CN208650049U - A kind of cement mixing pile instant-plugging steel pipe and cement mixing pile - Google Patents

A kind of cement mixing pile instant-plugging steel pipe and cement mixing pile Download PDF

Info

Publication number
CN208650049U
CN208650049U CN201821069214.4U CN201821069214U CN208650049U CN 208650049 U CN208650049 U CN 208650049U CN 201821069214 U CN201821069214 U CN 201821069214U CN 208650049 U CN208650049 U CN 208650049U
Authority
CN
China
Prior art keywords
steel pipe
main body
mixing pile
cement mixing
pipe main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821069214.4U
Other languages
Chinese (zh)
Inventor
徐伟豪
徐刃
黄俊文
颜海远
周志鸿
陈跃
潘伟村
黄铭研
林雁
周淑琴
吴明本
郑世明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Original Assignee
GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd filed Critical GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority to CN201821069214.4U priority Critical patent/CN208650049U/en
Application granted granted Critical
Publication of CN208650049U publication Critical patent/CN208650049U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model proposes a kind of cement mixing pile instant-plugging steel pipes comprising has steel pipe main body, steel pipe main body is cylindrical, hollow pipe structure, has symmetrical 2 auxiliary sinking mouth on the tube wall of steel pipe main body one end;Further comprising has auxiliary sinker bar, and auxiliary sinker bar passes through 2 auxiliary sinking mouths, the horizontal ends for inserting in steel pipe main body of steel pipe main body.Further there are several balancing orifices on the tube wall of steel pipe main body.A kind of cement mixing pile is proposed again comprising has a main body and above-mentioned instant-plugging steel pipe, steel pipe main body inserts in a main body vertically and makes that sinking mouth is assisted to expose stake main body, fills full water mud in the steel pipe main body below auxiliary sinking mouth.It has the characteristics that easy for construction, safety, time and labour saving material-saving to the utility model cement mixing pile, on the basis of ensuring mixing pile intensity and bending resistance, shearing resistance mechanical property, also has the characteristics that globality is reliable, sealing is strong.

Description

A kind of cement mixing pile instant-plugging steel pipe and cement mixing pile
Technical field
The utility model relates to cement mixing pile, specifically cement mixing pile and inserted before cement mixing pile initial set In the instant-plugging steel pipe in cement mixing pile.
Background technique
General cement mixing pile belongs to weak property stake, and pile strength is low, appears in composite foundation mostly as water-stop curtain In processing.By being inserted into miniature steel pipe in cement mixing pile, pile strength is greatly increased, the bending resistance of mixing pile, shearing resistance mechanics Performance is remarkably improved.The technique of traditional cement mixing pile interpolation reinforcing bar or steel pipe, is that first cement mixing pile drills Whitewashing stirring, again from pile crown drilling, borehole cleaning, insertion reinforcing bar or steel pipe, a work progress of last slip casting after pile body molding. There is the shortcomings that difficulty of construction is big, complex procedures in this form of construction work, very time-consuming and laborious, and construction cost is higher, the duration compared with It is long.It is therefore desirable to improve.
Summary of the invention
The purpose of this utility model is to propose a kind of cement mixing pile instant-plugging steel pipe, has the characteristics that structure is simple; A kind of cement mixing pile is proposed again, is inside inserted with the instant-plugging steel pipe, with easy for construction, safety, time and labour saving material-saving etc. Feature also has that globality is reliable, sealing is strong on the basis of ensuring mixing pile intensity and bending resistance, shearing resistance mechanical property The characteristics of.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of cement mixing pile instant-plugging steel pipe comprising have steel pipe main body, the steel pipe main body is cylindrical, hollow pipe Structure has symmetrical 2 auxiliary sinking mouth on the tube wall of steel pipe main body one end.
Prioritization scheme, the utility model further include having auxiliary sinker bar, and the auxiliary sinker bar passes through 2 of steel pipe main body Assist sinking mouth, the horizontal end for inserting in steel pipe main body.
Scheme is advanced optimized, there are several balancing orifices on the tube wall of steel pipe main body described in the utility model.
A kind of cement mixing pile comprising have a main body and steel pipe, the stake main body is the cylindricality condensed by cement slurry Structure, the steel pipe are inserted in vertically in main body, and the steel pipe is above-mentioned cement mixing pile instant-plugging steel pipe, and steel pipe main body is vertical It inserts in a main body and makes that sinking mouth is assisted to expose stake main body, fill full water in the steel pipe main body below auxiliary sinking mouth Mud.
The utility model has following substantive distinguishing features and progress.
1, the instant-plugging steel pipe of the utility model is realized after the completion of cement mixing pile drills whitewashing stirring, is sunk immediately Enter instant-plugging steel pipe, and further realize that human assistance sinks by auxiliary sinker bar, not only saves forming pile to be mixed again The construction time of drilling insertion steel pipe, and reduce the workloads such as drilling, borehole cleaning, slip casting, also a save water in secondary grouting The material utilization amounts such as mud have achieved the effect that time saving, saving of labor, material-saving, while substantially increasing construction efficiency, reduce project Construction cost, decrease construction site environmental pollution.
2, the utility model sinks to instant-plugging steel pipe after the completion of cement mixing pile driving construction immediately, is ensuring that mixing pile is strong On the basis of degree and bending resistance, shearing resistance mechanical property, the cement slurry of instant-plugging steel pipe and cement mixing pile is in close contact, effectively Ensure the better globality of cement mixing pile and sealing.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the cement mixing pile instant-plugging steel pipe of the utility model.
Fig. 2 is the structural schematic diagram of the cement mixing pile of the utility model.
Fig. 3 is the Construction State schematic diagram of the cement mixing pile of the utility model.
Fig. 4 is another structural schematic diagram of the cement mixing pile instant-plugging steel pipe of the utility model.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
Embodiment 1
With reference to Fig. 1, a kind of cement mixing pile instant-plugging steel pipe comprising have steel pipe main body 1, the steel pipe main body 1 is circle Cylindrical hollow pipe structure has symmetrical 2 auxiliary sinkings mouth 11 on the tube wall of 1 one end of steel pipe main body.
With reference to Fig. 2, a kind of cement mixing pile comprising have the instant-plugging steel pipe of main body 3 and the present embodiment, the stake master Body 3 is the column construction condensed by cement slurry, and the steel pipe main body 1 of instant-plugging steel pipe inserts in a main body 3 vertically and makes to assist Sinking mouth 11 exposes stake main body 3, fills full water mud in the steel pipe main body 1 of 11 lower section of auxiliary sinking mouth.
For deeper cement mixing pile of constructing, instant-plugging steel pipe is also equipped with auxiliary sinker bar 2, the auxiliary sinker bar 2 pass through 2 auxiliary sinking mouths 11, the horizontal ends for inserting in steel pipe main body 1 of steel pipe main body 1, sink for human assistance.
The construction procedure of the cement mixing pile of the present embodiment approximately as.
Step 1 presses prior art construction cement mixing pile stake main body 3 using stake machine, through processes such as drilling, whitewashing, stirrings Make to fill cement slurry in a main body 3.
Step 2, as shown in figure 3, step 1 construct after in 10 to 20 minutes, stake main body 3 middle part be inserted into instant-plugging The steel pipe main body 1 of steel pipe, the fixed crossbearer in the top end part of steel pipe main body 1 has auxiliary sinker bar 2, and assists the both ends of sinker bar 2 solid Surely it is connected with wirerope 21.
Specifically: being lifted by crane using crane, steel pipe main body 1 is sunk at the middle part of align piles main body 3, and steel pipe main body 1 is by self weight Sink, when self weight, which is sunk, has any problem, wirerope 21 is pulled downward on by hoist engine or manpower, and proofread simultaneously using theodolite The verticality of steel pipe main body 1 carries out human assistance sinking, until steel pipe main body 1 assists sinking mouth 11 close to the stake top of main body 3 Portion, the cement slurry in sinking watching in stake main body 3 are packed into steel pipe main body 1 by the bottom end opening of steel pipe main body 1.
Step 3, moving step 1 stake machine to next position is carried out, repeat the construction of step 1 and step 2.
The cement mixing pile of the present embodiment is to sink to instant-plugging steel pipe, construction technology immediately after the completion of stake main body 3 is constructed Simply, it does not need to be stirred drilling, intubation, the series of processes of slip casting again after a pile, does not only reach and mixing pile is resisted Curved shearing resistance requirement, and realize the close contact of mixing pile and instant-plugging steel pipe, there is more reliable globality and sealing, and Reduce construction site environmental pollution.
Embodiment 2
With reference to Fig. 4, the present embodiment cement mixing pile and cement mixing pile instant-plugging steel pipe the difference from embodiment 1 is that: In the present embodiment, there are several balancing orifices 12 on the tube wall of steel pipe main body 1.In instant-plugging steel pipe sinking watching, balancing orifice 12 Play the role of fast uniform instant-plugging steel pipe external and internal pressure, so that the cement slurry in mixing pile uniformly, is fast and efficiently filled Enter in instant-plugging steel pipe, to effectively improve construction efficiency.

Claims (3)

1. a kind of cement mixing pile instant-plugging steel pipe comprising have steel pipe main body (1), the steel pipe main body (1) is in cylinder Hollow tubular structure, it is characterised in that: there is symmetrical 2 auxiliary sinking mouths (11) on the tube wall of described steel pipe main body (1) one end;Also It include auxiliary sinker bar (2), auxiliary sinker bar (2) passes through 2 auxiliary sinking mouths (11), horizontal slotting of steel pipe main body (1) In the end of steel pipe main body (1).
2. cement mixing pile instant-plugging steel pipe according to claim 1, it is characterised in that: the pipe of the steel pipe main body (1) There are several balancing orifices (12) on wall.
3. a kind of cement mixing pile comprising have a main body (3) and steel pipe, the stake main body (3) is condensed by cement slurry Column construction, the steel pipe are inserted in vertically in a main body (3), it is characterised in that: the steel pipe is of any of claims 1 or 2 Cement mixing pile instant-plugging steel pipe, steel pipe main body (1) insert in a main body (3) vertically and make that sinking mouth (11) is assisted to expose stake Main body (3) is located in the steel pipe main body (1) below auxiliary sinking mouth (11) and fills full water mud.
CN201821069214.4U 2018-07-06 2018-07-06 A kind of cement mixing pile instant-plugging steel pipe and cement mixing pile Expired - Fee Related CN208650049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821069214.4U CN208650049U (en) 2018-07-06 2018-07-06 A kind of cement mixing pile instant-plugging steel pipe and cement mixing pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821069214.4U CN208650049U (en) 2018-07-06 2018-07-06 A kind of cement mixing pile instant-plugging steel pipe and cement mixing pile

Publications (1)

Publication Number Publication Date
CN208650049U true CN208650049U (en) 2019-03-26

Family

ID=65783053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821069214.4U Expired - Fee Related CN208650049U (en) 2018-07-06 2018-07-06 A kind of cement mixing pile instant-plugging steel pipe and cement mixing pile

Country Status (1)

Country Link
CN (1) CN208650049U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114703867A (en) * 2022-04-24 2022-07-05 深圳市工勘岩土集团有限公司 Quick connection construction method for steel pipe piles in support restricted area

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114703867A (en) * 2022-04-24 2022-07-05 深圳市工勘岩土集团有限公司 Quick connection construction method for steel pipe piles in support restricted area
CN114703867B (en) * 2022-04-24 2024-04-26 深圳市工勘岩土集团有限公司 Quick connection construction method for steel pipe pile in support limited area

Similar Documents

Publication Publication Date Title
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN203684230U (en) Prefabricated double-row pile structure
CN210562157U (en) Post-grouting composite pile
CN101942830B (en) Construction method of combined concrete soil pile with core pile
CN104563147A (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN210341897U (en) Novel prefabricated tubular pile structure
CN208650049U (en) A kind of cement mixing pile instant-plugging steel pipe and cement mixing pile
CN204491617U (en) A kind of static pressure or hammering concrete precast pipe pile pile bottom post-grouting device
CN201730093U (en) Pore forming device of multisection double protection casing cylindrical piles
CN212052717U (en) Structure for penetrating karst cave of precast tubular pile
CN101608454B (en) Cavity shallow foundation and construction method
CN203129151U (en) Grouting head capable of drilling and grouting synchronously
CN203080510U (en) Pin-sleeved type pile joint
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework
CN106592587A (en) Prefabricated PHC tube pile
CN205875146U (en) Broken pile's reinforced structure
CN206495205U (en) A kind of prefabricated PHC pile tubes
CN208650048U (en) Instant-plugging steel pipe cement mixing pile water stopping curtain
CN201232184Y (en) Pile-formation device of steel tube breast wall filling pile with soil drawn out drily
CN201857609U (en) Fabricated water-permeating thin-wall tapered pile
CN205975582U (en) Improve device of hollow pile bearing capacity
CN217267482U (en) Simple and easy drilling bored concrete pile post-grouting device based on flexible slip casting pipe
CN206599784U (en) Filling type stake hollow drill
CN205954609U (en) High frequency compaction grooving bridge type ground is wall construction professional equipment even

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190326

Termination date: 20200706