CN208563528U - Kitchen ground behind a kind of ground and food and drink with discharge structure - Google Patents

Kitchen ground behind a kind of ground and food and drink with discharge structure Download PDF

Info

Publication number
CN208563528U
CN208563528U CN201820657934.6U CN201820657934U CN208563528U CN 208563528 U CN208563528 U CN 208563528U CN 201820657934 U CN201820657934 U CN 201820657934U CN 208563528 U CN208563528 U CN 208563528U
Authority
CN
China
Prior art keywords
sink
cement mortar
ground
discharge structure
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820657934.6U
Other languages
Chinese (zh)
Inventor
郭广超
曹拴强
吴迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shuyun Oriental Decorative Engineering Co Ltd
Original Assignee
Beijing Shuyun Oriental Decorative Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shuyun Oriental Decorative Engineering Co Ltd filed Critical Beijing Shuyun Oriental Decorative Engineering Co Ltd
Priority to CN201820657934.6U priority Critical patent/CN208563528U/en
Application granted granted Critical
Publication of CN208563528U publication Critical patent/CN208563528U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model relates to Building technologies to make field; specifically disclose kitchen ground after a kind of ground with discharge structure and food and drink; the ground with discharge structure includes the cement mortar screeding layer, the first waterproof layer and the first cement mortar protective course being successively set on original building floor from the bottom to top; the ground with discharge structure further include: sink is located above the first cement mortar protective course;Extruded sheet layer positioned at the two sides of sink, and is located on the first cement mortar protective course;Gap is equipped between extruded sheet layer and sink;Filled media is filled in gap;Drainpipe is connect and between the first cement mortar protective course and extruded sheet layer with sink;Floor layer is located above filled media, and its upper surface is not less than the upper surface of sink.It is filled by using extruded sheet, floor load-bearing can be reduced;Construction is simple is quick, not will lead to fugitive dust also, after construction without etc. it is to be dried can directly carry out next step construction, substantially increase construction efficiency.

Description

Kitchen ground behind a kind of ground and food and drink with discharge structure
Technical field
The utility model relates to kitchen ground after building field more particularly to a kind of ground and food and drink with discharge structure.
Background technique
In daily life, the ground of many occasions needs to do discharge structure, such as the rear kitchen of catering industry, factory floor Deng.
By taking the rear kitchen of catering industry as an example, the rear kitchen ground surface finishing engineering of catering industry can be divided into two kinds at present.The first: Screed-coat is set on original structure flooring, first of waterproof and protective layer are laid on screed-coat, coagulation is set on the protection layer Soil ditch, concrete ground ditch are in the milk to be formed by formwork, are then laid with drainpipe, and the two sides and lower section of concrete trench are being protected Haydite is filled on layer, forms haydite layer, and cement sand bed, second waterproof and protective layer and dry sand are set gradually on haydite layer Grieshoch;And it is laid with floor tile on dry husky grieshoch, it is flushed at the top of floor tile and concrete trench.Second and the knot of the first Structure is essentially identical, and difference is to be needed when using stainless steel trench in trench area with stainless steel trench substitution concrete trench The two sides in domain build ground beam in advance, one of waterproof layer are arranged in ground beam, and stainless steel trench needs ready-made punching, to even Run in water pipe, while breaking sealant in junction.
Above two way, working procedure all very complicateds, and wet way is more, causes construction period longer;Adopt It is filled with ceramsite material, haydite layer occupies the larger specific gravity of ground structure overall weight, causes floor load-bearing to increase, together When, ceramsite material itself and not environmentally causes worker's site operation environment poor, in subsequent dismounting renovation, also results in Building waste is more.For the first way, due to using concrete trench, form erecting operation needs professional that could complete, And concrete material is used, daily cleaning is difficult in maintenance.For second of way, drainpipe and stainless steel trench directly connect It connects, there are leakage hidden troubles.
Therefore, kitchen ground is after needing a kind of ground with discharge structure and food and drink to solve the above problems.
Utility model content
One purpose of the utility model is: a kind of ground with discharge structure is provided, to solve in the prior art Ground with discharge structure is filled using ceramsite material, and haydite layer occupies the larger ratio of ground structure overall weight Weight causes floor load-bearing to increase and ceramsite material itself and not environmentally, causes worker's site operation environment poor, subsequent Dismounting renovation when, also result in the more problem of building waste.
Another purpose of the utility model is: kitchen ground after a kind of food and drink is provided, to solve food and drink in the prior art Kitchen ground is filled using ceramsite material afterwards, and haydite layer occupies the larger specific gravity of ground structure overall weight, leads to floor Load-bearing increases and ceramsite material itself and not environmentally, causes worker's site operation environment poor, in subsequent dismountings renovation When, also result in the more problem of building waste.
On the one hand, the utility model provides a kind of ground with discharge structure, and there is the ground of discharge structure to include for this Cement mortar screeding layer, the first waterproof layer and the protection of the first cement mortar being successively set on original building floor from the bottom to top Layer, which is characterized in that the ground with discharge structure further include:
Sink is located above first cement mortar protective course;
Extruded sheet layer positioned at the surrounding of the sink, and is located on first cement mortar protective course;The extruded sheet Gap is equipped between layer and the sink;
Filled media is filled in the gap;
Drainpipe is connect and between first cement mortar protective course and the extruded sheet layer with the sink;
Floor layer is located above the extruded sheet layer, and its upper surface is not less than the upper surface of the sink.
Preferably, the sink uses stainless steel material, the sink is connected with the drainpipe by adapter.
Preferably, the ground with discharge structure further includes sink bracket, the sink passes through the sink branch Frame is set up in above first cement mortar protective course, and the sink bracket is fixed in first cement mortar protective course On.
Preferably, the ground with discharge structure further includes between the floor layer and the extruded sheet layer And the second cement mortar protective course, the second waterproof layer and the third cement mortar protective course set gradually from the bottom to top, described One end of two waterproof layers connects with the side wall of the sink.
Preferably, the ground with discharge structure further includes steel wire, the steel wire is located at second water Between cement mortar protective layer and the extruded sheet layer and the filled media.
Preferably, the sink includes water trough body and trough rim, the trough rim it is horizontally disposed and with the water trough body The side wall of notch position surrounding connects, and the steel wire includes the first face and the second face, and first face is laid in the extrusion molding On plate layer and the filled media, second face is vertically arranged with first face and its one end position far from first face In the lower section of the trough rim.
Preferably, the floor layer includes doing husky grieshoch and the floor on the dry husky grieshoch, the floor Upper surface is not less than the upper surface of the sink.
Preferably, the filled media is cement mortar.
On the other hand, the utility model provides kitchen ground after a kind of food and drink, including having described in any of the above-described scheme The ground of discharge structure.
The utility model has the following beneficial effects: by the way that extruded sheet layer is arranged between the first waterproof protective layer and floor layer, Haydite in the prior art is substituted as filler using extruded sheet, extruded sheet it is light-weight, floor load-bearing can be reduced;Construction letter It is single quick, while being also convenient for removing, work progress not will lead to fugitive dust also, the operating environment of construction personnel can be significantly improved, Meanwhile next step construction can be directly carried out without waiting for drying after construction, substantially increase construction efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram on the ground in the utility model embodiment with discharge structure;
Fig. 2 is the structural schematic diagram of sink and steel wire in the ground for have shown in Fig. 1 discharge structure.
In figure:
1, cement mortar screeding layer;
2, the first waterproof layer;
3, the first cement mortar protective course;
4, sink;41, water trough body;42, trough rim;
5, sink bracket;
6, extruded sheet layer;
7, filled media;
8, steel wire;81, the first face;82, the second face;
9, the second cement mortar protective course;
10, the second waterproof layer;
11, third cement mortar protective course;
12, floor layer;121, husky grieshoch is done;122, floor;
13, original building floor.
Specific embodiment
Further illustrate the technical solution of the utility model below with reference to the accompanying drawings and specific embodiments.
As depicted in figs. 1 and 2, the present embodiment provides a kind of ground with discharge structure, including successively set from the bottom to top Cement mortar screeding layer 1, the first waterproof layer 2 and the first cement mortar protective course 3, the cement mortar screeding layer 1 set are laid on original On building floor 13, with a thickness of 20mm or so, the flatness error of upper surface and horizontal plane is less than or equal to 3mm, can be with The phenomenon of 13 surface irregularity of original building floor or skew is solved, and guarantees the levelness of subsequent construction.First waterproof layer, 2 He First cement mortar protective course 3 with a thickness of 20mm or so, wherein the material of the first waterproof layer 2 be polypropylene fibre, can be to avoid the tool There is a ground leak of discharge structure, the first cement mortar protective course 3 can prevent for protecting to the first waterproof layer 2 One waterproof layer 2 is damaged and leads to the problem of being easy leak, it should be noted that the present embodiment is not to the first waterproof layer 2 Material is defined, or other waterproof materials, such as JS water-repellent paint etc.;The upper table of first cement mortar protective course 3 The flatness of face and horizontal plane is likewise not greater than 3mm;The ingredient of cement mortar in the present embodiment is cement: yellow sand: water =1:3:1.
The ground with discharge structure further includes sink 4, sink bracket 5, drainpipe and extruded sheet layer 6, sink branch The quantity of frame 5 is two groups, and is each attached on the first cement mortar protective course 3, the sink of the use stainless steel material of sink 4, two Group sink bracket 5 is supported sink 4 from the two sides in 4 groove width direction of sink, and the lower surface of sink 4 is made to be higher than the first cement The upper surface of mortar cover 3.Extruded sheet layer 6 is laid on the upper surface of the first cement mortar protective course 3, extruded sheet layer 6 it is upper Surface is higher than the lower surface of sink 4, and gap is equipped between extruded sheet layer 6 and sink 4, which is 80mm~100mm.? Filled media 7 is filled in the gap, the upper surface of filled media 7 and the upper surface of extruded sheet layer 6 flush, it is possible to understand that It is that the filled media 7 also fills up the gap between sink 4 and the first cement mortar protective course 3, filled media 7 can be passed through Sink 4 is further supported, sink bracket 5 is similarly positioned in filled media 7 close to one end of the first cement mortar protective course 3 It is interior, sink bracket 5 is further fixed by filled media 7.The material of drainpipe is PVC, is located at the first cement mortar Between protective layer 3 and extruded sheet layer 6, one end is connect by adapter with sink 4, and adapter is stainless steel-PVC adapter, It is connected by adapter, it can be to avoid the interface leak of drainpipe and sink 4.It should be noted that being filled in the present embodiment Medium 7 is cement mortar, naturally it is also possible to be other media, such as dry husky ash.
In the present embodiment, extruded sheet layer 6 is filled by extruded sheet, and extruded sheet is to be aided with polymerization with polystyrene resin Object is while heating mixing, injecting catalyst, the rigid foam plate of then extrusion molding extrusion continuity closed-cell foam, in Portion is independent closed bubble structure, is a kind of low, moisture-proof, airtight, light, corrosion-resistant, super with high resistance to compression, water absorption rate The environment protecting thermal insulating material for the excellent properties such as anti-aging (be used for a long time almost without aging), thermal coefficient be low, it is light-weight, it can subtract Few floor load-bearing;And construction is simple is quick, while being also convenient for removing, and work progress not will lead to fugitive dust also, can significantly change The operating environment of kind construction personnel, after construction without etc. it is to be dried can directly carry out next step construction, substantially increase construction Efficiency.
The ground with discharge structure further includes steel wire 8, the second cement mortar protective course 9, the second waterproof layer 10, Three cement mortar protective courses 11 and floor layer 12, steel wire 8 are laid on the upper surface of extruded sheet layer 6 and filled media 7, and Steel wire 8 is folded upward at extension close to one end of sink 4, and is located at the lower section at the edge of sink 4, specifically, the present embodiment In sink 4 include water trough body 41 and trough rim 42, trough rim 42 is horizontally disposed, and the side with 41 notch position surrounding of water trough body Wall is wholely set, and steel wire 8 includes the first face 81 being laid on extruded sheet layer 6 and filled media 7, and is hung down with the first face 81 The second face 82 being directly arranged, the second face 82 is located at 7 top of filled media and the side wall close to water trough body 41, the second face 82 are separate The one end in the first face 81 is located at the underface of trough rim 42, and the second face 82 can be abutted with trough rim 42, can also be between trough rim 42 There are gaps.Steel wire 8 can enhance the intensity that 4 outer portion of sink is removed on the ground with discharge structure by the first face 81, lead to The second face 82 is crossed, can be improved the support strength to sink 4.Second cement mortar protective course 9, the second waterproof layer 10 and third Cement mortar protective course 11 is successively laid on from the bottom to top on the first face 81 of steel wire 8, one end of the second waterproof layer 10 and water The trough rim 42 of slot 4 connects, and the material of the second waterproof layer 10 is JS water-repellent paint, and certainly, the second waterproof layer 10 can also use it His waterproof material, then this is without limitation.The present embodiment passes through the second cement mortar protective course 9 and third cement mortar protective course 11 It can protect intermediate 10 damage of the second waterproof layer, twice waterproof constituted by the second waterproof layer 10 and the first waterproof layer 2 Structure, the second waterproof layer 10 can prevent position leak of the ground with discharge structure in addition to sink 4, the first waterproof layer 2 can prevent the entire ground fabric drain water including sink 4 and drainpipe.
It should be noted that the second cement mortar protective course of the present embodiment 9 equally upwardly extends simultaneously close to one end of sink 4 It is connected to the lower surface of trough rim 42, while also wrapping up the second face 82.
Floor layer 12 includes the dry husky grieshoch 121 being laid on third cement mortar protective course 11, and is laid on described Floor 122 on dry sand grieshoch 121, floor 122 can be floor tile or ceramic tile.In the present embodiment the upper surface on floor 122 with The upper surface of sink 4 flushes, and the upper surface on floor 122 can also be higher than to the upper surface of sink 4 in other examples, and And further can set concealed sink for sink 4, i.e., support construction and floor are laid with above the notch of sink 4 122, sink 4 is hidden.
It should be noted that the second cement mortar protective course 9 is prevented in embodiment itself with a thickness of 30mm or so, second Water layer 10 and third cement mortar protective course 11 with a thickness of 20mm or so, do sand grieshoch 121 with a thickness of 40mm or so, steel wire The network interface of net 8 is the square hole of 15mm*15mm, and steel wire 8 is 60mm or so in the length that the position close to sink 4 upwardly extends.
The present embodiment also provides kitchen ground after a kind of food and drink, including the above-mentioned ground with discharge structure.
The present embodiment also provides a kind of construction technology on above-mentioned ground with discharge structure.Include the following steps:
S1, on original building floor 13, be laid with 20mm solid cement mortar levelling layer 1, utilize level meter control cement mortar The surface smoothness error of screed-coat 1 is not more than 3mm.
S2, after the cement mortar screeding layer 1 in step S1 is dry (drying time is about six hours), successively in cement It is laid with the first waterproof layer 2 and the first cement mortar protective course 3 on mortar levelling layer 1, and controls the first cement bonded sand using level meter The surface smoothness error for starching protective layer 3 is not more than 3mm.
S3, (drying time is about six hours), sequentially peace after the first cement mortar protective course 3 in step S2 is dry Sink bracket 5, sink 4 and drainpipe are filled, and is connect sink 4 with drainpipe using stainless steel-PVC adapter, completes paving If after, there are gaps between sink 4 and the first cement mortar protective course 3.
S4, it is laid with extruded sheet layer 6, and reserves the gap of 80-100mm on the periphery of extruded sheet layer 6 and sink 4.
S5, it is filled out between sink 4 and the first cement mortar protective course 3 and in gap that sink 4 is formed with extruded sheet layer 6 Water-filling cement mortar, and with hand-held two phase vibration stick by the cement mortar vibration compacting of filling, the cement mortar of filling finally with The upper surface of extruded sheet layer 6 is concordant.
S6, after the cement mortar in step S5 is dry, being laid with mesh aperture in 6 upper surface of extruded sheet layer is 15mm* The steel wire 8 of 15mm, and by steel wire 8 close to the bending along the vertical direction upwards of one end of sink 4, and make the end and sink 4 Upper edge abut, the length of bending is 60mm.
S7, the second cement mortar protective course 9 for being laid with 30mm thickness.
S8, after the cement mortar in step S7 is dry, be successively laid with second in 9 upper surface of the second cement mortar protective course Waterproof layer 10 and third cement mortar protective course 11, overall thickness 20mm.
S9, after the cement mortar in step S8 is dry, be laid with the thick dry husky grieshoch 121 of 40mm.
S10, the paving floor 122 on dry husky grieshoch 121.
Obviously, the above embodiments of the present invention is used for the purpose of clearly illustrating examples for clearly illustrating the present invention, and It is not limitations of the embodiments of the present invention.For those of ordinary skill in the art, in above description On the basis of can also make other variations or changes in different ways.There is no need and unable to give all embodiments Exhaustion.Any modifications, equivalent replacements, and improvements made within the spirit and principle of the present invention etc., should be included in Within the protection scope of the utility model claims.

Claims (9)

1. a kind of ground with discharge structure, including the cement mortar being successively set on original building floor (13) from the bottom to top Screed-coat (1), the first waterproof layer (2) and the first cement mortar protective course (3), which is characterized in that described with discharge structure Ground further include:
Sink (4) is located above first cement mortar protective course (3);
Extruded sheet layer (6) is located at the surrounding of the sink (4), and is located on first cement mortar protective course (3);It is described Gap is equipped between extruded sheet layer (6) and the sink (4);
Filled media (7), is filled in the gap;
Drainpipe connect with the sink (4) and is located at first cement mortar protective course (3) and the extruded sheet layer (6) Between;
Floor layer (12) is located above the extruded sheet layer (6), and its upper surface is not less than the upper surface of the sink (4).
2. the ground according to claim 1 with discharge structure, which is characterized in that the sink (4) uses stainless steel Material, the sink (4) are connected with the drainpipe by adapter.
3. the ground according to claim 2 with discharge structure, which is characterized in that the ground with discharge structure It further include sink bracket (5), the sink (4) is set up in first cement mortar protective course by the sink bracket (5) (3) top, the sink bracket (5) are fixed on first cement mortar protective course (3).
4. the ground according to claim 1 with discharge structure, which is characterized in that the ground with discharge structure It further include the second cement mortar set gradually between the floor layer (12) and the extruded sheet layer (6) and from the bottom to top Protective layer (9), the second waterproof layer (10) and third cement mortar protective course (11), one end of second waterproof layer (10) and institute The side wall for stating sink (4) connects.
5. the ground according to claim 4 with discharge structure, which is characterized in that the ground with discharge structure Further include steel wire (8), the steel wire (8) be located at second cement mortar protective course (9) and the extruded sheet layer (6) and Between the filled media (7).
6. the ground according to claim 5 with discharge structure, which is characterized in that the sink (4) includes sink sheet Body (41) and trough rim (42), the trough rim (42) is horizontally disposed and connects with the side wall of the water trough body (41) notch position surrounding It connects, the steel wire (8) includes the first face (81) and the second face (82), and first face (81) is laid in the extruded sheet layer (6) and in the filled media (7), second face (82) is vertically arranged with first face (81) and it is far from described first The one end in face (81) is located at the lower section of the trough rim (42).
7. the ground according to claim 1-6 with discharge structure, which is characterized in that the floor layer (12) Including dry husky grieshoch (121) and the floor (122) being located on the dry husky grieshoch (121), the upper surface of the floor (122) is not Lower than the upper surface of the sink (4).
8. the ground according to claim 1-6 with discharge structure, which is characterized in that the filled media It (7) is cement mortar.
9. kitchen ground after a kind of food and drink, which is characterized in that including the described in any item ground with discharge structure claim 1-8 Face.
CN201820657934.6U 2018-05-04 2018-05-04 Kitchen ground behind a kind of ground and food and drink with discharge structure Active CN208563528U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820657934.6U CN208563528U (en) 2018-05-04 2018-05-04 Kitchen ground behind a kind of ground and food and drink with discharge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820657934.6U CN208563528U (en) 2018-05-04 2018-05-04 Kitchen ground behind a kind of ground and food and drink with discharge structure

Publications (1)

Publication Number Publication Date
CN208563528U true CN208563528U (en) 2019-03-01

Family

ID=65480411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820657934.6U Active CN208563528U (en) 2018-05-04 2018-05-04 Kitchen ground behind a kind of ground and food and drink with discharge structure

Country Status (1)

Country Link
CN (1) CN208563528U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227651A (en) * 2020-09-18 2021-01-15 华装兄弟(北京)装饰工程有限公司 Kitchen waterproof floor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227651A (en) * 2020-09-18 2021-01-15 华装兄弟(北京)装饰工程有限公司 Kitchen waterproof floor

Similar Documents

Publication Publication Date Title
CN104594387B (en) Improved post-cast strip advance water stop construction method
CN104612261A (en) Method for external insulation construction of polystyrene board thin plastered surface in cold and windy area
CN103276858B (en) Drainage structure for inverted roof and construction method of drainage structure
CN104179263A (en) Building exterior wall external thermal insulation system waterproof and drainage construction method
CN204492025U (en) The waterproof construction of the contour deformation joint of roofing
CN205134568U (en) A stagnant water structure for bathroom
CN205369689U (en) Keep warm and decorate assembled precast floor plank of integration
CN106958358A (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN208563528U (en) Kitchen ground behind a kind of ground and food and drink with discharge structure
CN104196135B (en) A kind of exterior-wall heat insulation construction energy saving technique
WO2020232981A1 (en) Bridge deck drain pipe device for bridge and construction method
CN214246017U (en) Secondary drainage structure of toilet
CN101818557B (en) Compound waterproof floor with sound insulation and energy-saving functions and construction method thereof
CN204492022U (en) The waterproof construction of parapet high-low bay deformation joint
CN104947934A (en) Floor layer manufacturing method
CN204252414U (en) Roof covering water-proof structure
CN212129250U (en) Construction structure for additionally arranging collecting groove on post-cast strip of high-water-level foundation
CN201539071U (en) Detachable floor tile
CN109057221A (en) A kind of cement insulation board outer heat preservation system construction method
CN208380085U (en) The draining pipe-through floor slab structure of a kind of ground leak
CN109113298A (en) A kind of toilet backfill construction technology
CN215166180U (en) Caisson type tertiary drainage system
CN105649222A (en) Treatment and construction method for connecting part of roof waterproof structure deformation joint and external wall
CN209585309U (en) Subsided rest room waterproof construction
CN207829371U (en) Whole paving marble floor structure on a kind of raised flooring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant