CN208760856U - A kind of Tailings Dam combined type buoyancy job platform - Google Patents
A kind of Tailings Dam combined type buoyancy job platform Download PDFInfo
- Publication number
- CN208760856U CN208760856U CN201821506466.9U CN201821506466U CN208760856U CN 208760856 U CN208760856 U CN 208760856U CN 201821506466 U CN201821506466 U CN 201821506466U CN 208760856 U CN208760856 U CN 208760856U
- Authority
- CN
- China
- Prior art keywords
- platform
- tailings dam
- combined type
- shipping
- type buoyancy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Barrages (AREA)
Abstract
The utility model discloses a kind of Tailings Dam combined type buoyancy job platforms, it is spliced by several rectangular hollow plastics floating blocks by connecting bayonet lock, including the operating platform and shipping platform two parts being detachably connected, wherein operating platform is the structure that middle part is equipped with that notch cross section is in " returning " font, each side of middle part notch and Tailings Dam gully and draining derrick tight fits;The upper surface of the shipping platform is article storage area, and is equipped with security guardrail along the two sides long side of shipping platform.The utility model combined type buoyancy job platform cross-sectional area is big, bearing capacity is strong, and stability is good, operation safety is reliable;Tool, material can disposably be transported in place, required operating personnel is few, to the more adaptable of weather condition, can increase substantially operating efficiency, reduce the activity duration;Its structure is simple, cheap, combination easy to disassemble, recycling.
Description
Technical field
The utility model belongs to mineral products processing technique field, is related to a kind of less important work platform, refers specifically to one kind and be suitable for
The combination type floating moving platform of the operations such as Tailings Dam gully arch bar installation.
Background technique
In the industries process design such as ore dressing, coal separation, chemical industry, it will usually it is clear as tailing storage and tailing to design Tailings Dam
The facility that clear water recycles.The safety devices that gully must be provided with as Tailings Dam can guarantee the flood in catchment area
It drains into outside library to water security, to ensure that Tailings Dam is safely operated in flood season, there is frame-type gully and two kinds of window type gully
Structure.This just needs during Tailings Dam is run aperiodically, to rise depending on reservoir water level and dry beach length situation discharge well adds
Steel loading circle, arch bar block window.Traditional arch bar installs additional or window blocks operation using glass reinforced plastic canoe as reservoir area
Means of transport and temporary operating platform install steel ring and arch bar additional for frame-type gully with this operating platform, exist with
Lower disadvantage: (1) mortar used in installation steel plate used, arch bar and grouting will repeatedly be round transported by canoe, influence to add
Fill efficiency;(2) 8 people is needed to complete (1 people commander, 4 people behaviour jointly when installing steel ring, arch bar additional using canoe as temporary operating platform altogether
Make, remaining 3 people need to hold fore stern to keep hull balance);In operating process, because working space is limited and hull balance is difficult
To grasp it is easy to appear shipwreck accident, there is very big security risk in operating personnel;(3) complete from steel ring transport, welding to
A whole set of process such as arch bar installation, grouting, which generally requires 2 to 3 days (16 to 24 hours), works continuously, topping-off operation working efficiency
Lowly;(4) it since the stationarity of existing job platform is inadequate, needs to carry out operation under right up and down weather condition, big
Transport of materials is difficult under the conditions of wind weather and rainy season continuously rain, and can not carry out arch bar topping-off operation.
In conclusion existing Tailings Dam operation canoe is flat since fault of construction exists before implementing the utility model
Stability is poor, safety work reliability is low, and operating efficiency is low and the technical problems such as labor intensive.
Utility model content
In view of the above technical problems, the utility model provides the Tailings Dam combination that a kind of bearing capacity is strong, stability is good
Formula floating job platform, efficiently solves that existing Tailings Dam job platform stationarity is poor, safety work reliability is low, operating efficiency
The technical problems such as low and labor intensive.
The utility model is achieved through the following technical solutions:
A kind of Tailings Dam combined type buoyancy job platform, the job platform pass through company by several rectangular hollow plastics floating blocks
It connects bayonet lock to be spliced, including the operating platform and shipping platform two parts being detachably connected, wherein operating platform sets for middle part
Jagged cross section is in the structure of " returning " font, and each side and the Tailings Dam gully and draining derrick of middle part notch are closely cut
It closes;The upper surface of the shipping platform is article storage area, and is equipped with security guardrail along the two sides long side of shipping platform.
Preferably, be equipped with can be with for the lateral surface of the operating platform and the rectangular hollow plastics floating block of shipping platform periphery
The balance plate that the water surface floats up and down, balance plate plate face are parallel with the water surface.
Preferably, described balance plate one end is equipped with sliding block, and the lateral surface of rectangular hollow plastics floating block is equipped with the vertical chute, sliding
Block correspondence is installed in sliding slot, can be floated up and down along the chute with the water surface.
Preferably, the shipping platform tail portion is connected with hawser, and shipping platform is connect with bank fixture.
Preferably, the tail portion of the shipping platform is equipped with drive motor.
The beneficial effects of the utility model are:
1. the utility model combined type buoyancy job platform cross-sectional area is big, bearing capacity is strong, stability is good, operation safety
Reliably;Tool, material can disposably be transported in place, required operating personnel is few, can be substantially to the more adaptable of weather condition
Degree improves operating efficiency, reduces the activity duration;Its structure is simple, cheap, combination easy to disassemble, recycling;
2. by adding the balance plate that can be floated up and down with the water surface in the periphery of floating job platform, in unobvious increase
Under the premise of job platform weight, the drinking water area of job platform is increased effectively, the steady of job platform is further improved
Property, prevent platform capsizing case from occurring, it is ensured that the operation safety of operating personnel;
3. the rectangular hollow plastics floating block and the connection card pin that constitute combination type floating moving platform are cheap, lead between floating block
Cross connection card lock it is close be connected as an entirety, floating platform shape can be desirably combined into arbitrary shape, floating block and connection bayonet lock
From heavy and light, intensity is high, corrosion-resistant, price is low, easy to disassemble, replacement and maintenance;Job platform can be used for multiple gullys, generally
It is installed additional suitable for Tailings Dam arch bar or window blocks operation.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model Tailings Dam combined type buoyancy job platform;
Fig. 2 is the structural schematic diagram of operating platform in the utility model Tailings Dam combined type buoyancy job platform;
Fig. 3 is the structural schematic diagram of shipping platform in the utility model Tailings Dam combined type buoyancy job platform;
Fig. 4 is another structural schematic diagram of the utility model Tailings Dam combined type buoyancy job platform;
Fig. 5 is the scheme of installation of the utility model Tailings Dam combined type buoyancy job platform;
Fig. 6 is the top view of Fig. 5;
In figure: 1- operating platform, 2- shipping platform, 3- rectangular hollow plastics floating block, the middle part 4- notch, 5- gully, 6-
Drain derrick, 7- security guardrail, 8- balance plate, 9- sliding block, 10- sliding slot.
Specific embodiment
The utility model and its effect are further elaborated below in conjunction with accompanying drawings and embodiments.
As shown in Figure 1-3, a kind of Tailings Dam combined type buoyancy job platform, the floating platform cross-sectional area is big, carries energy
Power is strong, and stability is good, operation safety is reliable, can disposably transport tool, material in place, required operating personnel is few, to weather
Condition it is more adaptable, can increase substantially operating efficiency, reduce the activity duration;Its structure is simple, cheap, convenient for tearing open
Dress combination is used repeatedly.The job platform is spliced by several rectangular hollow plastics floating blocks 3 by connecting bayonet lock,
Including 2 two parts of operating platform 1 and shipping platform being detachably connected;Operating platform 1 and shipping platform 2, which can both combine, to be connected as
One entirety is used and can independently be used again.Wherein, operating platform 1 is that middle part is equipped with notch, and cross section is in " returning " font
Structure, middle part being equidistant apart from each side edge of platform of notch 4, the distance can be controlled in 1.5m or so, are cement arch bar
The operations such as installation provide enough working spaces, and each side and the Tailings Dam gully 5 and draining derrick 6 of middle part notch 4 are closely cut
It closes, i.e. the whole firm periphery for being mounted on gully 5 of operating platform 1, improves the stationarity of job platform.The shipping platform
2 upper surface is the storage area for installing steel plate used, arch bar and the mortar used and other items that is in the milk additional, and along the two of shipping platform 2
Side long side is equipped with security guardrail 7.The tail portion of shipping platform 2 can be connected with hawser, and shipping platform is connect with bank fixture,
By pulling hawser round transport;Or Mechanical Moving is realized in the tail portion of shipping platform 2 installation drive motor.Work as shipping platform
When 2 conveying articles amounts are few, light, hawser can be pulled to move back and forth by 1 to 2 people;When conveying articles weight is big, starting driving horse
Up to round-trip, the purpose of energy-saving and emission-reduction is realized in the achievable 1 people operation of whole process depending on practical operation.
Further, as shown in figure 4, the operating platform 1 and the rectangular hollow plastics floating block 3 of the periphery of shipping platform 2
Lateral surface, which is equipped with, to be arranged in parallel with the balance plate 8 that the water surface floats up and down, 8 plate face of balance plate with the water surface.Specifically, balance plate
8 one end are equipped with sliding block 9, and the lateral surface of rectangular hollow plastics floating block 3 is respectively equipped with the vertical chute 10, and the correspondence of sliding block 9 is installed on cunning
In slot 10,10 it can float up and down along the chute with water surface buoyancy.By the periphery of floating job platform add can be with the water surface above and below
Floating equilibrium plate 8 increases effectively the drinking water area of job platform under the premise of unobvious increase job platform weight, into
One step improves the stationarity of job platform, prevents shipwreck accident from occurring, it is ensured that the operation safety of operating personnel.
When operation, first assembly shipping platform 2, is led to by about 50 kilograms of monomer buoyancy of 180 pieces of rectangular hollow plastics floating blocks 3
It crosses connection bayonet lock to be spliced, maximum capacity is up to 9 tons, and load-bearing area is up to 45 square metres;Along 2 longitudinal direction of shipping platform
Two sides install security guardrail 7, be reliably connected between shipping platform 2 and security guardrail 7, degree of protection reaches national security column
Bar relevant criterion;Platform short side direction, which does not install the main reason for security guardrail 7, to be had: one be easy for handling transport material and with behaviour
Make the docking of platform, second is that when personnel operate farther out apart from short side, operator can be protected safely.Shipping platform 2 is spelled
Assembled operating platform 1,108 pieces of square hollow plastics floating blocks by about 50 kilograms of monomer buoyancy pass through special connection card after installing
Pin is spliced, and bearing capacity is up to 5.4 tons, and up to 27 square metres, the whole firm periphery for being mounted on gully 5 is load-bearing area
Gully steel ring and arch bar installation provide safe and reliable operating condition.According to the reality of Tailings Dam gully 5 and draining derrick 6
Border size determines the size of notch 4 in the middle part of operating platform;First assembly part operation platform 1 keeps the side of middle part notch 4 spacious
Mouthful, and it is placed on shipping platform 2 with cement arch bar, steel ring and cement mortar, at transport to target gully 5, then
Part operation platform 1 is spliced completely around gully 5 and draining derrick 6, arch bar installation is carried out or window blocks operation.It is grasping
During making 2 assembly of platform 1 and shipping platform, the rectangular hollow plastics floating block 3 that lateral surface is equipped with balance plate 8 is placed on outermost
Side.Operating platform 1 is drawn to next gully using shipping platform 2 and reuses after completing previous draining well operations.
Above embodiments are merely exemplary, and can't limit to the utility model, it should be pointed out that for the technology of this field
For personnel, the other equivalent modifications and improvement made under technical inspiration provided by the utility model are regarded as this
The protection scope of utility model.
Claims (5)
1. a kind of Tailings Dam combined type buoyancy job platform, the job platform passes through connection by several rectangular hollow plastics floating blocks
Bayonet lock is spliced, it is characterised in that: including the operating platform (1) and shipping platform (2) two parts being detachably connected, wherein grasping
Making platform (1) is the structure that middle part is equipped with that notch cross section is in " returning " font, and each side of middle part notch (4) and Tailings Dam drain
Well (5) and draining derrick (6) tight fits;The upper surface of the shipping platform (2) is article storage area, and along shipping platform
(2) two sides long side is equipped with security guardrail (7).
2. Tailings Dam combined type buoyancy job platform according to claim 1, it is characterised in that: the operating platform (1)
The balance plate that can be floated up and down with the water surface is equipped with the lateral surface of the rectangular hollow plastics floating block (3) of shipping platform (2) periphery
(8), balance plate (8) plate face is parallel with the water surface.
3. Tailings Dam combined type buoyancy job platform according to claim 2, it is characterised in that: the balance plate (8) one
End is equipped with sliding block (9), and the lateral surface of rectangular hollow plastics floating block (3) is equipped with the vertical chute (10), and sliding block (9) correspondence is installed on cunning
In slot (10), (10) it can float up and down along the chute with the water surface.
4. Tailings Dam combined type buoyancy job platform according to claim 1, it is characterised in that: the shipping platform (2)
Tail portion is connected with hawser, and shipping platform (2) is connect with bank fixture.
5. Tailings Dam combined type buoyancy job platform according to claim 1, it is characterised in that: the shipping platform (2)
Tail portion drive motor is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821506466.9U CN208760856U (en) | 2018-09-14 | 2018-09-14 | A kind of Tailings Dam combined type buoyancy job platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821506466.9U CN208760856U (en) | 2018-09-14 | 2018-09-14 | A kind of Tailings Dam combined type buoyancy job platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208760856U true CN208760856U (en) | 2019-04-19 |
Family
ID=66135823
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821506466.9U Active CN208760856U (en) | 2018-09-14 | 2018-09-14 | A kind of Tailings Dam combined type buoyancy job platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208760856U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113198243A (en) * | 2021-05-11 | 2021-08-03 | 金建工程设计有限公司 | Device for improving backwater quality |
CN113386917A (en) * | 2021-07-08 | 2021-09-14 | 矿冶科技集团有限公司 | Movable working platform for tailing beach surface |
CN114606898A (en) * | 2022-02-10 | 2022-06-10 | 中国有色金属工业昆明勘察设计研究院有限公司 | Construction method convenient for building of arch slab of flood drainage well of tailing pond |
US11479324B2 (en) | 2016-09-12 | 2022-10-25 | Kai Concepts, LLP | Watercraft device with hydrofoil and electric propeller system |
-
2018
- 2018-09-14 CN CN201821506466.9U patent/CN208760856U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11479324B2 (en) | 2016-09-12 | 2022-10-25 | Kai Concepts, LLP | Watercraft device with hydrofoil and electric propeller system |
CN113198243A (en) * | 2021-05-11 | 2021-08-03 | 金建工程设计有限公司 | Device for improving backwater quality |
CN113386917A (en) * | 2021-07-08 | 2021-09-14 | 矿冶科技集团有限公司 | Movable working platform for tailing beach surface |
CN114606898A (en) * | 2022-02-10 | 2022-06-10 | 中国有色金属工业昆明勘察设计研究院有限公司 | Construction method convenient for building of arch slab of flood drainage well of tailing pond |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208760856U (en) | A kind of Tailings Dam combined type buoyancy job platform | |
CN106381870B (en) | A kind of deep concrete mixture ship pile frame system and pile making method | |
US10293280B2 (en) | Pumping system | |
CN207987900U (en) | A kind of removable deep water offshore operation platform of bottom-sitting type | |
US10293342B2 (en) | Vehicle system and method | |
CN112049641A (en) | Energy-saving deep sea mining system based on buoyancy gravity difference vertical lifting device | |
CN102383403A (en) | Combined gate-type dry dock door | |
CN202642027U (en) | Floating fitting-out device | |
CN212508304U (en) | Energy-saving deep sea mining system based on buoyancy gravity difference vertical lifting device | |
CN217608300U (en) | Middle-size and small-size hole formula tailing storehouse closed warehouse reclamation device | |
CN202925557U (en) | Steel cofferdam assembled floating platform | |
CN203569531U (en) | Buoyant box type self-adjustment temporary wharf | |
CN2716342Y (en) | Water plate-inserting machine | |
CN108439186A (en) | Water-permeable frame hoisting transportation equipment and method of jettisoninging | |
CN206279527U (en) | A kind of deep concrete mixture ship pile frame system | |
CN205557785U (en) | A device that is used for tailing storehouse frame -type pumping shaft arch bar to install | |
CN204980735U (en) | Jacket platform elevator that floats | |
CN206987821U (en) | One kind is applied to helix tunnel construction device | |
CN208278276U (en) | A kind of floating body, which is stepped on, multiplies stage apparatus | |
CN206231560U (en) | Foam pontoon is used in the transport of UHV transmission line engineering material | |
CN206784354U (en) | A kind of U-shaped casing seal installation | |
CN208897265U (en) | A kind of novel rudder paddle mounting tool | |
CN206125353U (en) | Pier pile foundation underwater maintenance operation device with self -navigation ability | |
CN214143606U (en) | Tidal river reach self-lifting trash holding facility adaptive to water level change | |
CN219410747U (en) | Dock suitable for ship berthing of water surface photovoltaic power station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 742312 Liulin Town, Hui County, Longnan City, Gansu Province Patentee after: Jinhui Mining Co.,Ltd. Address before: 742300 Liulin Town, Hui County, Longnan City, Gansu Province Patentee before: GANSU JINHUI MINING INDUSTRY Co.,Ltd. |
|