CN208830255U - A kind of multi-functional dyke of boundling main line - Google Patents
A kind of multi-functional dyke of boundling main line Download PDFInfo
- Publication number
- CN208830255U CN208830255U CN201821526331.9U CN201821526331U CN208830255U CN 208830255 U CN208830255 U CN 208830255U CN 201821526331 U CN201821526331 U CN 201821526331U CN 208830255 U CN208830255 U CN 208830255U
- Authority
- CN
- China
- Prior art keywords
- gallery
- water supply
- main line
- comprehensive
- collector drain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of multi-functional dykes of boundling main line, the trend of dyke is provided with the water supply gallery being arranged parallel in levee body, collector drain, comprehensive gallery and rail traffic gallery, water supply gallery and collector drain close on levee body upstream face, water supply gallery is placed in above collector drain, rail traffic gallery closes on levee body back side, comprehensive gallery is arranged among water supply gallery and collector drain and rail traffic gallery, highway communication main line is arranged at the top of the levee body of comprehensive gallery and rail traffic gallery, energy source is installed in comprehensive gallery, communication transfer main line and auxiliary equipment, antiskid seepage proof curtain is set in comprehensive gallery bottom part down.The compatible arrangement of the various gallery close parallels of the utility model, while realizing transportation function, forms the levee body impervious body of flood bank, reduces land occupation, reduce earth excavation and backfill amount;Although water supply gallery will not pollute water supply gallery close to collector drain, sewage;Comprehensive gallery has the function of damper;During passing the flood period, it can be ensured that the antiskid and seepage-resisting stability of boundling main line.
Description
Technical field
The utility model relates to a kind of hydraulic engineering, especially a kind of multi-functional dyke of boundling main line.
Background technique
In the existing stage, the planning and designing of the departments such as water conservancy, traffic, municipal administration, communication, energy are relatively independent, cause all kinds of bases
Infrastructure layout is mixed and disorderly, and especially main line is built, flood control, water supply, draining, energy source, information transmission, highway communication, track
The infrastructure main line such as traffic has a style of one's own, not only waste of resource, increase investment, but also interferes with each other, in the time and space,
It is difficult to unified implementation management.
Utility model content
Technical problem to be solved by the utility model is to provide a kind of multi-functional dykes of boundling main line, will supply water, row
The main lines such as water, energy source, information transmission, highway communication, rail traffic concentrate compatible construction, and joint plays flooding action, most
Big degree reduces project occupation of land and earth excavation and backfill amount.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is: a kind of multi-functional dike of boundling main line
Anti-, the trend in levee body along dyke is provided with the water supply gallery being arranged parallel, collector drain, comprehensive gallery and track
Access gallery, water supply gallery and collector drain close on levee body upstream face, and water supply gallery is placed in above collector drain, rail traffic corridor
Road closes on levee body back side, and comprehensive gallery is arranged among water supply gallery and collector drain and rail traffic gallery, highway communication
Main line is arranged at the top of the levee body of comprehensive gallery and rail traffic gallery, and it is dry to install energy source, communication transfer in comprehensive gallery
Line and auxiliary equipment set antiskid seepage proof curtain in comprehensive gallery bottom part down.
The water supply gallery transports raw water/drinking water using pressure flow/gravity stream mode, and collector drain uses pressure free current side
Formula transports sewage.
The collector drain backplane underground water unidirectionally in seepage hole, to reduce flood season upstream face dike bottom uplift pressure.
The top cover of the water supply gallery constitutes the part levee crown of levee body, close to the water supply gallery top cover and water supply corridor of upstream face
The abutment wall in road is hinged, and the abutment wall of water supply gallery top cover and water supply gallery far from upstream face overlaps, and water proof is stacked under lap position
Canvas, the both ends of water proof canvas seal respectively to be anchored on abutment wall and water supply gallery top cover, and top cover is enable to spin up to upstream face, rotation
Gyration improves water retaining height less than 60 degree.
The water supply gallery, collector drain, comprehensive gallery and rail traffic gallery close parallel arrangement.
The beneficial effects of the utility model are: the compatible arrangement of various gallery close parallels, while realizing transportation function, shape
At the levee body impervious body of flood bank, land occupation is reduced, reduces earth excavation and backfill amount;Although water supply gallery close to collector drain,
But sewage will not pollute water supply gallery;Comprehensive gallery has the function of damper;During passing the flood period, it can be ensured that the antiskid of boundling main line
With seepage-resisting stability.
Detailed description of the invention
Fig. 1 is the schematic cross-sectional view of the multi-functional dyke of the utility model boundling main line.
Fig. 2 is the schematic cross-sectional view that the water supply gallery top cover of the multi-functional dyke of the utility model boundling main line is opened.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
As shown in Figure 1, the multi-functional dyke of boundling main line of the utility model, moves towards setting along dyke in levee body 10
There are the water supply gallery 1 being arranged parallel, collector drain 2, comprehensive gallery 4 and rail traffic gallery 3, water supply gallery 1 and draining
Gallery 2 closes on 10 upstream face of levee body, and water supply gallery 1 is placed in 2 top of collector drain, and rail traffic gallery 3 closes on 10 backwater of levee body
Face, among water supply gallery 1 and collector drain 2 and rail traffic gallery 3, the setting of highway communication main line 6 exists for the comprehensive setting of gallery 4
At the top of the levee body of comprehensive gallery 4 and rail traffic gallery 3, installed in comprehensive gallery 4 energy source, communication transfer main line 5 and
Auxiliary equipment sets antiskid seepage proof curtain 7 in comprehensive 4 bottom part down of gallery.
The water supply gallery 1 transports raw water/drinking water using pressure flow/gravity stream mode, and collector drain 2 uses pressure free current
Mode transports sewage.
The 2 backplane underground water of collector drain unidirectionally in seepage hole 8, to reduce flood season upstream face dike bottom uplift pressure.
As shown in Fig. 2, the top cover of the water supply gallery 1 constitutes the part levee crown of levee body 10, close to the water supply corridor of upstream face
1 top cover of road and the abutment wall of water supply gallery 1 are hinged, and the abutment wall of 1 top cover of water supply gallery and water supply gallery 1 far from upstream face overlaps,
Water proof canvas 9 is stacked under lap position, the both ends of water proof canvas 9 seal respectively to be anchored on 1 top cover of abutment wall and water supply gallery, is made
Top cover can be spun up to upstream face, rotate angle less than 60 degree, and top cover and water proof canvas 9 have expanded 1 space of water supply gallery, improve gear
Water height.
It is preferred that the water supply gallery 1, collector drain 2, comprehensive gallery 4 and 3 close parallel of rail traffic gallery arrangement.
Water supply gallery 1 is placed in above collector drain 2 by the utility model in upstream face, and rail traffic corridor is arranged in back side
Road 3, is arranged comprehensive gallery 4 in centre, highway communication main line 6 is arranged in levee crown portion, divides into antiskid seepage proof curtain in comprehensive gallery
7,2 backplane underground water of collector drain unidirectionally in seepage hole 8, dike shape structures are integrally formed, it is ensured that supply water, draining, the energy pass
While structure space needed for defeated, information transmission, highway communication, rail traffic, joint plays flood control water blocking effect.
Comprehensive gallery 4 installs energy source, communication transfer main line 5 and main line auxiliary equipment etc., is also used for overhauling and do
Line reserves extending space, while having damping effect, auxiliary equipment include each gallery safety monitoring system, maintenance entrance and
Water supply gallery 1 and the gas vent of collector drain 2 etc..
The top cover of water supply gallery 1 and outside abutment wall are hinged, overlap with inside abutment wall, lower stacked water proof canvas 9.
The utility model can be used segmentation and move back standing posture construction scheme, i.e., divides Work sectors, every section of antiskid antiseepage curtain along the line
After 7 construction of curtain, using basis as construction transportation route, regression construction superstructure backward.
Water supply gallery 1, collector drain 2, rail traffic gallery 3, comprehensive gallery 4 are reinforced concrete structure, can be independent
Casting can also be integrally formed casting, in addition to traditional construction method, prefabrication on-site consolidation scheme can be used, also it is contemplated that adopting
With concrete three-dimensional printing technology.
The top cover and outside abutment wall hinge method of water supply gallery 1 are common hinge, and water proof canvas can be set as needed, with
The anchoring process of concrete sidewall can refer to Rubber dam anchoring fixing structure.
For example, can be combined with stagnant, flood storage areas embankments or the planning of main flood discharge river two sides flood bank, using main line as axis,
Develop green agriculture industry and tourism and leisure economy before dike, builds residential block, Industrial Area, shopping centre, section parish, shape on the way after dike
At wearing pearl comprehensive exploitation band.
The utility model arranges various gallery close parallels are compatible, realize waters supply, draining, energy source, information transmit,
It is whole to play flooding action while the transportation functions such as highway communication, rail traffic, land occupation is reduced, earth excavation is reduced and returns
The amount of filling out;Although water supply gallery will not pollute water supply gallery close to collector drain, sewage;Comprehensive gallery has cushioning effect, drop
Influence of the low orbit traffic vibration to supply and discharge water pipeline;During passing the flood period, pass through antiskid cut-pff wall, collector drain bottom plate list endosmosis
Hole and water supply gallery and collector drain water-filling, can ensure the antiskid and seepage-resisting stability of boundling main line.
Embodiment described above is merely to illustrate the technical idea and feature of the utility model, and its object is to make ability
Technical staff in domain, cannot be only practical to limit with the present embodiment it will be appreciated that the content of the utility model and implement accordingly
Novel the scope of the patents, i.e., same changes or modifications made by the revealed spirit of all the utility model, it is practical new still to fall in this
In the scope of the patents of type.
Claims (5)
1. a kind of multi-functional dyke of boundling main line, including levee body (10), which is characterized in that the walking along dyke in levee body (10)
To the water supply gallery (1) being arranged parallel, collector drain (2), comprehensive gallery (4) and rail traffic gallery (3) is provided with, supply
Water gallery (1) and collector drain (2) close on levee body (10) upstream face, and water supply gallery (1) is placed in above collector drain (2), track
Access gallery (3) closes on levee body (10) back side, and comprehensive gallery (4) are arranged in water supply gallery (1) and collector drain (2) and track
Access gallery (3) is intermediate, and highway communication main line (6) is arranged at the top of the levee body of comprehensive gallery (4) and rail traffic gallery (3),
Installation energy source, communication transfer main line (5) and auxiliary equipment in comprehensive gallery (4) are set in comprehensive gallery (4) bottom part down
Antiskid seepage proof curtain (7).
2. the multi-functional dyke of boundling main line according to claim 1, which is characterized in that the water supply gallery (1), which uses, pressure
Stream/gravity stream mode transports raw water/drinking water, and collector drain (2) transports sewage using pressure free current mode.
3. the multi-functional dyke of boundling main line according to claim 1, which is characterized in that collector drain (2) backplane
Underground water unidirectionally in seepage hole (8), to reduce flood season upstream face dike bottom uplift pressure.
4. the multi-functional dyke of boundling main line according to claim 1, which is characterized in that the top cover structure of the water supply gallery (1)
At the part levee crown of levee body (10), water supply gallery (1) top cover and the abutment wall of water supply gallery (1) close to upstream face are hinged, separate
Water supply gallery (1) top cover of upstream face and the abutment wall of water supply gallery (1) overlap, and are stacked water proof canvas (9) under lap position, water proof
The both ends of canvas (9) seal respectively to be anchored on abutment wall and water supply gallery (1) top cover, and top cover is enable to spin up to upstream face, rotation
Angle improves water retaining height less than 60 degree.
5. any one of -4 multi-functional dyke of boundling main line according to claim 1, which is characterized in that the water supply gallery (1),
Collector drain (2), comprehensive gallery (4) and rail traffic gallery (3) close parallel arrangement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821526331.9U CN208830255U (en) | 2018-09-18 | 2018-09-18 | A kind of multi-functional dyke of boundling main line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821526331.9U CN208830255U (en) | 2018-09-18 | 2018-09-18 | A kind of multi-functional dyke of boundling main line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208830255U true CN208830255U (en) | 2019-05-07 |
Family
ID=66313688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821526331.9U Active CN208830255U (en) | 2018-09-18 | 2018-09-18 | A kind of multi-functional dyke of boundling main line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208830255U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108914880A (en) * | 2018-09-18 | 2018-11-30 | 中水北方勘测设计研究有限责任公司 | The multi-functional dyke of boundling main line |
-
2018
- 2018-09-18 CN CN201821526331.9U patent/CN208830255U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108914880A (en) * | 2018-09-18 | 2018-11-30 | 中水北方勘测设计研究有限责任公司 | The multi-functional dyke of boundling main line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9915048B2 (en) | Method for river/lake level regulation and water conservancy system | |
CN201485823U (en) | Anti-seepage structure of hydraulic asphalt concrete panel | |
CN209429048U (en) | One kind being suitable for Mountainous Area in North China karez formula underground and catchments water delivery water storage gallery | |
CN106149626A (en) | A kind of automatic river levee controlled flood with flood | |
CN206070586U (en) | Inspection well structure for sewage access comprehensive pipe rack | |
CN208830255U (en) | A kind of multi-functional dyke of boundling main line | |
CN108757027A (en) | Multi-functional lobby water system in a kind of tunnel | |
CN105672213A (en) | Floating transportation type integral steel gate dam for coastal region | |
CN116136083B (en) | Water safety and hydrodynamic force regulation and control method for intelligent water conservancy campus | |
CN112267419A (en) | Automatic dredging, intercepting, sewage discharging and water transporting port on coastal region | |
CN112031119A (en) | Large-section flood discharge ditch for mountainous terrain and construction method thereof | |
KR101201684B1 (en) | Small scale power generation system using temporary levee protector and installation method | |
CN205475122U (en) | A whole steel gate dam of transportation by driving formula for coastal area | |
CN108914880A (en) | The multi-functional dyke of boundling main line | |
CN206554930U (en) | It is a kind of it is round overlap joint shape shield machine construction interflow regulate and store moldeed depth layer tunnel | |
CN206554937U (en) | A kind of interflow of class rectangle shield machine construction regulate and store moldeed depth layer tunnel | |
CN205894016U (en) | Automatic river levee with flood flood control | |
CN101644040A (en) | Flow guide and navigation pier structure and construction method thereof | |
CN206736965U (en) | A kind of electric power well construction | |
CN206554933U (en) | A kind of Shockproof damping type collaborates moldeed depth layer tunnel of regulating and storing | |
CN205894017U (en) | Block automation of tide with tide and block sea wall | |
CN207376568U (en) | A kind of anti-flood wall | |
Jing et al. | Application of Pneumatically Actuated Dams in Urban River Regulation | |
CN220550516U (en) | Mixed dam pivot arrangement structure | |
KR20110107892A (en) | Reformed tidal generation structures and working management program with the 3 basins |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |