CN208830716U - A kind of concrete frame trestle pouring construction system - Google Patents

A kind of concrete frame trestle pouring construction system Download PDF

Info

Publication number
CN208830716U
CN208830716U CN201821481871.XU CN201821481871U CN208830716U CN 208830716 U CN208830716 U CN 208830716U CN 201821481871 U CN201821481871 U CN 201821481871U CN 208830716 U CN208830716 U CN 208830716U
Authority
CN
China
Prior art keywords
template
reinforcing bar
square steel
steel tube
turnbuckle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821481871.XU
Other languages
Chinese (zh)
Inventor
李志慧
苏小东
李家新
葛争光
刘广
吴红伦
吕豪
张敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No7 Building Engineering Co Ltd Beijing Urban Construction Group
Original Assignee
No7 Building Engineering Co Ltd Beijing Urban Construction Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No7 Building Engineering Co Ltd Beijing Urban Construction Group filed Critical No7 Building Engineering Co Ltd Beijing Urban Construction Group
Priority to CN201821481871.XU priority Critical patent/CN208830716U/en
Application granted granted Critical
Publication of CN208830716U publication Critical patent/CN208830716U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of concrete frame trestle pouring construction systems, comprising: template, reinforcing bar earth anchor, concrete column has been poured in the template, the template exterior bottom is equipped with sponge strip, the frame being made of two pieces of Contraband shape square steel tubes is enclosed with below the template, the square steel tube is equipped with setscrew;The template both ends are equipped with multiple pressure plates, turnbuckle is equipped between the pressure plate, diagonal brace and reinforcing bar are connected on the reinforcing bar earth anchor, the diagonal brace is connect with turnbuckle, fixed ring is equipped on the outside of the square steel tube, the reinforcing bar is connect with fixed ring, and the template is equipped with the mouth that vibrates, and is equipped with sealing plate outside the mouth that vibrates.In the above embodiments of the present invention, it can effectively prevent the spillage of concrete column, be displaced, the common quality defects such as the mould that rises, supportive is good, and easy to operate, saving does over again, reprocesses expense, and can vibrate to concrete column, improves its intensity.

Description

A kind of concrete frame trestle pouring construction system
Technical field
The utility model belongs to concrete column mould plate technique field, more particularly to a kind of concrete frame trestle pouring construction System.
Background technique
Concrete column template is a kind of temporary supporting structure, makes by design requirement, makes concrete structure by defined Position, geometric dimension molding, keep its correct position, and bear the external load of building template own wt and effect on it Lotus.
There are plank sheathing, aluminum alloy pattern plate, steel form in the common template of current building trade, especially highly super to frame column When crossing 3 meters of frame column construction, aluminum alloy pattern plate and steel form bottom are not done generally between independent processing template and structure there are gap, There is a situation where spillage, displacement it is more universal, and plank sheathing not only easily occur spillage, be displaced and be easy to happen the mould phenomenon that rises, influence Surface Quality of Concrete, and cause to do over again, reprocess and increase engineering cost.
In conclusion problem of the prior art is: often there is phenomena such as spillage, the mould that rises, displacement in frame column, influences concrete Presentation quality, and cause to do over again, reprocess and increase engineering cost.
Utility model content
The purpose of the utility model is to provide a kind of concrete frame trestle pouring construction systems, often occur with solution framework column Phenomena such as spillage, the mould that rises, displacement, Surface Quality of Concrete is influenced, and the technology for doing over again, reprocessing and increasing engineering cost is caused to ask Topic.
The technical solution that the utility model solves above-mentioned technical problem is as follows: a kind of concrete frame trestle pouring construction system System comprising: template, reinforcing bar earth anchor have poured concrete column in the template, and the template exterior bottom is equipped with sponge strip, The frame being made of two pieces of Contraband shape square steel tubes is enclosed with below the template, the square steel tube is equipped with setscrew, described swollen Swollen screw is installed in construction surface;The template both ends are equipped with multiple pressure plates, are equipped with turnbuckle, institute between the pressure plate It states and is connected with diagonal brace and reinforcing bar on reinforcing bar earth anchor, the diagonal brace is connect with turnbuckle, is equipped with and is fixed on the outside of the square steel tube Ring, the reinforcing bar are connect with fixed ring, and the template is equipped with the mouth that vibrates, and are equipped with sealing plate outside the mouth that vibrates.
For example above-mentioned concrete frame trestle pouring construction system of the utility model, further, the diagonal brace are equipped with two, institute State diagonal brace respectively at top, the turnbuckle of middle connect.
For example above-mentioned concrete frame trestle pouring construction system of the utility model, further, the pressure plate length is greater than Template corresponds to two sides between pressure plate and installs turnbuckle, and the turnbuckle is close to template.
For example above-mentioned concrete frame trestle pouring construction system of the utility model, further, the mouth that vibrates is located at template Sealing plate is installed by shaft in middle, mouthful left end of vibrating, and the sealing plate is slightly less than the mouth that vibrates, the sealing plate surrounding Equipped with seal rubber, snap ring is equipped with by shaft on the right side of the sealing plate, the template is equipped with card in fixed ring corresponding position Block, the fixed ring and fixture block are clamped.
For example above-mentioned concrete frame trestle pouring construction system of the utility model is further through on the square steel tube 4-9 bolt hole, the setscrew pass through bolt hole and are installed in construction surface, and the frame of square steel tube composition is by template top Hard-pressed bale is wrapped up in, and the reinforcing bar holds out against square steel tube.
The beneficial effects of the utility model are: by square steel tube, diagonal brace and adding in the above embodiments of the present invention Solid rod is reinforced, and cooperation sponge strip can effectively prevent the spillage of concrete column, be displaced, the common quality defects such as the mould that rises, and supportive is good, Easy to operate, saving does over again, reprocesses expense;And can be vibrated to concrete column by the mouth that vibrates, largely reduce coagulation Phenomena such as voids and pits of earth pillar, improves its intensity.
Detailed description of the invention
By made detailed description in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will It becomes more apparent upon and is easier to understand, these attached drawings are only schematical, are not intended to limit the utility model, in which:
Fig. 1 is a kind of concrete frame trestle pouring construction system schematic of embodiment of the utility model;
Fig. 2 is a kind of concrete column of embodiment, template, the connection schematic diagram of setscrew, square steel tube.
In attached drawing, parts list represented by the reference numerals are as follows:
1, concrete column;2, template;3, pressure plate;4, turnbuckle;5, diagonal brace;6, vibrate mouth;7, sealing plate;8, block Button;9, setscrew;10, square steel tube;11, sponge strip;12, fixed ring;13, reinforcing bar;14, reinforcing bar earth anchor.
Specific embodiment
Hereinafter, the embodiment of the concrete frame trestle pouring construction system of the utility model is described with reference to the accompanying drawings.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein The technical solution of any obvious substitutions and modifications out.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each section Shape and its correlation.It note that for the ease of clearly showing the structure of each component of the utility model embodiment, respectively It is not drawn according to identical ratio between attached drawing.Identical reference marker is for indicating identical part.
Fig. 1 and concrete frame trestle pouring construction system Fig. 2 shows a kind of embodiment of the utility model comprising: mould Plate 2, reinforcing bar earth anchor 14 have poured concrete column 1 in template 2, and 2 exterior bottom of template is equipped with sponge strip 11, wraps up below template 2 By the frame being made of two pieces of Contraband shape square steel tubes 10, square steel tube 10 is equipped with setscrew 9, and setscrew 9 is installed to construction surface It is interior;2 both ends of template are equipped with multiple pressure plates 3, and turnbuckle 4 is equipped between pressure plate 3, is connected with diagonal brace 5 on reinforcing bar earth anchor 14 With reinforcing bar 13, diagonal brace 5 is connect with turnbuckle 4, and fixed ring 12 is equipped on the outside of square steel tube 10, and reinforcing bar 13 and fixed ring 12 connect It connects, template 2 is equipped with the mouth 6 that vibrates, and sealing plate 7 is equipped with outside the mouth 6 that vibrates.
In the utility model above-described embodiment, diagonal brace 5 be equipped with two, diagonal brace 5 respectively at top, the tension spiral shell of middle Bolt 4 connects.
In the utility model above-described embodiment, 3 length of pressure plate is greater than template 2, two sides installation between corresponding pressure plate 3 Turnbuckle 4, turnbuckle 4 are close to template 2.
In the utility model above-described embodiment, the mouth 6 that vibrates is located at 2 middle of template, and 6 left end of mouth of vibrating is pacified by shaft Sealing plate 7 is filled, sealing plate 7 is slightly less than the mouth 6 that vibrates, such as sealing board size ratio mouthful all directions size of vibrating distinguishes a small 2-5mm; Sealing plate 7 is surrounded by seal rubber, is equipped with snap ring by shaft on the right side of sealing plate 7, template 2 is equipped in snap ring corresponding position Fixture block, snap ring and fixture block are clamped.
In the utility model above-described embodiment, 4-9 bolt hole is through on square steel tube 10, setscrew 9 passes through spiral shell Keyhole is installed in construction surface, and 10 length and width specification of square steel tube is 100*100mm, and with a thickness of 3mm, the frame that square steel tube 10 forms will Template 2 holds out against package, and reinforcing bar 13 holds out against square steel tube 10.
It uses principle and process: setting sponge strip 11 around below the template 2, can largely reduce column root spillage situation hair It is raw, multiple pressure plates 3 are set on the outside of template 2, are fastened in 3 two sides of pressure plate by turnbuckle 4, and turnbuckle 4 is tight Mold plate 2, forms frame by two Contraband shape square steel tubes 10 and holds out against template 2, and setscrew 9 is passed through the bolt on square steel tube 10 Hole, and setscrew 9 is mounted in construction surface, avoid column root from being subjected to displacement, rise mould.
Fixed ring 12 is installed on the outside of square steel tube 10, reinforcing bar earth anchor 14 is installed in construction surface, is connected by reinforcing bar earth anchor 14 Connect two diagonal braces 5 and a reinforcing bar 13, by two diagonal braces 5 respectively at top, the turnbuckle 9 of middle be attached, it is right The whole further support of template 2, is connected and fixed ring 12 for reinforcing bar 13, reinforcing bar 13 is made to hold out against square steel tube 10, further other side Steel pipe 10 is reinforced.
After pouring half concrete in template 2, it can vibrate, subtract in the 6 pairs of concrete of mouth that vibrate of 2 middle of template Phenomena such as voids and pits of few concrete column, its intensity is improved, sealing plate 7 is closed after vibrating, and buckle 8 is clamped with fixture block, Cooperate the seal rubber around sealing plate 7, can prevent concrete from running out of at vibrate mouth 6 and 7 connection gap of sealing plate, then again Concreting is carried out to the top half in template 2.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and other feature combination, and those skilled in the art are also Other combinations between each technical characteristic can be carried out according to the purpose of invention, be subject to the purpose for realizing the utility model.

Claims (5)

1. a kind of concrete frame trestle pouring construction system characterized by comprising template, reinforcing bar earth anchor pour in the template Concrete column is built, the template exterior bottom is equipped with sponge strip, is enclosed with below the template by two pieces of Contraband shape square steel tube groups At frame, the square steel tube is equipped with setscrew, and the setscrew is installed in construction surface;The template both ends are equipped with Multiple pressure plates are equipped with turnbuckle between the pressure plate, are connected with diagonal brace and reinforcing bar on the reinforcing bar earth anchor, it is described tiltedly Support is connect with turnbuckle, and fixed ring is equipped on the outside of the square steel tube, and the reinforcing bar connect with fixed ring, sets in the template There is the mouth that vibrates, sealing plate is installed outside the mouth that vibrates.
2. concrete frame trestle pouring construction system according to claim 1, which is characterized in that the diagonal brace is equipped with two Root, the diagonal brace respectively at top, the turnbuckle of middle connect.
3. concrete frame trestle pouring construction system according to claim 1, which is characterized in that the pressure plate length is big Turnbuckle is installed in two sides between template, corresponding pressure plate, and the turnbuckle is close to template.
4. concrete frame trestle pouring construction system according to claim 1, which is characterized in that the mouth that vibrates is located at mould Sealing plate is installed by shaft in plate middle, mouthful left end of vibrating, and the sealing plate is slightly less than the mouth that vibrates, the sealing plate four It is equipped with seal rubber week, the sealing plate right side is equipped with snap ring by shaft, and the template is equipped in fixed ring corresponding position Fixture block, the fixed ring and fixture block are clamped.
5. concrete frame trestle pouring construction system according to claim 1, which is characterized in that penetrated through on the square steel tube There is 4-9 bolt hole, the setscrew passes through bolt hole and is installed in construction surface, and the frame of the square steel tube composition is by template Package is held out against, the reinforcing bar holds out against square steel tube.
CN201821481871.XU 2018-09-11 2018-09-11 A kind of concrete frame trestle pouring construction system Active CN208830716U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821481871.XU CN208830716U (en) 2018-09-11 2018-09-11 A kind of concrete frame trestle pouring construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821481871.XU CN208830716U (en) 2018-09-11 2018-09-11 A kind of concrete frame trestle pouring construction system

Publications (1)

Publication Number Publication Date
CN208830716U true CN208830716U (en) 2019-05-07

Family

ID=66312807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821481871.XU Active CN208830716U (en) 2018-09-11 2018-09-11 A kind of concrete frame trestle pouring construction system

Country Status (1)

Country Link
CN (1) CN208830716U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344587A (en) * 2019-07-08 2019-10-18 江苏旺材科技有限公司 Mold device is sealed needed for a kind of root slip casting of assembling frame column
CN110552347A (en) * 2019-10-14 2019-12-10 中国电建集团贵州工程有限公司 Pile foundation construction template tool
CN110761554A (en) * 2019-10-24 2020-02-07 北京城建集团有限责任公司 Concrete ultrahigh column pouring construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344587A (en) * 2019-07-08 2019-10-18 江苏旺材科技有限公司 Mold device is sealed needed for a kind of root slip casting of assembling frame column
CN110552347A (en) * 2019-10-14 2019-12-10 中国电建集团贵州工程有限公司 Pile foundation construction template tool
CN110761554A (en) * 2019-10-24 2020-02-07 北京城建集团有限责任公司 Concrete ultrahigh column pouring construction method

Similar Documents

Publication Publication Date Title
CN208830716U (en) A kind of concrete frame trestle pouring construction system
CN105926935A (en) Integral column formwork based on 3d printing and used for concrete pouring and column pouring method
CN107447767A (en) A kind of prefabricated reinforced concrete bottom plate steel lifted trunk and its construction method
CN204059957U (en) A kind of formwork reinforcement structure
CN110509396A (en) A kind of production method of superimposed sheet, superimposed sheet production equipment and superimposed sheet
CN107859058A (en) A kind of cast-in-place concrete retaining wall anti-incline anti-floating large steel moulding plate device and installation method
CN206220489U (en) Concrete post formwork for placing tightening device
CN106149877B (en) Concrete frame structure prefabricated post and the docking structure and method at beam slab node
CN106149878B (en) Concrete frame structure prefabricated post and the connection structure and method at beam slab node
CN107237272A (en) Crash barrier template structure and anticollision barrier casting system
CN106437146A (en) Template used for casting floor beam and construction method of floor beam
CN209368658U (en) A kind of precast beam with locating piece
CN105951987A (en) Sub-frame post-cast joint with external permanent aluminum plate outer mold
CN107327066B (en) Structure for the constraint of honeycomb core anti-floating
CN206205144U (en) Node is poured after the secondary external permanent aluminium sheet external mold of framework
CN207739390U (en) Overlap wall and horizontal member connecting node
CN207647181U (en) A kind of wall hangs mould template reinforcing device
CN109577641A (en) Prefabricated shear wall pours constrained edge template and its installation method with after
CN210315625U (en) Anti reinforcement structure that floats of sump pit template
CN209760030U (en) Dedicated bent cap mould of building site construction
CN209585613U (en) A section support device is poured after precast concrete column
CN206902702U (en) Mixed mud built pile
CN220058829U (en) Circular column wood formwork reinforcing apparatus
CN101324086A (en) Construction method of large-span box variable cross-section reinforcement concrete arch
CN110629933A (en) Structure of structural column without supporting form

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant