CN208623228U - A kind of electric system grid switching operation Risk Pre-control system - Google Patents
A kind of electric system grid switching operation Risk Pre-control system Download PDFInfo
- Publication number
- CN208623228U CN208623228U CN201820159388.3U CN201820159388U CN208623228U CN 208623228 U CN208623228 U CN 208623228U CN 201820159388 U CN201820159388 U CN 201820159388U CN 208623228 U CN208623228 U CN 208623228U
- Authority
- CN
- China
- Prior art keywords
- unit
- module
- operation order
- pda
- grid switching
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004088 simulation Methods 0.000 claims abstract description 19
- 238000012790 confirmation Methods 0.000 claims abstract description 18
- 238000012550 audit Methods 0.000 claims abstract description 16
- 230000005540 biological transmission Effects 0.000 claims abstract description 11
- 238000012545 processing Methods 0.000 claims abstract description 8
- 238000013500 data storage Methods 0.000 claims description 10
- 238000007405 data analysis Methods 0.000 claims description 9
- 238000004458 analytical method Methods 0.000 claims description 8
- 238000000034 method Methods 0.000 abstract description 5
- 238000012800 visualization Methods 0.000 abstract description 2
- 210000004027 cell Anatomy 0.000 description 7
- 210000000352 storage cell Anatomy 0.000 description 5
- 238000007792 addition Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 238000012502 risk assessment Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
The utility model relates to a kind of electric system grid switching operation Risk Pre-control systems, solve the problems, such as that the not rigorous Risk Pre-control of grid switching operation method is not in place in the prior art, a kind of electric system grid switching operation Risk Pre-control system, including operation order generation module, operation module, PDA module, data processing module, alarm module, operation order generation module includes operation task input unit, operation order edit cell, operation order generation unit, operation order audits unit, operation module includes simulation preview unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit, simulation preview unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit is sequentially connected, the operation order audit unit is connected with simulation preview unit, PDA module includes power supply unit, PDA unit, risk visualization, can be safe Grid switching operation is carried out to electric system, by a series of indicating reminders modules, the Risk generated when by grid switching operation is prompted to operator, avoids risk.
Description
Technical field
The utility model relates to a kind of electric system back brake fields, more particularly, to a kind of electric system grid switching operation risk
Pre-control System.
Background technique
Growing with society's electricity consumption load level, the maintenance of power grid enterprises, improvement project are more, existing operation
Risk assessment excessively relies on paper document to show, cannot reach real-time display, various dimensions are shown, comparison is shown, cannot be fine
Reflection operation risk actual conditions, the personnel of being also not susceptible to serve as a lookout dangerous distribution situation, be easy to cause personnel's erroneous judgement, risk of failing to judge
Cause situations such as blindly or by force operation leads to casualties, so a kind of system that can carry out safely grid switching operation is very must
It wants.
Summary of the invention
The utility model mainly solves the problems, such as that the not rigorous Risk Pre-control of grid switching operation method is not in place in the prior art,
Provide a kind of visual electric system grid switching operation Risk Pre-control system of security risk.
Above technical problems of the utility model are mainly solved by the following technical scheme: a kind of electric system
Grid switching operation Risk Pre-control system, including operation order generation module, operation module, PDA module, data processing module, alarm mould
Block, operation order generation module operation task input unit, operation order edit cell, operation order generation unit, operation order audit are single
Member, the operation task input unit, operation order edit cell, operation order generation unit, operation order audit unit are sequentially connected,
The operation module includes simulation preview unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit, the simulation
Preview unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit are sequentially connected, the operation order audit unit with
Simulation preview unit is connected, and the PDA module includes power supply unit, PDA unit, and power supply unit, PDA unit are sequentially connected, institute
It states confirmation unit to be connected with PDA unit, generate operation order and editor's audit is carried out to the operation order of generation, then pass through operation order
Grid switching operation is completed after carrying out simulation preview, it will be on the item that should be noted when operating placement and screen in operating process, wherein
Operation order input unit is keyboard input, and operation order edit cell, operation order generation unit, operation order audit unit, simulation are pre-
Unit to be drilled to carry out in the server, galvanoscopy unit is current detector, and points for attention screen reminding unit is display,
In PDA unit, data storage cell is data storage for phonetic order transmission unit, confirmation unit.
As a preferred embodiment, the PDA module includes power supply unit, PDA unit, and power supply unit, PDA unit are successively
It is connected, the confirmation unit is connected with PDA unit, and PDA module is used to indicate operator's operating procedure, and points for attention are being shielded
It is reminded on curtain.
As a preferred embodiment, the data processing module includes executing time recording unit, data analysis unit, number
According to writing unit, data storage cell, conclusion and comment unit, the execution time recording unit, data analysis unit, data are write
Enter unit, data storage cell, conclusion and comment unit to be sequentially connected, the execution time recording unit is connected with PDA unit, number
It realizes, after operation data is stored and analyzes, under being preferably in PDA module according to analytical unit, data write unit
Secondary back brake is prepared.
As a preferred embodiment, the operation module further includes points for attention screen reminding unit, points for attention screen
Reminding unit is connected with simulation preview unit, and points for attention screen reminding unit can remind operator.
As a preferred embodiment, the alarm module includes the anomaly analysis unit being connected with confirmation unit, with exception
The connected acousto-optic warning unit of analytical unit, anomaly analysis unit can analyze the exception generated in operation and by sound-light alarm lists
Member alarm.
Therefore, the utility model has the advantages that: risk visualization, can safety to electric system carry out grid switching operation, lead to
A series of indicating reminders modules are crossed, the Risk generated when by grid switching operation is prompted to operator, avoids risk.
Detailed description of the invention
Attached drawing 1 is system structure frame figure in the utility model
1. 2. operation order edit cell of operation task input unit
3. operation order generation unit 4. executes time recording unit
5. 6. data write unit of data analysis unit, 7. alarm module
8. 10. power supply unit of galvanoscopy unit 9.PDA unit
11. simulation preview 13. confirmation unit of unit of points for attention screen reminding unit 12.
14. 15. anomaly analysis unit of acousto-optic warning unit, 16. phonetic order transmission unit
17. operation order audits 18. conclusion and comment unit of unit, 19. data storage cell
21. data processing module of 20.PDA module, 22. operation order generation module
23. operation module.
Specific embodiment
A kind of electric system grid switching operation Risk Pre-control system of the present embodiment, including operation order generation module 22, operation mould
Block 23, PDA module 20, data processing module 21, alarm module 7, operation order generation module operation task input unit 1, operation
Ticket edit cell 2, operation order generation unit 3, operation order audit unit 17, operation task input unit, operation order edit cell,
Operation order generation unit, operation order audit unit are sequentially connected, and operation module includes simulation preview unit 12, galvanoscopy unit
8, phonetic order transmission unit 16, confirmation unit 13, simulation preview unit, galvanoscopy unit, phonetic order transmission unit, really
Recognize unit to be sequentially connected, operation order audit unit previews unit with simulation and is connected, and PDA module includes power supply unit 10, PDA mono-
Member 9, power supply unit, PDA unit are sequentially connected, and confirmation unit is connected with PDA unit, generate operation order and the operation order to generation
Editor's audit is carried out, completes grid switching operation after then carrying out simulation preview by operation order, it is required when will be operated in operating process
In the item placement paid attention to and screen, wherein operation order input unit is keyboard input, and operation order edit cell, operation order are raw
It being carried out in the server at unit, operation order audit unit, simulation preview unit, galvanoscopy unit is current detector,
Points for attention screen reminding unit is display, and in PDA unit, data storage is single for phonetic order transmission unit, confirmation unit
Member is data storage.
Data processing module includes executing time recording unit 4, data analysis unit 5, data write unit 6, data to deposit
Storage unit 19, conclusion and comment unit 18 execute time recording unit, data analysis unit, data write unit, data storage list
Member, conclusion and comment unit are sequentially connected, and are executed time recording unit and are connected with PDA unit, and data analysis unit, data write-in are single
Member is realized in PDA module, after operation data is stored and is analyzed, and can preferably be prepared for next back brake.
Operation module further includes points for attention screen reminding unit 11, and points for attention screen reminding unit and simulation preview are single
Member is connected, and points for attention screen reminding unit can remind operator.
Alarm module includes the anomaly analysis unit 15 being connected with confirmation unit, the acousto-optic report being connected with anomaly analysis unit
Alert unit 14, anomaly analysis unit can analyze the exception generated in operation and be alarmed by acousto-optic warning unit.
The specific embodiments described herein are merely examples of the spirit of the present invention.The utility model institute
Belonging to those skilled in the art can make various modifications or additions to the described embodiments or using similar
Mode substitute, but without departing from the spirit of the present application or beyond the scope of the appended claims.
Although confirmation unit is used more herein, data storage cell, data analysis unit, data write unit,
The terms such as PDA unit, but it does not exclude the possibility of using other terms.The use of these items is only for more easily retouch
State and explain the essence of the utility model;Being construed as any additional limitation all is and the spirit of the present invention phase
It violates.
Claims (5)
1. a kind of electric system grid switching operation Risk Pre-control system, it is characterised in that: including operation order generation module (22), operation
Module (23), PDA module (20), data processing module (21), alarm module (7), the input of operation order generation module operation task
Unit (1), operation order edit cell (2), operation order generation unit (3), operation order audit unit (17), the operation task are defeated
Enter unit, operation order edit cell, operation order generation unit, operation order audit unit to be sequentially connected, the operation module includes
Simulation preview unit (12), galvanoscopy unit (8), phonetic order transmission unit (16), confirmation unit (13), the simulation are pre-
It drills unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit to be sequentially connected, the operation order audit unit and mould
Quasi- preview unit is connected.
2. a kind of electric system grid switching operation Risk Pre-control system according to claim 1, which is characterized in that the PDA
Module includes power supply unit (10), PDA unit (9), and power supply unit, PDA unit are sequentially connected, and the confirmation unit and PDA are mono-
Member is connected.
3. a kind of electric system grid switching operation Risk Pre-control system according to claim 2, which is characterized in that the number
It include executing time recording unit (4), data analysis unit (5), data write unit (6), data storage list according to processing module
First (19), conclusion and comment unit (18), the execution time recording unit, data analysis unit, data write unit, data are deposited
Storage unit, conclusion and comment unit are sequentially connected, and the execution time recording unit is connected with PDA unit.
4. a kind of electric system grid switching operation Risk Pre-control system according to claim 1, which is characterized in that the behaviour
It further include points for attention screen reminding unit (11) as module, points for attention screen reminding unit is connected with simulation preview unit.
5. according to claim 1 to a kind of electric system grid switching operation Risk Pre-control system described in any one of 4 claims,
It is characterized in that, the alarm module includes the anomaly analysis unit (15) being connected with confirmation unit, with anomaly analysis unit phase
Acousto-optic warning unit (14) even.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820159388.3U CN208623228U (en) | 2018-01-30 | 2018-01-30 | A kind of electric system grid switching operation Risk Pre-control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820159388.3U CN208623228U (en) | 2018-01-30 | 2018-01-30 | A kind of electric system grid switching operation Risk Pre-control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208623228U true CN208623228U (en) | 2019-03-19 |
Family
ID=65692709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820159388.3U Active CN208623228U (en) | 2018-01-30 | 2018-01-30 | A kind of electric system grid switching operation Risk Pre-control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208623228U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109471375A (en) * | 2018-01-30 | 2019-03-15 | 国网浙江省电力公司湖州供电公司 | A kind of electric system grid switching operation Risk Pre-control system and method |
CN110571929A (en) * | 2019-09-09 | 2019-12-13 | 珠海优特电力科技股份有限公司 | Switching operation control method and device, storage medium and electronic device |
-
2018
- 2018-01-30 CN CN201820159388.3U patent/CN208623228U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109471375A (en) * | 2018-01-30 | 2019-03-15 | 国网浙江省电力公司湖州供电公司 | A kind of electric system grid switching operation Risk Pre-control system and method |
CN110571929A (en) * | 2019-09-09 | 2019-12-13 | 珠海优特电力科技股份有限公司 | Switching operation control method and device, storage medium and electronic device |
CN110571929B (en) * | 2019-09-09 | 2021-10-22 | 珠海优特电力科技股份有限公司 | Switching operation control method and device, storage medium and electronic device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106451761B (en) | Large-area power failure automatic monitoring and analyzing system based on dynamic data driving | |
CN208623228U (en) | A kind of electric system grid switching operation Risk Pre-control system | |
CN102055187B (en) | Large-scale interconnected power grid spinning reserve risk assessment method based on state space division method | |
CN108231227A (en) | A kind of monitoring method, system and the storage medium of nuclear power station operating status | |
CN109213108A (en) | A kind of nuclear power station operator runs auxiliary support system and method | |
Jiang et al. | System hazard analysis of tower crane in different phases on construction site | |
CN109471375A (en) | A kind of electric system grid switching operation Risk Pre-control system and method | |
Wang et al. | Risk monitor riskangel for risk-informed applications in nuclear power plants | |
US20190260230A1 (en) | Real-time electrical grid restoration | |
CN101860222A (en) | Unit serial connection type high-voltage frequency converter unit controller | |
JP2008263237A (en) | Method and device for managing alarm | |
Meshkati | Control rooms' design in industrial facilities | |
Vicente et al. | More about operator monitoring under normal operations: the role of workload regulation and the impact of control room technology | |
CN107767026A (en) | Automatically generate the method and system of Dispatch Safety supervision work early warning | |
CN209312187U (en) | A kind of electric fire monitoring system based on industrial personal computer | |
Zubair et al. | A methodology for living probabilistic safety assessment (LPSA) based on advanced control room operator support system (ACROSS) | |
Wei et al. | Visual Online Debugging and Diagnosis System for Substation Secondary Equipment | |
CN113085958B (en) | Railway monitoring system alarm method and device based on conditional expression | |
Kinzhalieva et al. | Structural analysis of the pricing for the power grid company team management process based on the system dynamics model | |
JPH01166199A (en) | Alarm device | |
Tulyaganovich et al. | IMPLEMENTATION OF AUTOMATED PROCESS CONTROL SYSTEMS AT SUBSTATIONS | |
Yi | Development and implementation of safety information management system for construction enterprises | |
Vicente | Review of alarm systems for nuclear power plants | |
Zhou et al. | Design and Implementation of Expert Decision Information System for Intelligent Operation and Maintenance of Traction Power Supply Based on GIS Technology | |
CN118008427A (en) | Distributed control method, device and equipment for advanced hydraulic support and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |