CN208594483U - A kind of large-scale bracket device of transom pier Coping Construction - Google Patents

A kind of large-scale bracket device of transom pier Coping Construction Download PDF

Info

Publication number
CN208594483U
CN208594483U CN201820779522.XU CN201820779522U CN208594483U CN 208594483 U CN208594483 U CN 208594483U CN 201820779522 U CN201820779522 U CN 201820779522U CN 208594483 U CN208594483 U CN 208594483U
Authority
CN
China
Prior art keywords
bracket
rod iron
pier
nut
punching rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820779522.XU
Other languages
Chinese (zh)
Inventor
孙猛
董化瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201820779522.XU priority Critical patent/CN208594483U/en
Application granted granted Critical
Publication of CN208594483U publication Critical patent/CN208594483U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The large-scale bracket device of a kind of transom pier Coping Construction, comprising: punching rod iron, bracket, steel plate washer, nut.In use, wearing rod iron to pier stud preformed hole, support force is provided for whole device.Bracket is mounted on rod iron both ends, and bracket is closely connected with rod iron, and support force is transferred on bracket by rod iron, and bracket provides support force and support platform for bracket.Nut is tightened in rod iron end, prevents from moving outside bracket, deform.Steel plate washer can provide a kind of firm non-floor-type support mode for adjusting scale error and dispersive stress present in construction and device processing for transom pier bent cap bracket.The device have the characteristics that support force is big, supporting surface is wide, without deformation, stability is good, easy to operate, work efficiency is high, at low cost, construction safety.

Description

A kind of large-scale bracket device of transom pier Coping Construction
Technical field
The utility model belongs to transom pier Coping Construction technical field, and in particular to a kind of transom pier Coping Construction is large-scale Bracket device.
Background technique
Bridge is crossing over the various Obstacle Positions such as existing road, river, often has part pier cap beam using prestressing force Gate-type pier capping beam.Gate-type pier capping beam span is big, pier stud flexible arrangement, can be very good to solve the problems, such as Bridge Pile position difficult arrangement. But under normal conditions, different degrees of at this to ask there are with a varied topography, construction space is narrow, to guarantee existing road unimpeded etc. Topic, brings many problems to prestressing force transom pier Coping Construction.
Capping construction support support at present is broadly divided into two classes: a kind of by the way of floor steel pipe column support;It is another Class is the supporting way using anchor ear as representative.When bent cap is larger with ground height, landform is more complex, can not use floor-type support When, the second class construction method becomes most suitable selection.And the support width and support force that anchor ear provides are limited, when bent cap is disconnected When face size is larger, it is badly in need of wanting a kind of support device that can overcome anchor ear disadvantage.
Summary of the invention
In order to overcome the above-mentioned deficiencies of the prior art, the purpose of the utility model is to provide a kind of transom pier Coping Construction use Large-scale bracket device overcomes existing anchor ear support width narrow, the small disadvantage of support force, can provide one for transom pier bent cap bracket The firm non-floor-type support mode of kind.The device have support force is big, supporting surface is wide, without deformation, stability it is good, it is easy to operate, The characteristics of work efficiency is high, at low cost, construction safety.
To achieve the goals above, the technical solution adopted in the utility model is:
A kind of transom pier Coping Construction large-scale bracket device, including punching rod iron, bracket, steel plate washer, nut, punching steel Stick is installed to pier stud preformed hole, and pier top preformed hole uses pre-buried diameter 153mm steel pipe, and bracket is respectively installed at punching rod iron both ends One, and make bracket and pier stud surface concrete closely connected as far as possible;Steel plate washer is mounted between bracket and nut, and nut is twisted from rod iron end Tightly, seamless between nut, gasket, bracket.The every end of rod iron must twist two nuts.
The equal length leaked out to the punching rod iron in pier stud preformed hole in pier stud preformed hole two sides is installed.
According to the punching rod iron outside bracket without thread length, determine steel plate washer installation number.
The device is accurately installed using punching rod iron to pier stud preformed hole, guarantees the length phase that rod iron two sides leak out Deng.Pier top preformed hole is formed using pre-buried diameter 153mm steel pipe, and when guaranteeing rod iron stress, aperture concrete is not crushed.
The device respectively installs one at punching rod iron both ends using bracket, and corbels support faces upward, and guarantees that installation is hung down Straight degree, and make bracket and pier stud surface concrete closely connected as far as possible.
The device steel plate washer is mounted between bracket and nut, is leaked outside on the outside of bracket according to rod iron long without thread Degree, determines steel plate washer installation number.
The device nut is tightened from rod iron end, guarantees that bracket and pier stud surface concrete compress, nut, gasket, bracket Between it is seamless.The every end of rod iron must twist two nuts.
The beneficial effects of the utility model are:
, supporting surface is wide, support force is big, without deformation, stability it is good
, described device supporting surface it is wide, maximum can provide the support platform of 70cm wide, can install 4 groups of beret slices side by side simultaneously. When stress, bracket is indeformable, can guarantee 4 groups of beret slice uniform forces, guarantees bracket stable.
, construction effect is high, low cost
, described device installation, remove that lifted load is small, and structure is simple, it is convenient to assemble and disassemble quick.Time processing is at low cost, can It is recycled.
, strong applicability, it is easy to operate
, described device on circular-sectioned pier, rectangular pier stud, Thin-Wall Piers pier stud can be used, strong applicability.It is only needed when use Accurate reserving installation hole position, that is, can be used, easy to operate.
Detailed description of the invention
Fig. 1 is the structure scheme of installation of the utility model;
Fig. 2 is the bracket structure schematic diagram of the utility model;
Wherein 1 is punching rod iron, and 2 be bracket, and 3 be steel plate washer, and 4 be nut.
Specific embodiment
The utility model is further discussed below below in conjunction with attached drawing.
As shown in Figure 1, a kind of transom pier Coping Construction large-scale bracket device, including punching rod iron 1, bracket 2, steel plate washer 3, nut 4, punching rod iron 1 are installed to pier stud preformed hole, and pier top preformed hole uses pre-buried diameter 153mm steel pipe, and bracket 2 is being worn 1 both ends of heart rod iron respectively install one, and make bracket 2 and pier stud surface concrete closely connected as far as possible;Steel plate washer 3 is mounted on bracket 2 and nut 4 Between, nut 4 is tightened from 1 end of punching punching rod iron, seamless between nut 4, gasket 3, bracket 2.The every end of punching rod iron 1 is necessary Twist two nuts 4.
The equal length leaked out to the punching rod iron 1 in pier stud preformed hole in pier stud preformed hole two sides is installed.
According to the punching rod iron 1 outside bracket 2 without thread length, determine 3 installation number of steel plate washer.
The device is accurately installed using punching rod iron to pier stud preformed hole, guarantees the length phase that rod iron two sides leak out Deng.Pier top preformed hole is formed using pre-buried diameter 153mm steel pipe, and when guaranteeing rod iron stress, aperture concrete is not crushed.
The device respectively installs one at punching rod iron both ends using bracket, and corbels support faces upward, and guarantees that installation is hung down Straight degree, and make bracket and pier stud surface concrete closely connected as far as possible.
The device steel plate washer is mounted between bracket and nut, is leaked outside on the outside of bracket according to rod iron long without thread Degree, determines steel plate washer installation number.
The device nut is tightened from rod iron end, guarantees that bracket and pier stud surface concrete compress, nut, gasket, bracket Between it is seamless.The every end of rod iron must twist two nuts.
The working principle of the utility model is:
Punching rod iron 1 is worn to preformed hole, provides support force for device.Bracket 2 is mounted on punching rod iron 1, bracket 2 with Punching punching rod iron 1 is closely connected, and support force is transferred on bracket 2 by punching rod iron 1, and bracket 2 provides support force and support for bracket Platform.Nut 4 is tightened on punching rod iron 1, is prevented from moving outside bracket 2, be deformed.Steel plate washer 3 is for adjusting construction and device processing Present in scale error and dispersive stress.It is finally reached and provides secure support for bracket and guarantee that whole device is indeformable.

Claims (3)

1. a kind of transom pier Coping Construction large-scale bracket device, including punching rod iron (1), bracket (2), steel plate washer (3), nut (4), which is characterized in that in punching rod iron (1) installation to pier stud preformed hole, pier top preformed hole uses pre-buried diameter 153mm steel pipe, Bracket (2) respectively installs one at punching rod iron (1) both ends, and makes bracket (2) and pier stud surface concrete closely connected as far as possible;Steel plate washer (3) It is mounted between bracket (2) and nut (4), nut (4) is tightened from punching rod iron (1) end, nut (4), gasket (3), bracket (2) seamless between;Punching rod iron (1) every end must twist two nuts (4).
2. a kind of large-scale bracket device of transom pier Coping Construction according to claim 1, which is characterized in that installation to pier The equal length that the punching rod iron (1) in column preformed hole is leaked out in pier stud preformed hole two sides.
3. a kind of large-scale bracket device of transom pier Coping Construction according to claim 1, which is characterized in that according to described Punching rod iron (1) bracket (2) outside without thread length, determine steel plate washer (3) installation number.
CN201820779522.XU 2018-05-24 2018-05-24 A kind of large-scale bracket device of transom pier Coping Construction Active CN208594483U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820779522.XU CN208594483U (en) 2018-05-24 2018-05-24 A kind of large-scale bracket device of transom pier Coping Construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820779522.XU CN208594483U (en) 2018-05-24 2018-05-24 A kind of large-scale bracket device of transom pier Coping Construction

Publications (1)

Publication Number Publication Date
CN208594483U true CN208594483U (en) 2019-03-12

Family

ID=65598839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820779522.XU Active CN208594483U (en) 2018-05-24 2018-05-24 A kind of large-scale bracket device of transom pier Coping Construction

Country Status (1)

Country Link
CN (1) CN208594483U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130225A (en) * 2019-04-02 2019-08-16 中铁十六局集团路桥工程有限公司 A kind of the construction operation platform hoisting frame and its construction method of Bridge High-pier

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130225A (en) * 2019-04-02 2019-08-16 中铁十六局集团路桥工程有限公司 A kind of the construction operation platform hoisting frame and its construction method of Bridge High-pier

Similar Documents

Publication Publication Date Title
CN204753354U (en) Cover worker's board landing stage
CN208594483U (en) A kind of large-scale bracket device of transom pier Coping Construction
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN110778020A (en) Removable RC frame beam column node
CN214657263U (en) Adjustable post-cast strip power transmission device of prestressing force
CN202116984U (en) Dragging-adjustable cross-brace device for continuous beams of spatial steel pipe trusses
CN205934890U (en) Can dismantle anti ice device suitable for marine large -diameter pile
CN2816119Y (en) Regulation positioning apparatus of prefabricated heavy-duty pier
CN210316768U (en) Single cantilever signboard
CN210134357U (en) Pi-shaped bracket for construction of upper cross beam of H-shaped cable tower
CN108223294B (en) Application method of prestress penetrating rib and anchor bolt leveling device for high altitude of concrete tower drum
CN108358080B (en) Wind-proof fixing mechanism of tower crane for building
CN206635801U (en) A kind of deep water waters bridge construction tower-crane foundation structure
CN213898375U (en) Pole tower in-situ lifting device
CN210439163U (en) Diagonal joist supporting structure applicable to assembly and disassembly of continuous beam
CN213508060U (en) Novel prestressed bent cap support device
CN204843340U (en) Prefabricated frock bed -jig of wind -powered electricity generation structure pipe
CN211499458U (en) Removable RC frame beam column node
CN204385786U (en) Multi-functional prestressed concrete pipe pile antibending shear resistance system
CN209194312U (en) A kind of steel pipe type pontoon bridge
CN108821140B (en) Anti-torsion fixing device and tower crane arm head
CN215669029U (en) Square entity pier reinforcing bar deviation correcting device
CN110565528A (en) Novel assembled cast in situ concrete support
CN206143795U (en) Wind turbine foundation template
CN205063046U (en) Steel mesh frame factory building capital node

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant