CN208581188U - A kind of solar energy photovoltaic panel roof fast integration installation system - Google Patents

A kind of solar energy photovoltaic panel roof fast integration installation system Download PDF

Info

Publication number
CN208581188U
CN208581188U CN201821069444.0U CN201821069444U CN208581188U CN 208581188 U CN208581188 U CN 208581188U CN 201821069444 U CN201821069444 U CN 201821069444U CN 208581188 U CN208581188 U CN 208581188U
Authority
CN
China
Prior art keywords
connecting pin
briquetting
hole
solar energy
photovoltaic panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821069444.0U
Other languages
Chinese (zh)
Inventor
章健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Sunshine Electric Communication Technology Co Ltd
Original Assignee
Xinjiang Sunshine Electric Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Sunshine Electric Communication Technology Co Ltd filed Critical Xinjiang Sunshine Electric Communication Technology Co Ltd
Priority to CN201821069444.0U priority Critical patent/CN208581188U/en
Application granted granted Critical
Publication of CN208581188U publication Critical patent/CN208581188U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model relates to the technical fields of solar energy photovoltaic panel installation, it is a kind of solar energy photovoltaic panel roof fast integration installation system, including solar energy photovoltaic panel, the first side briquetting equipped with through-hole, the second side briquetting equipped with through-hole, if the installation guide rail of mounting groove, heterotypic bolt, fixture nut, the solar energy photovoltaic panel includes left connecting pin, right connecting pin, left connecting pin and right connecting pin both ends are equipped with through-hole, left connecting pin is additionally provided with pairing slot, first in briquetting and second briquetting be equipped with link slot, the lower end of heterotypic bolt is identical as the installation inside dimension of guide rail, the utility model reasonable and compact in structure, mounting groove is sequentially passed through from installation guide rail interior by heterotypic bolt when use, the through-hole of right connecting pin, through-hole and the fixture nut cooperation of first side briquetting will install guide rail, right connecting pin, first side briquetting is fixed on Together, set-up time length, large labor intensity existing for existing photovoltaic board mounting assembly, ineffective is efficiently solved the problems, such as.

Description

A kind of solar energy photovoltaic panel roof fast integration installation system
Technical field
It is that a kind of solar energy photovoltaic panel roof quickly collects the utility model relates to the technical field of solar energy photovoltaic panel installation At installation system.
Background technique
Solar energy is important one of clean energy resource, but solar energy photovoltaic panel is mounted on the positions such as the top of building just more In preferably absorbing solar energy, existing solar energy photovoltaic panel is installed on a pack support, for it is light-duty or it is small-sized too It is positive can power generator, if one group or two groups of installation be clearly it is very uneconomic, in addition to this, solar energy photovoltaic panel during installation, It is generally fastened using multiple threaded connections, is punched if being mounted on roof by bolt, moisture can be made to enter the room even There is drainage, there is also the set-up time is long, inconvenient for operation and large labor intensity, installation effectiveness is low.
Summary of the invention
The utility model provides a kind of solar energy photovoltaic panel roof fast integration installation system, and which overcome above have technology Deficiency, efficiently solve set-up time length, large labor intensity, working efficiency existing for existing photovoltaic board mounting assembly Low problem.
The utility model is realized by following technical measures:
A kind of solar energy photovoltaic panel roof fast integration installation system, including solar energy photovoltaic panel, first equipped with through-hole While briquetting, equipped with through-hole second while briquetting, the installation guide rail equipped with mounting groove, heterotypic bolt, fixture nut, the solar energy Photovoltaic panel includes the left connecting pin and L-shaped right connecting pin in F type, and the both ends of the left connecting pin and right connecting pin are equipped with Through-hole, the left connecting pin further include pairing slot, and the left connecting pin is fixedly mounted on the left end of solar energy photovoltaic panel, the right side Connecting pin is fixedly mounted on the right end of solar energy photovoltaic panel, described first in briquetting and second briquetting be equipped with link slot, institute State first be connected by link slot with right connecting pin in briquetting and through-hole when first on briquetting and the through-hole on right connecting pin, Installation guide rail mounting groove coincide, second side briquetting be placed on left connecting pin by link slot block left connecting pin and Through-hole on second side briquetting coincides with the through-hole on left connecting pin, the mounting groove on installation guide rail, the heterotypic bolt from Installation guide rail interior sequentially passes through mounting groove, the through-hole of right connecting pin, the through-hole of the first side briquetting and fixture nut cooperation will peace Dress guide rail, right connecting pin, the first side briquetting are fixed together, and the heterotypic bolt sequentially passes through installation from installation guide rail interior Slot, the through-hole of left connecting pin, second are pressed when through-hole and the fixture nut cooperation of briquetting will install guide rail, left connecting pin, second Block is fixed together, and the lower end of the heterotypic bolt is identical as the installation inside dimension of guide rail, the adjacent solar energy photovoltaic panel it Between be connected by left connecting pin with right connecting pin, the right connecting pin is installed in the pairing slot on left connecting pin.
Here is the further optimization and/or improvement to above-mentioned utility model technical solution:
The fixture nut and first is equipped with rubber between briquetting in briquetting, second in one of the embodiments, Gasket.
The heterotypic bolt is T-bolt in one of the embodiments,.
The utility model reasonable and compact in structure sequentially passes through installation from installation guide rail interior by heterotypic bolt when use Slot, the through-hole of right connecting pin, first are pressed when through-hole and the fixture nut cooperation of briquetting will install guide rail, right connecting pin, first Block is fixed together, and heterotypic bolt sequentially passes through mounting groove, the through-hole of left connecting pin, the second side briquetting from installation guide rail interior Through-hole cooperates with fixture nut is fixed together installation guide rail, left connecting pin, the second side briquetting, special-shaped in fabrication design Being stuck on the inside of installation guide rail for bolt lower end, is not under heterotypic bolt when heterotypic bolt upper end is fastened by fixture nut Slipping phenomenon is held, guarantees the stability of solar energy photovoltaic panel installation, two pieces of adjacent solar energy photovoltaic panels pass through one block of solar energy The right connecting pin of photovoltaic panel is stuck in the pairing slot of adjacent one piece of solar energy photovoltaic panel, is sequentially staggered installation of with this, solar energy The both ends of volt plate are fixed on installation guide rail, are fixedly mounted on roof by that will install guide rail, are completed solar energy photovoltaic panel Installation, convenient and efficient, when encountering the rainy day, left connecting pin will appear a groove and deposit collection after being installed with right connecting pin Rainwater discharge, the utility model efficiently solves that the set-up time existing for existing photovoltaic board mounting assembly is long, labour Intensity is big, ineffective problem.
Detailed description of the invention
Attached drawing 1 is the optimum structure schematic diagram of the utility model.
Attached drawing 2 is the overlooking structure diagram of the utility model.
Attached drawing 3 is the left view structural representation of the utility model.
Attached drawing 4 is the portion A schematic enlarged-scale view in attached drawing 3.
Attached drawing 5 is the portion B schematic enlarged-scale view in attached drawing 3.
Attached drawing 6 is the portion C schematic enlarged-scale view in attached drawing 3.
Attached drawing 7 is that guide rail sectional view is installed in attached drawing 1.
Attached drawing 8 is solar energy photovoltaic panel structural schematic diagram in attached drawing 1.
Attached drawing 9 is solar energy photovoltaic panel top view in attached drawing 8.
Attached drawing 10 is the enlarged drawing of left connecting pin in attached drawing 8.
Attached drawing 11 is the first side briquette structure schematic diagram in attached drawing 1.
Attached drawing 12 is the second side briquette structure schematic diagram in attached drawing 1.
Coding in attached drawing is respectively as follows: 1 for solar energy photovoltaic panel, and 2 be through-hole, and 3 be the first side briquetting, and 4 press for the second side Block, 5 be mounting groove, and 6 be installation guide rail, and 7 be heterotypic bolt, and 8 be fixture nut, and 9 be left connecting pin, and 1 is right connecting pin, and 11 are Slot is matched, 12 be link slot, and 13 be rubber sheet gasket.
Specific embodiment
The utility model is not limited by the following example, can technical solution according to the present utility model and actual conditions Determine specific embodiment.
In the present invention, for ease of description, the description of the relative positional relationship of each component is according to specification What the Butut mode of attached drawing 1 was described, as: front, rear, top, and bottom, left and right positional relationship be according to Figure of description 1 Butut direction determines.
The utility model is further described below with reference to examples and drawings:
As shown in Fig. 1,2,3,4,5,6,7,8,9,10,11,12, a kind of solar energy photovoltaic panel roof fast integration installation system System, including solar energy photovoltaic panel 1, first equipped with through-hole 2 while briquetting 3, equipped with through-hole 2 second while briquetting 4, set mounting groove 5 Installation guide rail 6, heterotypic bolt 7, fixture nut 8, the solar energy photovoltaic panel 1 include in F type left connecting pin 9 with it is L-shaped Right connecting pin 10, the both ends of the left connecting pin 9 and right connecting pin 10 are equipped with through-hole 2, and the left connecting pin 9 further includes matching To slot 11, the left connecting pin 9 is fixedly mounted on the left end of solar energy photovoltaic panel 1, and the right connecting pin 10 is fixedly mounted on too It is positive can photovoltaic panel 1 right end, described first in briquetting 3 and second briquetting 4 be equipped with link slot 12, described 3 pieces of first side pressure It is connected by link slot 12 with right connecting pin 10 and the through-hole 2 on the through-hole 2 on the first side briquetting 3 and right connecting pin 10, peace The mounting groove 5 of dress guide rail 6 coincides, and second side briquetting 4, which is placed on left connecting pin 9, blocks left connection by link slot 12 Through-hole 2 on end 9 and the second side briquetting 4 coincides with the through-hole 2 on left connecting pin 9, the mounting groove 5 on installation guide rail 6, described Heterotypic bolt 7 sequentially passes through the through-hole 2 of mounting groove 5, the through-hole 2 of right connecting pin 10, the first side briquetting 3 inside installation guide rail 6 Installation guide rail 6, right connecting pin 10, the first side briquetting 3 are fixed together with the cooperation of fixture nut 8, the heterotypic bolt 7 is from peace Mounting groove 5, the through-hole 2 of left connecting pin 9, the through-hole 2 of the second side briquetting 4 and fixture nut 8 is sequentially passed through inside dress guide rail 6 to cooperate Installation guide rail 6, left connecting pin 9, the second side briquetting 4 are fixed together, lower end and the installation guide rail 6 of the heterotypic bolt 7 Inside dimension is identical, is connected by left connecting pin 9 with right connecting pin 10 between two pieces of solar energy photovoltaic panels 1, the right company End 10 is connect to be installed in the pairing slot 11 on left connecting pin 9.
The utility model reasonable and compact in structure sequentially passes through peace inside installation guide rail 6 by heterotypic bolt 7 when use Tankage 5, the through-hole 2 of right connecting pin 10, the through-hole 2 of the first side briquetting 3 and the cooperation of fixture nut 8 will install guide rail 6, right connecting pin 10, the first side briquetting 3 is fixed together, and heterotypic bolt 7 sequentially passes through mounting groove 5, left connecting pin 9 inside installation guide rail 6 The briquetting 4 when through-hole 2 and fixture nut 8 cooperation of briquetting 4 will install guide rail 6, left connecting pin 9, second of through-hole 2, second is fixed Together, in fabrication design, 7 lower end of heterotypic bolt is stuck in 6 inside of installation guide rail, passes through fixation in 7 upper end of heterotypic bolt Nut 8 is not in 7 lower end rotation phenomenon of heterotypic bolt when fastening, and guarantees the stability that solar energy photovoltaic panel 1 is installed, adjacent Two pieces of solar energy photovoltaic panels 1 are stuck in adjacent one piece of solar energy photovoltaic panel 1 by the right connecting pin 10 of one piece of solar energy photovoltaic panel 1 It matches in slot 11, is sequentially staggered installation of with this, the both ends of solar energy photovoltaic panel 1 are fixed on installation guide rail 6, are led by that will install Rail 6 is fixedly mounted on roof, completes the roof installation of solar energy photovoltaic panel 1, convenient and efficient, when encountering the rainy day, left connection End 9 will appear the rainwater that a groove deposits collection and be discharged after being installed with right connecting pin 10, the utility model effectively solves Set-up time length, large labor intensity, ineffective problem existing for existing 1 mounting device of solar energy photovoltaic panel.
It can be further to a kind of above-mentioned solar energy photovoltaic panel roof fast integration installation system progress according to actual needs Optimization or/and improvement:
As shown in Figure 1, the fixture nut 8 and first is equipped with rubber sheet gasket 13 between briquetting 4 in briquetting 3, second. Here setting rubber sheet gasket 13 be in order to enable fixture nut 8 and first fastened between briquetting 4 in briquetting 3, second it is more stable.
As shown in Figure 1, the heterotypic bolt 7 is T-bolt.
The above technical characteristic constitutes the optimal embodiment of the utility model, with stronger adaptability and optimal reality Effect is applied, non-essential technical characteristic can be increased or decreased, according to actual needs to meet the needs of different.

Claims (3)

1. a kind of solar energy photovoltaic panel roof fast integration installation system, which is characterized in that including solar energy photovoltaic panel, be equipped with and lead to The first of hole while briquetting, equipped with through-hole second while briquetting, the installation guide rail equipped with mounting groove, heterotypic bolt, fixture nut, institute Stating solar energy photovoltaic panel includes the left connecting pin and L-shaped right connecting pin in F type, the left connecting pin and the two of right connecting pin End is equipped with through-hole, and the left connecting pin further includes pairing slot, and the left connecting pin is fixedly mounted on a left side for solar energy photovoltaic panel End, the right connecting pin are fixedly mounted on the right end of solar energy photovoltaic panel, described first when briquetting is with second briquetting be equipped with Link slot, described first is connected by link slot with right connecting pin and through-hole and right connecting pin when first on briquetting in briquetting On through-hole, install guide rail mounting groove coincide, second side briquetting is placed on left connecting pin and is blocked by link slot Through-hole on left connecting pin and the second side briquetting coincides with the through-hole on left connecting pin, the mounting groove on installation guide rail, described Heterotypic bolt sequentially passes through the through-hole and fixed spiral shell of mounting groove, the through-hole of right connecting pin, the first side briquetting from installation guide rail interior Installation guide rail, right connecting pin, the first side briquetting are fixed together by mother's cooperation, the heterotypic bolt from installation guide rail interior successively Across mounting groove, the through-hole of left connecting pin, the through-hole of the second side briquetting and fixture nut cooperation will installation guide rail, left connecting pin, Second side briquetting is fixed together, and the lower end of the heterotypic bolt is identical as the installation inside dimension of guide rail, the adjacent solar energy It is connected by left connecting pin with right connecting pin between photovoltaic panel, the right connecting pin is installed on the pairing slot on left connecting pin It is interior.
2. a kind of solar energy photovoltaic panel roof fast integration installation system according to claim 1, which is characterized in that described Fixture nut and first is equipped with rubber sheet gasket between briquetting in briquetting, second.
3. a kind of solar energy photovoltaic panel roof fast integration installation system according to claim 1 or 2, which is characterized in that The heterotypic bolt is T-bolt.
CN201821069444.0U 2018-07-06 2018-07-06 A kind of solar energy photovoltaic panel roof fast integration installation system Expired - Fee Related CN208581188U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821069444.0U CN208581188U (en) 2018-07-06 2018-07-06 A kind of solar energy photovoltaic panel roof fast integration installation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821069444.0U CN208581188U (en) 2018-07-06 2018-07-06 A kind of solar energy photovoltaic panel roof fast integration installation system

Publications (1)

Publication Number Publication Date
CN208581188U true CN208581188U (en) 2019-03-05

Family

ID=65509949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821069444.0U Expired - Fee Related CN208581188U (en) 2018-07-06 2018-07-06 A kind of solar energy photovoltaic panel roof fast integration installation system

Country Status (1)

Country Link
CN (1) CN208581188U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114244266A (en) * 2021-12-24 2022-03-25 浙江宝利特新能源股份有限公司 Detachable structure for constructing tile type photovoltaic module and photovoltaic module

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114244266A (en) * 2021-12-24 2022-03-25 浙江宝利特新能源股份有限公司 Detachable structure for constructing tile type photovoltaic module and photovoltaic module
CN114244266B (en) * 2021-12-24 2023-08-22 浙江宝利特新能源股份有限公司 Detachable structure for constructing tile type photovoltaic module and photovoltaic module

Similar Documents

Publication Publication Date Title
CN207442750U (en) A kind of architecture-integral roof electricity generation system
CN201936895U (en) Installing bracket for solar cell panel
CN208581188U (en) A kind of solar energy photovoltaic panel roof fast integration installation system
CN202042496U (en) Guide rail connecting device
CN208272919U (en) Novel photovoltaic cell module's frame structure and photovoltaic cell module
CN102867867B (en) Support system for installing solar photovoltaic panel component
CN209517000U (en) A kind of fixed device of new energy photovoltaic plant
CN115071899B (en) Floating structure of water surface photovoltaic power station and construction process thereof
CN207782738U (en) Solar photovoltaic battery component fixed structure
CN207835383U (en) A kind of purlin photovoltaic module support
CN208441539U (en) A kind of photovoltaic power generation bicycle shed
CN202049963U (en) Solar cell panel mounting component
CN209358489U (en) Photovoltaic panel mounting assembly
CN208669783U (en) Briquetting is used in a kind of solar bracket and guiding gutter installation
CN208862795U (en) A kind of foldable photovoltaic module
CN209571981U (en) Photovoltaic support structure lower guide rail structure
CN203747729U (en) Novel photovoltaic support clamp
CN220307134U (en) Integrated stamping forming battery plate fixing device suitable for industrial and commercial roofs and flat roofs
CN112865674A (en) Photovoltaic bracket system with V-shaped supports for inclined beam and foundation
CN219351582U (en) Photovoltaic board coupling assembling convenient to quick connect
CN205647381U (en) Photovoltaic cell board subassembly fixed mounting device
CN211239745U (en) Photovoltaic mounting system convenient to installation
CN216340528U (en) Mounting structure of roof photovoltaic support
CN203617958U (en) Portable roof photovoltaic assembly support structure
CN210137298U (en) Roofing photovoltaic support mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190305

CF01 Termination of patent right due to non-payment of annual fee