The online system of assembly shop material trolley
Technical field
The utility model relates to vehicle factor general assembly logistics technology, small in particular to a kind of assembly shop material
The online system of vehicle.
Background technique
Match cargo interests in the SPS (the System of Sorting Components, Set Parts System) of vehicle manufactory assembly shop, logistics
Formula is using more and more extensive.In general, SPS is by that will be placed on SPS with goods from material storage area with goods personnel with cargo interests formula
On trolley, the guide rail that SPS trolley is laid along landing ground is slided to production line, is typically provided at least one level on production line
Transmission device, SPS trolley will send the Vehicle Assembly Area to production line with goods after transmission devices at different levels transmission.
Currently, most of vehicle manufactory generally can be raw using a few money mixed models to reduce the investment to production equipment
The mode of production reduces producing cost, and the configuration of every money vehicle can be also increasing with personalized demand, according to every money vehicle ten
A different configuration, three sections of vehicles calculate, and might have 30 even more configurations, therefore to the general assembly factory of Flexible production
For, the dispatching of material is required also higher and higher.
The production line of existing vehicle factor generally flushes setting, SPS (the System of Sorting Components Set Parts with ground
System) trolley can be conveyed directly on production line.But for emerging or more special production line, production line and ground it
Between there are certain height difference, currently used mode is that SPS trolley is transported to production by staff in difference in height position
On line.As can be seen that this kind of method of shipment not only increases the labor intensity of staff, and inefficiency.
Utility model content
In consideration of it, the utility model proposes a kind of online systems of assembly shop material trolley, it is intended to solve for ground
Face is there are the production line of difference in height, the problem of increasing the labor intensity and inefficiency of staff.
The utility model proposes a kind of online system of assembly shop material trolley, which includes being provided with the first guiding
The transmission device and lifting device of track.Wherein, it is deposited between the transmission device and the second guide rail being set on ground
In difference in height;The lifting device is provided with hoistable platform, and the hoistable platform is provided with third guide rail;The lifting dress
It installs and is placed between the transmission device and second guide rail, also, the lifting device is used for when being placed in low level,
The material trolley of the second guide rail transmission is received, and the material trolley is sent to the biography when being placed in a high position
Send device.
Further, in the above-mentioned online system of assembly shop material trolley, the transmission device is above the ground level, and corresponds to institute
The ground for stating lifting device offers a recessed portion;The lifting device is placed in the recessed portion.
Further, in the above-mentioned online system of assembly shop material trolley, when the lifting device is placed in low level, described
Gap between three guide rails and second guide rail is less than or equal to prepsetting gap and/or height difference is less than or equal to preset
Height difference.
Further, in the above-mentioned online system of assembly shop material trolley, when the lifting device is placed in a high position, described
Gap between three guide rails and first guide rail is less than or equal to be less than or equal to prepsetting gap and/or height difference pre-
If height difference.
Further, in the above-mentioned online system of assembly shop material trolley, the lifting device includes: hoistable platform, liquid
Hydraulic driver and pedestal;Wherein, the fluid pressure drive device is connected to the pedestal;The hoistable platform and the hydraulic drive
The telescopic end of dynamic device is connected.
Further, in the above-mentioned online system of assembly shop material trolley, the third guide rail includes:
First section guide rail, the second section guide rail, third section guide rail, the first driving mechanism and the second driving mechanism;Wherein,
First section guide rail and the third section guide rail are placed in the two sides of second section guide rail and with described second
Section guide rail slideably socket-connects;First driving mechanism is connected with first section guide rail, for driving described first
The relatively described second section guide rail sliding of section guide rail, so that first section guide rail is connected to each other with first guide rail;It is described
Second driving mechanism is connected with the third section guide rail, for driving relatively described second section guide rail of the third section guide rail sliding
It is dynamic, so that the third section guide rail is connected to each other with second guide rail.
Further, in the above-mentioned online system of assembly shop material trolley, further includes: first stroke switch;Wherein, described
First stroke switchs the end for being installed on first section guide rail, and is electrically connected with first driving mechanism, for described
When reaching prepsetting gap between the first section guide rail and first guide rail, the first driving mechanism of Xiang Suoshu, which issues, stops letter
Number.
Further, in the above-mentioned online system of assembly shop material trolley, further includes: second stroke switch;Wherein, described
Second stroke switchs the end for being installed on the third section guide rail, and is electrically connected with second driving mechanism, for described
When reaching prepsetting gap between third section guide rail and second guide rail, the second driving mechanism of Xiang Suoshu, which issues, stops letter
Number.
Further, in the above-mentioned online system of assembly shop material trolley, further includes: control device and height sensor;
Wherein, the height sensor is connected to the hoistable platform, for detecting the height of the hoistable platform;The control device
It is electrically connected with the height sensor and the fluid pressure drive device, for receiving the height of detection, and in the height
Stop signal is issued to the fluid pressure drive device when degree meets preset value.
As can be seen that by the second guide rail for being placed in ground and be placed on production line first in the utility model
Lifting device is set between guide rail, makes the material trolley of SPS system that can not need the dry of staff with automatic transfer
In advance, the labor intensity of staff is not only reduced, and improves production efficiency.
Detailed description of the invention
By reading the following detailed description of the preferred embodiment, various other advantages and benefits are common for this field
Technical staff will become clear.The drawings are only for the purpose of illustrating a preferred embodiment, and is not considered as practical to this
Novel limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the first working condition of the online system of assembly shop material trolley provided in the utility model embodiment
Structural schematic diagram;
Fig. 2 is the second working condition of the online system of assembly shop material trolley provided in the utility model embodiment
Structural schematic diagram;
Fig. 3 is the structural schematic diagram of the lifting device provided in the utility model embodiment.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
It is fully disclosed to those skilled in the art.It should be noted that in the absence of conflict, the implementation in the utility model
Feature in example and embodiment can be combined with each other.It is below with reference to the accompanying drawings and in conjunction with the embodiments practical new this is described in detail
Type.
Referring to Fig. 1 and Fig. 2, the online system of assembly shop material trolley provided by the embodiment of the utility model is shown in figure
Structural schematic diagram.As shown, the system includes transmission device 1 and lifting device 2.
Wherein, transmission device 1 is arranged in the production line, when it is implemented, transmission device 1 can set gradually level-one, two
Grade is multistage, and particular number can determine according to the actual situation.The first guided way is provided on every level-one transmission device 1
Material trolley 3 is sent to the assembly section 4 of automobile by the first guide rail by road (not shown), transmission device 1.
The transmission device 1 (left end shown in FIG. 1) for being placed in front end and the second guide rail being set on ground (figure
In be not shown) between there are differences in height.Lifting device 2 is set between transmission device 1 and the second guide rail.In general,
Transmission device 1 can be above the ground level certain altitude, so, when it is implemented, can be offered on the ground for corresponding to lifting device 2
Lifting device 2 is placed in the recessed portion by one recessed portion.
Lifting device 2 is provided with hoistable platform 21, and hoistable platform 21 is provided with third guide rail (not shown).It rises
Falling unit 2 is used for when being placed in low level, receives the material trolley 3 of the second guide rail transmission, and when being placed in a high position by object
Trolley 3 is sent to transmission device 1.Wherein, low level refers to the third guide rail on hoistable platform 21 and second on ground
Guide rail is flush, so that third guide rail receives the material trolley 3 of the SPS system of the second guide rail transmission, such as Fig. 1
It is shown.A high position refers to that the third guide rail on hoistable platform 21 send the first guide rail phase on device 1 with production lines
It flushes, the material trolley 3 of SPS system is sent to the first guide rail, as shown in Figure 2.
In order to make preferably to dock between third guide rail and the first guide rail and the second guide rail, filled in lifting
When setting 2 and being placed in low level, the gap between third guide rail and the second guide rail should be less than being equal to prepsetting gap, and/or, the
Difference in height between three guide rails and the second guide rail should be less than being equal to default height difference.
Similarly, when lifting device 2 is placed in a high position, the gap between third guide rail and the first guide rail is less than or equal to
Prepsetting gap, and/or, the height difference between third guide rail and the first guide rail is less than or equal to default height difference.
It should be noted that when it is implemented, prepsetting gap and default height difference can determine according to the actual situation, this reality
It applies example and does not do any restriction to it.
As can be seen that by the second guide rail for being placed in ground and what is be placed on production line first lead in the present embodiment
To lifting device 2 is arranged between track, make the material trolley 3 of SPS system that can not need the dry of staff with automatic transfer
In advance, the labor intensity of staff is not only reduced, and improves production efficiency.
It can also include: control device and height sensor in above-described embodiment.Wherein, height sensor is connected to liter
Platform 21 drops, for detecting the height of hoistable platform.Control device is electrically connected with height sensor and fluid pressure drive device, is used
Stop signal is issued to fluid pressure drive device in the height for receiving height sensor detection, and when highly meeting preset value.This
The height preset value at place corresponds to lifting device 2 and is in high-order and low level two states.
Referring back to Fig. 3, the preferred structure of lifting device 2 is shown in figure.As shown, the lifting device 2 includes: to rise
Platform 21, fluid pressure drive device 22 and pedestal 23 drop.Wherein, fluid pressure drive device 22 is connected on pedestal 23, hoistable platform 21
It is connected with the telescopic end of fluid pressure drive device 22.
In order to be oriented to the third guide rail on hoistable platform 21 preferably with the first guide rail of two sides and second
Track is connected to each other, so, when it is implemented, third guide rail can be set to three sections, it is respectively as follows: the first section guide rail,
Two section guide rails and third section guide rail, also, the first section guide rail and third section guide rail are placed in the two sides of the second section guide rail and with
Two section guide rails slideably socket-connect.In order to drive to the first section guide rail and the second section guide rail, the first drive should still be provided with
Motivation structure and the second driving mechanism.
Specifically, the first driving mechanism is connected with the first section guide rail, for driving the first section guide rail to lead with respect to second segment
Rail sliding, so that the first section guide rail is connected to each other with the first guide rail.Correspondingly, the second driving mechanism is connected with third section guide rail
It connects, for driving third section guide rail to slide with respect to the second section guide rail, so that third section guide rail is connected to each other with two guide rails.
It, can be in above-described embodiment in order to preferably make the first section guide rail and third section guide rail move to docking location
It include: first stroke switch.Wherein, first stroke switch is installed on the end of the first section guide rail (against the first guide rail
End), and be electrically connected with the first driving mechanism, when reaching prepsetting gap between the first section guide rail and the first guide rail, the
One stroke switchs to the first driving mechanism and issues stop signal.
It similarly, can also include: second stroke switch.Wherein, second stroke switch is installed on the end of third section guide rail,
And be electrically connected with the second driving mechanism, when for reaching prepsetting gap between third section guide rail and the second guide rail, second
Travel switch issues stop signal to the second driving mechanism.
To sum up, by the second guide rail for being placed in ground and the first guided way being placed on production line in the present embodiment
Lifting device is set between road, makes the material trolley 3 of SPS system that can not need the intervention of staff, not only with automatic transfer
The labor intensity of staff is reduced, and improves production efficiency.
Obviously, it is practical without departing from this can to carry out various modification and variations to the utility model by those skilled in the art
Novel spirit and scope.If in this way, these modifications and variations of the present invention belong to the utility model claims and
Within the scope of its equivalent technologies, then the utility model is also intended to include these modifications and variations.