CN208718420U - A kind of steel construction open air elevator aisle - Google Patents

A kind of steel construction open air elevator aisle Download PDF

Info

Publication number
CN208718420U
CN208718420U CN201821402668.9U CN201821402668U CN208718420U CN 208718420 U CN208718420 U CN 208718420U CN 201821402668 U CN201821402668 U CN 201821402668U CN 208718420 U CN208718420 U CN 208718420U
Authority
CN
China
Prior art keywords
aisle
fixed
elevator
support frame
steel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821402668.9U
Other languages
Chinese (zh)
Inventor
宋伟力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Fuyuan Environmental Protection Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821402668.9U priority Critical patent/CN208718420U/en
Application granted granted Critical
Publication of CN208718420U publication Critical patent/CN208718420U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to elevators to install and use technical field more particularly to a kind of steel construction open air elevator aisle.Including elevator, aisle, support frame, guardrail and inclined support bar, elevator is installed on the ground far from existing building, support frame is installed on the ground close to existing building, aisle is mounted between elevator and support frame, guardrail is mounted on aisle, and inclined support bar is mounted on the corner that aisle is connect with support frame.Aisle is the fixation aisle and flexible aisle being mutually slidably connected.Railing is the fixed link being mutually slidably connected and telescopic rod.Support frame bottom installs lifting device.Elevator aisle and elevator pin connection, it is easy for installation, it is highly-safe.It is connected by support frame, so that this product is adaptable, does not have to destroy original building structure.By scalable aisle and scalable railing, aisle is more accurately docked in length direction with original building.By lifting device, realize that aisle is accurately docked in high and low position direction and existing building.

Description

A kind of steel construction open air elevator aisle
Technical field
The utility model relates to elevators to install and use technical field more particularly to a kind of steel construction open air elevator aisle.
Background technique
Currently, the process of Chinese Urbanization is higher and higher, aging degree is also higher and higher.China has considerable more Layer house does not design elevator, and with the raising of aging, the elderly's stair climbing is just at a problem.And with China The update of house specification, many six layers or so of house require to install elevator additional.So the multi-storey building to not elevator installs additional Outdoor elevator is just at a kind of huge market demand.Currently, installing elevator additional to multi-storey building is all mounted directly fixed aisle, have When due to field erected error, cause aisle too long or too short, need to aisle carry out secondary treatment, it is relatively time-consuming to take Power.Some aisle are directly fixed by punching on the wall, cause construction wall to destroy in this way, are especially built always It builds, may cause damages to building structure, and the fastness installed is not high, it is understood that there may be endurance is inadequate.
Summary of the invention
To solve the above-mentioned problems, the utility model proposes a kind of steel construction open air elevator aisle.
A kind of steel construction open air elevator aisle, its main feature is that, including elevator, aisle, support frame and inclined support bar, elevator Well far from existing building install on the ground, support frame close to existing building install on the ground, aisle be mounted on elevator and Between support frame, inclined support bar is mounted on the corner that aisle is connect with support frame.
Preferably, the inclined support bar is anti-bow steel construction, anti-to bend the rectangular triangle of steel construction, and its bevel edge is arc Shape, or linear, vertical straight flange are fixed on the support frame;Its horizontal straight flange is fixed on aisle bottom.
Preferably, pin bracket is installed on the elevator, the fixed stiffening plate in elevator end, stiffening plate are located on aisle Upper installation rotating dog, rotating dog and the installation of pin support assorted.
Preferably, safe block is also installed, safe block is located at below pin bracket on elevator.
Preferably, the support frame includes vertical bar, crossbeam and footing device, and several crossbeams are fixed between two vertical bars The basic framework of support frame is formed, aisle is located at support frame one end and is fixed on crossbeam, and footing device is mounted on the bottom of vertical bar.
Preferably, footing device includes big bottom plate, big wire role, lifting device, and big wire role is fixed on big bottom plate, big bottom plate It fixes on the ground;Lifting device includes fixed disk, movable disk and pressure bearing, and fixed disk, movable disk are respectively and pressure bearing Shang Quan, lower circle fix, fixed disk is fixed on the bottom of vertical bar, big hole, movable disk is all arranged among fixed disk and movable disk Big hole in internal screw thread is set, movable disk is meshed with big wire role.
Preferably, aisle includes fixed aisle and flexible aisle, and flexible aisle is mounted on fixation in a manner of being slidably connected On aisle, guardrail is installed on aisle.
Preferably, the fixation aisle includes curb girder, intermediate beam, floor, and two curb girders and several intermediate beams fix group At the basic structure in fixed aisle;Flexible aisle includes sliding curb girder, sliding intermediate beam, in two sliding curb girders and a sliding Between beam form the frame structure in flexible aisle;It slides in curb girder insertion curb girder, floor, which is laid with, to be fixed on fixed aisle and stretch On road.
Preferably, cylinder and the second cylinder are installed in the top of the curb girder and sliding curb girder respectively, and guardrail is mounted on circle In cylinder and the second cylinder, fastening bolt is all set in cylinder and the second cylinder;Rotating dog and stiffening plate are mounted on curb girder;Guardrail Including railing fixed link, railing vertical bar, flexible railing, railing vertical bar is fixed on the horizon bar of fixed link, the water for the railing that stretches Flat bar is inserted into the horizon bar of fixed link in a manner of being slidably connected.
Preferably, curb girder bracket is arranged close to sliding curb girder end in the lower part of the curb girder, and it is solid that brace is arranged on crossbeam Determine block, big pin hole is all arranged on inclined support bar in curb girder bracket, brace fixed block, by the first king-bolt and the second king-bolt according to It is secondary to fix curb girder bracket, inclined support bar, the installation of brace fixed block.
The beneficial effects of the utility model are: the utility model relates to steel construction open air elevator aisle, by and elevator Well pin connection, it is easy for installation, it is highly-safe.It is connected by support frame, so that this product is adaptable, does not have to destroy original Building structure.By scalable aisle and scalable railing, aisle is more accurately docked in length direction with original building. By lifting device, realize that aisle is accurately docked in high and low position direction and existing building.This steel construction is also applied for overhang steel The elevator that platform is walked on stage is registered one's residence platform structure, on the outside of overhanging steel platform, is bent support by counter, is eliminated outer heel post, avoid Elevator outlet prepass is blocked by column, is open to traffic convenient for foot passage.
Detailed description of the invention
Fig. 1 is the right view structure oblique view in the utility model elevator aisle.
Fig. 2 is the utility model elevator aisle left view structure oblique view.
Fig. 3 is the utility model elevator aisle structural front view.
Fig. 4 is the utility model support frame structure oblique view.
Fig. 5 is the utility model support frame structure bottom view.
Fig. 6 is the A-A view of Fig. 5.
Fig. 7 is the utility model aisle substructure oblique view.
Fig. 8 is the utility model aisle superstructure oblique view.
Fig. 9 is the utility model guard bar structure main view.
Figure 10 is the utility model lifting device structure oblique view.
Figure 11 is the utility model lifting device structure main view.
Figure 12 is the B-B view of Figure 11.
Figure 13 is the utility model elevator aisle structure diagram.
Wherein: 1- elevator;The aisle 2-;3- support frame;4- guardrail;5- inclined support bar;9- existing building;11- pin branch Frame;13- safe block;21- fixes aisle;22- stretches aisle;31- vertical bar;32- crossbeam;33- footing device;34- brace is fixed Block;41- railing fixed link;42- railing vertical bar;43- stretches railing;The first king-bolt of 51-;The second king-bolt of 52-;The side 211- Beam;212- intermediate beam;213- rotating dog;214- cylinder;215- curb girder bracket;The floor 216-;221- slides curb girder;222- sliding Intermediate beam;223- the second cylinder;The big bottom plate of 331-;332- big wire role;333- lifting device;2111- peep hole;2131- reinforces Plate;2141- fastening bolt;3331- fixed disk;3332- movable disk;3333- pressure bearing;3334- internal screw thread.
Specific embodiment
The utility model is described further with reference to the accompanying drawing.
If Figure 13 is the utility model elevator aisle structure diagram.A kind of steel construction open air elevator aisle, including elevator 1, aisle 2, support frame 3, guardrail 4 and inclined support bar 5, elevator 1 far from existing building 9 install on the ground, support frame 3 close to Existing building 9 is installed on the ground, and aisle 2 is mounted between elevator 1 and support frame 3, and guardrail 4 is mounted on aisle 2, is tiltedly propped up Strut 5 is mounted on the corner that aisle 2 is connect with support frame 3.Inclined support bar 5 can be anti-bow steel construction, and the anti-steel construction that bends is in Right angled triangle, and its bevel edge is arc, vertical straight flange is fixed on support frame 3.Its horizontal straight flange is fixed on 2 bottom of aisle Portion.Its support construction uniform force is made using anti-bow steel construction, material is saved and shape is graceful, and is solved outside foot passage wall Side is without column, does not influence the underground utilities at channel convenient for being open to traffic, and in construction.
If Fig. 1 is the right view structure oblique view in the utility model elevator aisle.Fig. 2 is the utility model elevator aisle left view knot Structure oblique view.Fig. 3 is the utility model elevator aisle structural front view.Pin bracket 11 is installed, aisle 2 is upper on elevator 1 In installing rotating dog 213 in the fixed stiffening plate 2131 in 1 end of elevator, stiffening plate 2131, rotating dog 213 and pin bracket 11 cooperate Installation.By the way that stiffening plate 2131 is arranged between the curb girder 211 in rotating dog 213 and aisle 2, prevent from individually consolidating rotating dog 213 When determining onto curb girder 211, causes stress raisers, aisle 2 and elevator link position is be easy to cause to fall off.Pass through rotating dog 213 and pin bracket 11 pin connection so that aisle 2 is rotatably mounted on elevator 1.Thus, aisle 2 can and elevator Well 1 makes factory together, and when transport does not account for extra space, installs also simple.Safe block 13 is also installed, safety on elevator 1 Block 13 is located at 11 lower section of pin bracket.General steel construction over time, all gets rusty easily, mechanical properties decrease.Safe block 13 act on for safeguard protection, prevent aisle 2 and 1 Joint failure of elevator and fall off.Since after the time has been grown, rotating dog 213 It may get rusty and fall off or rotating dog 213 and 11 Joint failure of pin bracket from stiffening plate 2131.When aisle 2 and elevator When 1 Joint failure of well, aisle 2 can be supported by safe block 13, prevent aisle 2 from continuing to fall and cause safety accident.
If Fig. 4 is the utility model support frame structure oblique view.Fig. 5 is the utility model support frame structure bottom view.Fig. 6 It is the A-A view of Fig. 5.Figure 10 is the utility model lifting device structure oblique view.Figure 11 is the utility model lifting device knot Structure main view.Figure 12 is the B-B view of Figure 11.Support frame 3 includes vertical bar 31, crossbeam 32 and footing device 33, several crossbeams 32 It is fixed on the basic framework that support frame 3 is formed between two vertical bars 31, aisle 2 is located at 3 one end of support frame and is fixed on crossbeam 32, Footing device 33 is mounted on the bottom of vertical bar 31.The bottom in aisle 2 is ridden over first on crossbeam 32, then by welding will Aisle 2 and crossbeam 32 are fixed.Or bolt is set between aisle 2 and crossbeam 32, aisle 2 and crossbeam 32 is fixed.Pass through bottom Foot device 33 realizes that support frame 3 is preferably fixed on the ground.Footing device 33 includes big bottom plate 331, big wire role 332, lifting Device 333, big wire role 332 are fixed on big bottom plate 331, and big bottom plate 331 fixes on the ground;Lifting device 333 includes fixing Disk 3331, movable disk 3332 and pressure bearing 3333, fixed disk 3331, movable disk 3332 are upper with pressure bearing 3333 respectively Circle, lower circle are fixed, and fixed disk 3331 is fixed on the bottom of vertical bar 31, great circle is all arranged among fixed disk 3331 and movable disk 3332 Hole, the big hole of movable disk 3332 is interior to be arranged internal screw thread 3334, and movable disk 3332 is meshed with big wire role 332.Shi great Si is installed Bar 332 passes through the big hole among fixed disk 3331 and movable disk 3332.Decorative pattern is set in 3332 outer circle of movable disk, and when use is logical Cross spanner twist movable disk 3332, movable disk 3332 with respect to big wire role 332 move up and down, thus realize vertical bar 31 rising or under Drop.By lifting device 333, it can be achieved that adjusting the adjustment of the height of 3 end positions of support frame.Support frame 3 is installed in reality, it can The height that can have the installation of support frame 3 is not in place, by adjusting lifting device 333, high and low position accurate adjustment above and below realization, thus So that the installation site in aisle 2 is more accurate.
If Fig. 7 is the utility model aisle substructure oblique view.Fig. 8 is the utility model aisle superstructure strabismus Figure.Fig. 9 is the utility model guard bar structure main view.Aisle 2 includes fixed aisle 21 and flexible aisle 22, stretch aisle 22 with The mode being slidably connected is mounted on fixed aisle 21.Fixed aisle 21 includes curb girder 211, intermediate beam 212, floor 216, and two Curb girder 211 and the fixed basic structure for forming fixed aisle 21 of several intermediate beams 212.Flexible aisle 22 include sliding curb girder 221, Intermediate beam 222 is slided, two sliding curb girders 221 and a sliding intermediate beam 222 form the frame structure in flexible aisle 22.Sliding Curb girder 221 is inserted into curb girder 211.Floor 216 is laid with and is fixed on fixed aisle 21 and flexible aisle 22.Curb girder 211 and sliding Curb girder 221 can all be square steel or round steel, and the external dimensions for sliding curb girder 221 is more smaller than the inside dimension of curb girder 211, pass through Two of flexible aisle 22 sliding curb girders 221 are inserted into two curb girders 211 in fixed aisle 21, realize flexible aisle 22 and solid Determine being slidably connected between aisle 21.Peep hole 2111 is arranged on the outer wall of flexible 22 side of aisle in two curb girders 211, is used for Whether observation sliding curb girder 221 stretches transition, and anti-sliding stop curb girder 221 pulls out out of two curb girders 211 and causes sliding curb girder 221 fall off.By being slidably connected between aisle 22 and fixed aisle 21 of stretching, aisle 2 may be implemented, length is changed It adjusts.It is thus possible to adapt to any distance installation between elevator 1 and existing building 9.When reality installs aisle 2, due to Reason or production reason are installed, the distance between elevator 1 and existing building 9 size are not necessarily very quasi-, pass through this patent Aisle 2 may be implemented precisely to adjust.Wherein, the sliding intermediate beam 222 to stretch on aisle 22 is fixed by welding or bolt Mode is fixed on crossbeam 32.Cylinder 214 and the second cylinder 223 are installed in the top of curb girder 211 and sliding curb girder 221 respectively, protect Column 4 is mounted in cylinder 214 and the second cylinder 223, and fastening bolt 2141 is all arranged in cylinder 214 and the second cylinder 223.Rotation Pin 213 and stiffening plate 2131 are mounted on curb girder 211.Guardrail 4 includes railing fixed link 41, railing vertical bar 42, stretch railing 43, Railing vertical bar 42 is fixed on the horizon bar of railing fixed link 41, and the horizon bar of flexible railing 43 is inserted into a manner of being slidably connected In the horizon bar of railing fixed link 41.Railing fixed link 41, railing vertical bar 42, flexible railing 43 are all made of round steel, wherein The outer diameter of flexible railing 43 is more smaller than the internal diameter of railing fixed link 41, and then flexible railing 43 can be sliding with respect to railing fixed link 41 It is dynamic.When installation, the vertical bar of railing fixed link 41, railing vertical bar 42, flexible railing 43 are all directly inserted in cylinder 214 vertically, By tightening fastening bolt 2141, realize that guardrail 4 and the detachable of aisle 2 are fastenedly connected.The lower part of curb girder 211 is close to sliding side 221 end of beam be arranged curb girder bracket 215, on crossbeam 32 be arranged brace fixed block 34, curb girder bracket 215, brace fixed block 34, tiltedly Big pin hole is all set on support rod 5, by the first king-bolt 51 and the second king-bolt 52 successively by curb girder bracket 215, bearing diagonal Bar 5, the installation of brace fixed block 34 are fixed.Brace fixed block 34 is a rectangular plate, on brace fixed block 34 from top to bottom Several big holes are set, it is possible thereby to the setting angle of inclined support bar 5 be adjusted, for adapting to flexible aisle 22 and fixed aisle 21 Between different distance connection.Several big holes can also be set on inclined support bar 5, can further adjust inclined support bar 5 Setting angle, adapt to the different collapsing length in flexible aisle 22 with further.
Embodiment of above is merely to illustrate the utility model, and is not limitation of the utility model, related technology neck The those of ordinary skill in domain, in the case where not departing from the spirit and scope of the utility model, can also make a variety of changes and Modification, therefore all equivalent technical solutions also belong to scope of the invention, the scope of patent protection Ying Youquan of the utility model Benefit requires to limit.

Claims (10)

1. a kind of steel construction open air elevator aisle, it is characterised in that: including elevator (1), aisle (2), support frame (3) and oblique branch Strut (5), elevator (1) are installed on the ground far from existing building (9), and support frame (3) is mounted on ground close to existing building (9) On face, aisle (2) are mounted between elevator (1) and support frame (3), and inclined support bar (5) is mounted on aisle (2) and support frame (3) corner connected.
2. a kind of steel construction open air elevator aisle according to claim 1, it is characterised in that: the inclined support bar (5) It is anti-bow steel construction, it is anti-to bend the rectangular triangle of steel construction, and its bevel edge is arc, or linear is vertical straight While being fixed on support frame (3);Its horizontal straight flange is fixed on aisle (2) bottom.
3. a kind of steel construction open air elevator aisle according to claim 1, it is characterised in that: on the elevator (1) It installs pin bracket (11), elevator (1) is located on aisle (2) and holds fixed stiffening plate (2131), stiffening plate is installed on (2131) Rotating dog (213), rotating dog (213) and pin bracket (11) are coupled.
4. a kind of steel construction open air elevator aisle according to claim 3, it is characterised in that: elevator is also installed on (1) Safe block (13), safe block (13) are located at below pin bracket (11).
5. a kind of steel construction open air elevator aisle according to claim 3, it is characterised in that: support frame (3) packet Vertical bar (31), crossbeam (32) and footing device (33) are included, several crossbeams (32), which are fixed between two vertical bars (31), forms support The basic framework of frame (3), aisle (2) are located at support frame (3) one end and are fixed on crossbeam (32), and footing device (33) is mounted on perpendicular The bottom of bar (31).
6. a kind of steel construction open air elevator aisle according to claim 5, it is characterised in that: footing device (33) includes big Bottom plate (331), big wire role (332), lifting device (333), big wire role (332) are fixed on big bottom plate (331), big bottom plate (331) it fixes on the ground;Lifting device (333) includes fixed disk (3331), movable disk (3332) and pressure bearing (3333), Fixed disk (3331), movable disk (3332) are fixed with the Shang Quan of pressure bearing (3333), lower circle respectively, and fixed disk (3331) is fixed In the bottom of vertical bar (31), fixed disk (3331) and movable disk (3332) be intermediate to be all arranged big hole, movable disk (3332) it is big Internal screw thread (3334) are set in circular hole, movable disk (3332) is meshed with big wire role (332).
7. a kind of steel construction open air elevator aisle according to claim 5, it is characterised in that: aisle (2) include fixing Road (21) and flexible aisle (22), flexible aisle (22) are mounted on fixed aisle (21) in a manner of being slidably connected, aisle (2) Upper installation guardrail (4).
8. a kind of steel construction open air elevator aisle according to claim 7, it is characterised in that: the fixation aisle (21) Including curb girder (211), intermediate beam (212), floor (216), two curb girders (211) and the fixed composition of several intermediate beams (212) are solid Determine the basic structure of aisle (21);Flexible aisle (22) include sliding curb girder (221), sliding intermediate beam (222), two sliding sides Beam (221) and sliding intermediate beam (222) form the frame structure of flexible aisle (22);It slides curb girder (221) and is inserted into curb girder (211) in, floor (216) are laid with and are fixed on fixed aisle (21) and flexible aisle (22).
9. a kind of steel construction open air elevator aisle according to claim 8, it is characterised in that: the curb girder (211) and Cylinder (214) and the second cylinder (223) are installed in the top of sliding curb girder (221) respectively, guardrail (4) be mounted on cylinder (214) and In the second cylinder (223), fastening bolt (2141) are all set in cylinder (214) and the second cylinder (223);Rotating dog (213) and Stiffening plate (2131) is mounted on curb girder (211);Guardrail (4) includes railing fixed link (41), railing vertical bar (42), flexible railing (43), railing vertical bar (42) is fixed on the horizon bar of fixed link (41), and the horizon bar of flexible railing (43) is to be slidably connected Mode is inserted into the horizon bar of fixed link (41).
10. a kind of steel construction open air elevator aisle according to claim 8, it is characterised in that: the curb girder (211) Close to sliding curb girder (221) end setting curb girder bracket (215) brace fixed block (34) are arranged on crossbeam (32), curb girder in lower part Big pin hole is all arranged on (5) in bracket (215), brace fixed block (34), inclined support bar, by the first king-bolt (51) and second largest Bolt (52) successively fixes curb girder bracket (215), inclined support bar (5), brace fixed block (34) installation.
CN201821402668.9U 2018-08-29 2018-08-29 A kind of steel construction open air elevator aisle Active CN208718420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821402668.9U CN208718420U (en) 2018-08-29 2018-08-29 A kind of steel construction open air elevator aisle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821402668.9U CN208718420U (en) 2018-08-29 2018-08-29 A kind of steel construction open air elevator aisle

Publications (1)

Publication Number Publication Date
CN208718420U true CN208718420U (en) 2019-04-09

Family

ID=65979949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821402668.9U Active CN208718420U (en) 2018-08-29 2018-08-29 A kind of steel construction open air elevator aisle

Country Status (1)

Country Link
CN (1) CN208718420U (en)

Similar Documents

Publication Publication Date Title
CN106958346B (en) Intelligent attached lifting scaffold equipment for curved surface super high-rise building and construction method
CN109898819B (en) Foldable telescopic overhanging tool type scaffold system and installation method thereof
CN110409670B (en) Integral large-formwork shear wall and construction method
KR101449654B1 (en) Angle and height adjustable apparatus for inspecting bridge
CN108979130A (en) A kind of the side wall unilateral side vertical mold device and construction method of adjustable formwork height
CN112144854A (en) Anchor pulling type section steel overhanging support operation scaffold combined system and construction method
CN211622528U (en) Basket type outer vertical surface scaffold inclined-pulling type I-steel cantilever beam
CN105569242A (en) Assembling method for composite floor slabs
CN103422663A (en) Adhesive lifting scaffold
CN105781100A (en) Template component for sidewall of subway station
CN205476380U (en) Remove raise scaffold
CN103104090B (en) Silo concrete whole slip template
WO2023208250A1 (en) Curtain wall construction platform
KR102144434B1 (en) Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
US3927518A (en) Site assembled multi-story stair
KR102457474B1 (en) Device for supporting a slab formwork
CN208718420U (en) A kind of steel construction open air elevator aisle
CN206636168U (en) Overhanging type scaffold system
CN108584646A (en) A kind of additional elevator shaft structure of the assembled being adapted to jack-up construction
CN202831621U (en) Integrated slipform for silo concrete
FI126773B (en) Vertical support structure for guardrail construction in roofing
CN208718334U (en) A kind of support frame of assembled architecture cantilevered plate
CN111851982A (en) Scaffold frame liftable prevents weighing down safety device
CN208518307U (en) A kind of fast pylon easy to install of adjustable platform width
CN208345549U (en) A kind of additional elevator shaft structure of assembled being adapted to jack-up construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240620

Address after: 201600 No.32, Shenshen Road, Chedun Town, Songjiang District, Shanghai 5786

Patentee after: Shanghai Fuyuan Environmental Protection Engineering Co.,Ltd.

Country or region after: China

Address before: Room 302, Lingxiangfang 9, Nanhu Community, Nanhu District, Jiaxing City, Zhejiang Province, 314000

Patentee before: Song Weili

Country or region before: China