CN208777179U - A kind of base-supporting Hanging Basket closure segment traveling and retreat Demolition Construction device - Google Patents

A kind of base-supporting Hanging Basket closure segment traveling and retreat Demolition Construction device Download PDF

Info

Publication number
CN208777179U
CN208777179U CN201821322656.5U CN201821322656U CN208777179U CN 208777179 U CN208777179 U CN 208777179U CN 201821322656 U CN201821322656 U CN 201821322656U CN 208777179 U CN208777179 U CN 208777179U
Authority
CN
China
Prior art keywords
hanging basket
double hook
base
beam body
beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821322656.5U
Other languages
Chinese (zh)
Inventor
孙中华
何永义
于雷
侯利军
韩欣宇
李剑锋
刘波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Six Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Six Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Six Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201821322656.5U priority Critical patent/CN208777179U/en
Application granted granted Critical
Publication of CN208777179U publication Critical patent/CN208777179U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field that lower pressure-bearing type hangs blue construction, when hanging blue closure segment construction to solve base-supporting, Hanging Basket cannot smoothly traveling in place, the problem that beam body cannot be retreated smoothly after the completion of pouring, tower crane is removed, it provides a kind of base-supporting Hanging Basket closure segment traveling and retreats Demolition Construction device, including double hook beams and support column, double hook beams are arranged across beam body is poured, two support columns, which are symmetrically set in, pours beam body two sides, the double middle beams for hooking beam of top connection support of support column, the bottom support of support column are connected on the double hook tails for hooking beam of respective side;Double hook tails for hooking beam are connect with the outer nose girder truss of base-supporting Hanging Basket;Connection two can be along the sliding rail that beam body top surface is slided be poured below double hook beam middle beams, and two one slide rails edge pours the longitudinally asymmetric setting of beam body.The smooth traveling of the utility model realization base-supporting Hanging Basket closure segment;Base-supporting Hanging Basket smoothly retreats dismounting after the completion of ensure that beam body construction, provides construction efficiency, remarkable in economical benefits.

Description

A kind of base-supporting Hanging Basket closure segment traveling and retreat Demolition Construction device
Technical field
The utility model belongs to the technical field that lower pressure-bearing type hangs blue construction, and in particular to a kind of base-supporting Hanging Basket closure segment Traveling and retrogressing Demolition Construction device.
Background technique
The construction of Hanging Basket cantilever pouring is also known as Di Weidake construction, because its use cradle construction structure simple, reasonable stress and Primary movement makes cast-in-place cantilever method application most in place, without setting up the advantages that bracket does not interfere under-clearance and normal traffic It is extensive.There are various problems in existing base-supporting cradle construction, first is that, existing base-supporting Hanging Basket cannot achieve beam body closure segment Smooth construction, cannot go repacking Hanging Basket can not move forward at closure segment;Second is that base-supporting Hanging Basket complete beam body construction after, Difficulty is removed, constructional difficulties are retreated, the high crane of pier can not carry out the various problems such as lifting dismounting.
Summary of the invention
When the utility model hangs blue closure segment construction to solve base-supporting, Hanging Basket cannot smoothly in place, beam body be poured for traveling It cannot smoothly be retreated after the completion of building, the problem that tower crane is removed, and then provide a kind of base-supporting Hanging Basket closure segment traveling and retrogressing Demolition Construction device.
The utility model adopts the following technical solution:
A kind of base-supporting Hanging Basket closure segment traveling and retreat Demolition Construction device, including double hook beams and support column, double hook beams Across beam body setting is poured, two support columns, which are symmetrically set in, pours beam body two sides, the double hook beams of top connection support of support column Middle beam, the bottom support of support column are connected on the double hook tails for hooking beam of respective side;Double hook tails and base-supporting Hanging Basket for hooking beam Outer nose girder truss connection;Two energy edges of connection pour the sliding rail that beam body top surface is slided, two cunnings below double hook beam middle beams Rail edge pours the longitudinally asymmetric setting of beam body.
Passage oil cylinder is horizontally installed on double hook tails for hooking beam, the cylinder body of passage oil cylinder is fixed on double hook tails for hooking beam On, the piston rod end passage of passage oil cylinder holds out against support column bottom.It may be variable cross-section because pouring beam body, using passage oil Cylinder adjusts the fixed position of transverse direction of support column, interferes to avoid with beam body.
Double crossbeams for hooking beam, which are at least higher by, pours beam body top surface 50cm, to reserve sliding rail installation and retreat movement Space.
The utility model is that Hanging Basket weight is born by double hook beam combination C beams, and support column is used to support double hook beams, and slides Rail can drive double beams that hook to vertically move, and then realize the smooth traveling of base-supporting Hanging Basket closure segment;It ensure that beam body construction is completed Base-supporting Hanging Basket smoothly retreats dismounting afterwards, provides construction efficiency, remarkable in economical benefits.Meanwhile the lateral fixed bit of support column Setting can be adjusted by passage oil cylinder, adapt to the construction requirement of beam body variable cross-section.
Detailed description of the invention
Fig. 1 is that normal girder segment pours cross-section diagram;
Fig. 2 is that Hanging Basket retreats cross-section diagram;
In figure: 1- support column, 2- connection bolt, the outside 3- nose girder truss, the bis- hook beam ends of 4- hook in the middle part of the bis- hook beams of tail, 5- Crossbeam, 6- sliding rail.
Specific embodiment
Base-supporting Hanging Basket closure segment traveling and retrogressing Demolition Construction device as illustrated in fig. 1 and 2, including double hook beams and support Column, for double hook beams across beam body setting is poured, two support columns, which are symmetrically set in, pours beam body two sides, and the top of support column connects support Double middle beams for hooking beam, the bottom support of support column are connected on the double hook tails for hooking beam of respective side;Double hook tails for hooking beam are under Hold the outer nose girder truss connection of formula Hanging Basket;Two energy edges of connection pour the cunning that beam body top surface is slided below double hook beam middle beams Rail, two one slide rails edge pour the longitudinally asymmetric setting of beam body.
The utility model is to realize that preceding upper beam is higher by by double hook beams and support column to pour beam body top surface 50cm, double hook beams Two hook the outer nose girder truss front end of end (tail portion) and base-supporting Hanging Basket and be bolted, support column is supported in the hook ends of double hook beams On, support column lower part is bolted with double hook beam ends, top is also connected by screw bolts with double beam middle beams that hook, and is realized continuous The construction of beam normal phase;When closure segment is constructed, support column is laid down, the preceding lower beam of base-supporting Hanging Basket bed die system is passed through into suspender belt It is fixed on external sliding rail nose girder truss, while the suspender belt on preceding double tops Gou Liang removes, realizes that base-supporting Hanging Basket passes through Closure segment (upper beam is lower than beam face structure existing defects before conventional base-supporting Hanging Basket, cannot achieve Hanging Basket closure segment and moves ahead);When After the completion of closure segment construction, base-supporting Hanging Basket is removed, and when pier shaft is higher or lower part does not have construction site, need to be backed to Hanging Basket It is removed at 0# sections using tower crane, and conventional base-supporting Hanging Basket can not be retreated or be retreated there are very big construction risk, design one The double beams that hook of kind cooperate back sliding rails, realize the beam face tracks travel of Hanging Basket, and the double hook beams in front and rear portion C-type beam bear entire Hanging Basket Weight, while also forming the traveling support system of Hanging Basket.

Claims (3)

1. a kind of base-supporting Hanging Basket closure segment traveling and retrogressing Demolition Construction device, it is characterised in that: including double hook beams and support Column, for double hook beams across beam body setting is poured, two support columns, which are symmetrically set in, pours beam body two sides, and the top of support column connects support Double middle beams for hooking beam, the bottom support of support column are connected on the double hook tails for hooking beam of respective side;Double hook tails for hooking beam are under Hold the outer nose girder truss connection of formula Hanging Basket;Two energy edges of connection pour the cunning that beam body top surface is slided below double hook beam middle beams Rail, two one slide rails edge pour the longitudinally asymmetric setting of beam body.
2. base-supporting Hanging Basket closure segment traveling according to claim 1 and retrogressing Demolition Construction device, it is characterised in that: institute It states and is horizontally installed with passage oil cylinder on double hook tails for hooking beam, the cylinder body of passage oil cylinder is fixed on double hook tails for hooking beam, passage oil The piston rod end passage of cylinder holds out against support column bottom.
3. base-supporting Hanging Basket closure segment traveling according to claim 2 and retrogressing Demolition Construction device, it is characterised in that: institute The crossbeams for stating double hook beams, which are at least higher by, pours beam body top surface 50cm.
CN201821322656.5U 2018-08-16 2018-08-16 A kind of base-supporting Hanging Basket closure segment traveling and retreat Demolition Construction device Active CN208777179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821322656.5U CN208777179U (en) 2018-08-16 2018-08-16 A kind of base-supporting Hanging Basket closure segment traveling and retreat Demolition Construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821322656.5U CN208777179U (en) 2018-08-16 2018-08-16 A kind of base-supporting Hanging Basket closure segment traveling and retreat Demolition Construction device

Publications (1)

Publication Number Publication Date
CN208777179U true CN208777179U (en) 2019-04-23

Family

ID=66157250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821322656.5U Active CN208777179U (en) 2018-08-16 2018-08-16 A kind of base-supporting Hanging Basket closure segment traveling and retreat Demolition Construction device

Country Status (1)

Country Link
CN (1) CN208777179U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576248A (en) * 2020-05-29 2020-08-25 中铁七局集团有限公司 Dismantling method for cantilever cast-in-situ beam hanging basket system
CN114182651A (en) * 2021-12-31 2022-03-15 中铁一局集团有限公司 Method for dismantling guy cable hanging basket in sections
CN114517451A (en) * 2022-01-27 2022-05-20 中铁十五局集团有限公司 Swinging type hanging basket dismantling method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576248A (en) * 2020-05-29 2020-08-25 中铁七局集团有限公司 Dismantling method for cantilever cast-in-situ beam hanging basket system
CN114182651A (en) * 2021-12-31 2022-03-15 中铁一局集团有限公司 Method for dismantling guy cable hanging basket in sections
CN114182651B (en) * 2021-12-31 2024-06-11 中铁一局集团有限公司 Segmented dismantling method for guy rope hanging basket
CN114517451A (en) * 2022-01-27 2022-05-20 中铁十五局集团有限公司 Swinging type hanging basket dismantling method
CN114517451B (en) * 2022-01-27 2023-04-18 中铁十五局集团有限公司 Swinging type hanging basket dismantling method

Similar Documents

Publication Publication Date Title
CN208777179U (en) A kind of base-supporting Hanging Basket closure segment traveling and retreat Demolition Construction device
CN101586330B (en) Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN102094392B (en) Lower supported hanging basket in bridge construction and application thereof
CN205348004U (en) Moving die carrier
CN105155423A (en) Upward moving type movable formwork for continuous box girder construction
CN104631335A (en) Novel large-tonnage bridge girder erection machine and construction method thereof
CN208815424U (en) A kind of bridge descending hanging basket
CN206070393U (en) A kind of asynchronous construction hanging basket of Wavelike steel webplate composite beam bridge
CN208380591U (en) Send rail tunnel hydraulic two linings trolley automatically
CN206800212U (en) The Bridge Erector constructed by cross for precast segmental beam
CN108103945B (en) A kind of whole landing mould bases of cast-in-situ box girder
CN103498421A (en) Movable formwork used for U-type water-conservancy flume construction
CN109629422A (en) A kind of new Bridge Erector traverses over width method
CN109989330A (en) Continous way track and its erection method
CN206800208U (en) Constructed by cross for precast segmental beam the Auxiliary support leg structure of Bridge Erector
CN207987749U (en) Ride cable-styled erection crane
CN106245601B (en) Step-by-step vertical lifting hoist
CN201972099U (en) Through type hanging basket in bridge construction
CN208501523U (en) It is a kind of novel for setting up the Bridge Erector for spelling wide beam
CN206800209U (en) Constructed by cross for precast segmental beam the hangar system of Bridge Erector
CN101205702A (en) Beam-form unified movable mould frame
CN207700074U (en) The double limb triangle hanging baskets of continuous rigid frame bridge cantilever beam section construction
CN106351123B (en) A kind of more case Wavelike steel webplate main girder construction Hanging Baskets of list rope
CN111042004A (en) Hanging basket track beam traveling method
CN208763669U (en) Tunnel widened section construction assembly type trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant