CN208518137U CN201821190496.3U CN201821190496U CN208518137U CN 208518137 U CN208518137 U CN 208518137U CN 201821190496 U CN201821190496 U CN 201821190496U CN 208518137 U CN208518137 U CN 208518137U
Authority
CN
China
Prior art keywords
closed
section steel
steel
steel deck
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821190496.3U
Other languages
Chinese (zh)
Inventor
郭兰慧
张素梅
李志国
侯健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology
Original Assignee
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology filed Critical Harbin Institute of Technology
Priority to CN201821190496.3U priority Critical patent/CN208518137U/en
Application granted granted Critical
Publication of CN208518137U publication Critical patent/CN208518137U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A kind of closed-section steel deck combined concrete shear wall connecting node, it belongs to building structure field, it includes first edge stiffener, second edge stiffener, closed-section steel deck, shear connector, bar dowel, node connecting plate and concrete;First edge stiffener and second edge stiffener are arranged side by side, two sides are each provided with two opposed closed-section steel decks up and down between first edge stiffener and second edge stiffener, a plurality of rib of slab is respectively provided on closed-section steel deck inner surface along longitudinal direction, bar dowel is welded at the top of the rib of slab of closed-section steel deck, and one end of the bar dowel is stretched out at the docking of two closed-section steel decks of the same side, guarantee that the internal force of top floor effectively passes to lower part floor, is equipped with node connecting plate at two closed-section steel deck docking of the same side.The utility model stress is clear, easy for construction, and wall has preferable bearing capacity, ensure that node bonding strength.

Description

A kind of closed-section steel deck combined concrete shear wall connecting node
Technical field
The utility model relates to a kind of closed-section steel deck combined concrete shear wall connecting nodes, belong to building structure Field.
Background technique
Shear wall is most common a kind of lateral resistant member in skyscraper, and conventional steel bar concrete shear wall is with its entirety Property it is good, rigidity is big, lateral deformation is small, resist the advantages that wind load and medium and small grade earthquake effect are prominent and fire protecting performance is good, by The favor of numerous engineers and technicians.But reinforced concrete shear wall rigidity is big, and biggish level is born under seismic force effects Power, crack generation is more early, and the later period, ductility was small, energy dissipation capacity is poor based on failure by shear, is in brittle break, is not easily repaired after shake. Steel plate-concrete combined shear wall improves the deficiency of reinforced concrete shear wall, steel plate and concrete composite to a certain extent Shear wall, which refers to, is arranged steel plate in concrete two sides, by shear connector junction steel plate and concrete, makes the two as a whole It works together, steel plate-concrete combined shear wall shear-carrying capacity with higher, good ductility and energy dissipation capacity.But it wants Guarantee that steel plate-concrete combined shear wall light plate is cut buckling failure, guarantee that steel plate works together as a whole with concrete, Shear connector or the intensive ribbed stiffener of setting need to be covered on the steel plate, cause the design, manufacture and construction of shear wall complicated, cost Increase;It is simultaneously processing, production and the installation accuracy requirement for guaranteeing steel plate, " steel plate shear force wall technical regulation " (JGJ/T380- 2015) minimum thickness of unilateral steel plate is not preferably less than 10mm, and thickness of wall body in clear stipulaties steel plate-concrete combined shear wall It is not preferably less than 250mm, limits application of the steel plate-concrete combined shear wall in multi- story and high- rise building.In addition, to prevent from pouring It builds Concrete light plate and the mould phenomenon that rises occurs, a large amount of supports need to be set in steel plate two sides, increase the complexity of construction.It closes Shape of the mouth as one speaks profiled sheet compound shear wall, which efficiently solves, needs setting to socket key in double steel plate combined concrete shear wall, construction is complicated The problem of, using the geometrical property of closed-section steel deck itself, when casting concrete, closed-section steel deck has biggish Out of plane stiffness is able to satisfy the demand of casting concrete, and after concrete hardening, closed-section steel deck is embedded in concrete Portion can effectively anchor profiled sheet, avoid the problem of setting shear connector is needed in common double steel plate shear wall, while silent Type profiled sheet thickness can be adjusted accordingly according to bearing capacity and anti-side rigidity demand, compensate for steel in double steel plate shear wall The excessive problem of plate thickness, it is more economical, reasonable.Since closed type floor is inside wall, and steel plate is relatively thin, connection compared with For difficulty, thus the connection of closed-section steel deck compound shear wall medium-pressure type steel plate be limit its engineer application critical issue it One.
Utility model content
The utility model is to overcome the shortcomings of the existing technology, propose that a kind of stress is clear, closed type die mould steel easy for construction Plate concrete combined shear wall connecting node.
The utility model adopts the technical scheme that in order to solve the above problem:
A kind of closed-section steel deck combined concrete shear wall connecting node, it includes first edge stiffener, Two Edge Enhancement components, closed-section steel deck, shear connector, bar dowel, node connecting plate and concrete;
First edge stiffener and second edge stiffener are arranged side by side, first edge stiffener and second edge Two opposed closed-section steel decks, and first edge stiffener, the second side is respectively arranged in two sides up and down between stiffener Edge stiffener is connected with closed-section steel deck three surrounds a hollow building enclosure, on closed-section steel deck inner surface It is respectively provided with a plurality of rib of slab along longitudinal direction, a plurality of rib of slab interval is arranged, welding short steel rod at the top of the rib of slab of closed-section steel deck, and One end of the bar dowel is stretched out at the docking of two closed-section steel decks of the same side, guarantees that the internal force of top floor effectively passes Lower part floor is passed, node connecting plate is equipped at two closed-section steel deck docking of the same side, is set in hollow building enclosure There is the shear connector being connected with first edge stiffener and second edge stiffener, has been poured in hollow building enclosure mixed Solidifying soil.
The beneficial effect of the utility model compared with prior art is: closed-section steel deck combined concrete shear wall is by two Side closed-section steel deck, concrete and edge constraint component composition, the fin of closure are divided into profiled sheet multiple vertical Strip makes general steel plate be changed into multiple strips by being cut in integral planar and individually cut.Preliminary analysis shows: closed type die mould Steel plate concrete combined shear wall utilizes the compound action of profiled sheet and concrete, can give full play to two kinds of materials itself is excellent Gesture shows higher bearing capacity, good energy dissipation capacity and deformability under lateral force and longitudinal force collective effect.It closes Degree of lip-rounding fin is embedded in inside concrete, can effectively anchor profiled sheet, is it is not necessary that shear connector is arranged in hollow building enclosure It can guarantee that profiled sheet and concrete work together as a whole;Silent shape fin can be used as effective support of steel plate, improve Stability of the profiled sheet under vertical force and reciprocal horizontal load action, significantly improves the bearing capacity of profiled sheet;This Outside, profiled sheet has biggish out of plane stiffness, and the only a small amount of support of setting can meet construction requirement, and it is difficult to reduce construction Degree.The connecting node construction method of the utility model overcomes profiled sheet thinner thickness, more tired using butt weld connection Difficult problem.The utility model solves the problems such as existing Seismic Behavior of Reinforced Concrete Walls Strengthened is poor, easy to crack;Avoid steel Be arranged that a large amount of shear connectors, steel plate thickness be excessive in plate-combined concrete shear wall and concreting process in easily rise The problems such as mould;Affixed bar dowel and node connecting plate, solve profiled sheet in succession at the rib of slab of closed-section steel deck The place's of connecing intensity is not easy the problem of guaranteeing.
Detailed description of the invention
Fig. 1 is the utility model closed-section steel deck combined concrete shear wall connecting node schematic diagram;
Fig. 2 is the A-A section signal that Edge Enhancement component is all arranged using steel pipe and upper and lower two sides bar dowel in Fig. 1 Figure;
Fig. 3 is that Edge Enhancement component is illustrated using the A-A section of steel pipe and upper and lower two sides bar dowel dislocation arrangement in Fig. 1 Figure;
Fig. 4 is that Edge Enhancement component is shown using the A-A section that I-steel and upper and lower two sides bar dowel are all arranged in Fig. 1 It is intended to;
Fig. 5 is that Edge Enhancement component is shown using the A-A section of I-steel and upper and lower two sides bar dowel dislocation arrangement in Fig. 1 It is intended to;
Fig. 6 is the sectional view of the closed-section steel deck of the up-side down triangle rib of slab with lower mouth semi-closed;
Fig. 7 is the sectional view of the closed-section steel deck for the dovetail type rib of slab being closed with lower mouth.
Specific embodiment
The technical solution of the utility model is further described with reference to the accompanying drawings and detailed description:
Referring to shown in Fig. 1-Fig. 5, a kind of closed-section steel deck combined concrete shear wall connecting node, it includes first Edge Enhancement component 1, second edge stiffener 2, closed-section steel deck 3, shear connector 4, bar dowel 5, node connection Plate 6 and concrete seven;
First edge stiffener 1 and second edge stiffener 2 are arranged side by side, first edge stiffener 1 and second Two sides are each provided with two opposed closed-section steel decks 3, and first edge stiffener up and down between Edge Enhancement component 2 1, second edge stiffener 2 is connected with 3 three of closed-section steel deck surrounds a hollow building enclosure, closed type die mould steel A plurality of rib of slab 3-1, a plurality of rib of slab 3-1 arranged for interval, the plate of closed-section steel deck 3 are respectively provided on 3 inner surface of plate along longitudinal direction Welding short steel rod 5 at the top of rib 3-1, and the opposed of two closed-section steel decks 3 of the same side is stretched out in one end of the bar dowel 5 Place, the opposed place of two closed-section steel decks 3 of the same side are equipped with node connecting plate 6, are equipped with and first in hollow building enclosure The shear connector 4 that Edge Enhancement component 1 is connected with second edge stiffener 2 has poured concrete in hollow building enclosure 7。
In present embodiment, two sides are respectively arranged up and down between first edge stiffener 1 and second edge stiffener 2 Two closed-section steel decks 3 for thering is docking to be arranged, as shown in Figure 1.Profiled sheet has biggish out of plane stiffness, is only arranged A small amount of support can meet construction requirement, reduce difficulty of construction.Node connecting plate 6 can be welded with two closed-section steel decks 3 It connects.
Referring to shown in Fig. 6 and Fig. 7, in order to improve the bearing capacity of shear wall, there is good energy dissipation capacity and deformation energy Power, the rib of slab 3-1 of closed-section steel deck 3 are the up-side down triangle fin of lower mouth semi-closed.The rib of slab 3- of closed-section steel deck 3 The 1 dovetail type fin being closed for lower mouth.Profiled sheet is divided into multiple vertical plate bands by the rib of slab of closure, makes general steel plate by whole The flat shear in plane of body is changed into multiple strips and is individually cut.Silent shape rib of slab is embedded in inside concrete, can effectively anchor die mould steel Plate can guarantee that profiled sheet and concrete work together as a whole without shear connector;Silent shape rib of slab can be used as steel Effective support of plate improves stability of the profiled sheet under vertical force and reciprocal horizontal load action, significantly improves The bearing capacity of profiled sheet.
In order to further decrease difficulty of construction, first edge stiffener 1 and second edge stiffener 2 be I-steel or Steel pipe or channel steel.What Fig. 2 and Fig. 3 example provided is rectangular steel tube as first edge stiffener 1 and second edge reinforcement structure Part 2.What Fig. 4 and Fig. 5 example provided is I-steel as first edge stiffener 1 and second edge stiffener 2.
In order to which appropriateness reinforces first edge stiffener 1 and second edge stiffener 2, it is ensured that connection is reliable, with first The shear connector 4 that Edge Enhancement component 1 and second edge stiffener 2 connect is using peg, angle steel or channel steel.It is such to set It sets it is not necessary that shear connector is arranged in hollow encirclement structure, that is, can guarantee profiled sheet and concrete common work as a whole Make.
In general, the material of closed-section steel deck 3 is Q235 steel, Q345 steel, Q390 steel or Q420 steel.Node connecting plate 6 Material be Q235 steel, Q345 steel, Q390 steel or Q420 steel.Bar dowel 5 is HPB235 reinforcing bar, HRB335 reinforcing bar, HRB400 steel Muscle or RRB400 reinforcing bar.So set, materials are convenient.
Referring to shown in Fig. 1, Fig. 2 and Fig. 4, another embodiment also provides a kind of closed-section steel deck Combined concrete The production method of shear wall connecting node, includes the following steps:
Step 1: first edge stiffener 1 is connected with shear connector 4 by welding manner;
Step 2: second edge stiffener 2 is connected with shear connector 4 by welding manner;
Step 3: more bar dowels 5 are welded on the rib of slab 3-1 of closed-section steel deck 3, while stretch part reinforcing bar Closed-section steel deck 3 out;
Step 4: by closed-section steel deck 3, first edge stiffener 1 and second edge stiffener 2 using welding Mode is connected;
Step 5: node connecting plate 6 to be set to the place that is connected of closed-section steel deck 3, node connecting plate 6 passes through Welding manner and closed-section steel deck 3 connect;
Step 6: being poured inside first edge stiffener 1, second edge stiffener 2 and closed-section steel deck 3 Concrete seven, combined concrete shear wall production finish.
In the step of present embodiment four, upper and lower two sides between first edge stiffener 1 and second edge stiffener 2 It is respectively disposed with two closed-section steel decks 3 of docking setting.
The casting concrete in the cavity that Edge Enhancement component and two sides closed-section steel deck surround, to concrete hardening Afterwards, work together concrete and profiled sheet from anchor working principle using closed-section steel deck;In closed type die mould steel The vertical junction setting node connecting plate of plate guarantees the reliability and bearing strength that node connects with section reinforcing bar.
In general, the concrete poured is normal concrete, high-strength concrete, lightweight concrete or high performance concrete.
The utility model is disclosed as above with preferable case study on implementation, however is not intended to limit the utility model, any ripe Professional and technical personnel is known, is not being departed within the scope of technical solutions of the utility model, according to the technical essence of the utility model To any simple modification, equivalent change and modification that the above case study on implementation is done, still belong to technical solutions of the utility model range.

Claims (8)

1. a kind of closed-section steel deck combined concrete shear wall connecting node, it is characterised in that: it includes that first edge adds Strong component (1), second edge stiffener (2), closed-section steel deck (3), shear connector (4), bar dowel (5), node Connecting plate (6) and concrete (7);
First edge stiffener (1) and second edge stiffener (2) are arranged side by side, first edge stiffener (1) and the Two sides are each provided with two opposed closed-section steel decks (3) up and down between two Edge Enhancement components (2), and first edge adds Strong component (1), second edge stiffener (2) are connected with closed-section steel deck (3) three surrounds a hollow building enclosure, It is respectively provided with along longitudinal direction a plurality of rib of slab (3-1) on closed-section steel deck (3) inner surface, a plurality of rib of slab (3-1) arranged for interval is closed Welding short steel rod (5) at the top of the rib of slab (3-1) of shape of the mouth as one speaks profiled sheet (3), and one end of the bar dowel (5) stretches out the two of the same side Node is equipped at the docking of a closed-section steel deck (3), at the docking of two closed-section steel decks (3) of the same side to connect Plate (6), hollow building enclosure is interior to be equipped with the shearing resistance being connected with first edge stiffener (1) and second edge stiffener (2) Connecting key (4) has poured concrete (7) in hollow building enclosure.
2. a kind of closed-section steel deck combined concrete shear wall connecting node according to claim 1, it is characterised in that: The rib of slab (3-1) of the closed-section steel deck (3) is the up-side down triangle rib of slab of lower mouth semi-closed.
3. a kind of closed-section steel deck combined concrete shear wall connecting node according to claim 1, it is characterised in that: The rib of slab (3-1) of the closed-section steel deck (3) is the dovetail type rib of slab of lower mouth closure.
4. a kind of according to claim 1,2 or 3 closed-section steel deck combined concrete shear wall connecting node, feature Be: first edge stiffener (1) and second edge stiffener (2) are I-steel or steel pipe or channel steel.
5. a kind of closed-section steel deck combined concrete shear wall connecting node according to claim 4, it is characterised in that: Shear connector (4) is peg, angle steel or channel steel.
6. a kind of according to claim 1, the closed-section steel deck combined concrete shear wall connecting node of 2,3 or 5, special Sign is: the material of closed-section steel deck (3) is Q235 steel, Q345 steel, Q390 steel or Q420 steel.
7. a kind of closed-section steel deck combined concrete shear wall connecting node according to claim 6, it is characterised in that: The material of node connecting plate (6) is Q235 steel, Q345 steel, Q390 steel or Q420 steel.
8. a kind of according to claim 1, the closed-section steel deck combined concrete shear wall connecting node of 2,3,5 or 7, Be characterized in that: bar dowel (5) is HPB235 reinforcing bar, HRB335 reinforcing bar, HRB400 reinforcing bar or RRB400 reinforcing bar.
CN201821190496.3U 2018-07-25 2018-07-25 A kind of closed-section steel deck combined concrete shear wall connecting node Active CN208518137U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821190496.3U CN208518137U (en) 2018-07-25 2018-07-25 A kind of closed-section steel deck combined concrete shear wall connecting node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821190496.3U CN208518137U (en) 2018-07-25 2018-07-25 A kind of closed-section steel deck combined concrete shear wall connecting node

Publications (1)

Publication Number Publication Date
CN208518137U true CN208518137U (en) 2019-02-19

Family

ID=65332806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821190496.3U Active CN208518137U (en) 2018-07-25 2018-07-25 A kind of closed-section steel deck combined concrete shear wall connecting node

Country Status (1)

Country Link
CN (1) CN208518137U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589971A (en) * 2018-07-25 2018-09-28 哈尔滨工业大学 A kind of closed-section steel deck combined concrete shear wall connecting node and production method
CN112663824A (en) * 2020-12-15 2021-04-16 哈尔滨工业大学(深圳) Assembled spliced corrugated steel plate concrete combined shear wall and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589971A (en) * 2018-07-25 2018-09-28 哈尔滨工业大学 A kind of closed-section steel deck combined concrete shear wall connecting node and production method
CN112663824A (en) * 2020-12-15 2021-04-16 哈尔滨工业大学(深圳) Assembled spliced corrugated steel plate concrete combined shear wall and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN108589971A (en) A kind of closed-section steel deck combined concrete shear wall connecting node and production method
CN107178163B (en) Energy dissipation and shock absorption horizontal connecting device for fabricated shear wall and construction method of energy dissipation and shock absorption horizontal connecting device
CN105756235B (en) A kind of assembled steel concrete frame shear wall building system
US9856614B1 (en) Aseismic combined pier
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN102995756B (en) Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method
CN105133791A (en) Construction method for prefabricated thick plate steel rib concrete column variable cross-section transformation node structure
CN105275092A (en) Energy consumption type node for connecting section steel concrete beam and steel-plate-wrapped composite shear wall
CN107217787B (en) Built-in profiled sheet groove structure's assembled even roof beam
CN103643634B (en) Concrete-filled steel tubes arch bridge arch springing anchor structure
CN106368348B (en) A kind of superposed type compound shear wall with two benches stress characteristic
CN206090967U (en) Perforation rib pull rod restraint double -layer steel plate concrete shear force wall
CN209855047U (en) Full-bolt-connection high-strength steel plate assembled beam-concrete slab combined beam
CN206625402U (en) A kind of side intersection of cracking is put more energy into profiled sheet shear wall
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN109680796A (en) High-strength steel frame-overlapping corrugated sheet steel wall anti-side cold formed steel structure
CN208518137U (en) A kind of closed-section steel deck combined concrete shear wall connecting node
CN104294920A (en) Joint assembly of U-shaped steel reinforced concrete combined beam and special-shaped concrete-filled steel tube column and manufacturing method of joint assembly
CN206070792U (en) A kind of assembled steel lath band combined concrete shear wall
CN206829461U (en) After pour teeth groove and be linked and packed formula precast slab
CN207739438U (en) A kind of strip frame precast reinforced concrete shear wall structure
CN211548015U (en) Prefabricated assembled steel-concrete composite beam
CN209227834U (en) A kind of assembly concrete-filled steel tube frame-shear-wall structure
CN110939218A (en) Assembled profiled steel sheet composite shear wall and construction method thereof
CN106436969A (en) Intersecting reinforcement profiled steel plate shear wall with broadside slotting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant