CN208712492U - Construction site waste steel bar recovery system - Google Patents

Construction site waste steel bar recovery system Download PDF

Info

Publication number
CN208712492U
CN208712492U CN201820464447.8U CN201820464447U CN208712492U CN 208712492 U CN208712492 U CN 208712492U CN 201820464447 U CN201820464447 U CN 201820464447U CN 208712492 U CN208712492 U CN 208712492U
Authority
CN
China
Prior art keywords
cleaning
steel bar
waste steel
turnover panel
cutter device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820464447.8U
Other languages
Chinese (zh)
Inventor
李富
曹涛
石涛
李禹峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Qian Ao Construction Engineering Co Ltd
Original Assignee
Hubei Qian Ao Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Qian Ao Construction Engineering Co Ltd filed Critical Hubei Qian Ao Construction Engineering Co Ltd
Priority to CN201820464447.8U priority Critical patent/CN208712492U/en
Application granted granted Critical
Publication of CN208712492U publication Critical patent/CN208712492U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model relates to a kind of construction site waste steel bar recovery systems, including cleaning plant, cutter device and material collecting device, the cleaning plant, cutter device are sequentially coaxially arranged along reinforcing bar feedstock direction, the turnover panel height of the material collecting device is located at below the cutting groove on cutter device, the cleaning plant is made of scale mill and driving gear, the gear ring matched with driving gear is equipped on the outside of the scale mill, the driving gear is driven by motor;The scale mill is circular ring structure and is disposed with along waste steel bar feedstock direction except scrap layer, cleaning layer;The cutter device includes the pedestal for opening up V-type reinforcing bar cutting groove;The material collecting device includes rewinding bracket, second baffle and turnover panel.The concrete and iron rust that the utility model wraps up waste steel bar by cleaning plant above are cleared up, and the end of waste steel bar is carried out cutting recycling to the reinforcing bar after cleaning using cutter device, reduces production cost.

Description

Construction site waste steel bar recovery system
Technical field
The utility model belongs to technical field of buildings, is related to a kind of construction site waste steel bar recovery system.
Background technique
Reinforcing bar is a kind of bar of steel, is widely used in various building structure, particularly large size, heavy type, light thin wall And high building structure.It include a large amount of waste steel bars in the solid waste in removal house during carrying out work of renovating shantytowns, Concrete is wrapped up on these waste steel bar surfaces, and some surfaces generate a large amount of iron rust, manually uses hammer, it is difficult to remove, take When it is laborious.If these waste and old reinforcing bars, which carry out utilization, can save buildings and resources, reduce production cost.Therefore research and development one are needed Kind construction site waste steel bar recovery system.
Summary of the invention
In order to solve the above technical problems, the utility model provides a kind of construction site waste steel bar recovery system, life is reduced Produce cost.
The embodiment of the utility model is:
A kind of construction site waste steel bar recovery system, including cleaning plant, cutter device and material collecting device, the cleaning Device, cutter device are sequentially coaxially arranged along reinforcing bar feedstock direction, and the turnover panel height of the material collecting device is located on cutter device Cutting groove below, the cleaning plant is made of scale mill and driving gear, is equipped on the outside of the scale mill and active The gear ring that gear matches, the driving gear are driven by motor;The scale mill be circular ring structure and along waste steel bar into Material direction is disposed with except scrap layer, cleaning layer;The cutter device includes the pedestal for opening up V-type reinforcing bar cutting groove;It is described Material collecting device includes rewinding bracket, second baffle and turnover panel.
Preferably, described except scrap layer is except the internal symmetry of scrap layer is equipped with channel, the connecting rod one of the inside in the channel End is fixedly connected by spring with the inner wall except scrap layer, and the other end is rotatably equipped with steel brush;Described remove also sets inside scrap layer There are a cricoid iron rust and concrete slag collecting chamber, iron rust and concrete slag collecting chamber are uniformly provided with several iron close to steel brush side Rust and concrete slag feed opening;
Preferably, the cleaning layer middle position is equipped with cleaning disk;The cleaning disk is uniformly provided with several spray heads, It is successively arranged waste collection chamber and cleaning solution storage chamber on the outside of the cleaning disk, the waste collection chamber is close to the side of spray head It is evenly arranged with several inlet openings;The inside of the cleaning solution storage chamber is fixedly installed with water pump, the water outlet of water pump and cleaning Disk connection.
Preferably, several grooves, filled rubber in groove are opened up on the cell wall of the cutting groove.
Preferably, the pedestal is connect with casing by support rod, and installation cutting handle, casing internal install sand on casing Wheel, pedestal disengaging reinforcing bar two sides are equipped with first baffle.
Preferably, the rewinding bracket includes chassis and the support frame above the chassis, and support frame as described above includes Junction is provided with two struts of axle sleeve, and the angle between described two struts is 100-130 °;
Preferably, the turnover panel is located at the top of two struts, is fixedly connected on the turnover panel opposite with the axle sleeve The two sides of the axis answered, the rewinding bracket are equipped with charging conduit, and the second baffle is located at the side of the turnover panel, and perpendicular to institute State turnover panel.
The utility model the utility model has the advantages that
1, the concrete and iron rust that the utility model wraps up waste steel bar by cleaning plant above are cleared up, in addition The end of reinforcing bar reinforcing bar in use has usually carried out soldering processing, C, Mn inside welding wire, Si, Re, B, Nb, Ni, Cr element needs to carry out further melting recovery processing, using cutter device to the reinforcing bar after cleaning by the end of waste steel bar Carry out cutting recycling, at the same cutter device waste steel bar can also be carried out being cut to after the reinforcing bar of production standard size length Material collecting device is wrapped up to be recycled again.
2, the cleaning plant of the utility model, which is equipped with, removes scrap layer, cleaning layer, can effectively beat waste steel bar Mill, cleaning, remove the concrete and iron rust on surface.It is smaller to reinforcing bar injury, it does not need to beat, remove thoroughly.
3, filled rubber in the groove of the cutter device in the utility model increases reinforcing bar cutting groove groove wall frictional force, After reinforcing bar is placed in reinforcing bar cutting groove, reinforcing bar can generate friction with rubber, not easily shifted.
4, cutting groove is V-structure, and the reinforcing bar that can place different-diameter is cut.
5, first baffle make the spark generated when reinforcing bar cutting will not spluttering, guarantee operator safety.
6, the angle between described two struts is 100-130 °, and reversal rate can be improved so that reinforcing bar hurtle down to Charging conduit avoids reinforcing bar and accumulates on returning face plate, improves the falling speed of reinforcing bar.
7, the second baffle is located at the side of the turnover panel, and perpendicular to the turnover panel, reinforcing bar is prevented to be detached from returning face plate.
Detailed description of the invention
Fig. 1 Tthe utility model system schematic top plan view;
Fig. 2 cleaning plant structural schematic diagram;
Fig. 3 cleans schematic diagram of a layer structure;
Fig. 4 removes scrap schematic diagram of a layer structure;
Fig. 5 cutter device schematic diagram of a layer structure;
Fig. 6 material collecting device schematic diagram of a layer structure;
Fig. 7 material collecting device schematic diagram of a layer structure;
Fig. 8 material collecting device schematic diagram of a layer structure;
Wherein: cleaning plant 1, material collecting device 3, rewinding bracket 31, axle sleeve 311, strut 312, axis 321, turnover panel 32, cutting Device 2, cutting groove 211, pedestal 21, casing 22, support rod 23 cut handle 24, first baffle 25, grinding wheel 26, scale mill 11, gear ring 111, driving gear 12, motor 13, except scrap layer 112, channel 1121, connecting rod 1122, spring 1123, steel brush 1124, iron rust and concrete slag collecting chamber 1125, iron rust and concrete slag feed opening 1126, cleaning layer 113 clean disk 1131, spray head 11311, waste collection chamber 1132, cleaning solution storage chamber 1133, water pump 1134.
Specific embodiment
Further illustrate the utility model below with reference to embodiment, but the range of the requires of the utility model protection not office It is limited to the range of embodiment statement.
Embodiment 1
A kind of construction site waste steel bar recovery system, including cleaning plant 1, cutter device 2 and material collecting device 3, it is described Cleaning plant 1, cutter device 2 are sequentially coaxially arranged along reinforcing bar feedstock direction, and 32 height of turnover panel of the material collecting device 3, which is located at, cuts 211 lower section of cutting groove on device 2 is cut, the cleaning plant 1 is made of scale mill 11 and driving gear 12, the derusting rolling 11 outside of cylinder is equipped with the gear ring 111 matched with driving gear 12, and the driving gear 12 is driven by motor 13;The derusting rolling Cylinder 11 is disposed with except scrap layer 112, cleaning layer 113 for circular ring structure and along waste steel bar feedstock direction;The cutting dress Setting 2 includes the pedestal 21 for opening up V-type reinforcing bar cutting groove 211;The material collecting device 3 includes rewinding bracket 31,33 and of second baffle Turnover panel 32.
Preferably, described except scrap layer 112 is except the internal symmetry of scrap layer 112 is equipped with channel 1121, the channel 1121 Inside 1122 one end of connecting rod by spring 1123 with except the inner wall of scrap layer 112 is fixedly connected, the other end is rotatably equipped with Steel brush 1124;Described remove is additionally provided with cricoid iron rust and concrete slag collecting chamber 1125, iron rust and concrete inside scrap layer 112 Slag collecting chamber 1125 is uniformly provided with several iron rust and concrete slag feed opening 1126 close to 1124 side of steel brush;
Preferably, 113 middle position of cleaning layer is equipped with cleaning disk 1131;The cleaning disk 1131 is uniformly provided with Several spray heads 11311 are successively arranged waste collection chamber 1132 and cleaning solution storage chamber 1133 on the outside of the cleaning disk 1131, The waste collection chamber 1132 is evenly arranged with several inlet openings 1132 close to the side of spray head 11311;The cleaning solution storage The inside of chamber 1133 is fixedly installed with water pump 1134, and the water outlet of water pump 1134 is connected to cleaning disk 1131.The cleaning solution The cleaning solution stored in storage chamber 1133 is water or acid solution or aqueous slkali.
Preferably, several grooves 2111, filled rubber in groove are opened up on the cell wall of the cutting groove 211.
Preferably, the pedestal 21 is connect with casing 22 by support rod 23, installation cutting handle 24, casing on casing 23 Grinding wheel 26 is installed in 23 inside, and the pedestal 21 passes in and out reinforcing bar two sides and is equipped with first baffle 25.
Preferably, the rewinding bracket 31 includes chassis and the support frame above the chassis, support frame as described above packet Two struts 312 that junction is provided with axle sleeve 311 are included, the angle between described two struts 312 is 100-130 °;
Preferably, the turnover panel 32 is located at the top of two struts 312, is fixedly connected with and the axis on the turnover panel 32 311 corresponding axis 321 are covered, the two sides of the rewinding bracket 31 are equipped with charging conduit 34, and the second baffle 33 is located at described turn over The side of plate 32, and perpendicular to the turnover panel 32.
This utility system working principle: it by an insertion cleaning plant 1 of waste steel bar, initially enters except scrap layer 112, connecting rod 1122 makes steel brush 1124 be close to rebar surface under the action of spring 1123, carries out polishing derusting to rebar surface, The iron rust and concrete slag generated when polishing falls into iron rust and concrete slag collecting chamber 1125 and is collected, at the same time, electricity Machine 13 drives driving gear 12 to rotate, so that scale mill 11 be driven to rotate, waste steel bar is made to obtain comprehensive polishing;Reinforcing bar Polishing after the completion of enter cleaning layer 113 in, water pump 1134 by cleaning solution be pumped into cleaning disk 1131 in the reinforcing bar after polishing into Row is sprayed, and the waste liquid after cleaning flows into waste collection chamber 1132, and at the same time, the rotation of scale mill 11 obtains reinforcing bar To comprehensive cleaning, the reinforcing bar for cleaning completion enters cutter device 2, and material collecting device 3 is entered after cutting to cutter device Class carries out class wrapping.

Claims (6)

1. a kind of construction site waste steel bar recovery system, including cleaning plant (1), cutter device (2) and material collecting device (3), It is characterized by: the cleaning plant (1), cutter device (2) are sequentially coaxially arranged along reinforcing bar feedstock direction, the material collecting device (3) turnover panel (32) is highly located at below the cutting groove (211) on cutter device (2), and the cleaning plant (1) is by scale mill (11) it is formed with driving gear (12), the gear ring matched with driving gear (12) is equipped on the outside of the scale mill (11) (111), the driving gear (12) is driven by motor (13);The scale mill (11) be circular ring structure and along waste steel bar into Material direction is disposed with except scrap layer (112), cleaning layer (113);The cutter device (2) includes opening up the cutting of V-type reinforcing bar The pedestal (21) of slot (211);The material collecting device (3) includes rewinding bracket (31), second baffle (33) and turnover panel (32).
2. waste steel bar recovery system in construction site according to claim 1, it is characterised in that: described to remove scrap layer (112) except the internal symmetry of scrap layer (112) is equipped with channel (1121), the connecting rod (1122) one of the inside of the channel (1121) End is fixedly connected by spring (1123) with the inner wall except scrap layer (112), and the other end is rotatably equipped with steel brush (1124);It is described Cricoid iron rust and concrete slag collecting chamber (1125), iron rust and concrete slag collecting chamber are additionally provided with except scrap layer (112) is internal (1125) several iron rust and concrete slag feed opening (1126) are uniformly provided with close to steel brush (1124) side.
3. waste steel bar recovery system in construction site according to claim 1, it is characterised in that: the cleaning layer (113) Middle position is equipped with cleaning disk (1131);The cleaning disk (1131) is uniformly provided with several spray heads (11311), described clear It washes on the outside of disk (1131) and is successively arranged waste collection chamber (1132) and cleaning solution storage chamber (1133), the waste collection chamber (1132) side close to spray head (11311) is evenly arranged with several inlet openings;The inside of the cleaning solution storage chamber (1133) It is fixedly installed with water pump (1134), the water outlet of water pump (1134) is connected to cleaning disk (1131).
4. waste steel bar recovery system in construction site according to claim 1, it is characterised in that: the cutting groove (211) Cell wall on open up several grooves (2111), filled rubber in groove.
5. waste steel bar recovery system in construction site according to claim 1, it is characterised in that: the pedestal (21) and machine Shell (22) is connected by support rod (23), installation cutting handle (24) on casing (22), installs grinding wheel (26) inside casing (22), Pedestal (21) disengaging reinforcing bar two sides are equipped with first baffle (25).
6. waste steel bar recovery system in construction site according to claim 1, it is characterised in that: the rewinding bracket (31) Support frame including chassis and above the chassis, support frame as described above include two that junction is provided with axle sleeve (311) Strut (312), the angle between described two struts (312) is 100-130 °, and the turnover panel (32) is located at two struts (312) Top, be fixedly connected with axis (321) corresponding with the axle sleeve (311), the rewinding bracket on the turnover panel (32) (31) two sides are equipped with charging conduit (34), and the second baffle (33) is located at the side of the turnover panel (32), and perpendicular to described Turnover panel (32).
CN201820464447.8U 2018-04-03 2018-04-03 Construction site waste steel bar recovery system Expired - Fee Related CN208712492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820464447.8U CN208712492U (en) 2018-04-03 2018-04-03 Construction site waste steel bar recovery system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820464447.8U CN208712492U (en) 2018-04-03 2018-04-03 Construction site waste steel bar recovery system

Publications (1)

Publication Number Publication Date
CN208712492U true CN208712492U (en) 2019-04-09

Family

ID=65969523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820464447.8U Expired - Fee Related CN208712492U (en) 2018-04-03 2018-04-03 Construction site waste steel bar recovery system

Country Status (1)

Country Link
CN (1) CN208712492U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114260216A (en) * 2021-12-08 2022-04-01 苏州富强科技有限公司 Outer surface treatment equipment for cylindrical products

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114260216A (en) * 2021-12-08 2022-04-01 苏州富强科技有限公司 Outer surface treatment equipment for cylindrical products

Similar Documents

Publication Publication Date Title
CN205588118U (en) Steel rust removal device
CN104786125B (en) Polishing and dust collecting integrated device for concrete reinforcements on construction site
CN110340102A (en) Construction site waste steel bar recovery system
CN208712492U (en) Construction site waste steel bar recovery system
CN110539215A (en) Grinding device and method for outer circle of carbon felt heat-insulating cylinder
CN214772820U (en) Automatic cleaning and spraying device for prefabricated box girder model
CN210413818U (en) Grinding device for outer circle of carbon felt heat-insulating cylinder
CN210917363U (en) Underground continuous wall construction is with novel multi-functional wall ware of brushing
CN211755386U (en) Based on breaker for construction
CN209736144U (en) Cleaning device for battery pole piece rolling mill
CN207878358U (en) A kind of civil engineering works cleaning dust-extraction unit
CN214389318U (en) Automatic rotating device for waste gas treatment filter screen
CN211142747U (en) Dust-free type seam cleaning machine
CN210341756U (en) Highway rail guard curing means
CN214194317U (en) Damaged road surface reforms transform prosthetic preprocessing device
CN211490718U (en) A clean auxiliary device for digit control machine tool
CN211285193U (en) Road crack cleaning device
CN210121396U (en) Spraying and watering dust removal device for constructional engineering
CN110984041B (en) Dust removal vehicle for tunnel construction
CN205475003U (en) Full -automatic enclosure belt cleaning device
CN211885603U (en) Water saving fixtures is used at fitment job site
CN221089565U (en) Slag removal device for cutting CFG pile head
CN215696506U (en) Petroleum pipeline cleaning device with pipe diameter adjustable structure
CN212444617U (en) Angle grinder with cleaning function
CN218175551U (en) Road surface reducing mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190409

Termination date: 20200403

CF01 Termination of patent right due to non-payment of annual fee