safeguards hoisting mechanism, it is characterised in that: promote support arm (6) and use strip
Steel plate or hollow square tube be made.
3. transformer according to claim 1 safeguards hoisting mechanism, it is characterised in that: it promotes support arm (6) and is rectangle,
Both ends are equipped with the limit cotter way (7) of strip, and spacer pin (5) is movably arranged in limit cotter way (7).
4. transformer according to claim 1 safeguards hoisting mechanism, it is characterised in that: pass through at the top of vertical-lifting arm (3)
Lift arm pin shaft is movably articulated in horizontal lifting arms (2) both ends.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821835232.9U CN208849319U (en) | 2018-11-08 | 2018-11-08 | Transformer safeguards hoisting mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821835232.9U CN208849319U (en) | 2018-11-08 | 2018-11-08 | Transformer safeguards hoisting mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208849319U true CN208849319U (en) | 2019-05-10 |
Family
ID=66376663
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821835232.9U Active CN208849319U (en) | 2018-11-08 | 2018-11-08 | Transformer safeguards hoisting mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208849319U (en) |
-
2018
- 2018-11-08 CN CN201821835232.9U patent/CN208849319U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202340093U (en) | Equipment live mounting hoist device on power supply circuit post | |
CN208849319U (en) | Transformer safeguards hoisting mechanism | |
CN204751911U (en) | Jack -up hoist is with automatic knock off joint that hangs | |
CN204727505U (en) | A kind of truss structure formula wheel-mounted crane | |
CN201778531U (en) | Fixing base of auxiliary embraced bar | |
CN201682215U (en) | High-altitude line hanging device | |
CN201611741U (en) | Lifting device used for power equipment | |
CN205087828U (en) | Simple and easy lifting device of 35kV circuit breaker | |
CN203577185U (en) | Shifting mechanism in times of power transmission and distribution line repair | |
CN204772354U (en) | Frock is lifted to reducing | |
CN202988576U (en) | Simple and easy chain hoist lifting support | |
CN203513094U (en) | Lifting appliance | |
CN203924663U (en) | Guide-rail attached lifting discharge platform device | |
CN203754287U (en) | Small-sized interval dual-purpose lifting appliance | |
CN202657877U (en) | Circuit equipment construction lifting frame | |
CN203545559U (en) | Electric meter box hoisting tool | |
CN208401377U (en) | A kind of inspection platform for power station high voltage switchyard | |
CN203589597U (en) | Braking-type line displacement device | |
CN202296895U (en) | Main transformer on-load voltage regulation switch overhauling device | |
CN201261681Y (en) | Sling for mounting RH furnace circulating pipe | |
CN203982956U (en) | The mounting structure of bushing shell for transformer | |
CN201238159Y (en) | GW4-110 type isolation switch examination stand | |
CN205746694U (en) | Double leval jib elevating mechanism | |
CN205901172U (en) | Nearly pole of transmission line overhauls corridor hanger device | |
CN203871743U (en) | Iron tower overhead grounding wire elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Transformer maintenance lifting mechanism Effective date of registration: 20231108 Granted publication date: 20190510 Pledgee: Changxin Zhejiang rural commercial bank Limited by Share Ltd. Pledgor: CHANGXING SHENGQIANG ELECTRONIC EQUIPMENT CO.,LTD. Registration number: Y2023980064543 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |