CN208545955U - A kind of load-bearing mounting seat for building scaffold equipment - Google Patents
A kind of load-bearing mounting seat for building scaffold equipment Download PDFInfo
- Publication number
- CN208545955U CN208545955U CN201821064930.3U CN201821064930U CN208545955U CN 208545955 U CN208545955 U CN 208545955U CN 201821064930 U CN201821064930 U CN 201821064930U CN 208545955 U CN208545955 U CN 208545955U
- Authority
- CN
- China
- Prior art keywords
- main body
- fixed seat
- lower fixed
- load
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000013016 damping Methods 0.000 claims abstract description 11
- 238000009434 installation Methods 0.000 claims abstract description 6
- 239000000203 mixture Substances 0.000 claims description 2
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 5
- 230000001681 protective effect Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 239000007787 solid Substances 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- -1 main body Chemical compound 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of load-bearing mounting seats for building scaffold equipment, including main body, the main body is made of the first main body and the second main body, it is fixedly connected between first main body and the second main body by limit sleeve, and first main body it is identical as the structure of the second main body, first main body is made of lower fixed seat and upper fixed seat, the front outer wall of the lower fixed seat offers embedded groove, clump weight is installed in the embedded groove, the upper outer wall of the lower fixed seat is equipped with damping spring, upper fixed seat is installed above the damping spring, the equipment is made of the first main body and the second main body, it is fixedly connected simultaneously and by limit sleeve, suitable number of second main body can be installed when user needs to build scaffold according to the total length of scaffold, to reach use demand, and do not have to require efforts again Equipment is built, easy to operate quick for installation, worker's working efficiency is higher, and practicability is stronger.
Description
Technical field
The utility model belongs to Architectural Equipment technical field, and in particular to a kind of load-bearing peace for building scaffold equipment
Fill pedestal.
Background technique
Scaffold is to guarantee each work progress is gone on smoothly and is set up workbench.It is divided by the position set up outer
Scaffold, internal scaffolding;Timber scaffolding, bamboo scaffolding, steel pipe scaffold can be divided by material difference;It is divided by structural form vertical
Rod-type scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula foot hand bridge scaffold
The scaffold of different purposes is selected in frame, different types of engineering construction, and installation bottom is often used when people build scaffold
Seat.
The load-bearing mounting seat common currently on the market is generally faced with when people need to spend when building scaffold
Plenty of time and energy go to build mounting seat, and this allows for the reduction of work task efficiency, and cumbersome complexity is time-consuming
Arduously, not very practical;And most of firm bankings, if finding the lighter in weight of pedestal, easily occur when installing scaffold
The phenomenon that sliding, and this safety for allowing for work man-hour reduces, and has to cost fund more exchange device, economy effect
Benefit is lower not very practical;And most of equipment are all mounted directly when installing scaffold, when needing to spend when installing
Between position, and this allows for that operating process more very complicated is time-consuming and laborious, and the practicality is not strong.
Utility model content
The purpose of this utility model is to provide a kind of load-bearing mounting seats for building scaffold equipment, on solving
State proposed in background technique when people need to take a significant amount of time when building scaffold with energy go build mounting seat, and
This allows for the reduction of work task efficiency, and cumbersome complexity is time-consuming and laborious, not very practical;And most of firm bankings
When installing scaffold, if the lighter in weight of discovery pedestal, easily there is a phenomenon where sliding, and this allows for work man-hour
Safety reduces, and has to cost fund more exchange device, economic benefit is lower not very practical;And most of equipment are being pacified
All be mounted directly when filling scaffold, when installation, needs to spend timi requirement, and this to allow for operating process more cumbersome
Complicated time-consuming and laborious, the not strong problem of the practicality.
To achieve the above object, the utility model provides the following technical solutions: a kind of holding for building scaffold equipment
Re-mount pedestal, including main body, the main body is made of the first main body and the second main body, first main body and the second main body it
Between be fixedly connected by limit sleeve, and the first main body is identical as the structure of the second main body, first main body by lower fixed seat and
Upper fixed seat composition, the front outer wall of the lower fixed seat offers embedded groove, clump weight is equipped in the embedded groove, described
The upper outer wall of lower fixed seat is equipped with damping spring, and upper fixed seat is equipped with above the damping spring, fixed
The top of seat is equipped with limit casing, and secondary fixing sleeve is equipped with above the limit casing.
Preferably, the height number of the limit sleeve is greater than the height number of upper fixed seat.
Preferably, the limit casing is an integral structure with secondary fixing sleeve.
Preferably, the external wall beneath of the lower fixed seat offers fixing groove, is equipped with non-slip mat in the fixing groove.
Preferably, the width numerical value of the clump weight is equal to the width numerical value of lower fixed seat.
Compared with prior art, the utility model has the beneficial effects that the device structure is scientific and reasonable safe and convenient to use,
And the equipment is made of the first main body and the second main body, while and be fixedly connected by limit sleeve, when user needs to build foot
Suitable number of second main body can be installed when hand cradle according to the total length of scaffold, to reach use demand, and do not had to
It requires efforts again and builds equipment, easy to operate quick for installation, worker's working efficiency is higher, and practicability is stronger;And the equipment is also
Be provided with clump weight, usually for convenience equipment transport or movement can by clump weight all take out, once need using
When suitable number of clump weight can be installed in embedded groove according to the actual situation so that equipment can satisfy use demand without
It with more exchange device or takes a significant amount of time and builds equipment again, time saving and energy saving practicability easy to operate is stronger;And this sets
It is standby to be additionally provided with limit casing and secondary fixing sleeve, it can be by the way that steel pipe be inserted into limit sleeve when user builds scaffold
Pipe to play the role of positioning, and does not have to take a significant amount of time and position with energy, easy to operate, and is convenient for the later period
Disassembly, the practicality are stronger;And the equipment is additionally provided with damping spring, so that will not be because by outer when equipment is by greater impact
Boundary influences the case where damaging, and protective more high practicability is stronger.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the outside drawing of the utility model;
Fig. 3 is the top view of the utility model.
In figure: 1- main body, the first main body of 2-, the second main body of 3-, 4- limit sleeve, 5- limit casing, 6- bis- fixing sleeves, 7-
Upper fixed seat, 8- damping spring, 9- clump weight, 10- lower fixed seat.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of load-bearing peace for building scaffold equipment
Pedestal is filled, including main body 1, main body 1 are made of the first main body 2 and the second main body 3, are passed through between the first main body 2 and the second main body 3
Limit sleeve 4 is fixedly connected, and the first main body 2 is identical as the structure of the second main body 3, and the first main body 2 is by lower fixed seat 10 and upper solid
Reservation 7 forms, and the front outer wall of lower fixed seat 10 offers embedded groove, clump weight 9 is equipped in embedded groove, lower fixed seat 10
Upper outer wall is equipped with damping spring 8, and the top of damping spring 8 is equipped with upper fixed seat 7, and the top of upper fixed seat 7 is equipped with
Limit casing 5, the top of limit casing 5 are equipped with secondary fixing sleeve 6.
In the present embodiment, it is preferred that the height number of limit sleeve 4 is greater than the height number of upper fixed seat 7, and the equipment is upper
The left and right sides outer wall of fixing seat 7 is provided with embedded block, and because limit sleeve 4 is thicker when equipment is installed later, therefore limit sleeve 4 can be with
Upper fixed seat 7 is covered completely, while also assuring the intensity of equipment, so that equipment will not be because being damaged by biggish power
It is bad.
In the present embodiment, it is preferred that limit casing 5 is an integral structure with secondary fixing sleeve 6, is secondary solid in order to guarantee
Surely the intensity of set 6, can be fixed by steel pipe and limit casing 5 by screw after the steel pipe of scaffold is inserted into limit casing 5, it
The intensity of scaffold can be further reinforced by secondary fixing sleeve 6 afterwards, protective is stronger, if secondary fixing sleeve 6 not with
Secondary fixing sleeve 6 is an integral structure, then easily there is a situation where be broken for secondary fixing sleeve 6.
In the present embodiment, it is preferred that the external wall beneath of lower fixed seat 10 offers fixing groove, is equipped in fixing groove anti-skidding
Pad, will not be slided easily to increase the protective of equipment by non-slip mat and make the adherence properties of equipment more preferable
The case where, which is fixedly connected with the lower fixed seat 10 in the second main body 3 by limiting fixed fixture block.
In the present embodiment, it is preferred that the width numerical value of clump weight 9 is equal to the width numerical value of lower fixed seat 10, is to make
Clump weight 9 will not generate the case where sliding after installing, it, which is easily slided, if its width numerical value is smaller falls off to equipment
Normal use impacts.
Working principle: when the utility model is used, user first puts up the first main body 2 and the second main body 3, later
The upper fixed seat 7 in two main bodys is fixed by limit sleeve 4, while being consolidated two lower fixed seats 10 by limiting fixed fixture block
It sets, suitable number of second main body can be installed later according to the total length of scaffold, thus reach use demand, without
Equipment is built with requiring efforts again, easy to operate quick for installation, worker's working efficiency is higher, then can pass through swell fixture
By 1 fixing seat ground of main body, later can normal use equipment, use when can by by steel pipe be inserted into limit casing 5, from
And play the role of positioning, and do not have to take a significant amount of time and be positioned with energy, it is easy to operate, and dismantled convenient for the later period,
Can be fixed by steel pipe and limit casing 5 by screw after the steel pipe of scaffold is inserted into limit casing 5, two can be passed through later
Secondary fixing sleeve 6 further reinforces the intensity of scaffold, and protective is stronger, which is additionally provided with damping spring 8, so that setting
By to when greater impact will not because by the external world influence to damage the case where, protective more high practicability is stronger.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of load-bearing mounting seat for building scaffold equipment, including main body (1), it is characterised in that: the main body (1)
It is made of the first main body (2) and the second main body (3), passes through limit sleeve (4) between first main body (2) and the second main body (3)
Be fixedly connected, and the first main body (2) is identical as the structure of the second main body (3), first main body (2) by lower fixed seat (10) and
Upper fixed seat (7) composition, the front outer wall of the lower fixed seat (10) offer embedded groove, are equipped with counterweight in the embedded groove
The upper outer wall of block (9), the lower fixed seat (10) is equipped with damping spring (8), is equipped with above the damping spring (8)
Upper fixed seat (7) is equipped with limit casing (5) above fixed seat (7), the top installation of the limit casing (5)
There are secondary fixing sleeve (6).
2. a kind of load-bearing mounting seat for building scaffold equipment according to claim 1, it is characterised in that: described
The height number of limit sleeve (4) is greater than the height number of upper fixed seat (7).
3. a kind of load-bearing mounting seat for building scaffold equipment according to claim 1, it is characterised in that: described
Limit casing (5) is an integral structure with secondary fixing sleeve (6).
4. a kind of load-bearing mounting seat for building scaffold equipment according to claim 1, it is characterised in that: described
The external wall beneath of lower fixed seat (10) offers fixing groove, is equipped with non-slip mat in the fixing groove.
5. a kind of load-bearing mounting seat for building scaffold equipment according to claim 1, it is characterised in that: described
The width numerical value of clump weight (9) is equal to the width numerical value of lower fixed seat (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821064930.3U CN208545955U (en) | 2018-07-06 | 2018-07-06 | A kind of load-bearing mounting seat for building scaffold equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821064930.3U CN208545955U (en) | 2018-07-06 | 2018-07-06 | A kind of load-bearing mounting seat for building scaffold equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208545955U true CN208545955U (en) | 2019-02-26 |
Family
ID=65424042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821064930.3U Expired - Fee Related CN208545955U (en) | 2018-07-06 | 2018-07-06 | A kind of load-bearing mounting seat for building scaffold equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208545955U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115182564A (en) * | 2022-08-19 | 2022-10-14 | 中建港航局集团有限公司 | Construction cross operation supporting platform |
-
2018
- 2018-07-06 CN CN201821064930.3U patent/CN208545955U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115182564A (en) * | 2022-08-19 | 2022-10-14 | 中建港航局集团有限公司 | Construction cross operation supporting platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205096590U (en) | Simple and easy auxiliary device of ceiling punching operation | |
CN202023404U (en) | Multifunctional pole erecting device | |
CN208545955U (en) | A kind of load-bearing mounting seat for building scaffold equipment | |
CN205036063U (en) | A operation platform that encorbelments for building inside is encorbelmented position and is under construction | |
CN201517284U (en) | High-altitude semiautomatic hanging double-suspension type steel structure slipping operating platform | |
CN206829570U (en) | A kind of modularization scaffold of packaged type | |
CN209958708U (en) | Scaffold for construction site construction | |
CN103603426B (en) | A kind of bracing or strutting arrangement for frame construction | |
CN209704077U (en) | A kind of building structure supporting part | |
CN210003199U (en) | general type steelframe cat ladder climbing equipment | |
CN105113415B (en) | Hydraulic pressure sliding sash climbing frame | |
CN205036062U (en) | Cantilever frame for construction of hollow part inside building | |
CN105525755A (en) | Steel bar planting hole drilling mechanical hand | |
CN205444958U (en) | Fall protection device and fixed brackets thereof for steel structure engineering construction | |
CN204876519U (en) | Building interior decoration frame of ascending a height | |
CN108019225A (en) | Hydraulic moving formula subway station side wall formwork jumbo | |
CN209228092U (en) | A kind of steel core concrete column steel slideway for building jacking increasing layer | |
CN203392657U (en) | Machine maintenance platform | |
CN212582431U (en) | Hanging basket with high bearing performance | |
CN207160957U (en) | A kind of good double ladder of construction site stability | |
CN204059916U (en) | Safety scaffold | |
CN207144424U (en) | A kind of construction scaffold | |
CN221073402U (en) | Building construction scaffold with safety protection function | |
CN204224129U (en) | A kind of tower crane | |
CN206457725U (en) | It is a kind of to be used for the overall device transferred and remove dragging suspension basket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190226 |
|
CF01 | Termination of patent right due to non-payment of annual fee |