CN208762955U CN201821493507.5U CN201821493507U CN208762955U CN 208762955 U CN208762955 U CN 208762955U CN 201821493507 U CN201821493507 U CN 201821493507U CN 208762955 U CN208762955 U CN 208762955U
Authority
CN
China
Prior art keywords
dam
check
check dam
channel
dam body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821493507.5U
Other languages
Chinese (zh)
Inventor
刘肃
许晓鸿
杨献坤
崔斌
叶楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin water and soil conservation science research institute
Original Assignee
Jilin water and soil conservation science research institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin water and soil conservation science research institute filed Critical Jilin water and soil conservation science research institute
Priority to CN201821493507.5U priority Critical patent/CN208762955U/en
Application granted granted Critical
Publication of CN208762955U publication Critical patent/CN208762955U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of channel check dams, check dam dam body is laterally set in channel, and extend downwardly into the bottom of check dam dam body in bottom of trench, the two sides dam abutment of check dam dam body extends transversely into ditch slope, the height of check dam dam body upstream face gradually rises along water (flow) direction, the height of check dam dam body back side is gradually decreased along water (flow) direction, on two lateral sulcus slope of channel and it is located at check dam dam body inflow direction side setting protecting wall, and making the upstream end thereof of protecting wall to the inner bending of ditch slope, the downstream of protecting wall connects with the check dam dam body upstream face;After protecting wall is added in check dam dam body upstream face side, check dam dam body is avoided because of upstream face collapse of dam problem caused by by two lateral sulcus bank of waterpower downwash, and protecting wall upstream end thereof is to the inner bending of ditch slope, it protrudes into ditch slope, it can effectively prevent water flow seepage flow after wall, therefore channel check dam high stability provided by the utility model.

Description

A kind of channel check dam
Technical field
The utility model relates to erosion groove protection technology fields, more particularly to a kind of channel check dam.
Background technique
Check dam is that erosion groove administers maximally efficient one of technical measures, can be divided into native check dam, stone check dam by construction material And plant check dam.Native check dam is formed by earth filling tamping, is suitable for soil property hills area, but be unable to overflow by dam crest and limited, is answered With less;Plant check dam by willow stake and compile willow hedge in banket or rockfill, height be no more than 1.5m, be only applicable to flow compared with Small branch hair ditch is administered;Stone check dam is built by stone masonry, loose stone or gabion, is suitable for stone matter or native Mountainous Area, due to Pannier check dam high stability, therefore it is most widely used.
Pannier check dam is successively in that step assembles by cuboid gabion net cage at present, each extends into two lateral sulcus banks 0.5 ~1.0m, still has damaged or destroyed by flood problem, and main cause is that upstream face two sides soil property ditch bank by waterpower downwash is acted on lateral magnification, After causing check dam dam abutment exposed, seepage deformation occurs for the soil body at ditch bank dam abutment, and water flow streams backlash brush downstream slope foot along dam abutment, most The check dam dam foundation is caused to be emptied eventually, collapse of dam.
Therefore how to solve the problems, such as that pannier check dam dam body easily collapses because dam abutment streams, be that those skilled in the art are current The technical issues that need to address.
Utility model content
The purpose of the utility model is to provide a kind of channel check dams, increase protecting wall in upstream face, avoid because meeting The water surface is caused collapse of dam problem by two lateral sulcus bank of waterpower downwash.
In order to solve the above technical problems, the utility model provides a kind of channel check dam, including being horizontally installed in channel Check dam dam body, and it is located on two lateral sulcus slope of channel and is located at the protecting wall of check dam dam body inflow direction side, the paddy The bottom of mill dam body extends downwardly into bottom of trench, and the two sides dam abutment of the check dam dam body extends transversely into ditch slope, the check dam dam body The height of upstream face gradually rises along water (flow) direction, and the height of the check dam dam body back side is gradually decreased along water (flow) direction, institute The upstream end thereof of protecting wall is stated to the inner bending of ditch slope, the downstream of the protecting wall connects with the check dam dam body upstream face.
Preferably, the check dam dam body and the protecting wall are assembled by the layering of gabion net cage.
Preferably, the top center position of the check dam dam body is equipped with overflow port.
Preferably, the upstream end thereof of the protecting wall is along the upward closing slope of water (flow) direction.
Preferably, the slope ratio of the check dam dam body upstream face is 1:0.8, and the slope ratio of the check dam dam body back side is 1: 1.2。
Preferably, the depth that the bottom of the check dam dam body extends downwardly into bottom of trench is not less than 0.5m, the check dam dam body Two sides dam abutment extends transversely into the length in ditch slope not less than 0.5m.
Preferably, check dam dam body backwater section side trench bottom be equipped with protection-apron layer, the protection-apron layer with it is described Check dam dam body backwater section bottom connection, the two sides of the protection-apron layer are protruded into ditch slope.
Preferably, the protection-apron layer be inclination protection-apron layer, and its slope than with the slope of the check dam dam body back side than identical.
Preferably, geotextile layer and blotter are equipped between channel ditch slope and the protecting wall.
Channel check dam provided by the utility model, is laterally arranged check dam dam body in channel, and makes the bottom of check dam dam body It extends downwardly into bottom of trench, the two sides dam abutment of check dam dam body extends transversely into ditch slope, and the height of check dam dam body upstream face is along water flow side To gradually rising, the height of check dam dam body back side is gradually decreased along water (flow) direction, on two lateral sulcus slope of channel and is located at check dam Protecting wall is arranged in dam body inflow direction side, and makes the upstream end thereof of protecting wall to the inner bending of ditch slope, the downstream of protecting wall and institute Check dam dam body upstream face is stated to connect;After protecting wall is added in check dam dam body upstream face side, check dam dam body is avoided because of upstream face Collapse of dam problem is caused by two lateral sulcus bank of waterpower downwash, and protecting wall upstream end thereof protrudes into ditch slope to the inner bending of ditch slope, energy Enough it effectively prevent water flow seepage flow after wall, therefore channel check dam high stability provided by the utility model.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of specific embodiment of channel check dam provided by the utility model;
Fig. 2 is a kind of transverse sectional view of specific embodiment of channel check dam provided by the utility model;
Fig. 3 is a kind of longitudinal sectional view of specific embodiment of channel check dam provided by the utility model.
It is marked in attached drawing as follows:
Protecting wall 1, check dam dam body 2, protection-apron layer 3, blotter 4, leg wire of slope 5, costa colpi line 6.
Specific embodiment
The core of the utility model is to provide a kind of channel check dam, increases protecting wall in upstream face, avoids because meeting The water surface is caused collapse of dam problem by two lateral sulcus bank of waterpower downwash.
In order to make those skilled in the art better understand the scheme of the utility model, with reference to the accompanying drawing and specific implementation The utility model is described in further detail for mode.
Fig. 1 to Fig. 3 is please referred to, Fig. 1 is a kind of knot of specific embodiment of channel check dam provided by the utility model Structure schematic diagram;Fig. 2 is a kind of transverse sectional view of specific embodiment of channel check dam provided by the utility model;Fig. 3 is A kind of longitudinal sectional view of specific embodiment of channel check dam provided by the utility model.
The channel check dam that specific embodiment of the present invention provides, including the check dam dam body 2 being horizontally installed in channel, The bottom of check dam dam body 2 extends downwardly into bottom of trench, and the two sides dam abutment of check dam dam body 2 extends transversely into ditch slope, and check dam dam body 2 meets water The height in face gradually rises along water (flow) direction, and the height of 2 back side of check dam dam body is gradually decreased along water (flow) direction, in channel two sides On ditch slope and it is located at 2 inflow direction side of check dam dam body equipped with protecting wall 1, the upstream end thereof of protecting wall 1 is prevented to the inner bending of ditch slope The downstream of revetment 1 connects with 2 upstream face of check dam dam body.
In addition, protecting wall 1 is upwardly extended from leg wire of slope 5 along ditch slope, it is highly preferred at the top of check dam dam body 2 and protecting wall 1 It is flushed with costa colpi line 6, the transverse ends at top are respectively protruding into the ditch slope at costa colpi line 6, can protect entire channel.Wherein Leg wire of slope 5 is the differentiation line on ditch slope and bottom of trench, and costa colpi line 6 is the differentiation line of channel and Loess interfcure.
Channel check dam provided by the utility model is additionally arranged on the basis of existing check dam dam body 2 in its upstream face side Protecting wall 1, avoids check dam dam body 2 because of upstream face collapse of dam problem caused by by two lateral sulcus bank of waterpower downwash, especially suitable for 2 upstream face of check dam dam body, two lateral sulcus slope does not have the deep U type gully erosion for excavating engagement groove, and 1 upstream end thereof of protecting wall is to ditch Slope inner bending is protruded into ditch slope, can effectively prevent water flow seepage flow after wall, therefore channel check dam provided by the utility model is steady It is qualitative higher.
In addition, the height of 2 upstream face of check dam dam body gradually rises along water (flow) direction, the height edge of 2 back side of check dam dam body Water (flow) direction gradually decreases, and can slow down water and flow through the out-of-date impact force to dam body, since check dam dam body 2 is horizontally installed on channel It is interior, then the cross section of check dam dam body 2 be with the matched inverted trapezoidal of channel, check dam dam body 2 meet water section transverse width along water flow side To being gradually widened, the transverse width of 2 backwater section of check dam dam body becomes narrow gradually along water (flow) direction.
Further, the channel check dam that specific embodiment of the present invention provides, check dam dam body 2 and protecting wall 1 are excellent Choosing is assembled by the layering of gabion net cage, and construction is simple is convenient, and affected by environment smaller, high stability.It is of course also possible to Check dam dam body 2 or protecting wall 1 are made using cement, concrete etc., are also within the protection scope of the utility model.
The channel check dam that specific embodiment of the present invention provides, specifically, in the top center position of check dam dam body 2 It can be equipped with overflow port, so that water flow is mainly flowed out from overflow port, the unrestrained top of water flow, can preferably be protected when avoiding water larger Two lateral sulcus slopes.
Further, the upstream end thereof of protecting wall 1 is preferably along the upward closing slope of water (flow) direction, to slow down suffered water impact The slope of power, 1 upstream end thereof of protecting wall than specifically can be set to 1:1, and the slope of 2 upstream face of check dam dam body than specifically can be set Slope for 1:0.8, and 2 back side of check dam dam body than specifically can be set to 1:1.2, can preferably protect 2 He of check dam dam body Protecting wall 1.Certainly, the slope of check dam dam body 2 and protecting wall 1 ratio is not limited to this, and can be adjusted according to actual landform, this Shen Please this is not specifically limited.
The channel check dam that specific embodiment of the present invention provides, for the stabilization for guaranteeing check dam dam body 2 and protecting wall 1 Property, the depth that the bottom of check dam dam body 2 extends downwardly into bottom of trench are preferably not less than 0.5m, and the two sides dam abutment of check dam dam body 2 is laterally stretched The length entered in ditch slope is preferably not less than 0.5m.
The channel check dam that specific embodiment of the present invention provides on the basis of above-mentioned each specific embodiment, in paddy The trench bottom of 2 backwater section side of mill dam body is also provided with protection-apron layer 3, protection-apron layer 3 and 2 backwater section bottom phase of check dam dam body It connects, the stability of check dam dam body 2 can be improved in setting 3 one side of protection-apron layer, on the other hand can flow in water flow along check dam dam body 2 Trench bottom will be protected when lower, reduce water flow impact pressure.
Specifically, protection-apron layer 3 preferably tilts protection-apron layer 3, and its slope is than that can compare phase with the slope of 2 back side of check dam dam body Together, trench bottom can be protected when water flow is under the stream of check dam dam body 2, reduces water flow impact pressure.
In addition, the two sides of protection-apron layer 3 can be protruded into ditch slope, and the length protruded into ditch slope is preferably not less than 0.5m, prevents Only entire channel can be preferably protected by erosion at channel leg wire of slope 5.
On the basis of above-mentioned each specific embodiment, the channel check dam that specific embodiment of the present invention provides, Geotextile layer and blotter 4 are further preferably equipped between channel ditch slope and protecting wall 1, by the gabion net cage of protecting wall 1 with Soil body isolation, slows down current scour soil, and keep the overall structure and bearing capacity of protecting wall 1.
Wherein it should be noted that each embodiment is described in a progressive manner in specification, each embodiment emphasis What is illustrated is the difference from other embodiments, and similar portion may refer to each other between each embodiment.For implementing Disclosed in example for device, since it is corresponded to the methods disclosed in the examples, so description is relatively simple, related place referring to Method part illustration.
Channel check dam provided by the utility model is described in detail above.Specific case pair used herein The principles of the present invention and embodiment are expounded, and the above embodiments are only used to help understand, and this is practical new The method and its core concept of type.It is practical not departing from it should be pointed out that for those skilled in the art Under the premise of new principle, several improvements and modifications can be made to this utility model, these improvement and modification also fall into this In the protection scope of utility model claims.

Claims (9)

1. a kind of channel check dam, which is characterized in that including the check dam dam body being horizontally installed in channel, and be located at channel two sides Protecting wall on ditch slope and positioned at check dam dam body inflow direction side, the bottom of the check dam dam body extends downwardly into bottom of trench Interior, the two sides dam abutment of the check dam dam body extends transversely into ditch slope, the height of the check dam dam body upstream face along water (flow) direction by Edge up height, and the height of the check dam dam body back side is gradually decreased along water (flow) direction, and the upstream end thereof of the protecting wall is to ditch slope Inner bending, the downstream of the protecting wall connect with the check dam dam body upstream face.
2. channel check dam according to claim 1, which is characterized in that the check dam dam body and the protecting wall are by gabion Net cage layering assembles.
3. channel check dam according to claim 2, which is characterized in that the top center position of the check dam dam body, which is equipped with, overflows Head piece.
4. channel check dam according to claim 3, which is characterized in that the upstream end thereof of the protecting wall along water (flow) direction to Upper closing slope.
5. channel check dam according to claim 4, which is characterized in that the slope ratio of the check dam dam body upstream face is 1:0.8, The slope ratio of the check dam dam body back side is 1:1.2.
6. channel check dam according to claim 5, which is characterized in that the bottom of the check dam dam body extends downwardly into bottom of trench Depth is not less than 0.5m, and the two sides dam abutment of the check dam dam body extends transversely into the length in ditch slope not less than 0.5m.
7. according to claim 1 to channel check dam described in 6 any one, which is characterized in that in the check dam dam body backwater section The trench bottom of side is equipped with protection-apron layer, the protection-apron layer and the check dam dam body backwater section bottom connection, the protection-apron layer Two sides are protruded into ditch slope.
8. channel check dam according to claim 7, which is characterized in that the protection-apron layer is inclination protection-apron layer, and its slope ratio With the slope of the check dam dam body back side than identical.
9. channel check dam according to claim 8, which is characterized in that be equipped between channel ditch slope and the protecting wall Geotextile layer and blotter.
CN201821493507.5U 2018-09-12 2018-09-12 A kind of channel check dam Expired - Fee Related CN208762955U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821493507.5U CN208762955U (en) 2018-09-12 2018-09-12 A kind of channel check dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821493507.5U CN208762955U (en) 2018-09-12 2018-09-12 A kind of channel check dam

Publications (1)

Publication Number Publication Date
CN208762955U true CN208762955U (en) 2019-04-19

Family

ID=66134772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821493507.5U Expired - Fee Related CN208762955U (en) 2018-09-12 2018-09-12 A kind of channel check dam

Country Status (1)

Country Link
CN (1) CN208762955U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842720A (en) * 2018-09-12 2018-11-20 吉林省水土保持科学研究院 A kind of channel check dam and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842720A (en) * 2018-09-12 2018-11-20 吉林省水土保持科学研究院 A kind of channel check dam and its construction method

Similar Documents

Publication Publication Date Title
CN105926544B (en) A kind of economical mud-rock flow blocking dam structure and its construction method
CN108842720A (en) A kind of channel check dam and its construction method
CN104594287A (en) Ecological and economic bank protection structure
CN107119626A (en) A kind of ecological, environmental protective permeable spur structure
CN208762955U (en) A kind of channel check dam
CN111424620A (en) Hydraulic energy dissipation structure and method
CN204676485U (en) A kind of Eco-economic Type bank protection structure
CN212026132U (en) Hydraulic engineering protection buffering slope
CN211421033U (en) A ecological slope protection structure for hydraulic engineering
CN211312563U (en) Anti-seepage and anti-impact overflow cofferdam structure
CN210086181U (en) Sediment dam structure is blocked to formula of permeating water
CN110761246A (en) Ecological bank protection system combined with landscape greening and arrangement method
KR100461664B1 (en) Structures and system of construction based on the use of plants growing block that protect a shore
CN209493965U (en) A kind of dredging waterway retaining wall
CN217053257U (en) River sluice foundation structure
CN212153282U (en) Stable type flow guide dike
KR200259043Y1 (en) Construction type lining for rainwater inundation
CN218562255U (en) Cofferdam structure of weir crest self-collapsing overflow
CN215290006U (en) Dam face diversion trench structure of concrete faced rockfill dam
CN214613875U (en) Anti-impact structure combining earth and stone with gelled sand and gravel
CN214832418U (en) Combined type river course section structure
CN218479098U (en) Movable bank protection that hydraulic engineering used
CN218540592U (en) Hydraulic and hydroelectric engineering construction water conservancy diversion structure
CN220318450U (en) Check dam structure for erosion ditch treatment
CN215252686U (en) Construction structure of earth-rock dam on deep silt layer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190419