CN208591628U - A kind of purification water installations - Google Patents

A kind of purification water installations Download PDF

Info

Publication number
CN208591628U
CN208591628U CN201820940507.9U CN201820940507U CN208591628U CN 208591628 U CN208591628 U CN 208591628U CN 201820940507 U CN201820940507 U CN 201820940507U CN 208591628 U CN208591628 U CN 208591628U
Authority
CN
China
Prior art keywords
tank
process tank
baffle
water
water installations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820940507.9U
Other languages
Chinese (zh)
Inventor
童华宁
陈中凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changxin Yun Ting Xin Energy Technology Co Ltd
Original Assignee
Changxin Yun Ting Xin Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changxin Yun Ting Xin Energy Technology Co Ltd filed Critical Changxin Yun Ting Xin Energy Technology Co Ltd
Priority to CN201820940507.9U priority Critical patent/CN208591628U/en
Application granted granted Critical
Publication of CN208591628U publication Critical patent/CN208591628U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Water Treatment By Sorption (AREA)

Abstract

The utility model relates to refine the technical field of water installations, especially a kind of purification water installations, it has the first process tank, the first process tank upper end vertically plugs water inlet pipe, the upper end of first process tank is horizontally disposed with baffle, sealing is set on water inlet pipe in the middle part of the baffle, the peripherally disposed several spillway holes of the surrounding of the baffle, the side that the upper end of the baffle is located at the first process tank opens up water outlet, the water outlet connects second processing tank by pipeline, the second processing tank side is fixed on the first processing pot sidewall, drainpipe is arranged in the lower end of the second processing tank.The purification water installations, structure is simple, and cost of investment is low, and purification efficiency is high, convenient for being widely popularized and using.

Description

A kind of purification water installations
Technical field
The utility model relates to refine the technical field of water installations, especially a kind of purification water installations.
Background technique
With the continuous development of society, people are more and more stronger for the dependence of water resource.The scarcity of water resource is also to work as The main problem of this life circle faced.People inject capital into one after another and technology is studied for the reconstruction of water resource.It uses at present In the device of Purified Water, structure is more complicated, and input cost is higher, and the efficiency of Purified Water is also to be improved.
Summary of the invention
Technical problem to be solved by the utility model is: providing one to solve the problems, such as above-mentioned background technique Kind purification water installations, structure is simple, and cost of investment is low, and purification efficiency is high, convenient for being widely popularized and using.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of purification water installations, have at first Tank is managed, the first process tank upper end vertically plugs water inlet pipe, and the upper end of first process tank is horizontally disposed with baffle, institute Sealing is set on water inlet pipe in the middle part of the baffle stated, and the peripherally disposed several spillway holes of the surrounding of the baffle are described The upper end of baffle be located at the side of the first process tank and open up water outlet, the water outlet connects second processing by pipeline Tank, the second processing tank side are fixed on the first processing pot sidewall, the lower end setting of the second processing tank Drainpipe.
It further explains, in above-mentioned technical proposal, cone cell water outlet is arranged in the water inlet pipe lower end;Such design The inflow of water inlet can be increased.
It further explains, in above-mentioned technical proposal, reflecting plate, the reflecting plate is plugged in the cone cell water outlet In umbrella-shaped structure;Slowly rise after can waste water being uniformly distributed in pond in this way along the entire cross-section of river.
It further explains, in above-mentioned technical proposal, the dirty pipe of pumping is vertically arranged on the first processing top tank structure, it is described The dirty pipe of pumping upper end pass through the first process tank upper end after connect pressure pump;Such design is for the ease of in the first process tank Sludge obtain quickly extract out remove.
It further explains, in above-mentioned technical proposal, is successively horizontally disposed with the in the second processing tank from top to bottom One filter layer, the second filter layer and third filter layer;Further filtering purification can be carried out to water source.
It further explains, in above-mentioned technical proposal, setting control water valve on the drainpipe;It can control water outlet Amount.
It further explains, in above-mentioned technical proposal, sealing cover is arranged in the upper end of first process tank;It reduces external The pollution of boundary's environment.
It further explains, in above-mentioned technical proposal, the pumping dirt pipe is fixed in the first process tank by fixing sleeve On wall;Guarantee to take out stability of the dirty pipe in normal course of operation.
The beneficial effects of the utility model are: the utility model proposes a kind of purification water installations, structure is simple, investment at This is low, and purification efficiency is high, convenient for being widely popularized and using.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments as described in this application, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the first processing upper end in the utility model.
Label in attached drawing are as follows: the 1, first process tank, 2, water inlet pipe, 3, baffle, 4, spillway hole, 5, water outlet, 6, pipeline, 7, second processing tank, 8, drainpipe, 9, cone cell water outlet, 10, reflecting plate, 11, the dirty pipe of pumping, 12, pressure pump, the 13, first filtering Layer, the 14, second filter layer, 15, third filter layer, 16, control water valve, 17, sealing cover, 18, fixing sleeve.
Specific embodiment
The technical issues of in order to keep the utility model solved, technical solution and beneficial effect are more clearly understood, below In conjunction with accompanying drawings and embodiments, the present invention will be further described in detail.It should be appreciated that specific implementation described herein Example is only used to explain the utility model, is not used to limit the utility model.
In the description of the present invention, it should be understood that term " side ", " other side ", " two sides ", " middle part ", The orientation or positional relationship of the instructions such as " inside ", " upper surface ", " lower end surface ", " top ", " lower part ", " top " is based on attached drawing Shown in orientation or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than indication or suggestion institute The device or element of finger must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to this reality With novel limitation.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is set Set ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can It, can also be indirectly connected through an intermediary to be to be connected directly.It for the ordinary skill in the art, can be specific Situation understands the concrete meaning of above-mentioned term in the present invention.
In this application, the first filter layer 13, the second filter layer 14 and third filter layer 15 can need to select according to market The secondary treatment at water source is carried out with bamboo-carbon layer, RO reflective coating, HEPA layers or high efficiency filter cotton etc.;Pressure pump 12 is also basis Concrete model is directly commercially installed and used.
What is seen figure 1 and figure 2 is a kind of purification water installations, has the first process tank 1, and 1 upper end of the first process tank is vertical Water inlet pipe 2 is plugged, the upper end of the first process tank 1 is horizontally disposed with baffle 3, seals and be set on water inlet pipe 2 in the middle part of baffle 3, baffle 3 The peripherally disposed several spillway holes 4 of surrounding, the side that the upper end of baffle 3 is located at the first process tank 1 opens up water outlet 5, Water outlet 5 connects second processing tank 7 by pipeline 6, and 7 side of second processing tank is fixed on 1 side wall of the first process tank, the Drainpipe 8 is arranged in the lower end of two process tanks 7.
Wherein, cone cell water outlet 9 is arranged in 2 lower end of water inlet pipe.Reflecting plate 10 is plugged in cone cell water outlet 9, reflecting plate 10 is in Umbrella-shaped structure.The dirty pipe 11 of pumping is vertically arranged on first process tank, 1 inner wall, the upper end for taking out dirty pipe 11 passes through 1 upper end of the first process tank Pressure pump 12 is connected afterwards.The first filter layer 13, the second filter layer 14 and the are successively horizontally disposed in second processing tank 7 from top to bottom Three filter layers 15.Setting control water valve 16 on drainpipe 8.Sealing cover 17 is arranged in the upper end of first process tank 1.Dirty pipe 11 is taken out to pass through Fixing sleeve 18 is fixed on 1 inner wall of the first process tank.
The use principle of the purification water installations is as follows:
Firstly, the direct duchy's water inlet pipe 2 of boiling water can be discharged into the first process tank 1 by operator, water inlet pipe 2 divides into umbrella Shape reflecting plate 10 slowly rises after being uniformly distributed waste water in the first process tank 1 along the entire cross-section of river, suspended substance sedimentation into Enter in the heavy bucket of 1 taper of the first process tank, from pond surrounding, peripherally overflow weir flows out primary water.Baffled 3 and scum trough before weir Guarantee effluent quality to retain dross.The dirty pipe 11 of pumping is set on one side inner wall of first process tank 1 to determine sludge by pressure pump 12 Phase discharge;Water Man Houcong spillway hole 4 overflows in first process tank 1, is discharged eventually by the water outlet 5 of 1 side wall of the first process tank; The water of discharge again passes by the three layer filtration in second processing tank 7, can quickly and effectively be filtered to water, and purification effect is improved Rate.
It is above-described, the only preferable specific embodiment of the utility model, but the protection scope of the utility model is simultaneously It is not limited to this, anyone skilled in the art within the technical scope disclosed by the utility model, according to this reality It is subject to equivalent substitution or change with novel technical solution and its utility model design, should all covers the protection in the utility model Within the scope of.

Claims (8)

1. a kind of purification water installations, it is characterised in that: have the first process tank, the first process tank upper end vertically plug into Water pipe, the upper end of first process tank are horizontally disposed with baffle, and sealing is set on water inlet pipe in the middle part of the baffle, described Baffle the peripherally disposed several spillway holes of surrounding, the side that the upper end of the baffle is located at the first process tank opens up Water outlet, the water outlet connect second processing tank by pipeline, and the second processing tank side is fixed at first It handles on pot sidewall, drainpipe is arranged in the lower end of the second processing tank.
2. a kind of purification water installations according to claim 1, it is characterised in that: the water inlet pipe lower end setting cone cell goes out The mouth of a river.
3. a kind of purification water installations according to claim 2, it is characterised in that: plug reflection in the cone cell water outlet Plate, the reflecting plate are in umbrella-shaped structure.
4. a kind of purification water installations according to claim 1, it is characterised in that: vertical on the first processing top tank structure Dirty pipe is taken out in setting, and the upper end of the dirty pipe of the pumping connects pressure pump after passing through the first process tank upper end.
5. a kind of purification water installations according to claim 1, it is characterised in that: in the second processing tank from top to bottom Successively it is horizontally disposed with the first filter layer, the second filter layer and third filter layer.
6. a kind of purification water installations according to claim 1, it is characterised in that: setting control water on the drainpipe Valve.
7. a kind of purification water installations according to claim 1, it is characterised in that: the upper end of first process tank is arranged Sealing cover.
8. a kind of purification water installations according to claim 4, it is characterised in that: the pumping dirt pipe is fixed by fixing sleeve On the first processing top tank structure.
CN201820940507.9U 2018-06-19 2018-06-19 A kind of purification water installations Expired - Fee Related CN208591628U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820940507.9U CN208591628U (en) 2018-06-19 2018-06-19 A kind of purification water installations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820940507.9U CN208591628U (en) 2018-06-19 2018-06-19 A kind of purification water installations

Publications (1)

Publication Number Publication Date
CN208591628U true CN208591628U (en) 2019-03-12

Family

ID=65601499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820940507.9U Expired - Fee Related CN208591628U (en) 2018-06-19 2018-06-19 A kind of purification water installations

Country Status (1)

Country Link
CN (1) CN208591628U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108525395A (en) * 2018-06-19 2018-09-14 长兴云腾新能源科技有限公司 A kind of refined water installations

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108525395A (en) * 2018-06-19 2018-09-14 长兴云腾新能源科技有限公司 A kind of refined water installations

Similar Documents

Publication Publication Date Title
CN208591628U (en) A kind of purification water installations
CN107352592A (en) Marble sewage disposal production line
CN203342463U (en) Advection sedimentation tank with oblique baffle plate
CN107344034A (en) A kind of double filtration tank of sewage disposal
CN206970342U (en) A kind of rapid integrated processing system of Tungsten smelting waste water
CN108525395A (en) A kind of refined water installations
CN201809191U (en) Automatic purifying device
CN205442828U (en) Oil removal scummer
CN204841189U (en) Rain water treatment facilities
CN203379708U (en) Device for purifying and recycling wastewater generated by stone cutting
CN209286778U (en) A kind of portable water treatment device
CN208553287U (en) A kind of Industrial Wastewater Treatment primary filter
CN208733787U (en) A kind of municipal drainage multiple filtration well lid
CN207525090U (en) A kind of rural household sewage disposal system
CN207243659U (en) Efficiently into the water treatment facilities of water filtration
CN207375906U (en) A kind of river water environment treatment device with artificial swamp
CN105880203A (en) Sandbag brick wash trough
CN204841190U (en) Rain water treatment facilities
CN206188551U (en) Intelligence integration rain water purifying equipment
CN205815245U (en) Plain type filter-cloth filtering device
CN217613113U (en) Blowdown sedimentation tank
CN205360823U (en) Minute -pressure washout type sinks husky filtration system facility
CN107601633A (en) A kind of settling tank that can filter sedimentation type pollutant
CN203342464U (en) Horizontal flow sedimentation tank with suction pipe and mud scraper
CN204619445U (en) The horizontal sedimentation tank that multiple bucket extracts simultaneously

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190312

CF01 Termination of patent right due to non-payment of annual fee