CN208561977U - A kind of mobile integrated mining method construction wastewater treatment equipment - Google Patents
A kind of mobile integrated mining method construction wastewater treatment equipment Download PDFInfo
- Publication number
- CN208561977U CN208561977U CN201820934102.4U CN201820934102U CN208561977U CN 208561977 U CN208561977 U CN 208561977U CN 201820934102 U CN201820934102 U CN 201820934102U CN 208561977 U CN208561977 U CN 208561977U
- Authority
- CN
- China
- Prior art keywords
- conditioning tank
- agitating device
- connect
- pipe
- mining method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Separation Of Suspended Particles By Flocculating Agents (AREA)
- Physical Water Treatments (AREA)
Abstract
A kind of mobile integrated mining method construction wastewater treatment equipment, it is related to underground engineering mining method construction technical field;Water inlet pipe and oil exit pipe are connected in slagging-off oil separator, slagging-off oil separator is connect by the first outlet pipe with coagulating basin, the first dosing agitating device is provided in coagulating basin, coagulating basin is connect by the first water pump and the first drainpipe with centrifuge, centrifuge is connect with the second outlet pipe, sludge pipe, second outlet pipe is connect with ammonia nitrogen conditioning tank, the second dosing agitating device is provided in ammonia nitrogen conditioning tank, the side of second dosing agitating device is provided with weir divider, the side of weir divider is provided with pH conditioning tank, and third dosing agitating device is provided in pH conditioning tank.The utility model can be realized in the hole of construction waste water and be handled, and wastewater treatment capacity is greatly reduced;Load-carrying wheel can be moved forward with the propulsion of work surface;Fundamentally solve the problems, such as that mining method construction waste water is reluctant.
Description
Technical field
The utility model relates to underground engineering mining method construction technical fields, and in particular to a kind of mobile integrated mine
Method construction wastewater treatment equipment.
Background technique
With the development of economic technology, more and more underground engineerings such as railway tunnel, vcehicular tunnel, subway tunnel, comprehensive
Piping lane etc. is closed to be built.Main engineering method one of of the Mining Method as constructing underground building is widely used in underground engineering neck
Domain.Certain construction waste water can be generated when Mining Method constructing underground building at work surface.Waste water major pollutants are as follows: suspend
Object, petroleum-type, ammonia nitrogen, and pH higher.Past, underground engineering construction draining was provisional row in addition since environmental consciousness is thin
Water, pollution are long-term ignored.Sedimentation basin, oil separator, engineering practice hair is typically only arranged in underground engineering in the design process
Existing, construction waste water at all can not be up to standard.
Underground engineering construction waste water is concentrated mainly on two linings and does not complete section i.e. operation side between two lining completion sections
Region, its waste water of region that two linings have performed is mainly structural percolating water, and water quality is similar with underground water, can be with direct emission.Mesh
It is preceding also to there are individual underground engineerings to take treatment measures to construction waste water, but treatment measures are set to ground or underground engineering
Construct oral area, due to underground engineering narrow space, two serve as a contrast do not complete section waste water completed with two linings it is shared after segment structures infiltration mixes
Ground is discharged in temporary drainage system, and the processing unit actual treatment amount for being set to ground is caused to cover two lining to be treated not
Complete section waste water and be not required to two lining to be processed to complete segment structure infiltration, actual treatment amount is very big.Engineering practice shows to be set to
There are two types of results mostly for the processing unit on ground: one is because treatment scale is excessive, cost is excessively high and hard to carry on;It is a kind of because
It is too small for design treatment ability, and actual treatment scale is excessive and is difficult to up to standard.
It is easily installed in conclusion underground engineering mining method construction field urgent need is a set of at present, is easy to remove, can be directed to
Two serve as a contrast the mining method construction wastewater treatment equipment for not completing and handling in section construction waste water progress hole.
Utility model content
The purpose of this utility model is that in view of the drawbacks of the prior art and insufficient, mine can be effectively removed by providing one kind
The mobile integrated mining method construction wastewater treatment equipment of the pollutants such as suspended matter, petroleum-type, ammonia nitrogen in method construction waste water.
In order to achieve the above purposes, the technical solution adopted by the utility model is:, and it includes water inlet pipe, slagging-off oil separator, the
One outlet pipe, oil exit pipe, coagulating basin, the first dosing agitating device, the first water pump, the first drainpipe, centrifuge, the second water outlet
Pipe, sludge pipe, ammonia nitrogen conditioning tank, the second dosing agitating device, weir divider, pH conditioning tank, third dosing agitating device;It is described
Slagging-off oil separator on be connected with water inlet pipe and oil exit pipe, slagging-off oil separator is connect by the first outlet pipe with coagulating basin, coagulation
The first dosing agitating device is provided in pond, coagulating basin is connect by the first water pump and the first drainpipe with centrifuge, centrifuge
It is connect with the second outlet pipe, sludge pipe, the second outlet pipe is connect with ammonia nitrogen conditioning tank, and the second dosing is provided in ammonia nitrogen conditioning tank
Agitating device, the side of the second dosing agitating device are provided with weir divider, and the side of weir divider is provided with pH conditioning tank, pH
Third dosing agitating device is provided in conditioning tank.
Preferably, the pH conditioning tank is connect by the second water pump and the second drainpipe with transfer pond.
Preferably, the slagging-off oil separator, coagulating basin, centrifuge, ammonia nitrogen conditioning tank and the setting of pH conditioning tank are being dragged
On chassis, the bottom of trailer chassis is equipped with load-carrying wheel.
Preferably, the water inlet pipe is connect by submersible sewage pump with catch pit.
When the utility model operates, is adjusted with oil removal precipitating, dosing flocculation, centrifuge separation, ammonia nitrogen and PH adjusts technique
Flow processing Tunneling by mining method operation surface construction waste water.Operation side waste water is pooled to the catch pit before work surface, passes through collection
Puddle it is first it is heavy after, raw wastewater is promoted to the utility model through submersible sewage pump.Raw wastewater initially enters slagging-off oil removal by water inlet pipe
Pond, bulky grain suspended matter are slagged tap by filter screen retention, and petroleum substance contained by waste water is retained by slagging-off oil separator and passes through oil extraction
Pipe periodically collects outward transport.Waste water through the first outlet pipe enters coagulating basin after the slagging-off oil removal processing by the oil separator that removes the gred, through the
Through the first water pump lifting after one dosing agitating device dosing coagulation, processing is centrifuged through the first drainpipe to centrifuge.
Waste water after flocculation is separated into sludge and waste water by centrifuge, and sludge B is through sludge pipe outlet and collects outward transport landfill.Through centrifuge
Treated waste water enters ammonia nitrogen conditioning tank through the second outlet pipe, by overflowing after the second dosing agitating device dosing removes ammonia nitrogen
Stream partition enters pH conditioning tank, after third dosing agitating device chemicals addition control pH value, handles up to standard.Through second after waste water up to standard
Water pump lifting is drained by the second drainpipe to transfer pond, is completed together with segment structure percolating water with two linings through temporary drainage system
System is promoted to construction portal emission.
After adopting the above structure, the utility model is the beneficial effects are as follows: a kind of movable type described in the utility model
Integrated mining method construction wastewater treatment equipment greatly reduces wastewater treatment capacity, it can be achieved that processing in the hole of construction waste water;It carries
Roller can accordingly be moved with the propulsion of work surface, can by work surface wastewater treatment it is up to standard after be discharged into tunnel drainage system and be discharged together
Outside hole;Handle it is up to standard after waste water can with two lining complete sections structure seep water share temporary drainage system together with promote discharge, from
Fundamentally solve the problems, such as that mining method construction waste water is reluctant.
Detailed description of the invention
Fig. 1 is the structure chart of the utility model.
Specific embodiment
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property
It puts, is also possible to obtain other drawings based on these drawings.
Referring to as shown in Figure 1, present embodiment adopts the following technical scheme that it includes water inlet pipe 1, slagging-off oil separator
2, the first outlet pipe 3, oil exit pipe 4, coagulating basin 5, the first dosing agitating device 6, the first water pump 7, the first drainpipe 8, centrifuge
9, the second outlet pipe 10, sludge pipe 11, ammonia nitrogen conditioning tank 12, the second dosing agitating device 13, weir divider 14, pH conditioning tank
15, third dosing agitating device 16;Water inlet pipe 1 and oil exit pipe 4 are connected in the slagging-off oil separator 2, slagging-off oil separator 2 is logical
It crosses the first outlet pipe 3 to connect with coagulating basin 5, the first dosing agitating device 6 is provided in coagulating basin 5, coagulating basin 5 passes through the first water
Pump 7 and the first drainpipe 8 are connect with centrifuge 9, and centrifuge 9 is connect with the second outlet pipe 10, sludge pipe 11, the second outlet pipe 10
It is connect with ammonia nitrogen conditioning tank 12, the second dosing agitating device 13, the second dosing agitating device 13 is provided in ammonia nitrogen conditioning tank 12
Side be provided with weir divider 14, the side of weir divider 14 is provided with pH conditioning tank 15, and is provided in pH conditioning tank 15
Three dosing agitating devices 16.
Preferably, the pH conditioning tank 15 is connect by the second water pump 17 and the second drainpipe 18 with transfer pond.
Preferably, the slagging-off oil separator 2, coagulating basin 5, centrifuge 9, ammonia nitrogen conditioning tank 12 and pH conditioning tank 15 are set
It sets on trailer chassis 19, the bottom of trailer chassis 19 is equipped with load-carrying wheel 20.
Preferably, the water inlet pipe 1 is connect by submersible sewage pump with catch pit.
When present embodiment operates, operation side waste water is pooled to the catch pit before work surface, passes through catch pit
It is first it is heavy after, raw wastewater C is promoted to present embodiment through submersible sewage pump.Raw wastewater by water inlet pipe 1 initially enter slagging-off every
Oil sump 2, bulky grain suspended matter are slagged tap by filter screen retention, and petroleum substance A contained by waste water is retained and passed through by slagging-off oil separator 2
Oil exit pipe 4 periodically collects outward transport.Enter coagulation through the first outlet pipe 3 after slagging-off oil removal processing of the waste water by the oil separator 2 that removes the gred
Pond 5, after 6 dosing coagulation of the first dosing agitating device through the first water pump 7 promoted, through the first drainpipe 8 to centrifuge 9 carry out from
Heart separating treatment.Waste water after flocculation is separated into sludge and waste water by centrifuge 9, and sludge B is through 11 outlet of sludge pipe and collects outer
Fortune landfill.Enter ammonia nitrogen conditioning tank 12 through the second outlet pipe 10 through treated the waste water of centrifuge 9, through the second dosing agitating device
Enter pH conditioning tank 15 by weir divider 14 after 13 dosings removal ammonia nitrogen, through 16 chemicals addition control pH value of third dosing agitating device
Afterwards, it handles up to standard.It is promoted after waste water D up to standard through the second water pump 17, is drained by the second drainpipe 18 to transfer pond, with two linings
Segment structure percolating water is completed together through temporary drainage system improving to portal emission of constructing.
First dosing agitating device 6, centrifuge 9 described in present embodiment, the second dosing agitating device 13 and
Three dosing agitating devices 16 are the prior art, and this will not be repeated here.
After adopting the above structure, present embodiment is the beneficial effects are as follows: one described in present embodiment
The mobile integrated mining method construction wastewater treatment equipment of kind greatly reduces waste water, it can be achieved that processing in the hole of construction waste water
Treating capacity;Load-carrying wheel can be moved forward with the propulsion of work surface;Handle it is up to standard after waste water can with two lining complete sections structure
The shared temporary drainage system that seeps water promotes discharge together, fundamentally solves the problems, such as that mining method construction waste water is reluctant.
The advantages of basic principles and main features and the utility model of the utility model have been shown and described above.This
The technical staff of industry is retouched in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments
That states only illustrates the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model
It will also have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.This is practical new
Type is claimed range and is defined by the appending claims and its equivalent thereof.
Claims (4)
1. a kind of mobile integrated mining method construction wastewater treatment equipment, it is characterised in that: it includes water inlet pipe, slagging-off oil removal
Pond, the first outlet pipe, oil exit pipe, coagulating basin, the first dosing agitating device, the first water pump, the first drainpipe, centrifuge, second
Outlet pipe, sludge pipe, ammonia nitrogen conditioning tank, the second dosing agitating device, weir divider, pH conditioning tank, third dosing agitating device;
Water inlet pipe and oil exit pipe are connected in the slagging-off oil separator, slagging-off oil separator is connect by the first outlet pipe with coagulating basin,
The first dosing agitating device is provided in coagulating basin, coagulating basin is connect by the first water pump and the first drainpipe with centrifuge, from
Scheming is connect with the second outlet pipe, sludge pipe, and the second outlet pipe is connect with ammonia nitrogen conditioning tank, is provided with second in ammonia nitrogen conditioning tank
Dosing agitating device, the side of the second dosing agitating device are provided with weir divider, and the side of weir divider is provided with pH adjusting
Pond is provided with third dosing agitating device in pH conditioning tank.
2. a kind of mobile integrated mining method construction wastewater treatment equipment according to claim 1, it is characterised in that: institute
The pH conditioning tank stated is connect by the second water pump and the second drainpipe with transfer pond.
3. a kind of mobile integrated mining method construction wastewater treatment equipment according to claim 1, it is characterised in that: institute
Coagulating basin, ammonia nitrogen conditioning tank and the pH conditioning tank stated are arranged on trailer chassis, and the bottom of trailer chassis is equipped with load-carrying wheel.
4. a kind of mobile integrated mining method construction wastewater treatment equipment according to claim 1, it is characterised in that: institute
The water inlet pipe stated is connect by submersible sewage pump with catch pit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820934102.4U CN208561977U (en) | 2018-06-15 | 2018-06-15 | A kind of mobile integrated mining method construction wastewater treatment equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820934102.4U CN208561977U (en) | 2018-06-15 | 2018-06-15 | A kind of mobile integrated mining method construction wastewater treatment equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208561977U true CN208561977U (en) | 2019-03-01 |
Family
ID=65487001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820934102.4U Active CN208561977U (en) | 2018-06-15 | 2018-06-15 | A kind of mobile integrated mining method construction wastewater treatment equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208561977U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108483753A (en) * | 2018-06-15 | 2018-09-04 | 中铁第六勘察设计院集团有限公司 | A kind of mobile integrated mining method construction wastewater treatment equipment |
-
2018
- 2018-06-15 CN CN201820934102.4U patent/CN208561977U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108483753A (en) * | 2018-06-15 | 2018-09-04 | 中铁第六勘察设计院集团有限公司 | A kind of mobile integrated mining method construction wastewater treatment equipment |
CN108483753B (en) * | 2018-06-15 | 2023-10-31 | 中铁第六勘察设计院集团有限公司 | Mobile integrated mine construction wastewater treatment device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103232132B (en) | Magnetic separation method and apparatus for mine water underground treatment | |
CN104174191B (en) | Integrated grit chamber for treating rainwater and treatment method | |
CN211676669U (en) | Shield muck treatment system | |
CN105170631B (en) | A kind of quick elution complexes of contaminated soil remediation | |
CN104478193B (en) | The dewatering system of a kind of Soil leaching mud and method thereof | |
CN103570179A (en) | Underground mine water treatment system and method | |
CN208561977U (en) | A kind of mobile integrated mining method construction wastewater treatment equipment | |
CN203425567U (en) | Sewage treatment device | |
CN103981375A (en) | Gold extraction method by heap leaching | |
CN206769017U (en) | A kind of hole pumping system with precipitation function | |
CN206735879U (en) | Integrated high-efficiency magnetic-coagulation precipitation equipment | |
CN202766398U (en) | Pull type sludge treatment equipment | |
CN207016661U (en) | A kind of portable mud thickener | |
CN104963333A (en) | Combined treatment method for dehumidification and vacuum preloading of dredger fill and slurry flocculation | |
CN109956574A (en) | A kind of bulk cement carrier carwash waste liquid synthesization utilizes method and system | |
CN205840846U (en) | Drilling mud does not land processing means | |
CN108483753A (en) | A kind of mobile integrated mining method construction wastewater treatment equipment | |
CN105417660B (en) | Method and device for treating production wastewater of water works | |
CN212609938U (en) | TBM construction tunnel sewage treatment system | |
CN107754395A (en) | A kind of sludge discharging method, sludge drainage system and sludge discharging machine | |
CN207294427U (en) | A kind of quick processing system of beneficiation wastewater | |
CN208055076U (en) | A kind of novel integrated mine water pre-treatment means | |
CN207048708U (en) | A kind of mud does not land intelligent environment protection press filtration skid equipment | |
CN107434330A (en) | A kind of manpower rapid-infiltration sewage water treatment method | |
CN105174591A (en) | Equipment for treating water under mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |