CN208678665U - The depositing dust spray equipment of workshop - Google Patents

The depositing dust spray equipment of workshop Download PDF

Info

Publication number
CN208678665U
CN208678665U CN201820979070.XU CN201820979070U CN208678665U CN 208678665 U CN208678665 U CN 208678665U CN 201820979070 U CN201820979070 U CN 201820979070U CN 208678665 U CN208678665 U CN 208678665U
Authority
CN
China
Prior art keywords
water pipe
wall
baffle
depositing dust
cover board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820979070.XU
Other languages
Chinese (zh)
Inventor
葛珏逊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Jieda Plastic Industry Co., Ltd.
Original Assignee
Nanjing Yongchuan Concrete Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Yongchuan Concrete Co Ltd filed Critical Nanjing Yongchuan Concrete Co Ltd
Priority to CN201820979070.XU priority Critical patent/CN208678665U/en
Application granted granted Critical
Publication of CN208678665U publication Critical patent/CN208678665U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The utility model discloses a kind of depositing dust spray equipments of workshop, it applies in environmentally friendly dust falling device field, its key points of the technical solution are that: including wall, water pipe is equipped on wall, several spray heads are connected on water pipe, wall is equipped with for securing the tubes with the fixing piece on wall;Fixing piece includes several is connected on wall by fastening screw and along the fixed plate of length of pipe directional spreding and baffle of the fixed plate far from wall one end being arranged in, baffle is equipped with the cover board parallel with fixed plate, clamping bar is connected with by central axis rotation on cover board, is arranged with torsional spring on central axis;Water pipe is located at the inside of baffle and cover board, and when water pipe is pushed against on baffle by clamping bar, torsional spring is in and is twisted state, its advantage is that: by securing the tubes on wall, reduce labor intensity when artificial watering.

Description

The depositing dust spray equipment of workshop
Technical field
The utility model relates to environmentally friendly dust falling device field, in particular to the depositing dust spray equipment of a kind of workshop.
Background technique
Concrete mixing plant at work, is related to the conveying of various aggregates, in the process, since aggregate size is small Property brings adverse effect to the environment of entire on-site so that some aggregate dust inevitably drift in air.
Spray dust's measure that people take is usually to utilize sprinkling truck to aerial watering, increases the wet of workshop surrounding air Degree, increases the self weight of the dust in air, so under fall to the ground, achieve the purpose that depositing dust, but this method needs Special personnel are employed to sprinkle water, labor intensity is larger.
Utility model content
The purpose of the utility model is to provide a kind of depositing dust spray equipments of workshop, its advantage is that: by the way that water pipe is fixed On wall, labor intensity when artificial watering is reduced.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of depositing dust spray of workshop Shower device, including wall are equipped with water pipe on the wall, several spray heads are connected on the water pipe, the wall is equipped with For securing the tubes with the fixing piece on wall;
The fixing piece includes several being connected to by fastening screw on wall and along the fixation of length of pipe directional spreding Plate is equipped with the cover board parallel with fixed plate, the cover board with baffle of the fixed plate far from wall one end, the baffle is arranged in It is upper that clamping bar is connected with by central axis rotation, torsional spring is arranged on the central axis;The water pipe is located at baffle and cover board Inside, when water pipe is pushed against on baffle by the clamping bar, the torsional spring is in and is twisted state.
Through the above technical solutions, operator first overcomes the elastic force of torsional spring when needing to carry out depositing dust work, to separate Baffle direction rotates clamping bar, and then water pipe is placed on the inside of baffle and fixed plate, unclamps clamping bar, bullet of the clamping bar in torsional spring Property power effect is lower inverts and water pipe is pushed against on baffle, to secure the tubes on wall, operator connects water pipe later Water flowing source can carry out manually watering work without professional, the labour for reducing operator is strong from spray head to aerial water spray Degree, it is convenient and efficient.
The utility model is further arranged to: the mobile sliding groove of cover board, the cover board and cunning are offered on the baffle Multiple extension springs are connected between dynamic slot slot bottom.
Through the above technical solutions, when the water flow pressure in water pipe changes, water pipe also can when water pipe is soft pipe Therewith expansion or or shrink so that cover board and clamping bar are moved with the variation of water pipe volume, reduce due to water pipe It shrinks, so that occurring gap between water pipe and baffle or cover board, causes water pipe the case where sliding in fixed plate.
The utility model is further arranged to: the side of the baffle is equipped with fixed frame, is connected with two on the fixed frame A movable plate, two opposite sides of the movable plate are equipped with sleeve, slidably connect in the sleeve across movable plate Slide bar, and it is connected with arc panel in the one end passed through, the sleeve is equipped with far from one end of movable plate and is pierced by for the slide bar other end End cap, the slide bar is equipped with intermediate mass, and the slide bar is arranged with the first compressed spring between intermediate mass and end cap.
Through the above technical solutions, pushing against two arc panels by water pipe by the elastic force of the first compressed spring, play Further fix the effect of water pipe;And arc panel can be mobile with moving slide-bar with expansion, the contraction of water pipe, so that arc panel The state contradicted with water pipe is kept, the stability of fixed water pipe is improved.
The utility model is further arranged to: the movable plate is slidably connected with fixed frame, and the fixed frame, which is equipped with, to be used In the mobile limited part of limitation movable plate.
Through the above technical solutions, operator can adjust the opposite position between arc panel and water pipe by sliding movable plate It sets, to adapt to clamping of the arc panel to different size water pipe, ensure that the useful effect power between arc panel and water pipe;Limited part is then Facilitate fixation of the operator to mobile Board position.
The utility model is further arranged to: the limited part includes that the dovetails of mobile board ends are arranged in and are provided with Dovetail groove on fixed frame is threaded with fixing bolt, one end of the fixing bolt and dovetail groove slot in the dovetails Bottom contradicts.
Through the above technical solutions, operator tightens fixing bolt, makes fixing bolt and dovetail groove in fixed movable plate Slot bottom pushes against, and is fixed the position of dovetails by the interaction force between dovetails and dovetail groove groove wall, simple and convenient.
The utility model is further arranged to: the side of the baffle and fixed plate conflict is equipped with convex block, the fixed plate On offer clamping groove for convex block insertion, offer limiting slot on the opposite two sidewalls of convex block, it is sliding in the limiting slot It is dynamic to be connected with arc block, it is connected with the second compressed spring between the arc block and limiting slot slot bottom, is opened in the clamping groove groove wall Equipped with the arc groove being partially submerged into for arc block.
Through the above technical solutions, operator firmly pulls baffle, so that arc block is moved down in the extruding of arc groove groove wall Dynamic to enter in limiting slot, operator can separate baffle with fixed plate at this time, facilitate the fractionations of components, carrying and more It changes.
The utility model is further arranged to: sealing ring is arranged with outside the convex block.
Through the above technical solutions, reduce the gap between convex block and clamping groove by sealing ring, reduce rainwater into A possibility that entering in clamping groove, the second compressed spring caused to be got rusty.
The utility model is further arranged to: the side that the arc panel and water pipe contradict is equipped with non-slip mat.
Through the above technical solutions, non-slip mat increases the frictional force between arc panel and water pipe, arc is further improved The stability of the fixed water pipe of shape plate.
In conclusion the utility model has the following beneficial effects:
Work is sprayed 1. securing the tubes with by fixing piece and carrying out depositing dust on wall, when reducing operator and sprinkling water manually Labor intensity;Cover board and clamping bar can be moved with the expansion or shrinkage of water pipe simultaneously, improve the steady of fixed water pipe It is qualitative;
2. being cooperated by the first compressed spring and arc panel, plays and water pipe is further fixed;Baffle and solid Fixed board is detachably connected, and is facilitated fractionation, carrying and replacement to components in fixing piece, is improved the flexible of fixing piece Property.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the present embodiment;
Fig. 2 is enlarged drawing at A in Fig. 1;
Fig. 3 is enlarged drawing at B in Fig. 2;
Fig. 4 is the structural schematic diagram that the present embodiment is used to embody fixed frame and movable plate;
Fig. 5 is enlarged drawing at C in Fig. 4;
Fig. 6 is the structural schematic diagram that the present embodiment is used to embody intermediate mass;
Fig. 7 is the structural schematic diagram that the present embodiment is used to embody arc block.
Appended drawing reference: 1, wall;11, water pipe;12, spray head;2, fixing piece;21, fixed plate;211, fastening screw;22, it keeps off Plate;23, cover board;24, central axis;241, torsional spring;25, clamping bar;26, sliding groove;27, extension spring;3, fixed frame;31, it moves Movable plate;32, sleeve;33, slide bar;34, arc panel;341, non-slip mat;35, end cap;36, intermediate mass;37, the first compressed spring; 4, limited part;41, dovetails;42, dovetail groove;43, fixing bolt;5, convex block;51, clamping groove;52, limiting slot;53, arc Block;54, the second compressed spring;55, arc groove;56, sealing ring.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Wherein identical components are presented with like reference characters.It should be noted that word used in the following description Language "front", "rear", "left", "right", "up" and "down" refer to the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and "outside" refers respectively to the direction towards or away from geometric center of specific component.
Embodiment: a kind of depositing dust spray equipment of workshop, as shown in Figure 1, including wall 1, the water pipe being laid on wall 1 11, several spray heads 12 for being connected on water pipe 11 and the fixation on wall 1 and for being fixed on water pipe 11 on wall 1 is set Part 2.
As shown in Figure 1, since water pipe 11 is fixed on wall 1 by fixing piece 2, operator only need to by water pipe 11 with originally Water pipe 11 is connected, and water can be made to spray in the air from spray head 12, thus achieve the purpose that spray dust, it is convenient and efficient, without operation Person carries out watering work manually, thereby reduces the labor intensity of operator.
As shown in Fig. 2, fixing piece 2 is connected to the fixed plate 21 on wall 1 by fastening screw 211 including several, it is several Fixed plate 21 along 11 length direction of water pipe be distributed, fixed plate 21 far from wall 1 one end be equipped with baffle 22, baffle 22 be equipped with The parallel cover board 23 of fixed plate 21, cover board 23 pass through central axis 24(such as Fig. 3 far from one end of baffle 22) it is rotatably connected to clamping Bar 25 is arranged with torsional spring 241(such as Fig. 3 on central axis 24);Fixed plate 21, baffle 22, cover board 23 and clamping bar 25 are in mouth at this time Font distribution, water pipe 11 are just located at the inside of baffle 22 and cover board 23, and when water pipe 11 is pushed against on baffle 22 by clamping bar 25 When, torsional spring 241 is in and is twisted state, so that elastic-restoring force is provided with, so that clamping bar 25 keeps the thrust to water pipe 11 Effect, water pipe 11 is fixed, convenient and efficient.
As shown in Fig. 2, offer the mobile sliding groove 26 of cover board 23 on baffle 22, the moving direction of cover board 23 perpendicular to Fixed plate 21 is also connected with multiple extension springs 27 between 26 slot bottom of cover board 23 and sliding groove;On the one hand make cover board 23 and fix Space between plate 21 is suitable for the clamping of the water pipe 11 of different tube diameters, on the other hand, when cover board 23 and the conflict of water pipe 11, stretches Spring 27 is in the state that is stretched, to drive cover board 23 that water pipe 11 is pressed in fixed plate 21, it is fixed to improve water pipe 11 Stability.
As shown in figure 4, the side of baffle 22 is equipped with fixed frame 3, fixed frame 3 is fixed perpendicular to the length direction of water pipe 11 It connects on frame 3 there are two the movable plate 31 along the distribution of 11 axisymmetrical of water pipe, two opposite sides of movable plate 31 are equipped with set Cylinder 32, sleeve 32 are equipped with end cap 35 far from one end of movable plate 31, slidably connect slide bar 33 in sleeve 32, as shown in fig. 6, sliding One end of bar 33 passes through movable plate 31, and the other end is pierced by end cap 35 along 31 direction of plate is moved away from, and slide bar 33 is passing through movable plate 31 one end is also connected with arc panel 34 compatible with 11 outer wall of water pipe, and the side that arc panel 34 and water pipe 11 contradict is equipped with anti- Skidding 341.
As shown in fig. 6, slide bar 33 is equipped with intermediate mass 36, slide bar 33 is arranged with the first pressure between intermediate mass 36 and end cap 35 Contracting spring 37;When arc panel 34 and water pipe 11 contradict, the first compressed spring 37 is in confined state, so that two slide bars 33 Under the resilient force of the first compressed spring 37, two arc panels 34 is driven to clamp water pipe 11, it is fixed to improve water pipe 11 Reliability;Simultaneously when water pipe 11 is soft material, when water pipe 11 is with the variation of water flow pressure and when expansion or shrinkage, arc Shape plate 34 can also keep contradicting with water pipe 11 under the action of the first compressed spring 37.
As shown in figure 5, further, movable plate 31 is slidably connected with fixed frame 3, facilitates operator and adjusts movable plate 31 With the relative position between water pipe 11 so that the first compressed spring 37 is maintained in reasonable regime of elastic deformation, so that arc Shape plate 34 is suitable for being fixedly clamped for different size water pipe 11 to the clamping of water pipe 11, and fixed frame 3 is equipped with for limiting movement The mobile limited part 4 of plate 31.
As shown in figure 5, limited part 4 includes that the dovetails 41 at 31 both ends of movable plate are arranged in and are provided on fixed frame 3 Dovetail groove 42, fixing bolt 43 is threaded in dovetails 41, and one end of fixing bolt 43 and 42 slot bottom of dovetail groove contradict;When When operator slides movable plate 31, dovetails 41 are also moved along dovetail groove 42, and operator need to only tighten fixing bolt 43, by swallow Tail block 41 is pushed against on 42 cell wall of dovetail groove, can limit the movement of dovetails 41, so that movable plate 31 is fixed, it is convenient Fast.
As shown in fig. 7, baffle 22 is detachably connected with fixed plate 21, fractionation, carrying conducive to each components in fixing piece 2 And replacement;The side that baffle 22 and fixed plate 21 contradict is equipped with convex block 5, and the clamping being inserted into for convex block 5 is offered in fixed plate 21 Slot 51, convex block 5 offer limiting slot 52 on opposite two sidewalls, arc block 53, arc block 53 are slidably connected in limiting slot 52 Axis it is parallel with 11 axis of water pipe, be connected with the second compressed spring 54 between 52 slot bottom of arc block 53 and limiting slot;When second Compressed spring 54 in the raw when, be also provided with the arc groove 55 being partially submerged into for arc block 53 on 51 cell wall of clamping groove.
As shown in fig. 7, operator's convex block 5 is inserted into clamping groove 51, arc block 53 when connecting baffle 22 and fixed plate 21 By 51 cell wall of clamping groove extruding and move into limiting slot 52, the second compressed spring 54 is in confined state at this time, When convex block 5 is moved to arc block 53 and 55 opposite position of arc groove, elastic force of the arc block 53 in the second compressed spring 54 It acts in lower insertion arc groove 55, so that convex block 5 is fixed on clamping groove 51 by constraint of the arc groove 55 to arc block 53 It is interior.
As shown in fig. 7, being arranged with sealing ring 56 outside convex block 5.The gap between convex block 5 and clamping groove 51 is reduced, is reduced Rainwater flows into clamping groove 51, the case where the second compressed spring 54 is corroded.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (8)

1. a kind of depositing dust spray equipment of workshop, it is characterised in that: including wall (1), be equipped with water pipe on the wall (1) (11), it is connected with several spray heads (12) on the water pipe (11), the wall (1) is equipped with for water pipe (11) to be fixed on wall Fixing piece (2) on body (1);
The fixing piece (2) includes several is connected on wall (1) by fastening screw (211) and along water pipe (11) length direction The fixed plate (21) of distribution and setting are set on the baffle (22) of fixed plate (21) far from wall (1) one end, the baffle (22) Have the cover board parallel with fixed plate (21) (23), is rotatably connected to clamping bar by central axis (24) on the cover board (23) (25), torsional spring (241) are arranged on the central axis (24);The water pipe (11) is located at the interior of baffle (22) and cover board (23) Side, when water pipe (11) is pushed against on baffle (22) by the clamping bar (25), the torsional spring (241) is in and is twisted state.
2. the depositing dust spray equipment of workshop according to claim 1, it is characterised in that: offer lid on the baffle (22) The mobile sliding groove (26) of plate (23), is connected with multiple extension springs (27) between the cover board (23) and sliding groove (26) slot bottom.
3. the depositing dust spray equipment of workshop according to claim 2, it is characterised in that: the side of the baffle (22) is equipped with Fixed frame (3), there are two movable plate (31), two opposite sides of the movable plate (31) are equal for connection on the fixed frame (3) Equipped with sleeve (32), the slide bar (33) across movable plate (31) is slidably connected in the sleeve (32), and in the one end passed through It is connected with arc panel (34), the sleeve (32) is equipped with the end being pierced by for slide bar (33) other end far from the one end of movable plate (31) It covers (35), the slide bar (33) is equipped with intermediate mass (36), and the slide bar (33) is arranged between intermediate mass (36) and end cap (35) There are the first compressed spring (37).
4. the depositing dust spray equipment of workshop according to claim 3, it is characterised in that: the movable plate (31) and fixed frame (3) it is slidably connected, the fixed frame (3) is equipped with for limiting movable plate (31) mobile limited part (4).
5. the depositing dust spray equipment of workshop according to claim 4, it is characterised in that: the limited part (4) includes setting Dovetails (41) at movable plate (31) both ends and the dovetail groove (42) that is provided on fixed frame (3), on the dovetails (41) It is threaded with fixing bolt (43), one end of the fixing bolt (43) and dovetail groove (42) slot bottom contradict.
6. the depositing dust spray equipment of workshop according to claim 1, it is characterised in that: the baffle (22) and fixed plate (21) side contradicted is equipped with convex block (5), and the clamping groove (51) for convex block (5) insertion, institute are offered on the fixed plate (21) It states and is offered limiting slot (52) on the opposite two sidewalls of convex block (5), slidably connect arc block (53) in the limiting slot (52), It is connected with the second compressed spring (54) between the arc block (53) and limiting slot (52) slot bottom, is opened on clamping groove (51) cell wall Equipped with the arc groove (55) being partially submerged into for arc block (53).
7. the depositing dust spray equipment of workshop according to claim 6, it is characterised in that: be arranged with outside the convex block (5) close Seal (56).
8. the depositing dust spray equipment of workshop according to claim 3, it is characterised in that: the arc panel (34) and water pipe (11) side contradicted is equipped with non-slip mat (341).
CN201820979070.XU 2018-06-22 2018-06-22 The depositing dust spray equipment of workshop Active CN208678665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820979070.XU CN208678665U (en) 2018-06-22 2018-06-22 The depositing dust spray equipment of workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820979070.XU CN208678665U (en) 2018-06-22 2018-06-22 The depositing dust spray equipment of workshop

Publications (1)

Publication Number Publication Date
CN208678665U true CN208678665U (en) 2019-04-02

Family

ID=65879148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820979070.XU Active CN208678665U (en) 2018-06-22 2018-06-22 The depositing dust spray equipment of workshop

Country Status (1)

Country Link
CN (1) CN208678665U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113172740A (en) * 2021-04-07 2021-07-27 范德华 Novel bubble is got rid of for ceramic manufacture device
CN113952812A (en) * 2021-09-08 2022-01-21 洪权 Tunnel water curtain dust collector

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113172740A (en) * 2021-04-07 2021-07-27 范德华 Novel bubble is got rid of for ceramic manufacture device
CN113952812A (en) * 2021-09-08 2022-01-21 洪权 Tunnel water curtain dust collector

Similar Documents

Publication Publication Date Title
CN208678665U (en) The depositing dust spray equipment of workshop
CN106808822B (en) A kind of accounting glue spreading apparatus
CN207042729U (en) A kind of fixtures for painting
CN209379263U (en) A kind of water paint spraying device
CN208712040U (en) Cabinet-wood surface spraying device
CN111974574A (en) Spraying device for building material processing
CN109109121A (en) A kind of novel batten edge banding apparatus and its application method
CN213557894U (en) Steel cable bridge protective paint spraying device
CN209273818U (en) A kind of Quick die exchange structure of foaming and forming apparatus
CN114046022B (en) Wall plastering with telescopic adjusting structure for building construction
CN215235149U (en) Injection apparatus that two component polyurethane waterproof coating used
CN209531172U (en) A kind of paint compensating device for aeronautical maintenance
CN113171912B (en) White paint spraying equipment for protecting landscape tree
CN211160540U (en) Drying device is used in surfboard production
CN209034618U (en) A kind of component of machine spray-painting plant
CN206714393U (en) The paint brush of belt scraping plate
CN112923143A (en) Can be according to chain clamp of construction size automatic change fastening size
CN210263811U (en) Labor-saving paint spraying equipment for decoration
CN211447657U (en) Quick spraying device of emulsion paint construction
CN206293803U (en) A kind of box-type substation surface lacquer equipment
CN214211055U (en) Paint spraying device of sewage treatment equipment
CN219396470U (en) Forming device is used in snowshoe production
CN220861774U (en) Paint spraying equipment
CN211649566U (en) Artificial intelligence's component for water jet equipment
CN110725647A (en) Portable screw rod drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220818

Address after: 211200 industrial concentration area, Baima Town, Lishui District, Nanjing City, Jiangsu Province

Patentee after: Nanjing Jieda Plastic Industry Co., Ltd.

Address before: Sanliting Administrative Village, Honglan Town, Lishui District, Nanjing City, Jiangsu Province, 211219

Patentee before: NANJING YONGCHUAN CONCRETE Co.,Ltd.

TR01 Transfer of patent right