CN208539452U - A kind of communication cable portable pay off rack - Google Patents

A kind of communication cable portable pay off rack Download PDF

Info

Publication number
CN208539452U
CN208539452U CN201820914947.7U CN201820914947U CN208539452U CN 208539452 U CN208539452 U CN 208539452U CN 201820914947 U CN201820914947 U CN 201820914947U CN 208539452 U CN208539452 U CN 208539452U
Authority
CN
China
Prior art keywords
mounting plate
fixed
screw rod
communication cable
belt pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820914947.7U
Other languages
Chinese (zh)
Inventor
潘岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kebandong Wire (shenzhen) Co Ltd
Original Assignee
Kebandong Wire (shenzhen) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kebandong Wire (shenzhen) Co Ltd filed Critical Kebandong Wire (shenzhen) Co Ltd
Priority to CN201820914947.7U priority Critical patent/CN208539452U/en
Application granted granted Critical
Publication of CN208539452U publication Critical patent/CN208539452U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

The utility model relates to pay off rack more particularly to a kind of communication cable portable pay off racks.The technical problem to be solved by the present invention is to provide a kind of unwrapping wire of placement and cable that can be convenient for cable reel, and mitigate the communication cable portable pay off rack of staff's work load.A kind of communication cable portable pay off rack includes the first mounting plate, universal wheel, first motor, first rotating shaft, the first belt pulley, the first flat belt, the second mounting plate, the second shaft, first bearing seat, the second belt pulley, bindiny mechanism, rotation axis, snap-gauge, elevating mechanism, the second flat belt, third mounting plate, the second motor, third shaft and third belt pulley.The utility model, which has reached, carries out high speed payout to communication cable, and unwrapping wire process can reduce the effect of the work load of staff, be cooperated by the second motor and elevating mechanism.

Description

A kind of communication cable portable pay off rack
Technical field
The utility model relates to pay off rack more particularly to a kind of communication cable portable pay off racks.
Background technique
Communication needs to use the transmission that cable carries out data, therefore cable needs to carry out the laying of long range, current Cable is usually to be wound on cable reel, and cable reel unwrapping wire needs use pay off rack after manufacture, but current unwrapping wire Frame is not easy to move, and the placement process of cable reel is time-consuming and laborious, and needs staff to pull cable manually when cable drum It carries out, increases the work load of staff.
Such as application number: a kind of cable pay-off rack of CN201621265912.2, including pedestal, in the middle part of pedestal is equipped with Core bar is equipped with plane needle bearing on pedestal, and pallet is equipped on plane needle bearing, and pallet passes through center-pole, pallet Middle part is equipped with rolling bearing, and rolling bearing is sheathed on center-pole;On center-pole, the top of rolling bearing is stopped equipped with limit Gear.The utility model provides a kind of cable pay-off rack, changes the structure of pay off rack, makes cable pay-off rack be easier to carry, reduces Pay off rack volume, reduces the time of pay off rack on cable reel, improves the efficiency of cable laying.
It is mobile that above-mentioned patented invention solves the problems, such as pay off rack, but still can not solve cable reel and place and unwrapping wire Problem causes the work load of staff to increase.
Therefore need to research and develop a kind of unwrapping wire of placement and cable that can be convenient for cable reel, and mitigate staff's work The communication cable of burden portable pay off rack.
Utility model content
For the utility model in order to overcome current pay off rack to be not easy to move, the placement process of cable reel is time-consuming and laborious, and And the shortcomings that needing staff to pull cable progress manually when cable drum, increasing the work load of staff, this reality It is to provide a kind of unwrapping wire of placement and cable that can be convenient for cable reel with novel technical problems to be solved, and mitigates work The communication cable portable pay off rack of person works' burden.
The utility model is reached by technological means in detail below:
A kind of communication cable portable pay off rack, include the first mounting plate, universal wheel, first motor, first rotating shaft, First belt pulley, the first flat belt, the second mounting plate, the second shaft, first bearing seat, the second belt pulley, bindiny mechanism, rotation Axis, snap-gauge, elevating mechanism, the second flat belt, third mounting plate, the second motor, third shaft and third belt pulley;Second installation Plate is fixed in one side of the first mounting plate, and third mounting plate is fixed in first mounting plate the other side;Universal wheel is fixed in first Mounting plate bottom, first motor are fixed in a side of first mounting plate far from third mounting plate, and the second motor is fixed in third Mounting plate is close to a side of the second mounting plate;First rotating shaft one end and the output end driven type of first motor connect, another End and the first belt pulley are affixed;Second mounting plate offers the first through hole passed through for first rotating shaft, and first bearing seat is embedded in Second mounting plate is pivotally connected close to a side of the first mounting plate, the second shaft one end and first bearing seat, and the other end passes through Bindiny mechanism and rotation axis connection;Second belt pulley is fixed in the second shaft, and is passed by the first flat belt and the first belt pulley Dynamic formula connection;Snap-gauge is fixed in one end of the rotation axis far from bindiny mechanism, and elevating mechanism is fixed at the top of the first mounting plate, the The output end of three shaft tops and the second motor is sequentially connected, and third belt pulley is fixed in third shaft bottom end, third belt pulley It is connect by the second flat belt with elevating mechanism driven type.
Further, bindiny mechanism includes the first screw rod and the first nut;Second shaft and rotation axis inserting cooperate, the Two shafts offer third through-hole close to the one end of rotation axis, and rotation axis offers second close to the one end of the second shaft and leads to Hole, the first screw rod passes through the second through-hole, third through-hole is spirally connected with the first nut.
Further, elevating mechanism includes second bearing seat, the 4th belt pulley, the second nut, the first screw rod, lifting Plate, sliding block and sliding rail;Second bearing seat is fixed in a side of first mounting plate close to the second motor, and sliding rail is fixed in the first peace Loading board is pivotally connected close to a side of the second mounting plate, the first screw rod bottom end and second bearing seat;4th belt pulley is fixed in first Screw rod, and connect by the second flat belt with third pulley drive;Second nut is spirally connected with the first screw rod;Lifter plate one end Affixed with the second nut, the other end is slidably connected by sliding block and sliding rail.
Further, placing groove is also provided at the top of lifter plate.
Further, which further includes having the first protecting frame, the first cover board, the second lid Plate, the second protecting frame, the first wing bolt and the second wing bolt;First protecting frame is fixed at the top of the first mounting plate, and the One motor is located inside the first protecting frame;First cover board, one side and the first protecting frame are hinged, and the other side offers the first spiral shell Pit;First protecting frame offers the second threaded hole, the first wing bolt and the first threaded hole, the second screw hole;Second Protecting frame is fixed in one side of third mounting plate, and the second motor is located inside the second protecting frame;Second cover board bottom and second Protecting frame is hinged, offers the 4th threaded hole at the top of the second cover board, the second protecting frame offers third threaded hole, the second butterfly spiral shell Bolt and third threaded hole, the 4th screw hole.
Further, which further includes having turntable, third nut, the second screw rod and fixation Plate;Third nut is embedded in the first mounting plate close to one end of first motor, and the second screw rod is spirally connected with third nut, and turntable is fixed in Second screw mandrel top, fixed plate are fixed in the second screw rod bottom end.
Further, which further includes having weather shield;Weather shield is fixed in the second installation At the top of plate.
Further, which further includes having fixed link and the second screw rod;Rotation axis opens up There are the 5th threaded hole, the second screw rod and the 5th screw hole, fixed link one end and the second screw rod are affixed.
Compared with prior art, the utility model has the following beneficial effects:
The utility model, which has reached, carries out high speed payout to communication cable, and unwrapping wire process can reduce staff's The effect of work load is cooperated by the second motor and elevating mechanism, easily can vertically carry cable reel, alleviate The work load of staff, and handling process will not enable cable reel to artificial at danger, by driving first motor It is enough voluntarily to rotate, therefore cable drum does not need staff and firmly pulls, and alleviates the work load of staff.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the utility model.
Fig. 2 is the schematic view of the front view of the utility model bindiny mechanism.
Fig. 3 is the first schematic view of the front view of the utility model elevating mechanism.
Fig. 4 is the first schematic view of the front view of the utility model elevating mechanism.
Fig. 5 is second of schematic view of the front view of the utility model.
Fig. 6 is the amplification schematic view of the front view of A in the utility model Fig. 5.
Fig. 7 is the amplification schematic view of the front view of B in the utility model Fig. 5.
Fig. 8 is the third schematic view of the front view of the utility model.
Fig. 9 is the 4th kind of schematic view of the front view of the utility model.
Figure 10 is the amplification schematic view of the front view of C in the utility model Fig. 9.
The label in accompanying drawing is: the first mounting plate of 1-, 2- universal wheel, 3- first motor, 4- first through hole, first turn of 5- Axis, the first belt pulley of 6-, the first flat belt of 7-, the second mounting plate of 8-, the second shaft of 9-, 10- first bearing seat, the second skin of 11- Belt wheel, 12- bindiny mechanism, the second through-hole of 121-, 122- third through-hole, the first screw rod of 123-, the first nut of 124-, 13- rotation Axis, 14- snap-gauge, 15- elevating mechanism, 151- second bearing seat, the 4th belt pulley of 152-, the second nut of 153-, 154- first Bar, 155- lifter plate, 156- sliding block, 157- sliding rail, 158- placing groove, the second flat belt of 16-, 17- third mounting plate, 18- Two motors, 19- third shaft, 20- third belt pulley, the first protecting frame of 21-, the first cover board of 22-, the second cover board of 23-, 24- Two protecting frames, the first wing bolt of 25-, the first threaded hole of 26-, the second threaded hole of 27-, the second wing bolt of 28-, 29- third Threaded hole, the 4th threaded hole of 30-, 31- turntable, 32- third nut, the second screw rod of 33-, 34- fixed plate, 35- weather shield, 36- Fixed link, the 5th threaded hole of 37-, the second screw rod of 38-.
Specific embodiment
The utility model is described further below in conjunction with attached drawing:
Embodiment
A kind of communication cable portable pay off rack includes as Figure 1-10 shows the first mounting plate 1, universal wheel 2, One motor 3, first rotating shaft 5, the first belt pulley 6, the first flat belt 7, the second mounting plate 8, the second shaft 9, first bearing seat 10, Second belt pulley 11, bindiny mechanism 12, rotation axis 13, snap-gauge 14, elevating mechanism 15, the second flat belt 16, third mounting plate 17, Second motor 18, third shaft 19 and third belt pulley 20;Second mounting plate 8 is fixed in 1 one side of the first mounting plate, third peace Loading board 17 is fixed in 1 the other side of the first mounting plate;Universal wheel 2 is fixed in 1 bottom of the first mounting plate, and first motor 3 is fixed in A side of first mounting plate 1 far from third mounting plate 17, the second motor 18 are fixed in third mounting plate 17 close to the second installation One side of plate 8;5 one end of first rotating shaft is connect with the output end driven type of first motor 3, the other end and the first belt pulley 6 is affixed;Second mounting plate 8 offers the first through hole 4 passed through for first rotating shaft 5, and first bearing seat 10 is embedded in the second mounting plate 8 Close to a side of the first mounting plate 1,9 one end of the second shaft and first bearing seat 10 are pivotally connected, and the other end passes through connection machine Structure 12 is connect with rotation axis 13;Second belt pulley 11 is fixed in the second shaft 9, and passes through the first flat belt 7 and the first belt pulley 6 Driven type connection;Snap-gauge 14 is fixed in one end of the rotation axis 13 far from bindiny mechanism 12, and elevating mechanism 15 is fixed in the first peace The output end of 1 top of loading board, 19 top of third shaft and the second motor 18 is sequentially connected, and third belt pulley 20 is fixed in third and turns 19 bottom end of axis, third belt pulley 20 are connect by the second flat belt 16 with 15 driven type of elevating mechanism.
Rotation axis 13 is removed from the second shaft 9 by bindiny mechanism 12, convenient for the placement work of communication cable disk, then Communication cable disk is placed in elevating mechanism 15, the second motor 18 of control rotates clockwise, and the second motor 18 is turned by third Axis 19 drives third belt pulley 20 to rotate clockwise, and the second flat belt 16 promotes elevating mechanism 15 to be promoted to cable reel and second 9 horizontal position of shaft, then rotation axis 13 is passed through among cable reel, and is attached by bindiny mechanism 12 with the second shaft 9, Cable reel is fixed in rotation axis 13 by snap-gauge 14, prevents cable reel from falling in unwrapping wire process, is solved and is placed cable reel at present More people are needed to lift, placement process is time-consuming and laborious, and there may be danger, it is operated again by the second motor 18 of control at this time, The output end of elevating mechanism 15 is restored to initial position.
The pay off rack is moved to the place that cable needs unwrapping wire by universal wheel 2, and staff is by one end of cable from electricity It is removed on cable disk, and cable is pulled to walk to outside, while controlling the rotation of first motor 3, made by the transmission of the first flat belt 7 With the second shaft 9, rotation axis 13 start turning, therefore cable reel unwrapping wire process, do not need staff firmly by cable from electricity Cable disk pull-up, which pulls, to be come, and when alleviating the work load of staff, and being able to solve cable and do not need unwrapping wire, cable holds The problem of easily being laid out from cable reel.
Wherein, bindiny mechanism 12 includes the first screw rod 123 and the first nut 124;Second shaft 9 is inserted with rotation axis 13 Cooperation, the second shaft 9 offer third through-hole 122 close to the one end of rotation axis 13, rotation axis 13 close to the second shaft 9 one End offers the second through-hole 121, and the first screw rod 123 passes through 124 spiral shell of the second through-hole 121, third through-hole 122 and the first nut It connects.
First nut 124 is screwed out from the first screw rod 123, then the first screw rod 123 is led to from the second through-hole 121, third It is extracted in hole 122, rotation axis 13 just can be removed from the second shaft 9 at this time, when cable reel is moved to 9 one side of the second shaft When, rotation axis 13 is passed through into cable reel, and insert and cooperate with the second shaft 9, the first screw rod 123 is inserted into the second through-hole 121, the Three through-holes 122, then the first nut 124 is screwed in the first screw rod 123, so that the fixation of rotation axis 13 is completed, so convenient for electricity The placement of cable disk.
Wherein, elevating mechanism 15 includes second bearing seat 151, the 4th belt pulley 152, the second nut 153, the first screw rod 154, lifter plate 155, sliding block 156 and sliding rail 157;Second bearing seat 151 is fixed in the first mounting plate 1 close to the second motor 18 One side, sliding rail 157 are fixed in the first mounting plate 1 close to a side of the second mounting plate 8,154 bottom end of the first screw rod and second Bearing block 151 is pivotally connected;4th belt pulley 152 is fixed in the first screw rod 154, and passes through the second flat belt 16 and third belt pulley 20 Transmission connection;Second nut 153 is spirally connected with the first screw rod 154;155 one end of lifter plate and the second nut 153 are affixed, the other end Portion is slidably connected by sliding block 156 with sliding rail 157.
Cable reel is placed in lifter plate 155, by driving the second motor 18 work, enables the first screw rod 154 suitable Hour hands rotation, since the first screw rod 154 and the second nut 153 are spirally connected, lifter plate 155 is by sliding block 156 along 157 rail of sliding rail Mark rises, and is fixed so that cable reel is carried to 9 side of the second shaft, solves carrying cable reel at present and more people is needed to remove The problem of fortune, increase staff's work load.
Wherein, it is also provided with placing groove 158 at the top of lifter plate 155, cable reel is placed in placing groove 158, electricity is prevented Cable disk is easy to fall from lifter plate 155 in the handling process.
Wherein, which further includes having the first protecting frame 21, the first cover board 22, the second cover board 23, the second protecting frame 24, the first wing bolt 25 and the second wing bolt 28;First protecting frame 21 is fixed in the first mounting plate 1 Top, and first motor 3 is located inside the first protecting frame 21;First cover board, 22 1 side and the first protecting frame 21 are hinged, another Side offers the first threaded hole 26;First protecting frame 21 offers the second threaded hole 27, the first wing bolt 25 and the first spiral shell Pit 26, the second threaded hole 27 are spirally connected;Second protecting frame 24 is fixed in 17 1 side of third mounting plate, and the second motor 18 is located at Inside second protecting frame 24;Second cover board, 23 bottom and the second protecting frame 24 are hinged, offer the 4th spiral shell at the top of the second cover board 23 Pit 30, the second protecting frame 24 offer third threaded hole 29, the second wing bolt 28 and third threaded hole 29, the 4th threaded hole 30 are spirally connected.
First protecting frame 21 plays the role of protection to first motor 3, the first wing bolt 25 is rotated clockwise, by first Wing bolt 25 is screwed out out of second threaded hole 27, and the first cover board 22 just can be opened at this time, to determine first motor 3 The maintenance and repair of phase, the second protecting frame 24 play the role of protection to the second motor 18, rotate clockwise the second wing bolt 28, the second wing bolt 28 is screwed out out of the 4th threaded hole 30, the second cover board 23 just can be opened at this time, thus to the second electricity Machine 18 carries out regularly maintenance and repair, guarantees that pay off rack is able to use more permanent.
Wherein, which further includes having turntable 31, third nut 32, the second screw rod 33 and consolidating Fixed board 34;Third nut 32 is embedded in the first mounting plate 1 close to one end of first motor 3, the second screw rod 33 and 32 spiral shell of third nut It connects, turntable 31 is fixed in 33 top of the second screw rod, and fixed plate 34 is fixed in 33 bottom end of the second screw rod.
Turntable 31 is rotated clockwise, since the second screw rod 33 is spirally connected with third nut 32, turntable 31 drives the second screw rod 33 It rotates down clockwise, to push fixed plate 34 to ground, and is squeezed with ground, pass through the friction of fixed plate 34 Power when needing mobile pay off rack, need to only rotate counterclockwise turntable so that the pay off rack will not move easily in the process of laying the line 31, allow fixed plate 34 and surface separation, such pay off rack is just able to carry out movement.
Wherein, which further includes having weather shield 35;Weather shield 35 is fixed in the second installation 8 top of plate, influences the setting-out work of cable when weather shield 35 prevents from raining.
Wherein, which further includes having fixed link 36 and the second screw rod 38;Rotation axis 13 is opened Equipped with the 5th threaded hole 37, the second screw rod 38 is spirally connected with the 5th threaded hole 37, and 36 one end of fixed link and the second screw rod 38 are affixed, Second screw rod 38 is screwed in the 5th threaded hole 37, such fixed link 36 can limit cable reel, prevent cable reel from existing Bindiny mechanism 12 is touched in rotation process, so as to cause cable reel damage.
The control mode of the utility model is automatically controlled by controller, and the control circuit of controller passes through this field Technical staff's simple programming can be realized, the offer of power supply also belongs to the common knowledge of this field, and the utility model master To be used to protect mechanical device, so the utility model is not explained control mode and circuit connection.
The opening in technical solutions of the utility model using technical solution described in the utility model or those skilled in the art It gives, designs similar technical solution, and reach above-mentioned technical effect, be to fall into the protection scope of the utility model.

Claims (8)

1. a kind of communication cable portable pay off rack, which is characterized in that include the first mounting plate (1), universal wheel (2), One motor (3), first rotating shaft (5), the first belt pulley (6), the first flat belt (7), the second mounting plate (8), the second shaft (9), First bearing seat (10), the second belt pulley (11), bindiny mechanism (12), rotation axis (13), snap-gauge (14), elevating mechanism (15), Second flat belt (16), third mounting plate (17), the second motor (18), third shaft (19) and third belt pulley (20);Second Mounting plate (8) is fixed in (1) one side of the first mounting plate, and third mounting plate (17) is fixed in the first mounting plate (1) the other side; Universal wheel (2) is fixed in the first mounting plate (1) bottom, and first motor (3) is fixed in the first mounting plate (1) far from third mounting plate (17) a side, the second motor (18) are fixed in the side of third mounting plate (17) close to the second mounting plate (8);First turn Axis (5) one end is connect with the output end driven type of first motor (3), and the other end and the first belt pulley (6) are affixed;Second peace Loading board (8) offers the first through hole (4) passed through for first rotating shaft (5), and first bearing seat (10) is leaned on embedded in the second mounting plate (8) One side of nearly first mounting plate (1), the second shaft (9) one end and first bearing seat (10) are pivotally connected, and the other end passes through company Connection mechanism (12) is connect with rotation axis (13);Second belt pulley (11) is fixed in the second shaft (9), and passes through the first flat belt (7) it is connect with the first belt pulley (6) driven type;Snap-gauge (14) is fixed in the one end of rotation axis (13) far from bindiny mechanism (12) Portion, elevating mechanism (15) are fixed at the top of the first mounting plate (1), the output end on third shaft (19) top and the second motor (18) Transmission connection, third belt pulley (20) are fixed in third shaft (19) bottom end, and third belt pulley (20) passes through the second flat belt (16) it is connect with elevating mechanism (15) driven type.
2. a kind of communication cable portable pay off rack according to claim 1, which is characterized in that bindiny mechanism (12) packet The first screw rod (123) and the first nut (124) are included;Second shaft (9) and rotation axis (13) inserting cooperate, the second shaft (9) One end close to rotation axis (13) offers third through-hole (122), and one end of the rotation axis (13) close to the second shaft (9) is opened Equipped with the second through-hole (121), the first screw rod (123) passes through the second through-hole (121), third through-hole (122) and the first nut (124) It is spirally connected.
3. a kind of communication cable portable pay off rack according to claim 2, which is characterized in that elevating mechanism (15) packet Included second bearing seat (151), the 4th belt pulley (152), the second nut (153), the first screw rod (154), lifter plate (155), Sliding block (156) and sliding rail (157);Second bearing seat (151) is fixed in the side of the first mounting plate (1) close to the second motor (18) Portion, sliding rail (157) be fixed in the first mounting plate (1) close to the second mounting plate (8) a side, the first screw rod (154) bottom end with Second bearing seat (151) pivot joint;4th belt pulley (152) is fixed in the first screw rod (154), and by the second flat belt (16) with Third belt pulley (20) transmission connection;Second nut (153) is spirally connected with the first screw rod (154);Lifter plate (155) one end and Two nuts (153) are affixed, and the other end is slidably connected by sliding block (156) with sliding rail (157).
4. a kind of communication cable portable pay off rack according to claim 3, which is characterized in that lifter plate (155) top Portion is also provided with placing groove (158).
5. a kind of communication cable portable pay off rack according to claim 4, which is characterized in that the communication cable is with just Prompt formula pay off rack further includes having the first protecting frame (21), the first cover board (22), the second cover board (23), the second protecting frame (24), One wing bolt (25) and the second wing bolt (28);First protecting frame (21) is fixed at the top of the first mounting plate (1), and first It is internal that motor (3) is located at the first protecting frame (21);(22) one side of first cover board and the first protecting frame (21) hingedly, the other side Offer the first threaded hole (26);First protecting frame (21) offers the second threaded hole (27), the first wing bolt (25) and the One threaded hole (26), the second threaded hole (27) are spirally connected;Second protecting frame (24) is fixed in (17) one side of third mounting plate, and It is internal that two motors (18) are located at the second protecting frame (24);Hingedly, second covers for second cover board (23) bottom and the second protecting frame (24) The 4th threaded hole (30) is offered at the top of plate (23), the second protecting frame (24) offers third threaded hole (29), the second butterfly spiral shell Bolt (28) is spirally connected with third threaded hole (29), the 4th threaded hole (30).
6. a kind of communication cable portable pay off rack according to claim 5, which is characterized in that the communication cable is with just Prompt formula pay off rack further includes having turntable (31), third nut (32), the second screw rod (33) and fixed plate (34);Third nut (32) Embedded in the first mounting plate (1) close to the one end of first motor (3), the second screw rod (33) is spirally connected with third nut (32), turntable (31) it is fixed in the second screw rod (33) top, fixed plate (34) is fixed in the second screw rod (33) bottom end.
7. a kind of communication cable portable pay off rack according to claim 6, which is characterized in that the communication cable is with just Prompt formula pay off rack further includes having weather shield (35);Weather shield (35) is fixed at the top of the second mounting plate (8).
8. a kind of communication cable portable pay off rack according to claim 7, which is characterized in that the communication cable is with just Prompt formula pay off rack further includes having fixed link (36) and the second screw rod (38);Rotation axis (13) offers the 5th threaded hole (37), the Two screw rods (38) are spirally connected with the 5th threaded hole (37), and fixed link (36) one end and the second screw rod (38) are affixed.
CN201820914947.7U 2018-06-13 2018-06-13 A kind of communication cable portable pay off rack Expired - Fee Related CN208539452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820914947.7U CN208539452U (en) 2018-06-13 2018-06-13 A kind of communication cable portable pay off rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820914947.7U CN208539452U (en) 2018-06-13 2018-06-13 A kind of communication cable portable pay off rack

Publications (1)

Publication Number Publication Date
CN208539452U true CN208539452U (en) 2019-02-22

Family

ID=65391672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820914947.7U Expired - Fee Related CN208539452U (en) 2018-06-13 2018-06-13 A kind of communication cable portable pay off rack

Country Status (1)

Country Link
CN (1) CN208539452U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110668252A (en) * 2019-10-09 2020-01-10 国网辽宁省电力有限公司盘锦供电公司 Automatic pay-off of control cable
CN113479703A (en) * 2021-06-01 2021-10-08 中国水利水电第四工程局有限公司 Cable pay-off device for urban comprehensive pipe rack

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110668252A (en) * 2019-10-09 2020-01-10 国网辽宁省电力有限公司盘锦供电公司 Automatic pay-off of control cable
CN113479703A (en) * 2021-06-01 2021-10-08 中国水利水电第四工程局有限公司 Cable pay-off device for urban comprehensive pipe rack

Similar Documents

Publication Publication Date Title
CN208539452U (en) A kind of communication cable portable pay off rack
CN207242316U (en) A kind of power construction portable tool box
CN108773726A (en) A kind of easy-to-dismount paying out machine of cable
CN106927302A (en) A kind of safety type power cable can wind access device
CN107545989B (en) A kind of transformer installation lifting apparatus
CN206886415U (en) A kind of wire winding device
CN204835319U (en) Platform is overhauld to substation equipment fortune dimension
CN107327202A (en) It is a kind of that the vertical equipment directly installed can be carried out to concrete wire pole
CN207348100U (en) A kind of municipal administration well cover for sewer more changing device
CN207228015U (en) A kind of gardens are dropped with branch picks up a device
CN212101671U (en) Hoisting device
CN111731984A (en) Lifting equipment for warehousing loading and unloading
CN108055953B (en) Multi-angle automatic stop type tree straw bundling rope robot
CN107840191A (en) A kind of silica gel high-voltage line uniformly receives winding apparatus with lift
CN207061538U (en) A kind of electric power cable windings frame for building
CN208907024U (en) A kind of power construction cable manhole cover hoisting device
CN206799436U (en) A kind of solar energy photovoltaic glass production glass cutting device
CN208143998U (en) A kind of large cherry greenhouse lifts ejection device automatically
CN206949189U (en) A kind of plant portable type pig feed adding set
CN107472655B (en) A kind of transport installation equipment for electric pole
CN206886406U (en) A kind of cable automatic coil winding machine
CN216129255U (en) Novel marsh gas torch construction is with lifting transport device
CN108083003A (en) A kind of electric power cable pay-off rack
CN217692232U (en) Low-voltage power distribution cabinet convenient to overhaul
CN219297104U (en) Automatic auxiliary overhaul equipment for electrical engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190222