CN208623228U - A kind of electric system grid switching operation Risk Pre-control system - Google Patents

A kind of electric system grid switching operation Risk Pre-control system Download PDF

Info

Publication number
CN208623228U
CN208623228U CN201820159388.3U CN201820159388U CN208623228U CN 208623228 U CN208623228 U CN 208623228U CN 201820159388 U CN201820159388 U CN 201820159388U CN 208623228 U CN208623228 U CN 208623228U
Authority
CN
China
Prior art keywords
unit
module
operation order
pda
grid switching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820159388.3U
Other languages
Chinese (zh)
Inventor
吴健
席俞佳
高奥
卜鹏
闵倩倩
归宇
陈昱
王涤
章铭
凌秋阳
杨海威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUZHOU ELECTRIC POWER DESIGN INSTITUTE Co Ltd
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
HUZHOU ELECTRIC POWER DESIGN INSTITUTE Co Ltd
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUZHOU ELECTRIC POWER DESIGN INSTITUTE Co Ltd, State Grid Corp of China SGCC, Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical HUZHOU ELECTRIC POWER DESIGN INSTITUTE Co Ltd
Priority to CN201820159388.3U priority Critical patent/CN208623228U/en
Application granted granted Critical
Publication of CN208623228U publication Critical patent/CN208623228U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

The utility model relates to a kind of electric system grid switching operation Risk Pre-control systems, solve the problems, such as that the not rigorous Risk Pre-control of grid switching operation method is not in place in the prior art, a kind of electric system grid switching operation Risk Pre-control system, including operation order generation module, operation module, PDA module, data processing module, alarm module, operation order generation module includes operation task input unit, operation order edit cell, operation order generation unit, operation order audits unit, operation module includes simulation preview unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit, simulation preview unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit is sequentially connected, the operation order audit unit is connected with simulation preview unit, PDA module includes power supply unit, PDA unit, risk visualization, can be safe Grid switching operation is carried out to electric system, by a series of indicating reminders modules, the Risk generated when by grid switching operation is prompted to operator, avoids risk.

Description

A kind of electric system grid switching operation Risk Pre-control system
Technical field
The utility model relates to a kind of electric system back brake fields, more particularly, to a kind of electric system grid switching operation risk Pre-control System.
Background technique
Growing with society's electricity consumption load level, the maintenance of power grid enterprises, improvement project are more, existing operation Risk assessment excessively relies on paper document to show, cannot reach real-time display, various dimensions are shown, comparison is shown, cannot be fine Reflection operation risk actual conditions, the personnel of being also not susceptible to serve as a lookout dangerous distribution situation, be easy to cause personnel's erroneous judgement, risk of failing to judge Cause situations such as blindly or by force operation leads to casualties, so a kind of system that can carry out safely grid switching operation is very must It wants.
Summary of the invention
The utility model mainly solves the problems, such as that the not rigorous Risk Pre-control of grid switching operation method is not in place in the prior art, Provide a kind of visual electric system grid switching operation Risk Pre-control system of security risk.
Above technical problems of the utility model are mainly solved by the following technical scheme: a kind of electric system Grid switching operation Risk Pre-control system, including operation order generation module, operation module, PDA module, data processing module, alarm mould Block, operation order generation module operation task input unit, operation order edit cell, operation order generation unit, operation order audit are single Member, the operation task input unit, operation order edit cell, operation order generation unit, operation order audit unit are sequentially connected, The operation module includes simulation preview unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit, the simulation Preview unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit are sequentially connected, the operation order audit unit with Simulation preview unit is connected, and the PDA module includes power supply unit, PDA unit, and power supply unit, PDA unit are sequentially connected, institute It states confirmation unit to be connected with PDA unit, generate operation order and editor's audit is carried out to the operation order of generation, then pass through operation order Grid switching operation is completed after carrying out simulation preview, it will be on the item that should be noted when operating placement and screen in operating process, wherein Operation order input unit is keyboard input, and operation order edit cell, operation order generation unit, operation order audit unit, simulation are pre- Unit to be drilled to carry out in the server, galvanoscopy unit is current detector, and points for attention screen reminding unit is display, In PDA unit, data storage cell is data storage for phonetic order transmission unit, confirmation unit.
As a preferred embodiment, the PDA module includes power supply unit, PDA unit, and power supply unit, PDA unit are successively It is connected, the confirmation unit is connected with PDA unit, and PDA module is used to indicate operator's operating procedure, and points for attention are being shielded It is reminded on curtain.
As a preferred embodiment, the data processing module includes executing time recording unit, data analysis unit, number According to writing unit, data storage cell, conclusion and comment unit, the execution time recording unit, data analysis unit, data are write Enter unit, data storage cell, conclusion and comment unit to be sequentially connected, the execution time recording unit is connected with PDA unit, number It realizes, after operation data is stored and analyzes, under being preferably in PDA module according to analytical unit, data write unit Secondary back brake is prepared.
As a preferred embodiment, the operation module further includes points for attention screen reminding unit, points for attention screen Reminding unit is connected with simulation preview unit, and points for attention screen reminding unit can remind operator.
As a preferred embodiment, the alarm module includes the anomaly analysis unit being connected with confirmation unit, with exception The connected acousto-optic warning unit of analytical unit, anomaly analysis unit can analyze the exception generated in operation and by sound-light alarm lists Member alarm.
Therefore, the utility model has the advantages that: risk visualization, can safety to electric system carry out grid switching operation, lead to A series of indicating reminders modules are crossed, the Risk generated when by grid switching operation is prompted to operator, avoids risk.
Detailed description of the invention
Attached drawing 1 is system structure frame figure in the utility model
1. 2. operation order edit cell of operation task input unit
3. operation order generation unit 4. executes time recording unit
5. 6. data write unit of data analysis unit, 7. alarm module
8. 10. power supply unit of galvanoscopy unit 9.PDA unit
11. simulation preview 13. confirmation unit of unit of points for attention screen reminding unit 12.
14. 15. anomaly analysis unit of acousto-optic warning unit, 16. phonetic order transmission unit
17. operation order audits 18. conclusion and comment unit of unit, 19. data storage cell
21. data processing module of 20.PDA module, 22. operation order generation module
23. operation module.
Specific embodiment
A kind of electric system grid switching operation Risk Pre-control system of the present embodiment, including operation order generation module 22, operation mould Block 23, PDA module 20, data processing module 21, alarm module 7, operation order generation module operation task input unit 1, operation Ticket edit cell 2, operation order generation unit 3, operation order audit unit 17, operation task input unit, operation order edit cell, Operation order generation unit, operation order audit unit are sequentially connected, and operation module includes simulation preview unit 12, galvanoscopy unit 8, phonetic order transmission unit 16, confirmation unit 13, simulation preview unit, galvanoscopy unit, phonetic order transmission unit, really Recognize unit to be sequentially connected, operation order audit unit previews unit with simulation and is connected, and PDA module includes power supply unit 10, PDA mono- Member 9, power supply unit, PDA unit are sequentially connected, and confirmation unit is connected with PDA unit, generate operation order and the operation order to generation Editor's audit is carried out, completes grid switching operation after then carrying out simulation preview by operation order, it is required when will be operated in operating process In the item placement paid attention to and screen, wherein operation order input unit is keyboard input, and operation order edit cell, operation order are raw It being carried out in the server at unit, operation order audit unit, simulation preview unit, galvanoscopy unit is current detector, Points for attention screen reminding unit is display, and in PDA unit, data storage is single for phonetic order transmission unit, confirmation unit Member is data storage.
Data processing module includes executing time recording unit 4, data analysis unit 5, data write unit 6, data to deposit Storage unit 19, conclusion and comment unit 18 execute time recording unit, data analysis unit, data write unit, data storage list Member, conclusion and comment unit are sequentially connected, and are executed time recording unit and are connected with PDA unit, and data analysis unit, data write-in are single Member is realized in PDA module, after operation data is stored and is analyzed, and can preferably be prepared for next back brake.
Operation module further includes points for attention screen reminding unit 11, and points for attention screen reminding unit and simulation preview are single Member is connected, and points for attention screen reminding unit can remind operator.
Alarm module includes the anomaly analysis unit 15 being connected with confirmation unit, the acousto-optic report being connected with anomaly analysis unit Alert unit 14, anomaly analysis unit can analyze the exception generated in operation and be alarmed by acousto-optic warning unit.
The specific embodiments described herein are merely examples of the spirit of the present invention.The utility model institute Belonging to those skilled in the art can make various modifications or additions to the described embodiments or using similar Mode substitute, but without departing from the spirit of the present application or beyond the scope of the appended claims.
Although confirmation unit is used more herein, data storage cell, data analysis unit, data write unit, The terms such as PDA unit, but it does not exclude the possibility of using other terms.The use of these items is only for more easily retouch State and explain the essence of the utility model;Being construed as any additional limitation all is and the spirit of the present invention phase It violates.

Claims (5)

1. a kind of electric system grid switching operation Risk Pre-control system, it is characterised in that: including operation order generation module (22), operation Module (23), PDA module (20), data processing module (21), alarm module (7), the input of operation order generation module operation task Unit (1), operation order edit cell (2), operation order generation unit (3), operation order audit unit (17), the operation task are defeated Enter unit, operation order edit cell, operation order generation unit, operation order audit unit to be sequentially connected, the operation module includes Simulation preview unit (12), galvanoscopy unit (8), phonetic order transmission unit (16), confirmation unit (13), the simulation are pre- It drills unit, galvanoscopy unit, phonetic order transmission unit, confirmation unit to be sequentially connected, the operation order audit unit and mould Quasi- preview unit is connected.
2. a kind of electric system grid switching operation Risk Pre-control system according to claim 1, which is characterized in that the PDA Module includes power supply unit (10), PDA unit (9), and power supply unit, PDA unit are sequentially connected, and the confirmation unit and PDA are mono- Member is connected.
3. a kind of electric system grid switching operation Risk Pre-control system according to claim 2, which is characterized in that the number It include executing time recording unit (4), data analysis unit (5), data write unit (6), data storage list according to processing module First (19), conclusion and comment unit (18), the execution time recording unit, data analysis unit, data write unit, data are deposited Storage unit, conclusion and comment unit are sequentially connected, and the execution time recording unit is connected with PDA unit.
4. a kind of electric system grid switching operation Risk Pre-control system according to claim 1, which is characterized in that the behaviour It further include points for attention screen reminding unit (11) as module, points for attention screen reminding unit is connected with simulation preview unit.
5. according to claim 1 to a kind of electric system grid switching operation Risk Pre-control system described in any one of 4 claims, It is characterized in that, the alarm module includes the anomaly analysis unit (15) being connected with confirmation unit, with anomaly analysis unit phase Acousto-optic warning unit (14) even.
CN201820159388.3U 2018-01-30 2018-01-30 A kind of electric system grid switching operation Risk Pre-control system Active CN208623228U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820159388.3U CN208623228U (en) 2018-01-30 2018-01-30 A kind of electric system grid switching operation Risk Pre-control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820159388.3U CN208623228U (en) 2018-01-30 2018-01-30 A kind of electric system grid switching operation Risk Pre-control system

Publications (1)

Publication Number Publication Date
CN208623228U true CN208623228U (en) 2019-03-19

Family

ID=65692709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820159388.3U Active CN208623228U (en) 2018-01-30 2018-01-30 A kind of electric system grid switching operation Risk Pre-control system

Country Status (1)

Country Link
CN (1) CN208623228U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109471375A (en) * 2018-01-30 2019-03-15 国网浙江省电力公司湖州供电公司 A kind of electric system grid switching operation Risk Pre-control system and method
CN110571929A (en) * 2019-09-09 2019-12-13 珠海优特电力科技股份有限公司 Switching operation control method and device, storage medium and electronic device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109471375A (en) * 2018-01-30 2019-03-15 国网浙江省电力公司湖州供电公司 A kind of electric system grid switching operation Risk Pre-control system and method
CN110571929A (en) * 2019-09-09 2019-12-13 珠海优特电力科技股份有限公司 Switching operation control method and device, storage medium and electronic device
CN110571929B (en) * 2019-09-09 2021-10-22 珠海优特电力科技股份有限公司 Switching operation control method and device, storage medium and electronic device

Similar Documents

Publication Publication Date Title
CN106451761B (en) Large-area power failure automatic monitoring and analyzing system based on dynamic data driving
CN208623228U (en) A kind of electric system grid switching operation Risk Pre-control system
CN102055187B (en) Large-scale interconnected power grid spinning reserve risk assessment method based on state space division method
CN108231227A (en) A kind of monitoring method, system and the storage medium of nuclear power station operating status
CN109213108A (en) A kind of nuclear power station operator runs auxiliary support system and method
Jiang et al. System hazard analysis of tower crane in different phases on construction site
CN109471375A (en) A kind of electric system grid switching operation Risk Pre-control system and method
Wang et al. Risk monitor riskangel for risk-informed applications in nuclear power plants
US20190260230A1 (en) Real-time electrical grid restoration
CN101860222A (en) Unit serial connection type high-voltage frequency converter unit controller
JP2008263237A (en) Method and device for managing alarm
Meshkati Control rooms' design in industrial facilities
Vicente et al. More about operator monitoring under normal operations: the role of workload regulation and the impact of control room technology
CN107767026A (en) Automatically generate the method and system of Dispatch Safety supervision work early warning
CN209312187U (en) A kind of electric fire monitoring system based on industrial personal computer
Zubair et al. A methodology for living probabilistic safety assessment (LPSA) based on advanced control room operator support system (ACROSS)
Wei et al. Visual Online Debugging and Diagnosis System for Substation Secondary Equipment
CN113085958B (en) Railway monitoring system alarm method and device based on conditional expression
Kinzhalieva et al. Structural analysis of the pricing for the power grid company team management process based on the system dynamics model
JPH01166199A (en) Alarm device
Tulyaganovich et al. IMPLEMENTATION OF AUTOMATED PROCESS CONTROL SYSTEMS AT SUBSTATIONS
Yi Development and implementation of safety information management system for construction enterprises
Vicente Review of alarm systems for nuclear power plants
Zhou et al. Design and Implementation of Expert Decision Information System for Intelligent Operation and Maintenance of Traction Power Supply Based on GIS Technology
CN118008427A (en) Distributed control method, device and equipment for advanced hydraulic support and storage medium

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant