CN208720403U - A kind of phase change cold-storage Air Conditioning Facilities - Google Patents

A kind of phase change cold-storage Air Conditioning Facilities Download PDF

Info

Publication number
CN208720403U
CN208720403U CN201820957840.0U CN201820957840U CN208720403U CN 208720403 U CN208720403 U CN 208720403U CN 201820957840 U CN201820957840 U CN 201820957840U CN 208720403 U CN208720403 U CN 208720403U
Authority
CN
China
Prior art keywords
cold
refrigeration
phase change
heat
air conditioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820957840.0U
Other languages
Chinese (zh)
Inventor
许加潭
李国荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan City Million Rong Jieneng Science And Technology Ltds
Original Assignee
Dongguan City Million Rong Jieneng Science And Technology Ltds
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan City Million Rong Jieneng Science And Technology Ltds filed Critical Dongguan City Million Rong Jieneng Science And Technology Ltds
Priority to CN201820957840.0U priority Critical patent/CN208720403U/en
Application granted granted Critical
Publication of CN208720403U publication Critical patent/CN208720403U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The utility model provides a kind of phase change cold-storage Air Conditioning Facilities, including refrigeration system, cooling system, heat-exchange system, cold accumulation system and control system, cold accumulation system connects central control system with refrigeration system, cooling system and refrigeration system are equipped with one-way cock system and temperature sensor, one-way cock system and temperature sensor are equipped between cold accumulation system and refrigeration system, refrigeration system and cold accumulation system are connected in parallel heat-exchange system, heat-exchange system is located at load end, refrigeration system includes the refrigeration machine of 1-10 platform parallel connection, cooling system includes 1-10 cooling tower, cold accumulation system includes 1-10 phase change cold-storage slot, heat-exchange system includes the 1-8 heat exchangers combined in parallel or series or in series and parallel.The utility model can shift peak potential period electricity consumption: increase existing system peak refrigerating capacity;Increase refrigerating water sets benefit;Increase the control of chilled water system;Increase the service life of chilled water system;Increase the reliability of chilled water system;Increase chilled water system operating flexibility;Refrigeration unit energy use efficiency in part load operation is improved, electric power is saved and reaches 30%-50%, save electricity cost 40%-70%.

Description

A kind of phase change cold-storage Air Conditioning Facilities
Technical field
The invention belongs to air conditioner cold accumulation field of energy-saving technology, and in particular to a kind of phase change cold-storage Air Conditioning Facilities.
Background technique
With popularizing for air-conditioning, electricity consumed by air-conditioning also gradually increases in the ratio of building energy consumption.In summer, sky The energy consumption of tune accounts for the 85% of building energy consumption, keeps the peak-valley difference of electricity usage larger, and peak times of power consumption electricity consumption occur, supply falls short of demand, The phenomenon of electricity consumption low peak period electricity consumption surplus.And since country is proposed the Power policy of encouragement peak load shifting, to make full use of Therefore electric power resource, cold accumulation air-conditioner are favored by people.
So-called cold accumulation air-conditioner works in night electricity consumption low peak period, at this time and the air conditioner load lower period, air-conditioning Host refrigeration and by cooling capacity savings get up, cooling capacity is released to peak times of power consumption on daytime, to meet peak times of power consumption Air conditioner load needs.In this way, most of power consumption of air-conditioning is transferred to night, and daytime only air-conditioning ancillary equipment running, Realize " peak load shifting " of air conditioning electricity load.
Existing central air conditioner system is to design by peak load, and there are certain allowances.Under regular situation, in portion System can be run in inefficient area (when especially less than 60% load) when dividing load, and energy consumption is higher.Central air conditioner room is mainly used Electric equipment includes: refrigeration host computer, chilled water pump, cooling water pump and cooling tower.Wherein 60% or more energy consumption is refrigeration host computer energy Consumption.The comprehensive energy efficiency COP of computer room is improved, optimal state is to make this four big electrical equipment, under different load state, all It can be run in high efficient district.Wherein, host efficiency is most importantly improved.Major measure has two o'clock: one is to try to reduce cooling water Temperature;Second is that formulating reasonable booting strategy, makes host in the operation of different load state, can be run in high efficient district.Water pump This two o'clock is all surrounded with the control strategy of cooling tower to formulate.
Current Air Conditioning Facilities lack the accurate detection to above-mentioned four big equipment running status, realize to equipment operation extensive Formula management;Or without formulating the booting strategy that host can be made to keep efficient operation again simultaneously according to end load variation, or control Means processed are limited, cannot perform effectively;Or system debug is not in place, does not exclude defect, causes system longtime running in spite of illness;Row Industry specification payes attention to the efficiency of host, ignores computer room comprehensive energy efficiency.
Summary of the invention
Aiming at the problems existing in the prior art, the object of the present invention is to provide a kind of phase change cold-storage machines of peak load shifting Room saves electricity and is up to 30%-50%, and the electricity charge, which are saved, is up to 40%-70%.
In order to achieve the above object, the technical solution of the present invention is as follows:
A kind of phase change cold-storage Air Conditioning Facilities, including refrigeration system, cooling system, heat-exchange system, cold accumulation system and control system System, cold accumulation system connect central control system with refrigeration system, and cooling system and refrigeration system are equipped with one-way cock system and temperature Sensor is spent, one-way cock system and temperature sensor, refrigeration system and cold-storage system are equipped between cold accumulation system and refrigeration system System is connected in parallel heat-exchange system, and heat-exchange system is located at load end, and refrigeration system includes the refrigeration machine of 1-10 platform parallel connection, cooling system System includes 1-10 cooling tower, and cold accumulation system includes 1-10 phase change cold-storage slot, and heat-exchange system includes 1-8 a in parallel or series Or the heat exchanger combined in series and parallel.
Preferably, the refrigeration system connects expansion tank by check valve, and expansion tank gets around check valve by catchmenting Device, water segregator connect refrigeration system.
Preferably, it is equipped with apparatus for eliminating sludge between expansion tank and water collector, is equipped with by pressure difference between water collector and water segregator Port valve, water collector connect return pipe, and water segregator is connected with water supplying pipe.
Preferably, the cold accumulation system includes 2-10 cold-storage groove in parallel.Cold-storage groove refers to our company authorized hair A kind of bright patent ZL201410329724.0 " phase-changing energy-storing water tank ".
Preferably, equipped with stacked on top or the hold-over plate being bolted together in the cold-storage groove.Hold-over plate has referred to our company Authorized patent 201420680626.7, " a kind of energy storage board for cooling cycle system ".
It is equipped with phase-change material for cold storage in the hold-over plate, phase-change material for cold storage is equipped in the hold-over plate, the correlation stores Cold material includes the raw material of following parts by weight: anhydrous sodium sulfate 10-40 parts by weight, chlorate 8-50 parts by weight, thickener 1-15 Parts by weight, nucleating agent 1-5 parts by weight, water 20-60 parts by weight.
Preferably, the processing technology of phase-change material for cold storage are as follows: a, divide anhydrous sodium sulfate, chlorate, thickener, nucleating agent It is 3 parts of equivalent, by 2 parts that moisture is equivalent;B, the anhydrous sodium sulfate of 1/3 amount, chlorate, thickener, nucleating agent are added In the water of 1/2 amount, be heated to 50 DEG C, stir evenly, added after near room temperature remaining water and 1/3 amount anhydrous sodium sulfate, Then chlorate, thickener, nucleating agent are added whole soda ash, stir evenly;C, by anhydrous sodium sulfate, the chlorine of remaining 1/3 amount Xylitol is added after being added in salt dissolving, thickener, nucleating agent, stirs as paste or gel, obtains phase-change material for cold storage.
Preferably, one-way cock system includes 2-5 check valve in parallel, and each check valve and temperature sensor electrically connect It connects.
The beneficial effects of the present invention are:
1, phase change cold-storage computer room of the invention is having reasonable timesharing peak, paddy electricity price difference by the time-of-use tariffs using night Area, night using low valley electric system carry out cold-storage, let cool using the cooling capacity that cold accumulation system night stores daytime. And host booting or few booting are reduced as far as possible, it can achieve the effect that economize on resources;Difference is coped with using different modes The case where, air conditioning energy consumption can be utmostly reduced, achievees the effect that energy-saving and emission-reduction;Pass through the control of intelligence, temperature step Control management, the Optimum utilization of fresh air improve environmental degree of comfort simultaneously, realize that energy saving of system guarantees the balanced fortune of every equipment Row, greatly improves the service life of equipment.
2. the hold-over plate stacked in cold-storage groove, hold-over plate multiple can splice, assembling is very convenient, even in mobility Biggish environment use air-conditioning, hold-over plate will not auto Deformation, phase change cold-storage plate is extended while ensure that cold accumulation effects Service life.
3. phase-change material production procedure of the present invention is simple, raw material are easy to get and low in cost;Using xylitol as temperature adjustment Additive, so that cold accumulation effects become apparent, and storage density of cold relatively up to 285-295J/cm3
4. the present invention can increase existing system peak refrigerating capacity;Increase refrigerating water sets benefit;Increase chilled water system Control;Increase the service life of chilled water system;Increase the reliability of chilled water system;Increase chilled water system operating flexibility;It mentions High refrigeration unit energy use efficiency in part load operation saves electricity and is up to 30%-50, and the electricity charge, which are saved, is up to 40%-70%.
5. energy-storage system goes to the power demand peak peak period in the dump power of low-valley interval using national grid It prunes, i.e. " peak load shifting ".As a result, power generation department provides reward, the electricity price of low-valley interval is reduced.Time-of-use tariffs difference up to 3 To 6.5 times.This generates good economic benefit to using the energy unit of energy-storage system.
6. reducing refrigerating water sets capacity: being in general to compare traditional air-conditioning system with the refrigerating water sets of energy-storage system The small 30-60% of the capacity of required refrigerating water sets, because the mass storage of phase-change material latent heat can satisfy greatest requirements.Cause This, refrigerating water sets all freezed and store in low-valley interval in the most of the time, and stopped operating in peak of power consumption and with " single Solely letting cool " mode discharges the energy cooling supply all stored, or with " serial or parallel connection " (Hybrid) mode and freezes when needed Water dispenser group air conditioning.Just because of this, energy-storage system air-conditioning reduces refrigerating water sets capacity than traditional air-conditioning system.
7. refrigerating water sets capacity is reduced up to 30% to 60% due to the hot accumulation of energy TES of application, and corresponding heat dissipation equipment It reduces therewith.Refrigerating water sets switch starting number, load operation, computer room land used are also reduced simultaneously, reduce refrigerating water sets dimension Repair expense.
Refrigerant is used 8. reducing.
9. due to reducing refrigerating water sets capacity with energy-storage system up to 30% to 60%, and corresponding power supply unit is also therewith It reduces.And increase-volume expense is also accordingly reduced.It, can be with due to the characteristic of PCM high-temperature phase-change especially to PCM energy-storage system is used It is used cooperatively with general refrigerating water sets, does not need to install low temperature ice making unit and ethylene glycol unit additional, so being not required to power supply Department applies for increase-volume and pays a large sum of expense of increasing capacity.
10. cold accumulation system of the invention not only has good economic benefit, but also has considerable environmental benefit, it is It through refrigerating water sets capacity is reduced, reduces refrigerant and uses, so that lowering direct global temperature rise influences.In terms of indirect, two The discharge of carbonoxide also with refrigerating water sets capacity reduction and reduce.If we can effectively take " peak load shifting " Measure, power plant is not just single can also be reduced the CO2 emission in power plant with lower energy prices, be finally exactly Whole system includes that the discharge amount of the carbon dioxide of power plant and energy unit is reduced.
Detailed description of the invention
Fig. 1 is the overall structure diagram of embodiment 1;
Fig. 2 is the water collector and water segregator schematic diagram of embodiment 1;
The structural schematic diagram of cold-storage groove in the position Fig. 3 embodiment 1.
In figure: 1, refrigeration machine;2, cooling tower;3, heat-exchange system;4, check valve;5, temperature sensor;6, return pipe;7, Water supplying pipe;8, cold-storage groove;9, hold-over plate;10, expansion tank;11, water collector;12, water segregator;13, differential-pressure bypass valve, 14, valve Door;15, water level sensor.
Specific embodiment
One embodiment of the present invention is further illustrated with reference to the accompanying drawings.
Embodiment 1, with reference to attached drawing 1, attached drawing 2, attached drawing 3:
A kind of phase change cold-storage Air Conditioning Facilities, the refrigeration system composed in parallel including 4 refrigeration machines 1,2 heat exchangers form The cold accumulation system that cooling system, 3 cold-storage grooves 8 of 3,4 cooling towers 2 of heat-exchange system composition form, refrigeration machine 1 and cooling water 4 check valve 4 and 8 temperature sensors 5 are equipped between tower 2, temperature sensor 5 is located at the two sides of individual event valve 4, refrigeration machine 1 It is connected in parallel heat exchanger with cold-storage groove 8, heat exchanger is located in computer room.Cold-storage groove 8 and cooling tower 2 connect refrigeration machine 1 side by side, store 3 check valve 4 and 6 temperature sensors 5 are equipped between cold trap 8 and heat exchanger, temperature sensor 5 is located at the two sides of check valve 4 And it is electrically connected check valve, 4 refrigeration machines connect expansion tank 10 by check valve, and expansion tank 10 gets around check valve and passes through collection Hydrophone, water segregator connect refrigeration system.Apparatus for eliminating sludge, water collector 11 and water segregator are equipped between expansion tank 10 and water collector 11 Differential-pressure bypass valve 13 is equipped between 12, water collector 13 connects return pipe 6, and water segregator 14 is connected with water supplying pipe 7.Each cooling tower 2 are designed with independent valve 19.
The hold-over plate 9 being stacked is equipped in cold-storage groove.Hold-over plate can control splicing, also capable of stacking one over the other, be filled in Cold-storage groove.
Phase-change material for cold storage is equipped in hold-over plate, the correlation cool storage material includes the raw material of following parts by weight: anhydrous sulphur Sour sodium 10-40 parts by weight, chlorate 8-50 parts by weight, thickener 1-15 parts by weight, nucleating agent 1-5 parts by weight, water 20-60 weight Part.
The processing technology of phase-change material for cold storage are as follows: anhydrous sodium sulfate, chlorate, thickener, nucleating agent a, are divided into equivalent 3 parts, be 2 parts of equivalent by moisture;B, 1/2 amount is added in the anhydrous sodium sulfate of 1/3 amount, chlorate, thickener, nucleating agent In water, be heated to 50 DEG C, stir evenly, added after near room temperature the anhydrous sodium sulfate of remaining water and 1/3 amount, chlorate, Then thickener, nucleating agent are added whole soda ash, stir evenly;C, by anhydrous sodium sulfate, the chlorate, increasing of remaining 1/3 amount Thick dose, nucleating agent xylitol is added after being added, stir as paste or gel, obtain phase-change material for cold storage.
The operation principle of the present invention is that: using the time-of-use tariffs at night, the form of cooling capacity low-temperature phase-change material is stored Get up, cold energy storage is used up in peak times of power consumption, and reduces host booting in peak potential period as far as possible or be not switched on, Neng Gouda To the effect to economize on resources.
The above is not intended to limit the scope of the present invention, and all technical spirits according to the present invention are to above Any modification, equivalent variations and modification made by embodiment, in the range of still falling within technical solution of the present invention.

Claims (6)

1. a kind of phase change cold-storage Air Conditioning Facilities, including refrigeration system, cooling system, heat-exchange system, control system and cold accumulation system, It is characterized by: cold accumulation system connects central control system with refrigeration system, cooling system and refrigeration system are equipped with one-way cock System and temperature sensor are equipped with one-way cock system and temperature sensor, refrigeration system between cold accumulation system and refrigeration system It is connected in parallel heat-exchange system with cold accumulation system, heat-exchange system is located at load end, and refrigeration system includes the refrigeration of 1-10 platform parallel connection Machine, cooling system include 1-10 cooling tower, and cold accumulation system includes 1-10 phase change cold-storage slot, and heat-exchange system includes 1-8 The heat exchanger combined in parallel or series or in series and parallel.
2. phase change cold-storage Air Conditioning Facilities according to claim 1, it is characterised in that: the refrigeration system is connected by check valve Expansion tank is connect, expansion tank gets around check valve and connects refrigeration system by water collector, water segregator.
3. phase change cold-storage Air Conditioning Facilities according to claim 2, it is characterised in that: be equipped between expansion tank and water collector Apparatus for eliminating sludge is equipped with differential-pressure bypass valve between water collector and water segregator, water collector connects return pipe, and water segregator is connected with water supply Pipe.
4. phase change cold-storage Air Conditioning Facilities according to claim 1, it is characterised in that: the cold accumulation system includes 1-10 a simultaneously The cold-storage groove of connection.
5. phase change cold-storage Air Conditioning Facilities according to claim 4, it is characterised in that: be equipped with stacked on top in the cold-storage groove Or the hold-over plate being bolted together.
6. phase change cold-storage Air Conditioning Facilities according to claim 1, it is characterised in that: one-way cock system includes 2- in parallel 5 check valves, each check valve and temperature sensor are electrically connected.
CN201820957840.0U 2018-06-21 2018-06-21 A kind of phase change cold-storage Air Conditioning Facilities Active CN208720403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820957840.0U CN208720403U (en) 2018-06-21 2018-06-21 A kind of phase change cold-storage Air Conditioning Facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820957840.0U CN208720403U (en) 2018-06-21 2018-06-21 A kind of phase change cold-storage Air Conditioning Facilities

Publications (1)

Publication Number Publication Date
CN208720403U true CN208720403U (en) 2019-04-09

Family

ID=65971842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820957840.0U Active CN208720403U (en) 2018-06-21 2018-06-21 A kind of phase change cold-storage Air Conditioning Facilities

Country Status (1)

Country Link
CN (1) CN208720403U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108662701A (en) * 2018-06-21 2018-10-16 东莞市兆荣节能科技有限公司 A kind of phase change cold-storage Air Conditioning Facilities

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108662701A (en) * 2018-06-21 2018-10-16 东莞市兆荣节能科技有限公司 A kind of phase change cold-storage Air Conditioning Facilities

Similar Documents

Publication Publication Date Title
Osterman et al. Review on compression heat pump systems with thermal energy storage for heating and cooling of buildings
Yu et al. Techno-economic analysis of air source heat pump combined with latent thermal energy storage applied for space heating in China
Moreno et al. The use of phase change materials in domestic heat pump and air-conditioning systems for short term storage: A review
CN205717678U (en) A kind of ice storage cold-hot pump system
CN203501534U (en) Combined system of energy storage ground source heat pump and solar energy
CN201731710U (en) Time-sharing electricity saving device of ice house, freezer and refrigerator
CN103912948A (en) Conventional air-conditioning operating condition distributed phase change energy storage air conditioning system
CN101893299A (en) Solar adsorption type air-conditioning system based on phase change cold accumulation
CN103438530B (en) A kind ofly cold with ice conserve cold combined refrigeration system
CN103148554B (en) Water cold storage and the parallel central air conditioner system of ice crystal cold and operation method thereof
CN201259282Y (en) Complete thermal recovery energy accumulation type Geothermal pump central air-conditioning system
Chen et al. Experimental research and energy consumption analysis on the economic performance of a hybrid-power gas engine heat pump with LiFePO4 battery
CN101165418A (en) Dynamic ice-storage type cold-hot water energy-saving set
CN201547899U (en) Central air-conditioning system for cold storage of ice slurry
CN201218577Y (en) Exhaust heat recovery and cold accumulation apparatus
TW202113281A (en) Phase-change cold storage emergency cold supply system
CN108895587B (en) Series-parallel connection heat pump double-storage energy supply system
CN208720403U (en) A kind of phase change cold-storage Air Conditioning Facilities
CN111928389B (en) Efficient cold and heat supply system based on combined operation of heat source tower and ice cold accumulation
CN101424459A (en) Novel energy resource central air-conditioning system
CN202902525U (en) Ice storage and water thermal storage system
CN210463179U (en) Indirect cooling phase-change energy storage type ice source heat pump system
CN205664710U (en) Data center solar energy phase transition cold -storage system
CN209295316U (en) A kind of series-parallel heat pump is double to store energy supplying system
CN108662701A (en) A kind of phase change cold-storage Air Conditioning Facilities

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant