CN208578053U - Construction of hydro project waterwall - Google Patents

Construction of hydro project waterwall Download PDF

Info

Publication number
CN208578053U
CN208578053U CN201820980882.6U CN201820980882U CN208578053U CN 208578053 U CN208578053 U CN 208578053U CN 201820980882 U CN201820980882 U CN 201820980882U CN 208578053 U CN208578053 U CN 208578053U
Authority
CN
China
Prior art keywords
column
water fender
construction
hydro project
waterwall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201820980882.6U
Other languages
Chinese (zh)
Inventor
王守雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shuifa Jinshui Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820980882.6U priority Critical patent/CN208578053U/en
Application granted granted Critical
Publication of CN208578053U publication Critical patent/CN208578053U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of construction of hydro project waterwalls, including multiple columns equidistantly arranged, before the top of the column, there are two fixation holes for setting afterwards, anchor pole is combined with by the fixation hole, the lower end of anchor pole is drilled into riverbed after being passed down through the column, the depth pierced is greater than 200cm, limited block is welded in the upper end of the anchor pole, the limited block limit is at the top position of the column, the width of limited block is greater than the diameter of the fixation hole, slot there are four being symmetrical arranged at the left and right sides position of the column, water fender and breast boards are combined with by the slot between the two neighboring column, the water fender is set to the side towards river water, the filled cavity of a filling is formed between the water fender and the breast boards, the water fender is laminated with muti-piece;The present apparatus has enough water-retaining capacities convenient for assembling.

Description

Construction of hydro project waterwall
Technical field
The utility model relates to a kind of construction of hydro project waterwalls.
Background technique
When carrying out construction of hydro project, need to carry out construction point waterproofing protection, existing mode is mainly using gear Waterwall, waterwall in the prior art steel plate with more root posts form, and difficulty when assembled is larger, and steel plate needs The pressure of water is born, therefore the design thickness of steel plate is larger, causes the quality of monolithic steel plate excessively big, further increases installation On difficulty.
Based on the above issues, it is desirable to provide one kind is convenient for assembling, and the construction of hydro project with enough water-retaining capacities Use waterwall.
Utility model content
The technical problem to be solved by the utility model is to provide one kind convenient for assembling, and with enough water-retaining capacities Construction of hydro project waterwall.
The utility model is achieved through the following technical solutions:
A kind of construction of hydro project waterwall, including multiple columns equidistantly arranged, the top of the column is forward and backward to be set Fixation hole there are two setting, is combined with anchor pole by the fixation hole, the lower end of anchor pole is drilled into river after being passed down through the column In bed, the depth pierced is greater than 200cm, is welded with limited block in the upper end of the anchor pole, the limited block limit is described vertical At the top position of column, the width of limited block is greater than the diameter of the fixation hole, at the left and right sides position of the column pair Claiming setting, there are four slots, are combined with water fender and breast boards by the slot between the two neighboring column, described Water fender is set to the side towards river water, and the filling of a filling is formed between the water fender and the breast boards Chamber is filled primarily with soil and stone in filled cavity, can gather materials on the spot, by the filling of stone and soil, can increase water blocking The ability of anti-deformation of plate, while increasing the self weight of the present apparatus, increase stress-bearing capability, the water fender is laminated with muti-piece.
Preferably, the column is stainless steel material.
Preferably, the height of every piece of water fender is 40cm ~ 60cm.
Preferably, the upper end surface of the water fender is provided with card slot, the bottom of the water fender is provided with insertion It is formed and is sealed after the strip of the card slot, the strip and card slot cooperation, card slot, Ke Yizeng are cooperated by setting strip Add leakproofness, reducing infiltration may.
Preferably, the breast boards is a frame shape, has an earth-retaining net in the interior welds of the breast boards, by set Earth-retaining net can reduce the self weight of breast boards, while earth-retaining net can also observe the filling situation of inside stuffing.
Preferably, the mesh aperture of the earth-retaining net is 30 ~ 60 mesh.
Preferably, it is welded with wrapping post in the upper end of the column, the wrapping post has winding slot, in two neighboring institute It states and wirerope is combined with by the wrapping post between column.
Preferably, by obtaining after three strands or more of steel wire spiral winding, the single gauge of wire is the wirerope 0.8mm~1.55mm。
Preferably, the water fender be steel plate, the water fender with a thickness of 15mm ~ 25mm.
The installation steps of the present apparatus are as follows:
The spacing between column is determined first, then positioning vertical column, squeezed into anchor pole in river by piling machine, so that Column is fixed, and after the completion of column is fixed, water fender and breast boards is inserted into, after insertion, pass through institute between multiple columns The cofferdam that water fender forms a water proof is stated, filler is filled to filled cavity at this time, after the completion of filling, then passes through water pumper By the water extraction in cofferdam, that is, complete installation.
The beneficial effects of the utility model are: the present apparatus is after installation is complete, water blocking can be realized by water fender, realized The blocking of water is allowed by the cooperation of breast boards and water fender and is filled stone, soil, sand etc. in the side of backwater and fill out It fills object to be supported, increases the ability of anti-deformation and stress-bearing capability of water fender, increase the stability of the present apparatus, the structure of the present apparatus Relatively simple, use is more firm, and it is more convenient to install, and is suitble to promote the use of.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the top view of the utility model;
Fig. 2 is the side view of column;
Fig. 3 is the main view of water fender;
Fig. 4 is the side view of water fender;
Fig. 5 is the main view of breast boards;
Fig. 6 is the usage state diagram of the utility model.
Specific embodiment
All features disclosed in this specification or disclosed all methods or in the process the step of, in addition to mutually exclusive Feature and/or step other than, can combine in any way.
Any feature disclosed in this specification (including any accessory claim, abstract and attached drawing), except non-specifically chatting It states, can be replaced by other alternative features that are equivalent or have similar purpose.That is, unless specifically stated, each feature is only It is an example in a series of equivalent or similar characteristics.
In the description of the present invention, it should be understood that term " one end ", " other end ", " outside ", "upper", " interior The orientation or positional relationship of the instructions such as side ", "horizontal", " coaxial ", " center ", " end ", " length ", " outer end " is based on attached drawing Shown in orientation or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than indication or suggestion institute The device or element of finger must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to this reality With novel limitation.
In addition, in the description of the present invention, the meaning of " plurality " is at least two, such as two, three etc., unless Separately there is clearly specific restriction.
In the present invention unless specifically defined or limited otherwise, term " setting ", " connection ", " passes through at " socket " Wear ", the terms such as " grafting " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral; It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, can also indirectly connected through an intermediary, it can be with It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly.For this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
A kind of construction of hydro project waterwall as shown in Figures 1 to 6, it is described including multiple columns 1 equidistantly arranged There are two fixation holes 101 for the forward and backward setting in the top of column 1, are combined with anchor pole 2, the lower end of anchor pole 2 by the fixation hole 101 It is drilled into riverbed after being passed down through the column 1, the depth pierced is greater than 200cm, and in the upper end of the anchor pole 2, welding is limited Position block 201, at the top position of the column 1, the width of limited block 201 is greater than the fixation for the limit of limited block 201 The diameter in hole 101 is symmetrical arranged there are four slot 102, two neighboring described vertical at the left and right sides position of the column 1 Water fender 3 and breast boards 4 are combined with by the slot 102 between column 1, the water fender 3 is set to the side towards river water, The filled cavity 8 that a filling is formed between the water fender 3 and the breast boards 4, be filled primarily in filled cavity soil and Stone can gather materials on the spot, and by the filling of stone and soil, can increase the ability of anti-deformation of water fender, while increase this The self weight of device, increases stress-bearing capability, and the water fender 3 is laminated with muti-piece.
A preferred embodiment in the utility model, the column 1 are stainless steel material.
A preferred embodiment in the utility model, the height of every piece of water fender 3 are 50cm.
A preferred embodiment in the utility model is provided with card slot 331 in the upper end surface of the water fender 3, The bottom of the water fender 3 is provided with the strip 332 for being embedded in the card slot 331, and the strip 332 is matched with the card slot 331 Sealing is formed after conjunction, and card slot is cooperated by setting strip, can increase leakproofness, reducing infiltration may.
A preferred embodiment in the utility model, the breast boards 4 is a frame shape, in the inside of the breast boards 4 It is welded with an earth-retaining net 444, the self weight of breast boards can be reduced by set earth-retaining net, while earth-retaining net can also be observed The filling situation of inside stuffing.
A preferred embodiment in the utility model, the mesh aperture of the earth-retaining net 444 are 40 mesh.
A preferred embodiment in the utility model is welded with wrapping post 5, the coiling in the upper end of the column 1 Column 5 has winding slot 511, is combined with wirerope 512 by the wrapping post 5 between the two neighboring column 1.
A preferred embodiment in the utility model, the wirerope 512 obtain after being wound by 4 strands of steel wire spirals, single Gauge of wire described in root is 0.8mm.
A preferred embodiment in the utility model, the water fender 3 be steel plate, the water fender 3 with a thickness of 20mm。
The installation steps of the present apparatus are as follows:
The spacing between column is determined first, then positioning vertical column, squeezed into anchor pole in river by piling machine, so that Column is fixed, and after the completion of column is fixed, water fender and breast boards is inserted into, after insertion, pass through institute between multiple columns The cofferdam that water fender forms a water proof is stated, filler is filled to filled cavity at this time, after the completion of filling, then passes through water pumper By the water extraction in cofferdam, that is, complete installation.
The beneficial effects of the utility model are: the present apparatus is after installation is complete, water blocking can be realized by water fender, realized The blocking of water is allowed by the cooperation of breast boards and water fender and is filled stone, soil, sand etc. in the side of backwater and fill out It fills object to be supported, increases the ability of anti-deformation and stress-bearing capability of water fender, increase the stability of the present apparatus, the structure of the present apparatus Relatively simple, use is more firm, and it is more convenient to install, and is suitble to promote the use of.
Above description is only a specific implementation of the present invention, but the protection scope of the utility model is not limited to In this, any change or replacement expected without creative work be should be covered within the scope of the utility model. Therefore, the protection scope of the utility model should be determined by the scope of protection defined in the claims.

Claims (9)

1. a kind of construction of hydro project waterwall, it is characterised in that: including multiple columns equidistantly arranged, the top of the column There are two fixation holes for the forward and backward setting in portion, anchor pole are combined with by the fixation hole, after the lower end of anchor pole is passed down through the column It is drilled into riverbed, the depth pierced is greater than 200cm, is welded with limited block, the limited block limit in the upper end of the anchor pole At the top position of the column, the width of limited block is greater than the diameter of the fixation hole, in the left and right sides of the column Slot there are four being symmetrical arranged at position, is combined with water fender and earth-retaining by the slot between the two neighboring column Plate, the water fender are set to the side towards river water, form a filling between the water fender and the breast boards and use Filled cavity, the water fender is laminated with muti-piece.
2. construction of hydro project waterwall according to claim 1, it is characterised in that: the column is stainless steel Matter.
3. construction of hydro project waterwall according to claim 1, it is characterised in that: the height of every piece of water fender For 40cm ~ 60cm.
4. construction of hydro project waterwall according to claim 1, it is characterised in that: in the upper surface of the water fender Place is provided with card slot, and the strip for being embedded in the card slot, the strip and the card slot are provided in the bottom of the water fender Sealing is formed after cooperation.
5. construction of hydro project waterwall according to claim 1, it is characterised in that: the breast boards is a frame shape, There is an earth-retaining net in the interior welds of the breast boards.
6. construction of hydro project waterwall according to claim 1, it is characterised in that: the mesh aperture of the earth-retaining net For 30 ~ 60 mesh.
7. construction of hydro project waterwall according to claim 1, it is characterised in that: welded in the upper end of the column There is wrapping post, the wrapping post has winding slot, is combined with steel wire by the wrapping post between the two neighboring column Rope.
8. construction of hydro project waterwall according to claim 7, it is characterised in that: the wirerope is by three strands or more Steel wire spiral winding after obtain, the single gauge of wire be 0.8mm ~ 1.55mm.
9. construction of hydro project waterwall according to claim 1, it is characterised in that: the water fender is steel plate, institute State water fender with a thickness of 15mm ~ 25mm.
CN201820980882.6U 2018-06-25 2018-06-25 Construction of hydro project waterwall Withdrawn - After Issue CN208578053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820980882.6U CN208578053U (en) 2018-06-25 2018-06-25 Construction of hydro project waterwall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820980882.6U CN208578053U (en) 2018-06-25 2018-06-25 Construction of hydro project waterwall

Publications (1)

Publication Number Publication Date
CN208578053U true CN208578053U (en) 2019-03-05

Family

ID=65509307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820980882.6U Withdrawn - After Issue CN208578053U (en) 2018-06-25 2018-06-25 Construction of hydro project waterwall

Country Status (1)

Country Link
CN (1) CN208578053U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030873A (en) * 2020-07-22 2020-12-04 山东海建水利工程有限公司 Soil retaining device for hydraulic engineering and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030873A (en) * 2020-07-22 2020-12-04 山东海建水利工程有限公司 Soil retaining device for hydraulic engineering and using method thereof
CN112030873B (en) * 2020-07-22 2024-05-17 山东海建水利工程有限公司 Soil retaining device for hydraulic engineering and application method thereof

Similar Documents

Publication Publication Date Title
CN105297704B (en) A kind of electric osmose strengthens stake reinforcing flexible foundation device and construction method
CN203200747U (en) Cast-in-place pile applicable to karst cave geology
CN208578053U (en) Construction of hydro project waterwall
CN103628571B (en) Beam-column joint for reverse construction method and construction method
CN104863177A (en) Composite retaining wall structure and construction method thereof
RU188394U1 (en) REINFORCED CONSTRUCTION FROM GABIONS
CN208669283U (en) A kind of corrosion-proof high-temp sand screen
CN202706023U (en) Anchor body sealing structure for connecting frame beam and anchor rod
CN213683316U (en) Wall post reinforced structure of existing building
CN204780990U (en) Combined type retaining wall structure
CN104863406A (en) Arranging method of support used for solar panel bracket based on pouring impact mode
CN204919627U (en) Frame -type insulation blocking system
CN203742020U (en) Novel frame wall structure
CN107964975B (en) Construction method of PBL (Poly-p-phenylene benzobisoxazole) shear force key connection structure of steel pipe composite pile and bearing platform
CN110219657A (en) Processing method after the main tunnel large deformation of coal measure strata tunnel
CN109750680A (en) A kind of earth-retaining net and friction pile-earth-retaining net combine retaining system
CN215715493U (en) Pile foundation in water
CN213390159U (en) Foundation pit construction supports reinforced structure
CN211143100U (en) Double steel-pipe pile cofferdam structure of coastal soft soil foundation
CN108221971A (en) For the cotton stalk supporting construction of cement mixing method
CN209114478U (en) A kind of composite anchor pole foundation pit enclosing structure
CN110805060B (en) Base structure for stay wire of stay wire tower and stay wire fixing method
CN210562020U (en) Composite foundation adds muscle anchor rockfill retaining wall structure
CN208917821U (en) The shoe of oscillatory type board-plugging device and plastic draining board insert mechanism
CN206220099U (en) For the slope retaining device of solution cavity fluid bowl

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200107

Address after: 272000 9 / F, block B, Xincheng development building, Beihu provincial tourist resort, Jining City, Shandong Province

Patentee after: Shuifa Jinshui Construction Engineering Co.,Ltd.

Address before: Taibai building 272000 west of Shandong Province, Jining City No. 191

Patentee before: Wang Shoulei

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20190305

Effective date of abandoning: 20230531

AV01 Patent right actively abandoned

Granted publication date: 20190305

Effective date of abandoning: 20230531

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned