CN208636060U - Workover rig movable type pull test platform - Google Patents

Workover rig movable type pull test platform Download PDF

Info

Publication number
CN208636060U
CN208636060U CN201821443458.4U CN201821443458U CN208636060U CN 208636060 U CN208636060 U CN 208636060U CN 201821443458 U CN201821443458 U CN 201821443458U CN 208636060 U CN208636060 U CN 208636060U
Authority
CN
China
Prior art keywords
platform
support
rack
running
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821443458.4U
Other languages
Chinese (zh)
Inventor
王迎兰
杨庆华
李超
姜桂龙
辛云鹏
阴向明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TONGHUA PETROCHEMICAL MACHINERY MANUFACTURING Co Ltd
Original Assignee
TONGHUA PETROCHEMICAL MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TONGHUA PETROCHEMICAL MACHINERY MANUFACTURING Co Ltd filed Critical TONGHUA PETROCHEMICAL MACHINERY MANUFACTURING Co Ltd
Priority to CN201821443458.4U priority Critical patent/CN208636060U/en
Application granted granted Critical
Publication of CN208636060U publication Critical patent/CN208636060U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model relates to oil-field workover rig fields, i.e. workover rig movable type pull test platform.For load test.It includes connected preceding pedestal, rear base, rack, and puller system, running-in platform and hydraulic control device are fixed in rack;Puller system includes upper and lower sequentially connected upper beam, pressure difference transmitter fluid cylinder, lower beam, is connected between upper beam, lower beam by pull rod, there is nut in pull rod upper end;Running-in platform includes the platform of two support columns support, and support column and rack are movably hinged, and support fluid cylinder is connect with support column skewed horizontal load, and support platform is equipped with beside support column.Cancel original melt pit, pouring weight, it is changed to carry out maximum pull test and the run-in test of complete machine by puller system and running-in platform, avoids wirerope of seting out under operator repeats into melt pit in this way, reduce Personal Risk, safety coefficient is improved, time, human and material resources are saved.

Description

Workover rig movable type pull test platform
Technical field
The utility model relates to oil-field workover rig fields, i.e. workover rig movable type pull test platform.For load test.
Background technique
In the prior art, after complete machine need to being set position when workover rig does load test, further according to test requirements document by work Guy wire is mounted on pouring weight into melt pit under people, then is lifted, there is following disadvantages: 1, danger coefficient for this test It is high.2, waste of manpower, material resources.3, repetitive operation, wirerope of seting out under operator's repetition into melt pit, jeopardizes personal danger Danger, safety coefficient are low.
Utility model content
The purpose of this utility model is regarding to the issue above and provides a kind of safety, the examination of labour-saving workover rig movable type pulling force Test platform.
The technical solution of the utility model is: workover rig movable type pull test platform, it is characterised in that including being connected Preceding pedestal, rear base, rack, be fixed with puller system, running-in platform and hydraulic control device in rack;Puller system includes Upper and lower sequentially connected upper beam, pressure difference transmitter fluid cylinder, lower beam, are connected between upper beam, lower beam by pull rod, pull rod upper end There is nut;Running-in platform includes the platform of four support columns support, and support column and rack are movably hinged, and supports fluid cylinder and support column Skewed horizontal load connection, support column side are equipped with support platform.
The utility model has the advantages that: 1, cancel original melt pit, pouring weight, is changed to be carried out by puller system and running-in platform The maximum pull of complete machine is tested and run-in test, avoids wirerope of seting out under operator repeats into melt pit, drop in this way Low Personal Risk, improves safety coefficient.2, being reduced to 2-3 people by original complete group of personnel 8-10 people participation can be operated, Save time, human and material resources.3, it can dismantle, assemble at any time with different operating conditions.
The embodiments of the present invention is described in further detail below in conjunction with attached drawing.
Detailed description of the invention
Fig. 1 is the utility model structure diagram.
Fig. 2 is Fig. 1 plan structure schematic diagram.
Fig. 3 is mobile puller system schematic diagram.
Fig. 4 is Fig. 3 left view device schematic diagram.
Fig. 5 is running-in platform structure schematic diagram.
Specific embodiment
Referring to Fig. 1-5, parts title is as follows: preceding pedestal 1, rear base 2, puller system 3, running-in platform 4, hydraulic control Device 5 processed, pin shaft 6, nut 7, upper beam 8, pressure difference transmitter fluid cylinder 9, lower beam 10, pull rod 11, rack 12, platform 13, support column 14, support fluid cylinder 15, support platform 16.
Referring to Fig. 1-5, workover rig movable type pull test platform, it is characterised in that including connected preceding pedestal 1, rear base 2, rack 12, be fixed in rack 12 when hanging load when puller system 3(is test complete machine with), running-in platform 4(be complete machine running-in It is used when test) and hydraulic control device 5(be control puller system and running-in platform);Puller system 3 includes sequentially connecting up and down Upper beam 8, pressure difference transmitter fluid cylinder 9, the lower beam 10 connect is connected between upper beam 8, lower beam 10 by pull rod 11, on pull rod 11 There is stop nut 7 at end;Running-in platform 4 includes the platform 13 of four support columns 14 support, and support column 14 and rack 12 are movably hinged, Support fluid cylinder 15 is connect with 14 skewed horizontal load of support column, and support platform 16 is equipped with beside support column 14.
Working principle: according to workover rig after-poppet to the requirement of well head size, first complete machine is moved backward to preceding 1 specific bit of pedestal Set, each very heavy stretching adjusted, after be pressed in master is very heavy on rear base 2 again, derrick is risen by raising cylinder It is transferred to suitable position.Manipulating hydraulic control device again, (hydraulic control device is by motor, fuel tank, hand-operated direction valve, shut-off valve, fast Quick coupling, sebific duct composition, routine techniques) in hand-operated direction valve to support fluid cylinder 15 refuel, stretch out fluid cylinder slowly, drive branch Dagger 14 and platform 13 rotate to the left movement, until the weight of support column 14 of running-in platform is directly in maximum pull device defined position When turn back middle position again, at this moment stop operation, run-in test can be carried out.
Derrick hook is first mounted lifting pouring weight and carries out run-in test, the run-in test time about 4 hours, run by run-in test After the completion of closing test, pouring weight is placed on running-in platform, the hand-operated direction valve in reverse operating hydraulic control system will support Fluid cylinder 15 is slowly withdrawn, and support column 14 is driven to rotate to the right movement, until running-in platform is put off completely in support platform 16, Hand-operated direction valve is pulled to position in adding again, at this moment run-in test is completed, and can carry out maximum pull test.
Maximum pull test.The pin shaft 6 in puller system is extracted across wirerope or hanging ring first and wirerope or Hanging ring upper end is hung on workover rig hook block, and the quick coupling in hydraulic control system pipeline is then opened and connected to biography On depressor fluid cylinder 9, at this moment start workover rig, control steering brake handle, make the roller wirerope on workover rig drive hook block to Upper movement, by hanging apparatus by puller system upper and lower crossbeam 8,10 and pressure difference transmitter fluid cylinder 9 pull up, until arrive at At limiting device nut 7, the weight indicator on workover rig is at this moment observed again, observes tonnage, while observing the pressure gauge on testing stand The pressure of display.Maximum pull trial stretch is 0-2500KN, pressure 0-18MPa.

Claims (1)

1. workover rig movable type pull test platform, it is characterised in that including connected preceding pedestal (1), rear base (2), rack (12), puller system (3), running-in platform (4) and hydraulic control device (5) are fixed in rack (12);Puller system (3) includes Upper and lower sequentially connected upper beam (8), pressure difference transmitter fluid cylinder (9), lower beam (10), upper beam (8), lower beam pass through between (10) Pull rod (11) connection, pull rod (11) upper end has nut (7);Running-in platform (4) includes the platform of four support columns (14) support (13), support column (14) and rack (12) are movably hinged, and support fluid cylinder (15) is connect with support column (14) skewed horizontal load, support column (14) side is equipped with support platform (16).
CN201821443458.4U 2018-09-05 2018-09-05 Workover rig movable type pull test platform Active CN208636060U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821443458.4U CN208636060U (en) 2018-09-05 2018-09-05 Workover rig movable type pull test platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821443458.4U CN208636060U (en) 2018-09-05 2018-09-05 Workover rig movable type pull test platform

Publications (1)

Publication Number Publication Date
CN208636060U true CN208636060U (en) 2019-03-22

Family

ID=65743597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821443458.4U Active CN208636060U (en) 2018-09-05 2018-09-05 Workover rig movable type pull test platform

Country Status (1)

Country Link
CN (1) CN208636060U (en)

Similar Documents

Publication Publication Date Title
CN101927429B (en) Double-cylinder hydraulic pin remover
CN2929699Y (en) Shearing tester between road surface layers
CN106969927B (en) Jack dynamic test system
CN105236271B (en) Comprehensive laboratory examination device for anti-wind brake product of crane
CN102620923A (en) Indoor test detector for wind-resistant anti-slip brake of port crane
CN109339717A (en) A kind of petroleum well servicing rig
CN208636060U (en) Workover rig movable type pull test platform
CN201300180Y (en) Wire rope straightener
CN205157330U (en) Horizontal pulling force of electronic hydraulic pressure machine
CN203949780U (en) A kind of large-diameter flanged valve hydraulic pressure pressure testing table
CN105672910B (en) Oil pipe traction lifting Aided Machine
CN201269792Y (en) Pulling force and static settlement hydraulic test device for raiser of tractor
CN105067407A (en) Automatic sample preparation and saturation device for triaxial rheological experiment of tailing materials
CN206258265U (en) A kind of load test device for lifting node
CN206070260U (en) High-speed railway track plate lays precision high-speed adjustment device
CN206208669U (en) For the bending resistance test device of T-shaped pipe fitting
CN102182188B (en) Full hydraulic static pulling machine and method of underground diaphragm wall joint pipe
CN201575930U (en) Combined test device for safety clothes protection device
CN101509358B (en) Tube fitting pressing device
CN106319119A (en) Automatic replacer of tuyere small sleeve
CN205294156U (en) Evaporate and press sand air entrainment panel letter sorting turning device
CN113945458A (en) Multifunctional geogrid drawing test device and use method
CN210427000U (en) Valve pressure test and hydrostatic life test combined device
CN205879416U (en) Magnetic force equipment pulling -out force test machine
CN102704963A (en) Large multifunctional dismounting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Mobile tension test bed for workover rig

Effective date of registration: 20210707

Granted publication date: 20190322

Pledgee: Tonghua Branch of China Everbright Bank Co.,Ltd.

Pledgor: TONGHUA PETROCHEMICAL MACHINERY MANUFACTURING Co.,Ltd.

Registration number: Y2021220000072

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230621

Granted publication date: 20190322

Pledgee: Tonghua Branch of China Everbright Bank Co.,Ltd.

Pledgor: TONGHUA PETROCHEMICAL MACHINERY MANUFACTURING Co.,Ltd.

Registration number: Y2021220000072

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Mobile tensile test bench for workover rig

Effective date of registration: 20230629

Granted publication date: 20190322

Pledgee: Tonghua Branch of China Everbright Bank Co.,Ltd.

Pledgor: TONGHUA PETROCHEMICAL MACHINERY MANUFACTURING Co.,Ltd.

Registration number: Y2023220000046

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20190322

Pledgee: Tonghua Branch of China Everbright Bank Co.,Ltd.

Pledgor: TONGHUA PETROCHEMICAL MACHINERY MANUFACTURING Co.,Ltd.

Registration number: Y2023220000046