CN208668281U - A kind of bridge construction suspension arrangement - Google Patents

A kind of bridge construction suspension arrangement Download PDF

Info

Publication number
CN208668281U
CN208668281U CN201821004657.5U CN201821004657U CN208668281U CN 208668281 U CN208668281 U CN 208668281U CN 201821004657 U CN201821004657 U CN 201821004657U CN 208668281 U CN208668281 U CN 208668281U
Authority
CN
China
Prior art keywords
fixed device
fixed
fixedly installed
support plate
suspension arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821004657.5U
Other languages
Chinese (zh)
Inventor
朱涛
马东阳
朱关宏
朱关雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xutuo Construction Co ltd
Original Assignee
Jiangsu 28 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu 28 Construction Co Ltd filed Critical Jiangsu 28 Construction Co Ltd
Priority to CN201821004657.5U priority Critical patent/CN208668281U/en
Application granted granted Critical
Publication of CN208668281U publication Critical patent/CN208668281U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge construction suspension arrangements, it is related to technical field of bridge engineering, including fixed column, one middle side part of the fixed column is fixedly installed with fixed device, the connecting rod is fastened with fixed column by fixed device and is connect, the interior of the fixed device includes the first spring part, and one end of first spring part is fixedly mounted in the middle part of the inside upper surface of fixed device, and the other end of first spring part is fixedly installed with the upper surface middle part of the first support plate.The bridge construction suspension arrangement, on the one hand, after fixed column is fixed, connecting rod is attached support to fixed column by fixed device, on the other hand, stablized by fixed device clamping, and installed fastly, it is high-efficient, it can start construction operation after fixed installation, substantially increase whole job schedule, connecting rod, which passes through fixed device, Fast Installation and to form the hanging frame of bridge, quick for installation and stablize.

Description

A kind of bridge construction suspension arrangement
Technical field
The utility model relates to technical field of bridge engineering, specially a kind of bridge construction suspension arrangement.
Background technique
The construction of science of bridge building requires suspension arrangement and first plays a frame greatly, starts to apply to bridge by the support of frame Work industry, and the suspension arrangement of bridge is essential preposition work before bridge construction, and the steel of suspension arrangement consumption are few, can increase Add effective usable floor area, there are also good earthquake resisting performances, and can reduce the quantity on basis, and it is non-uniform heavy to reduce basis Drop etc., but working efficiency when current bridge suspension arrangement plays frame is low, needs when installation just to can be carried out installation by tool, And need to dismantle there is still a need for the isometric time is expended when transfer uses, disassembly installation is all more inconvenient.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of bridge construction suspension arrangement, solves Inconvenient problem when the existing suspension arrangement installation effectiveness for science of bridge building is low and dismantles.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs: a kind of bridge construction use Suspension arrangement, including fixed column, a middle side part of the fixed column are fixedly installed with fixed device, and connecting rod passes through fixed device It is fastened and connect with fixed column;
The interior of the fixed device includes the first spring part, and one end of first spring part is fixedly mounted on fixed device Inside upper surface in the middle part of, the other end of first spring part is fixedly installed with the upper surface middle part of the first support plate, described One middle side part of fixed device offers installing port, is fixedly installed with second spring part in the middle part of the other side of the fixed device One end, the other end of the second spring part are fixedly installed with a middle side part of the second support plate, the inside of the fixed device Be fixedly installed with clamping block in the middle part of lower surface, the upper surface side of the clamping block open up it is fluted, the fixed device it is interior Lower surface side is fixedly installed with one end of spout, and the other end of the spout is fixedly connected with the following table of fixed block Face, the upper surface of the fixed block are fixedly mounted on the inside upper surface side of fixed device, and the spout is located at close to peace The side of mouth is filled, one end of the connecting rod is fixedly connected with L-type mounting blocks, fixes in the middle part of the front surface of the L type mounting blocks One end of L-type dowel is installed, the other end of the L-type dowel is connected with sliding block.
Optionally, the L-type mounting blocks are mutually adapted with installing port, and one end of the L-type mounting blocks and groove are mutually suitable Match.
Optionally, the lower surface of first support plate and the upper surface of clamping block are parallel to each other, and the clamping block is located at The underface of first support plate.
Optionally, the upper surface of second support plate and the lower surface of the first support plate are fitted and connected and are parallel to each other, The fixed device is symmetrically fixedly installed with limited block close to the side of second spring part, and the limited block is located at second spring part Two sides.
Optionally, the sliding block is mutually adapted with spout, and the inner wall two sides of the spout are fixedly installed with tooth socket, The outer surface of the sliding block is fixedly installed with the gear teeth compatible with tooth socket.
Optionally, one end of dowel, the fixed device are fixedly installed in the middle part of the front surface of first support plate Front surface offer slideway compatible with dowel, the other end of the dowel through slideway and is located at fixed device It is external.
(3) beneficial effect
The utility model provides a kind of bridge construction suspension arrangement, have it is following the utility model has the advantages that
(1), bridge construction suspension arrangement, on the one hand, after fixed column installation is fixed, connecting rod passes through fixed dress It sets and support is attached to fixed column, on the other hand, stablized by fixed device clamping, and fast, high-efficient, fixed peace is installed It can start construction operation after dress, substantially increase whole job schedule.
(2), the bridge construction suspension arrangement, on the one hand, connecting rod pass through fixed device can Fast Installation simultaneously The hanging frame of bridge is formed, it is quick for installation and stable, the time of place mat early period is shortened, general work efficiency is strengthened, On the other hand, by being bonded through installing port and with the side of the second support plate L-type mounting blocks, secondly, continue to press inward against, The other side of the second support plate is set to be bonded limited block, sliding block fastens the inside into tooth socket at the same time, in addition, passing through tooth socket and cunning The cooperation of block is fixed on one end of L-type mounting blocks in groove plus the downward elastic acting force of the first support plate, with this to even Extension bar is fastened.
Detailed description of the invention
Fig. 1 is the utility model fixed column structural schematic diagram;
Fig. 2 is the structure sectional view of the fixed device of the utility model;
Fig. 3 is the utility model spout structural schematic diagram;
Fig. 4 is the utility model connecting rod structural schematic diagram;
Fig. 5 is the utility model L-type mounting blocks top view;
Fig. 6 is the first support plate of the utility model top view.
In figure: fixed column 1, fixed device 2, the first spring part 201, the first support plate 202, second spring part 203, second Support plate 204, clamping block 205, spout 206, connecting rod 3, L-type mounting blocks 301.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " suitable The orientation or positional relationship of the instructions such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " is orientation based on the figure Or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than the device of indication or suggestion meaning or Element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as the limit to the utility model System.
In the present invention unless specifically defined or limited otherwise, term " setting ", " connected ", " connects " installation " Connect ", the terms such as " fixation " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection;It can be machine Tool connection;It can be directly connected, it can also be indirectly connected through an intermediary.For those of ordinary skill in the art and Speech, can understand the concrete meaning of above-mentioned term in the present invention as the case may be.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or One or more of the features is implicitly included, the meaning of " plurality " is two or two in the description of the present invention, More than, unless otherwise specifically defined.
Fig. 1-6 is please referred to, the utility model provides a kind of technical solution: a kind of bridge construction suspension arrangement, packet Fixed column 1 is included, after fixed column 1 is fixed, connecting rod 3 passes through fixed device 2 and is attached support to fixed column 1, fixed column 1 One middle side part is fixedly installed with fixed device 2, is stablized by the fixed clamping of device 2, and install fastly, high-efficient, is fixedly mounted After can start construction operation, substantially increase whole job schedule, connecting rod 3 passes through fixed device 2 and fastens with fixed column 1 It is fixedly connected, connecting rod 3, which passes through fixed device 2, Fast Installation and to form the hanging frame of bridge, quick for installation and steady It is fixed, the time of place mat early period is shortened, general work efficiency is strengthened;
Fixed the interior of device 2 includes the first spring part 201, and one end of the first spring part 201 is fixedly mounted on fixed device 2 Inside upper surface in the middle part of, the other end of the first spring part 201 is fixedly installed with the upper surface middle part of the first support plate 202, Gu The middle side part for determining device 2 offers installing port, is fixedly installed with second spring part 203 in the middle part of the other side of fixed device 2 One end, the other end of second spring part 203 are fixedly installed with a middle side part of the second support plate 204, the interior subordinate of fixed device 2 Surface middle part is fixedly installed with clamping block 205, and the upper surface side of clamping block 205 opens up fluted, the interior subordinate of fixed device 2 Surface side is fixedly installed with one end of spout 206, and the other end of spout 206 is fixedly connected with the lower surface of fixed block, The upper surface of fixed block is fixedly mounted on the inside upper surface side of fixed device 2, and spout 206 is located at one close to installing port Side, one end of connecting rod 3 are fixedly connected with L-type mounting blocks 301, by by L-type mounting blocks 301 through installing port and with second The side of support plate 204 is bonded, and continues to press inward against, and so that the other side of the second support plate 204 is bonded limited block, is slided at the same time Block fastens the inside into tooth socket, and one end of L-type dowel, the connection of L type are fixedly installed in the middle part of the front surface of L-type mounting blocks 301 The other end of muscle is connected with sliding block.
A kind of optional technical solution as the utility model: L-type mounting blocks 301 are mutually adapted with installing port, L-type peace One end of dress block 301 is mutually adapted with groove, and being mutually clamped by L-type mounting blocks 301 and groove makes connecting rod 3 and fixed device 2 fastenings are more stable.
A kind of optional technical solution as the utility model: the lower surface of the first support plate 202 is upper with clamping block 205 Surface is parallel to each other, and clamping block 205 is located at the underface of the first support plate 202, makes second when L type mounting blocks 301 press inward against When support plate 204 is separated with the first support plate 202, the first support plate 202 can be by pinch groove under one end of L-type mounting blocks 301 Inside it is fixed.
A kind of optional technical solution as the utility model: the upper surface of the second support plate 204 and the first support plate 202 Lower surface be fitted and connected and be parallel to each other, fixed device 2 is symmetrically fixedly mounted limited close to the side of second spring part 203 Position block, limited block is located at the two sides of second spring part 203, and when L-type mounting blocks 301 press inward against the bottom of to, limited block plays limit With the effect of support, when the second support plate 204 is contacted with limited block, the second support plate 204 and the first support plate 202 are simultaneously Between separate, L-type mounting blocks 301 are connected in groove and are fixed.
A kind of optional technical solution as the utility model: sliding block is mutually adapted with spout 206, spout 206 Inner wall two sides are fixedly installed with tooth socket, and the outer surface of sliding block is fixedly installed with the gear teeth compatible with tooth socket, by tooth socket with The cooperation of sliding block is fixed on one end of L-type mounting blocks 301 in groove plus the downward elastic acting force of the first support plate 202, It is fastened with this to connecting rod 3.
A kind of optional technical solution as the utility model: it is fixedly installed in the middle part of the front surface of the first support plate 202 One end of dowel, the front surface of fixed device 2 offer slideway compatible with dowel, and the other end of dowel is through cunning Road and the outside for being located at fixed device 2, are pushed up by dowel, are driven the first support plate 202 upwards, are pushed then up Connecting rod 3 separates connecting rod 3 with fixed device 2, connecting rod 3 is taken out.
In conclusion the bridge construction suspension arrangement, in use, user is fixed by fixed column 1, connecting rod 3 Support is attached to fixed column 1 by fixed device 2, by supporting by L-type mounting blocks 301 through installing port and with second The side of plate 204 is bonded, and then proceedes to press inward against, and so that the other side of the second support plate 204 is bonded limited block, is slided at the same time Block fastens the inside into tooth socket, and the cooperation of tooth socket and sliding block installs L-type plus the downward elastic acting force of the first support plate 202 One end of block 301 is fixed in groove, is fastened to connecting rod 3, when needing to dismantle frame, by by dowel to Upper promotion drives the first support plate 202 upwards, and L-type mounting blocks 301 are skidded off out of groove, divide connecting rod 3 with fixed device 2 From taking-up connecting rod 3.
It should be noted that in the present invention unless specifically defined or limited otherwise, fisrt feature is in the second spy It can be that the first and second features directly contact or the first and second features are connect indirectly by intermediary "above" or "below" sign Touching.Moreover, fisrt feature can be above the second feature " above ", " above " and " above " fisrt feature right above second feature or Oblique upper, or first feature horizontal height is merely representative of higher than second feature.Fisrt feature second feature " under ", " lower section " " following " can be fisrt feature and be directly under or diagonally below the second feature, or is merely representative of first feature horizontal height and is less than Second feature.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of bridge construction suspension arrangement, including fixed column (1), it is characterised in that: the side of the fixed column (1) Middle part is fixedly installed with fixed device (2), and connecting rod (3) is fastened with fixed column (1) by fixed device (2) and is connect;
The interior of the fixed device (2) includes the first spring part (201), and one end of first spring part (201) is fixedly mounted In the middle part of the inside upper surface of fixed device (2), the other end of first spring part (201) is fixedly installed with the first support plate (202) upper surface middle part, a middle side part of the fixed device (2) offer installing port, the fixed device (2) it is another Middle side part is fixedly installed with one end of second spring part (203), and the other end of the second spring part (203) is fixedly installed with The bottom inner surface middle part of one middle side part of two support plates (204), the fixed device (2) is fixedly installed with clamping block (205), The upper surface side of the clamping block (205) opens up fluted, the bottom inner surface side fixed installation of the fixed device (2) There is one end of spout (206), the other end of the spout (206) is fixedly connected with the lower surface of fixed block, the fixation The upper surface of block is fixedly mounted on the inside upper surface side of fixed device (2), and the spout (206) is located at close to installing port Side, one end of the connecting rod (3) is fixedly connected with L-type mounting blocks (301), the front surface of the L-type mounting blocks (301) Middle part is fixedly installed with one end of L-type dowel, and the other end of the L-type dowel is connected with sliding block.
2. a kind of bridge construction suspension arrangement according to claim 1, it is characterised in that: the L-type mounting blocks (301) it is mutually adapted with installing port, one end of the L-type mounting blocks (301) is mutually adapted with groove.
3. a kind of bridge construction suspension arrangement according to claim 1, it is characterised in that: first support plate (202) upper surface of lower surface and clamping block (205) is parallel to each other, and the clamping block (205) is located at the first support plate (202) Underface.
4. a kind of bridge construction suspension arrangement according to claim 1, it is characterised in that: second support plate (204) upper surface and the lower surface of the first support plate (202) are fitted and connected and are parallel to each other, and the fixed device (2) is close The side of second spring part (203) is symmetrically fixedly installed with limited block, and the limited block is located at the two of second spring part (203) Side.
5. a kind of bridge construction suspension arrangement according to claim 1, it is characterised in that: the sliding block and sliding slot Part (206) is mutually adapted, and the inner wall two sides of the spout (206) are fixedly installed with tooth socket, and the outer surface of the sliding block is solid Dingan County is equipped with the gear teeth compatible with tooth socket.
6. a kind of bridge construction suspension arrangement according to claim 1, it is characterised in that: first support plate (202) one end of dowel is fixedly installed in the middle part of front surface, the front surface of the fixed device (2) offers and dowel Compatible slideway, the other end of the dowel is through slideway and positioned at the outside of fixed device (2).
CN201821004657.5U 2018-06-28 2018-06-28 A kind of bridge construction suspension arrangement Expired - Fee Related CN208668281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821004657.5U CN208668281U (en) 2018-06-28 2018-06-28 A kind of bridge construction suspension arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821004657.5U CN208668281U (en) 2018-06-28 2018-06-28 A kind of bridge construction suspension arrangement

Publications (1)

Publication Number Publication Date
CN208668281U true CN208668281U (en) 2019-03-29

Family

ID=65825440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821004657.5U Expired - Fee Related CN208668281U (en) 2018-06-28 2018-06-28 A kind of bridge construction suspension arrangement

Country Status (1)

Country Link
CN (1) CN208668281U (en)

Similar Documents

Publication Publication Date Title
CN201268943Y (en) Novel dual-shearing force deformation joint template
CN208668281U (en) A kind of bridge construction suspension arrangement
CN106437136A (en) Connecting piece used for scaffold
CN108915122A (en) A kind of steel construction assembled wallboard node
CN209329176U (en) A kind of power distribution cabinet copper bar quick lap joint device
CN208268124U (en) A kind of protection mounting seat for mechanical chemical industry pump
CN203188637U (en) Trowel easy to disassemble and assemble
CN208518372U (en) The connection pedestal of construction safety protective fence
CN208044174U (en) A kind of easy-to-dismount instrument board
CN208702002U (en) A kind of steel pipe column for assembled architecture
CN209427981U (en) A kind of clamping device for electromechanical equipment maintenance installation
CN209146510U (en) A kind of antidetonation suspension and support
CN206838989U (en) A kind of rigid cable brake forming servicing unit
CN207662738U (en) A kind of experiment of ceramic tile bend resistance is with compressing holder
CN207162064U (en) A kind of display mounting seat
CN205314606U (en) Constructional steel structure base
CN208826428U (en) Electric bicycle maintenance tool
CN109888968B (en) Motor damping device with temperature measurement function
CN211140493U (en) Novel easily press and press brick device
CN207714132U (en) A kind of stable structure has tiny fragments of stone, coal, etc. waterproof telescopic device
CN211203562U (en) Anti-seismic support convenient to install
CN217860997U (en) Multi-functional photovoltaic spanner convenient to dismantle
CN211291839U (en) MCU test fixture
CN213330044U (en) A template supporting construction for building engineering construction
CN210422046U (en) Baffle structure of civil engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210304

Address after: 223800 No.35, building B, Wanyuan mall, Suqian Economic and Technological Development Zone, Jiangsu Province

Patentee after: Jiangsu xutuo Construction Co.,Ltd.

Address before: 223800 Commerce of Marriott New Town, Suqian City, Jiangsu Province (I) 128

Patentee before: JIANGSU ERBA CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190329

Termination date: 20210628