CN208545053U CN201820596201.6U CN201820596201U CN208545053U CN 208545053 U CN208545053 U CN 208545053U CN 201820596201 U CN201820596201 U CN 201820596201U CN 208545053 U CN208545053 U CN 208545053U
Authority
CN
China
Prior art keywords
pedestal
rack
reinforcing rod
power construction
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820596201.6U
Other languages
Chinese (zh)
Inventor
马心美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Rongwei Electric Power Engineering Co., Ltd.
Original Assignee
马心美
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 马心美 filed Critical 马心美
Priority to CN201820596201.6U priority Critical patent/CN208545053U/en
Application granted granted Critical
Publication of CN208545053U publication Critical patent/CN208545053U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of power construction lifting devices, including pedestal and hoistable platform, the bottom of the pedestal is equipped with universal wheel, push rod is connected on the left of the pedestal, left side at the top of the pedestal is additionally provided with clump weight, centre at the top of the pedestal connects organic frame by connecting plate, the first reinforcing rod is additionally provided between the rack and connecting plate, the front and back of the hoistable platform is respectively connected with the idler wheel for guiding, four groups of leading trucks are vertically arranged between the pedestal and rack, the leading truck is c-type, guide groove and idler wheel in the leading truck are correspondingly arranged, the idler wheel is located in guide groove.Wirerope is wound using motor driven reel, so that hoistable platform rises, is transported manually instead of worker, labor intensity is reduced, high-efficient, structural strength is transported, the bottom of pedestal is equipped with universal wheel, push rod is connected on the left of pedestal, movement is convenient, is suitble to be widely popularized.

Description

A kind of power construction lifting device
Technical field
The utility model relates to technical field of electric power construction, specially a kind of power construction lifting device.
Background technique
Power engineering is production with electric energy, conveying, the related engineering of distribution, broadly further include using electricity as power with The engineering that the energy is applied in multiple fields.Electric power is the energy using electric energy as power.Invention is in 19 century 70s, electric power Invention and application started second industrialization climax.Since 18th century of human history, the world occurs scientific and technological three times One of revolution changes people's lives from this science and technology.The large-scale electrical power system that 20th century occurred is the human engineering history of science One of upper most important achievement, the power generation and consumption be made of links such as power generation, transmission of electricity, power transformation, distribution and electricity consumptions are System.The non-renewable energy of nature is converted to electric power by mechanical energy device by it, then through transmission of electricity, power transformation and distribution by power supply To each user.
Present society be unable to do without electric energy, and electric energy is all to need to transport transmission using cable, is transported to city from power station City rural area, however cable transmission is set up transmission with electric pole, cable is all installed in electric pole top, in power construction When, worker climbs up very laborious, it is also necessary to a large amount of tool and material also be installed, they are a very difficult things Feelings, worker's load climb up danger close the shortcomings that, therefore need to research and develop it is a kind of can be by the tool of power construction and material easily It serves, and convenient and stable, moreover it is possible to the power construction lifting device being moved easily.
Utility model content
The purpose of this utility model is to provide a kind of power construction lifting devices, to solve to mention in above-mentioned background technique Out the problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of power construction lifting device, including Pedestal and hoistable platform, the bottom of the pedestal are equipped with universal wheel, and push rod, the pedestal top are connected on the left of the pedestal Clump weight is additionally provided on the left of portion, the centre at the top of the pedestal connects organic frame, the rack and connection by connecting plate It is additionally provided with the first reinforcing rod between plate, crossbeam is fixedly connected at the top of the rack, it is fixed between the crossbeam and rack to connect It is connected to the second reinforcing rod, third reinforcing rod, the left side installation of the cross rail top are fixedly connected between the rack and pedestal There is motor, the output end of the motor is sequentially connected by shaft coupling in the reel being fixed between reel stand, the reel stand It is fixed on crossbeam, volume has wirerope on the reel, and guardrail, the top of the guardrail are symmetrically arranged at the top of the hoistable platform Portion is equipped with the hanging ring for lifting, and one end of the wirerope is fixedly attached to hanging ring, is also provided on the crossbeam and steel wire It restricts corresponding through-hole, the front and back of the hoistable platform is respectively connected with the idler wheel for guiding, the pedestal and rack Between be vertically arranged with four groups of leading trucks, the leading truck is c-type, and the guide groove and pair of rollers in the leading truck should be set It sets, the idler wheel is located in guide groove.
As advanced optimizing for the technical program, a kind of power construction lifting device of the utility model, the connection The section of plate is rectangle, offers bolt hole on the connecting plate, the connecting plate is bolted to connection in pedestal, institute It is horizontally disposed to state pedestal, the rack vertical welding is in connecting plate.
As advanced optimizing for the technical program, a kind of power construction lifting device of the utility model, described first Reinforcing rod and the second reinforcing rod are obliquely installed, and first reinforcing rod and the second reinforcing rod are fixedly welded on the right side of rack Side, the third reinforcing rod are also obliquely installed, and the third reinforcing rod is fixedly welded on the left side of rack.
As advanced optimizing for the technical program, a kind of power construction lifting device of the utility model, the guiding Frame uses C-type steel, and the leading truck is fixedly welded between pedestal and rack.
As advanced optimizing for the technical program, a kind of power construction lifting device of the utility model, the lifting The upper surface of platform is uniformly covered with rubber antiskid pad.
As advanced optimizing for the technical program, a kind of power construction lifting device of the utility model, the counterweight Block is solid lead, and the push rod is obliquely installed, and is covered with urethane pad on the push rod.
Compared with prior art, the utility model has the beneficial effects that a kind of power construction of the utility model lifting dress It sets, is wound wirerope using motor driven reel, so that hoistable platform rises, transported manually instead of worker, reduce labor Fatigue resistance, transport is high-efficient, and guardrail is arranged by the edge at the top of hoistable platform, prevents article from falling, by being arranged four groups Leading truck is correspondingly arranged guide groove and idler wheel in leading truck, so that idler wheel is merely able to along leading in leading truck when lifting It is mobile to slot, and then guarantee the direction of motion of hoistable platform, and hoistable platform is effectively prevent to turn on one's side because of weighting, pass through setting the One reinforcing rod, the second reinforcing rod and third reinforcing rod improve structural strength, and the bottom of pedestal is equipped with universal wheel, pedestal Left side is connected with push rod, and movement is convenient, and the left side at the top of pedestal is additionally provided with clump weight, more stable, has very high practical Property, a kind of use functionality of power construction lifting device is greatly improved, guarantees its using effect and utilization benefit, is fitted Conjunction is widely popularized.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of power construction lifting device of the utility model;
Fig. 2 is structural schematic diagram when a kind of hoistable platform of power construction lifting device of the utility model rises;
Fig. 3 is a kind of A-A schematic cross-sectional view of power construction lifting device of the utility model.
In figure: 1 pedestal, 2 universal wheels, 3 push rods, 4 clump weights, 5 connecting plates, 6 racks, 7 first reinforcing rods, 8 second are reinforced Bar, 9 crossbeams, 10 third reinforcing rods, 11 motors, 12 reel stands, 13 reels, 14 wirerope, 15 hoistable platforms, 16 guardrails, 17 are led To frame, 18 idler wheels.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention;Term " first ", " the Two ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance;In addition, unless otherwise specific Regulation and restriction, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to It is detachably connected, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, can also lead to It crosses intermediary to be indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be with Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of power construction lifting device, including base Seat 1 and hoistable platform 15, the bottom of the pedestal 1 are equipped with universal wheel 2, and the left side of the pedestal 1 is connected with push rod 3, described The left side at 1 top of pedestal is additionally provided with clump weight 4, and the centre at 1 top of pedestal connects organic frame 6 by connecting plate 5, described The first reinforcing rod 7 is additionally provided between rack 6 and connecting plate 5, the top of the rack 6 is fixedly connected with crossbeam 9, the crossbeam 9 It is fixedly connected with the second reinforcing rod 8 between rack 6, is fixedly connected with third reinforcing rod 10 between the rack 6 and pedestal 1, The left side at 9 top of the crossbeam is equipped with motor 11, and the output end of the motor 11 is by shaft coupling transmission connection in being fixed on Reel 13 between reel stand 12, the reel stand 12 are fixed on crossbeam 9, and volume has wirerope 14 on the reel 13, described The top of hoistable platform 15 is symmetrically arranged with guardrail 16, and the top of the guardrail 16 is equipped with the hanging ring for lifting, the wirerope 14 one end is fixedly attached to hanging ring, is also provided on the crossbeam 9 and the corresponding through-hole of wirerope 14, the hoistable platform 15 front and back is respectively connected with the idler wheel 18 for guiding, and four groups of guiding are vertically arranged between the pedestal 1 and rack 6 Frame 17, the leading truck 17 is c-type, and the guide groove and idler wheel 18 in the leading truck 17 are correspondingly arranged, 18, the idler wheel In guide groove.
Specifically, the section of the connecting plate 5 is rectangle, bolt hole, the connecting plate are offered on the connecting plate 5 5 are bolted to connection in pedestal 1, and the pedestal 1 is horizontally disposed, and 6 vertical welding of rack is in connecting plate 5.
Specifically, first reinforcing rod 7 and the second reinforcing rod 8 are obliquely installed, first reinforcing rod 7 and second Reinforcing rod 8 is fixedly welded on the right side of rack 6, and the third reinforcing rod 10 is also obliquely installed, and the third reinforcing rod 10 is solid Surely it is welded on the left side of rack 6.
Specifically, the leading truck 17 uses C-type steel, the leading truck 17 is fixedly welded between pedestal 1 and rack 6.
Specifically, the upper surface of the hoistable platform 15 is uniformly covered with rubber antiskid pad.
Specifically, the clump weight 4 is solid lead, the push rod 3 is obliquely installed, and is covered with poly- ammonia on the push rod 3 Ester pad.
Working principle: a kind of power construction lifting device of the utility model, in use, operator first will be wait transport Tool and material be placed on hoistable platform 15, then start motor 11, drive reel 13 by wirerope 14 using motor 11 Winding is transported so that hoistable platform 15 rises instead of worker manually, reduces labor intensity, by pushing up in hoistable platform 15 Guardrail 16 is arranged in the edge in portion, prevents article from falling, and by the way that four groups of leading trucks 17 are arranged, makes the guide groove and rolling in leading truck 17 Wheel 18 is correspondingly arranged, so that idler wheel 18 is merely able to move along the guide groove in leading truck 17 when lifting, and then guarantees that lifting is flat The direction of motion of platform 15, and hoistable platform 15 is effectively prevent to turn on one's side because of weighting, reinforced by the first reinforcing rod 7, second of setting Bar 8 and third reinforcing rod 10 improve structural strength, and the bottom of pedestal 1 is equipped with universal wheel 2, and the left side of pedestal 1, which is connected with, to push away Bar 3, movement is convenient, and the left side at 1 top of pedestal is additionally provided with clump weight 4, more stable, is suitble to promote the use of.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of power construction lifting device, including pedestal (1) and hoistable platform (15), it is characterised in that: the pedestal (1) Bottom be equipped with universal wheel (2), be connected with push rod (3) on the left of the pedestal (1), the left side at the top of the pedestal (1) is also Be provided with clump weight (4), the centre at the top of the pedestal (1) by connecting plate (5) connection organic frame (6), the rack (6) and It is additionally provided between connecting plate (5) the first reinforcing rod (7), is fixedly connected with crossbeam (9), the crossbeam at the top of the rack (6) (9) it is fixedly connected between rack (6) the second reinforcing rod (8), is fixedly connected between the rack (6) and pedestal (1) Three reinforcing rods (10), the left side at the top of the crossbeam (9) are equipped with motor (11), and the output end of the motor (11) passes through shaft coupling Device is sequentially connected in the reel (13) being fixed between reel stand (12), and the reel stand (12) is fixed on crossbeam (9), described There is wirerope (14) volume on reel (13), be symmetrically arranged with guardrail (16) at the top of the hoistable platform (15), the guardrail (16) Top be equipped with for lifting hanging ring, one end of the wirerope (14) is fixedly attached to hanging ring, also opens on the crossbeam (9) Equipped with through-hole corresponding with wirerope (14), the front and back of the hoistable platform (15) is respectively connected with the rolling for guiding It takes turns (18), four groups of leading trucks (17) is vertically arranged between the pedestal (1) and rack (6), the leading truck (17) is C Type, guide groove and idler wheel (18) in the leading truck (17) are correspondingly arranged, and the idler wheel (18) is located in guide groove.
2. a kind of power construction lifting device according to claim 1, it is characterised in that: the connecting plate (5) is cut Face is rectangle, and bolt hole is offered on the connecting plate (5), and the connecting plate (5) is bolted to connection in pedestal (1), the pedestal (1) is horizontally disposed, and rack (6) vertical welding is in connecting plate (5).
3. a kind of power construction lifting device according to claim 1, it is characterised in that: first reinforcing rod (7) It is obliquely installed with the second reinforcing rod (8), first reinforcing rod (7) and the second reinforcing rod (8) are fixedly welded on rack (6) Right side, the third reinforcing rod (10) is also obliquely installed, and the third reinforcing rod (10) is fixedly welded on a left side for rack (6) Side.
4. a kind of power construction lifting device according to claim 1, it is characterised in that: the leading truck (17) uses C-type steel, the leading truck (17) are fixedly welded between pedestal (1) and rack (6).
5. a kind of power construction lifting device according to claim 1, it is characterised in that: the hoistable platform (15) Upper surface is uniformly covered with rubber antiskid pad.
6. a kind of power construction lifting device according to claim 1, it is characterised in that: the clump weight (4) is real Heart lead, the push rod (3) are obliquely installed, and are covered with urethane pad on the push rod (3).
CN201820596201.6U 2018-04-25 2018-04-25 A kind of power construction lifting device Active CN208545053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820596201.6U CN208545053U (en) 2018-04-25 2018-04-25 A kind of power construction lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820596201.6U CN208545053U (en) 2018-04-25 2018-04-25 A kind of power construction lifting device

Publications (1)

Publication Number Publication Date
CN208545053U true CN208545053U (en) 2019-02-26

Family

ID=65419627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820596201.6U Active CN208545053U (en) 2018-04-25 2018-04-25 A kind of power construction lifting device

Country Status (1)

Country Link
CN (1) CN208545053U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110407079A (en) * 2019-07-29 2019-11-05 蚌埠市建金智能科技有限公司 A kind of underwater rescue cradle head device
CN111054285A (en) * 2019-12-27 2020-04-24 广州建盛建材有限公司 Device convenient to maintain polycarboxylate high efficiency water reducing agent automatic production system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110407079A (en) * 2019-07-29 2019-11-05 蚌埠市建金智能科技有限公司 A kind of underwater rescue cradle head device
CN111054285A (en) * 2019-12-27 2020-04-24 广州建盛建材有限公司 Device convenient to maintain polycarboxylate high efficiency water reducing agent automatic production system

Similar Documents

Publication Publication Date Title
CN201722965U (en) Balancing and guiding device for pneumatic jacking operation of large storage tank dome
CN208545053U (en) A kind of power construction lifting device
CN104847098A (en) Multi-guide-rail attachment type electric ascending and descending scaffold
CN202054588U (en) Hydraulic lift-type platform for overhaul and maintenance of GW-6 disconnecting links
CN205932929U (en) Large power supply equipment fixing is with hoist and mount framework
CN203373022U (en) Self-lifting type cableway transportation device
CN110040665A (en) It is a kind of terraced using fork truck as the novel ladder of platform
CN206144163U (en) A slip dolly that is used for wall body to print machine people
CN218976148U (en) Electric power overhauls work rack
CN103274310A (en) Self-lifting type cableway transporting device
CN207497964U (en) It is a kind of to sling equipment with steel wire rope
CN207130627U (en) The overhead job platform of bridge construction
CN201868794U (en) Roller pulley trolley for cable laying
CN205709758U (en) A kind of aerial work platform for building
CN206645447U (en) A kind of logistics express mail automatic sorting device
CN206562122U (en) Belt extends servicing unit
CN202953757U (en) Burial pit cover carriage of special steel mill
CN105800473A (en) Gantry crane with material stacking dolly linkage
CN207209863U (en) High heavy burden elevator
CN203284163U (en) Detachable type movable lifting frame
CN206014346U (en) Valve tower module inspection platform
CN110790026A (en) Novel tablet feeding machine and method for coating equipment
CN212044682U (en) PF line removes maintenance platform
CN205520313U (en) Frock is used in equipment of reinforcing bar cylinder mould
CN220926024U (en) High-rise building floor hoisting assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190415

Address after: 050000 B-1-1805, No. 319 Xiangjiang Road, Shijiazhuang High-tech Zone, Hebei Province

Patentee after: Hebei Rongwei Electric Power Engineering Co., Ltd.

Address before: No. 474, North Xuwangcun, Liangji Town, Wuqiao County, Cangzhou City, Hebei Province, 061000

Patentee before: Ma Xinmei