CN208701620U - It is a kind of for blocking the dam body of mountain channel mountain torrents, mud-rock flow - Google Patents

It is a kind of for blocking the dam body of mountain channel mountain torrents, mud-rock flow Download PDF

Info

Publication number
CN208701620U
CN208701620U CN201820986244.5U CN201820986244U CN208701620U CN 208701620 U CN208701620 U CN 208701620U CN 201820986244 U CN201820986244 U CN 201820986244U CN 208701620 U CN208701620 U CN 208701620U
Authority
CN
China
Prior art keywords
arch
dam body
barricade
dam
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820986244.5U
Other languages
Chinese (zh)
Inventor
王立成
任鑫龙
李岳东
马妹英
李佳隆
丁兆亮
王蓟清
关宇飞
武帅
刘伟丽
许鸿飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN201820986244.5U priority Critical patent/CN208701620U/en
Application granted granted Critical
Publication of CN208701620U publication Critical patent/CN208701620U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of for blocking the dam body of mountain channel mountain torrents, mud-rock flow, and dam body includes at least one fabricated precast prestressed arch, and arch ring is in the arch for being convex to upstream in the plane, and arch springing is assemblied between two lateral retaining wall brackets.The precast prestressed arch is that precast prestressed concrete encircles.The barricade includes abutment pier barricade and middle pier barricade, and abutment pier barricade and middle pier retaining wall foundation are constructed using diaphram wall mode, provides the skid resistance of dam body.Dam body upstream interlaced arrangement has armored concrete anticollision to block the stone pier.The dam body downstream is equipped with energy dissipating end sill, and cushion pool is formed between precast prestressed arch and energy dissipating end sill, and energy dissipating end sill downstream is laid with erosion control apron.Dam body is low to ground fundamental importance, and stability is good, is suitable for various topographic and geologic conditions.Prestressing force arch is precast concrete domes, can shift to an earlier date and manufacture in factory, and scene directly lifts, and convenient and quick construction, short time limit facilitate maintenance maintenance;And construction diversion is not necessarily to when such dam construction, manpower and material resources are greatly saved;Because its figure is smaller, structure is simple, and project cost is lower.

Description

It is a kind of for blocking the dam body of mountain channel mountain torrents, mud-rock flow
Technical field
The utility model relates to a kind of hydraulic structure structures, especially a kind of for blocking mountain channel mountain torrents, mudstone The dam body of stream.
Background technique
Mountain torrents, mud-rock flow are the common natural calamities in mountain area, and have it is sudden, and China's national territorial area there are about three/ Second is that alpine terrain, therefore mud-rock flow, in China, especially west area distribution is quite extensive, and disaster is than more serious.River is attached The facilities such as close resident's security of the lives and property and cities and towns, factories and miness, road and bridge can all be destroyed by mud-rock flow, caused by economy damage Dephasing is when huge.The development of disaster directly threatens in basin and catchment people life property safety, seriously restricts and works as The sound development of ground social economy.The forecast means of mud-stone flow disaster are still immature, therefore, to ensure personal and property safety, Effective safe prevention measure should be taken, the harmfulness of mud-stone flow disaster is minimized.
The block dam body of mud-rock flow of tradition can be divided into gravity dam and arch dam two major classes type.Gravity dam according to filling material not Together, and earth dam, dry-laid masonry dam, stone masonry dam, native stone mixed dam, iron wire shilong dam can be divided into etc., there are also block mudstone stream part The through mode gravity dam of gear, such dam type blocks thick row carefully, such as crib dam, slit dam dam type.In addition there are also steel cable dams flexible. The selection of dam type is considered as cheuch type, topographic and geologic condition, the scale of mud-rock flow and importance of downstream protected object etc., knot Close the applicable elements of different dam types, advantage and disadvantage carry out reasonable selection.
Traditional check dam more or less has some disadvantages in engineering practice.
(1) gravity dam: thrust and impact force to resist mud-rock flow generation from the frictional force generated on ground is focused on.It is excellent Point is: structure is simple, easy for construction, gathers materials on the spot, and durability is strong.The disadvantage is that figure is heavy, project amount is big, and to the ground of ground Matter condition is more demanding, and construction needs construction diversion, and operational procedure is complex.
(2) arch dam: arch dam can be built at the dam site that cheuch is narrow, two sides basement rock is firm.Arch dam is in be convex in the plane The arch of trip, arch ring compression chord effect, can make full use of building stones and the very high compression strength of concrete, have labor and material saving etc. Feature.But arch dam is more demanding to dam site geological conditions, and design and construction are complicated difficult.
(3) crib dam and slit dam: crib dam have good water penetration, can selective Littoral Barrier, also have The advantages that scouring before dam is small, is easy to dredging behind dam.Its main body can be assembled at the scene, and speed of application is fast.The disadvantage is that: it is not suitable for Retain slumped mass and periodicity viscous mud-flow and fine grain mud-rock flow;Easily by swiftly flowing mud-rock flow faucet and boulder It breaks, needs steel more, it is desirable that have preferable execution conditions and skilled artisan.
(4) steel cable dam: cable type check dam is to work out networking using cable wire, then be fixed on ditch bed and constitute.It is this Structure has good flexibility, can eliminate the huge impact force of mud-rock flow, and mud-rock flow is promoted to deposit in dam upstream.This dam structure letter It is single, it is easy for construction, but durability is poor, at present using less.
(5) steel-wire stone dam: dam body is piled up by iron wire gabion, and iron wire gabion is box.This dam is suitable for small-sized Waste small stream.Its advantages are to build simply, and construction is rapid, low cost.The disadvantage is that validity period is short, the globality poor on dam.
Utility model content
Technical problem to be solved by the utility model is to provide a kind of reduction cost, guarantee construction quality for blocking Hinder the dam body of mountain channel mountain torrents, mud-rock flow.
To solve the above-mentioned problems, the technical scheme adopted by the utility model is it is a kind of for blocking mountain channel mountain The dam body of flood, mud-rock flow, dam body includes at least one fabricated precast prestressed arch, and arch ring is in be convex to upstream in the plane Arch, arch springing are assemblied between two lateral retaining wall brackets.
The precast prestressed arch is that precast prestressed concrete encircles.
The barricade includes abutment pier barricade and middle pier barricade, and abutment pier barricade and middle pier retaining wall foundation use diaphram wall side Formula construction, provides the skid resistance of dam body.
Dam body upstream interlaced arrangement has armored concrete anticollision to block the stone pier.
The dam body downstream is equipped with energy dissipating end sill, forms cushion pool, energy dissipating tail between precast prestressed arch and energy dissipating end sill Bank downstream is laid with erosion control apron.
The utility model has the beneficial effects that dam body is low to the requirement of landform geological conditions, scheme is limited less in addressing, it is right Reducing investment has direct help;Prefabricated and in-site installation can be shifted to an earlier date, and prestressing force can be applied, be to reduce cost, guarantee engineering It has a clear superiority in terms of quality;It is not necessarily to construction diversion engineering when construction, can shorten the construction period and reduce construction investment.
Detailed description of the invention
Fig. 1 is the dam body overall floor plan that the utility model is used to block mountain channel mountain torrents, mud-rock flow.
Fig. 2 is the sectional view of the precast prestressed arch of the utility model.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description:
As shown in Figure 1, 2, the utility model is used to block the dam body of mountain channel mountain torrents, mud-rock flow, and dam body includes at least One fabricated precast prestressed arch, arch ring are in the arch for being convex to upstream in the plane, and arch springing is assemblied in two lateral retaining wall brackets Between.
The precast prestressed arch is that precast prestressed concrete encircles.
The barricade includes abutment pier barricade 2 and middle pier barricade 3, and abutment pier barricade 2 and 3 basis of middle pier barricade are continuous using underground Wall mode is constructed, and the skid resistance of dam body is provided.
Dam body upstream interlaced arrangement has armored concrete anticollision to block the stone pier 4.
The dam body downstream is equipped with energy dissipating end sill 5, forms cushion pool 6 between precast prestressed arch 1 and energy dissipating end sill 5, disappears It can 5 downstream of end sill laying erosion control apron 7.
Specifically:
(1) according to the design length of check dam and a mud-rock flow flood peak come amount, after being really sized, in precast concrete Component factory makes the concrete pre-stress arch for being disposed with prestress wire 8 in advance.
(2) construction two sides abutment pier barricade 2 and middle pier barricade 3, basis use diaphram wall pattern.
(3) stone pier 4 and concrete floor construction are blocked in concrete anticollision in upstream, can be poured its scene of progress according to design size Note.Anticollision blocks the stone pier 4 to block the coarse solid matter such as boulder and drift wood in mud-rock flow, and violent mud-rock flow is made to reduce it Impact force and destructive power.
(4) construction of the dam body water cushion pool downstream pool 6 and energy dissipating end sill 5 and erosion control apron 7.
(5) the precast concrete prestressing force arch that lifting processes.
The utility model makes the concrete pre-stress for being disposed with prestress wire in precast concrete factory in advance Arch, prestressing force arch can assembled in situ fix, arch ring is in the arch for being convex to upstream in the plane, and arch springing is assemblied in two lateral retaining wall brackets Between, since concrete itself has very strong compression strength, in addition prestressed application, prestressing force arch can bear huge enough The impulsive force of mud flow, pressure is transferred to abutment pier and middle pier by arch ring, and the pressure of the two sides Zhong Dun can largely offset each other, abutment pier Pressure be transferred to two sides massif, to provide good stress condition to dam body.Abutment pier and middle pier foundation are connected using underground Continuous wall pattern, it is main that the skid resistance of dam body is provided, while having very great help to the overall stability of dam body.Dam body upstream arrangement has The stone pier is blocked in armored concrete anticollision, to boulder of blocking, reduces mud-rock flow destructive power.Dam body downstream certain distance is equipped with energy dissipating End sill forms cushion pool between arch dam and energy dissipating end sill, energy dissipating end sill downstream is laid with erosion control apron, and cushion pool and apron make jointly For the dissipation and scouring facility in dam downstream.
The utility model can be applied to prevent mountain channel mountain torrents and mud-rock flow, and advantage includes to ground fundamental importance Low, antiskid, stability against overturning are good, are suitable for various topographic and geologic conditions;Prestressing force arch is precast concrete domes, can be mentioned Preceding to manufacture in factory, scene directly lifts, and convenient and quick construction, short time limit facilitate maintenance maintenance;And when such dam construction Without construction diversion, manpower and material resources are greatly saved;Because its figure is smaller, structure is simple, therefore its project cost is relatively low.
Embodiment described above is merely to illustrate the technical idea and feature of the utility model, and its object is to make ability Technical staff in domain, cannot be only practical to limit with the present embodiment it will be appreciated that the content of the utility model and implement accordingly Novel the scope of the patents, i.e., same changes or modifications made by the revealed spirit of all the utility model, it is practical new still to fall in this In the scope of the patents of type.

Claims (3)

1. a kind of for blocking the dam body of mountain channel mountain torrents, mud-rock flow, which is characterized in that dam body includes at least one assembled Precast prestressed arch, arch ring is in the arch for being convex to upstream in the plane, and arch springing is assemblied between two lateral retaining wall brackets, on dam body Trip interlaced arrangement has armored concrete anticollision to block the stone pier (4);Dam body downstream be equipped with energy dissipating end sill (5), precast prestressed arch (1) and Cushion pool (6) are formed between energy dissipating end sill (5), energy dissipating end sill (5) downstream is laid with erosion control apron (7).
2. according to claim 1 for blocking the dam body of mountain channel mountain torrents, mud-rock flow, which is characterized in that described prefabricated Prestressing force encircles (1) as precast prestressed concrete arch.
3. according to claim 1 for blocking the dam body of mountain channel mountain torrents, mud-rock flow, which is characterized in that the barricade Including abutment pier barricade (2) and middle pier barricade (3), abutment pier barricade (2) and middle pier barricade (3) basis are applied using diaphram wall mode Work provides the skid resistance of dam body.
CN201820986244.5U 2018-06-22 2018-06-22 It is a kind of for blocking the dam body of mountain channel mountain torrents, mud-rock flow Active CN208701620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820986244.5U CN208701620U (en) 2018-06-22 2018-06-22 It is a kind of for blocking the dam body of mountain channel mountain torrents, mud-rock flow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820986244.5U CN208701620U (en) 2018-06-22 2018-06-22 It is a kind of for blocking the dam body of mountain channel mountain torrents, mud-rock flow

Publications (1)

Publication Number Publication Date
CN208701620U true CN208701620U (en) 2019-04-05

Family

ID=65937225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820986244.5U Active CN208701620U (en) 2018-06-22 2018-06-22 It is a kind of for blocking the dam body of mountain channel mountain torrents, mud-rock flow

Country Status (1)

Country Link
CN (1) CN208701620U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112144488A (en) * 2020-10-27 2020-12-29 中水北方勘测设计研究有限责任公司 Multi-curved arch water-permeable stepped energy dissipation secondary dam capable of preventing river channel undercut from being damaged

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112144488A (en) * 2020-10-27 2020-12-29 中水北方勘测设计研究有限责任公司 Multi-curved arch water-permeable stepped energy dissipation secondary dam capable of preventing river channel undercut from being damaged

Similar Documents

Publication Publication Date Title
Jansen Dams and public safety
CN202298556U (en) Novel prevention structure for landslide converting-type debris flow
CN204849680U (en) Novel ecological shore protection system
CN207633352U (en) A kind of slope reinforcement structure for rapid rescue construction
CN111270698A (en) Protective structure for exposed diseases of bridge pile foundation in sand-mining river channel in mountainous area and construction method of protective structure
CN208981282U (en) A kind of high earthquake territory concrete face rockfill dam dam crest structure
CN108547262A (en) Dam body for blocking mountain channel mountain torrents, mud-rock flow
CN204690698U (en) A kind of debris flow dam
CN208701620U (en) It is a kind of for blocking the dam body of mountain channel mountain torrents, mud-rock flow
CN107700434B (en) Arch-shaped grid type reinforced concrete debris flow blocking dam and construction method thereof
Saxena et al. Dams: Incidents and accidents
CN210946536U (en) Protective structure of small dangerous rock falling stone
CN203821306U (en) Flexible anti-scour protection pad
CN105569055B (en) A kind of structure for preventing landslide
CN104727301A (en) Geological reinforcement device
Chen et al. Protection mechanisms, countermeasures, assessments and prospects of local scour for cross-sea bridge foundation: A review
CN104963323A (en) Scour-preventing groove for chain precast block protective surface
CN212223936U (en) A protective structure that is used for mountain area to adopt sand river course inner bridge pile foundation to expose disease
CN111321705B (en) Construction method of debris flow blocking dam
CN210887090U (en) Breakwater with energy dissipation function
CN207597544U (en) A kind of high resiliency water conservancy chute
CN204728288U (en) Chain prefabricated section mask anti-scour trench
CN204199238U (en) Mud-rock flow Composite pile-geonets device
CN219992659U (en) Ecological diversion structure of rainwater on high steep side slope of river course
CN103821106A (en) Small-scale fishing port and riverway revetment structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant