CN208513924U - Pipelining equipment is used in a kind of assembling of headstock frame - Google Patents
Pipelining equipment is used in a kind of assembling of headstock frame Download PDFInfo
- Publication number
- CN208513924U CN208513924U CN201820770371.1U CN201820770371U CN208513924U CN 208513924 U CN208513924 U CN 208513924U CN 201820770371 U CN201820770371 U CN 201820770371U CN 208513924 U CN208513924 U CN 208513924U
- Authority
- CN
- China
- Prior art keywords
- shelves
- pedal
- column
- positioning
- rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Assembled Shelves (AREA)
Abstract
The utility model discloses a kind of headstock frame assembling pipelining equipments, being intended to provide one kind can be positioned and be fixed by shelves, pedal column, preceding shelves and top longitudinal beam to the rear of headstock frame, guarantee the headstock frame assembling pipelining equipment of the precision that is welded of headstock frame.It leans on shelves and pedal column welding post and headstock frame welding post after including.It include: afterwards the first rack by shelves and pedal column welding post;First pedal stud location tooling;And shelves positioning tool is leaned on after first.Headstock frame welding post includes: the second rack, and the second rack includes leaning on the left and right two upper support stringers being parallel to each other on shelves locating rack top after second base, second be arranged in second base by shelves locating rack and after being arranged in second;Second pedal stud location tooling;Shelves positioning tool is leaned on after second;With the one-to-one top longitudinal beam fixing tool of upper support stringer;And with upper support stringer correspondingly before shelves fixing tools.
Description
Technical field
The utility model relates to a kind of welding toolings of headstock frame, and in particular to a kind of headstock frame assembling is set with assembly line
It is standby.
Background technique
The headstock frame of current transport vehicle is usually to be formed by several big component welding assemblies, one type small transporting vehicle
Headstock frame be by it is rear by shelves 1a, left and right two pedal column 1b, preceding shelves 1c and left and right two top longitudinal beams weldering 1d connect assembling and
At, wherein it is inverted U shape afterwards by shelves, is made of steel pipe bending, as shown in Figure 1.
The actual welding packaging technology of the headstock frame of the small transporting vehicle includes following two station, vertical by shelves and pedal afterwards
Column welding post and headstock frame welding post and headstock frame welding post, in which:
It is used to for rear be welded by shelves with pedal column being integrated with pedal column welding post by shelves afterwards, leans on shelves and pedal afterwards
Column before welding, needs to lean on shelves and pedal column to be positioned, fixed to rear, thus needing to design one kind can be to rear by shelves
The device for being positioned, being fixed with pedal column leans on the welding quality of shelves and pedal column after guarantee.
Headstock frame welding post be used for by rear be welded by shelves and pedal the column semi-finished product module being integrated and preceding shelves and a left side,
Right two top longitudinal beams, which are welded, is formed as one headstock frame, and similarly needing to design one kind in headstock frame welding post can be right
It positioned, fixed by the be welded semi-finished product module being integrated, preceding shelves and left and right two top longitudinal beams of shelves and pedal column afterwards
Device guarantees the welding quality of headstock frame entirety.
Utility model content
The purpose of this utility model is to provide for one kind can be to the rear by shelves, pedal column, preceding shelves and top of headstock frame
Portion's stringer is positioned and is fixed, and guarantees the headstock frame assembling pipelining equipment of the precision that is welded of headstock frame.
The technical solution of the utility model is:
A kind of headstock frame assembling pipelining equipment, including it is rear by shelves and pedal column welding post and headstock frame Welder
Position includes: afterwards the first rack by shelves and pedal column welding post, and the first rack includes first base and is arranged in first base
On first after lean on shelves locating rack;First pedal stud location tooling, the first pedal stud location tooling are arranged in first base
On for positioning pedal column;And shelves positioning tool is leaned on after first, it is arranged after first after first by shelves positioning tool and leans on shelves
For leaning on shelves after positioning on locating rack;Headstock frame welding post includes: the second rack, and the second rack includes second base, setting
In second base second after be parallel to each other by shelves locating rack and by left and right two of shelves locating rack top after being arranged in second
Upper support stringer;Second pedal stud location tooling, the second pedal stud location tooling are arranged in second base for fixed
Position pedal column;Shelves positioning tool is leaned on after second, is used on shelves locating rack after second after second by the setting of shelves positioning tool
Shelves are leaned on after positioning;With the one-to-one top longitudinal beam fixing tool of upper support stringer, top longitudinal beam fixing tool is arranged in upper branch
For fixing top longitudinal beam on support stringer;And with upper support stringer correspondingly before shelves fixing tools, preceding shelves fixing tool
It is arranged on upper support stringer for fixed preceding shelves.
Preferably, the first pedal stud location tooling includes the first pedal stud location component, the first pedal column is fixed
Hyte part includes that the first support column for being used to support pedal column in first base and the first supporting block is arranged in, is arranged first
For positioning two first vertical pedal positioning pins of pedal column and being arranged in first base for founding pedal on pedestal
Column is pressed on the pedal column active grab in the first supporting block.
Preferably, the first upper end of support column is equipped with the side limited block for spacing pedal column, the first upper end of support column
Equipped with the first vertical pillar for being used to support pedal column.
Preferably, the first supporting block is located between two first vertical pedal positioning pins.
Preferably, the first support column is located at after the first supporting block and first between shelves locating rack.
Preferably, leaning on shelves positioning tool after first includes leaning on after the first of the top of shelves locating rack after being arranged in first
It shelves upper limit position block and is leaned on after shelves positioning component, described first behind two group first of left and right on shelves locating rack after being arranged in first
Shelves positioning component include it is several be successively set on first from top to bottom after on the shelves locating rack first after by shelves locating piece, setting
After first on shelves locating piece first after by shelves locating slot and with first after be used to seal screening correspondingly by shelves locating piece
By the first pressing plate of the notch of shelves locating slot after first, the first pressing plate leans on shelves locating piece to connect by bolt with after corresponding first
It connects.
Preferably, the second pedal stud location tooling includes the second pedal stud location component, the second pedal column is fixed
Hyte part includes that the second support column for being used to support pedal column in second base is arranged in and is arranged to be used in second base
Position the second vertical pedal positioning pin of pedal column.
Preferably, leaning on shelves positioning tool after second includes leaning on after the second of the top of shelves locating rack after being arranged in second
It shelves upper limit position block and is leaned on after shelves positioning component, described second behind two group second of left and right on shelves locating rack after being arranged in second
Shelves positioning component includes positioning after second by shelves after leaning on second on shelves locating rack after being arranged in second by shelves locating piece, setting
On block second after by shelves locating slot and for seal hide second after lean on shelves locating slot notch the second pressing plate, the second pressing plate and the
It is bolted after two by shelves locating piece.
Preferably, top longitudinal beam fixing tool includes that several are arranged on upper support stringer for compressing top longitudinal beam
Top longitudinal beam active grab.
Preferably, preceding shelves fixing tool includes that the preceding shelves on upper support stringer for shelves before compressing are arranged at least one
Active grab.
The beneficial effects of the utility model are: can to headstock frame it is rear by shelves, pedal column, preceding shelves and top longitudinal beam into
Row is positioned and is fixed, and guarantees the precision that is welded of headstock frame.
Detailed description of the invention
Fig. 1 is the explosive view before headstock frame in the prior art is welded.
Fig. 2 is a kind of structural schematic diagram of the headstock frame assembling pipelining equipment of the embodiments of the present invention 1,
In, 2a leans on shelves and pedal column welding post after referring to, 2b refers to headstock frame welding post.
Fig. 3 is a kind of rear structural schematic diagram by shelves and pedal column welding post of the embodiments of the present invention 1.
Fig. 4 is the rear first pedal stud location by shelves and pedal column welding post of the embodiments of the present invention 1
A kind of partial structural diagram of tooling.
Fig. 5 is a kind of structural schematic diagram of the headstock frame welding post of the embodiments of the present invention 1.
In figure:
Shelves 1a, rear shelves column 1a.1 are depended on afterwards, attachment beam 1a.2 on rear shelves;
Pedal column 1b;
Preceding shelves 1c;
Top longitudinal beam welds 1d;
Afterwards by shelves and pedal column welding post 2a;
First rack 1, first base 1.1 lean on shelves locating rack 1.2 after first;
Shelves upper limit position block 2.0 is leaned on after first;
Shelves locating piece 2.01, the first pressing plate 2.02 are leaned on after first after shelves positioning component 2: the first;
First pedal stud location component, 3: the first support column 3.1, the first supporting block 3.2, the first vertical pedal positioning pin
3.3, pedal column active grab 3.4, side limited block 3.5, the first vertical pillar 3.6;
Headstock frame welding post 2b:
Second rack 4: second base 4.1 leans on shelves locating rack 4.2, upper support stringer 4.3 after second;
Shelves upper limit position block 5.0 is leaned on after second;
Shelves locating piece 5.01, the second pressing plate 5.02 are leaned on after second after shelves positioning component 5: the second;Second pedal column is fixed
Hyte part 6, the second support column 6.1, the second vertical pillar 6.2, the second vertical pedal positioning pin 6.3;
Top longitudinal beam active grab 7;
Preceding shelves active grab 8.
Specific embodiment
The utility model is described in further detail with specific embodiment with reference to the accompanying drawing:
Embodiment 1: as shown in Fig. 2, a kind of headstock frame assembling pipelining equipment, including it is rear by shelves and the welding of pedal column
Station 2a and headstock frame welding post 2b.
As shown in Figure 2 and Figure 3, include the first rack 1, the first pedal stud location by shelves and pedal column welding post afterwards
Shelves positioning tool is leaned on after tooling and first.
First rack include first base 1.1 and be arranged in first base first after by shelves locating rack 1.2.After first
It is vertical supports by shelves locating rack.
It is used to position pedal column on shelves locating rack after first by the setting of shelves positioning tool after first.Shelves are leaned on after first
Positioning tool includes leaning on shelves upper limit position block 2.0 after being arranged in first after the first of the top of shelves locating rack and being arranged after first
Shelves positioning component 2 is leaned on behind two group first of the left and right on shelves locating rack.The is distributed in by shelves positioning component behind two group first of left and right
The left and right sides of shelves locating rack is leaned on after one.
After first by shelves positioning component include it is several be successively set on first from top to bottom after on the shelves locating rack first
Afterwards by shelves locating piece 2.01, be arranged in first after on the shelves locating piece first after by shelves locating slot and with first after positioned by shelves
Block be used to seal correspondingly hide first after by shelves locating slot notch the first pressing plate 2.02.Pass through after first by shelves locating piece
After being bolted to first on shelves locating rack.First pressing plate leans on shelves locating piece to be bolted with after corresponding first.
As shown in Figure 3, Figure 4, the first pedal stud location tooling is arranged in first base for positioning pedal column.The
One pedal stud location tooling includes two group of first pedal stud location component 3.Two group of first pedal stud location components distribution
In the left and right sides of the upper surface of first base.After two group of first pedal stud location component and first one by one by shelves positioning component
It is corresponding.
First pedal stud location component includes that the first support column that pedal column is used to support in first base is arranged in
3.1 and first supporting block 3.2, it is arranged in first base for positioning two first vertical pedal positioning pins of pedal column
3.3 and it is arranged in first base for the pedal column active grab 3.4 that is pressed on pedal column in the first supporting block.
First support column is located at after the first supporting block and first between shelves locating rack.First support column is vertically arranged.The
One supporting block is located between two first vertical pedal positioning pins.
First upper end of support column is equipped with the first side limited block 3.5 for spacing pedal column.First upper end of support column is set
There is the be used to support pedal column first vertical pillar 3.6.
As shown in Fig. 2, Fig. 5, after headstock frame welding post is including the second rack 4, the second pedal stud location tooling, second
By shelves positioning tool, top longitudinal beam fixing tool and preceding shelves fixing tool.
Second rack includes existing after second base 4.1, second be arranged in second base by shelves locating rack 4.2 and setting
The left and right two upper support stringers 4.3 being parallel to each other on shelves locating rack top are leaned on after second.
It is leaned on after second on shelves locating rack by the setting of shelves positioning tool for leaning on shelves after positioning after second.It is fixed by shelves after second
Position tooling includes leaning on after second after the second of the top of shelves locating rack by shelves upper limit position block 5.0 and setting after being arranged in second
Shelves positioning component 5 is leaned on behind two group second of left and right on shelves locating rack.Second is distributed in by shelves positioning component behind two group second of left and right
The left and right sides of shelves locating rack is leaned on afterwards.
After second by shelves positioning component include after being arranged in second on the shelves locating rack second after by shelves locating piece 5.01,
After being arranged in second on the shelves locating piece second after by shelves locating slot and for seal hide second after lean on the notch of shelves locating slot
Second pressing plate 5.02.It is bolted after second pressing plate and second by shelves locating piece.
Second pedal stud location tooling is arranged in second base for positioning pedal column.Second pedal stud location
Tooling includes two group of second pedal stud location component 6, and two group of second pedal stud location components distribution is in the upper of second base
The left and right sides on surface.It is corresponded after two group of second pedal stud location component and second by shelves positioning component.
Second pedal stud location component includes that the second support column that pedal column is used to support in second base is arranged in
6.1 and it is arranged in second base for positioning the second vertical pedal positioning pin 6.3 of pedal column.Second upper end of support column is set
There is the be used to support pedal column second vertical pillar 6.2.Second upper end of support column is equipped with second for spacing pedal column
Side limited block.
Top longitudinal beam fixing tool is two, and top longitudinal beam fixing tool and upper support stringer are one-to-one.Top
Stringer fixing tool is arranged on upper support stringer for fixing top longitudinal beam.Top longitudinal beam fixing tool includes that two settings exist
For compressing the top longitudinal beam active grab 7 of top longitudinal beam on upper support stringer.
Preceding shelves fixing tool is two, and preceding shelves fixing tool and upper support stringer correspond.Preceding shelves regular worker installing
It sets on upper support stringer for fixed preceding shelves.Preceding shelves fixing tool includes that preceding shelves spacer pin and one are arranged in upper support stringer
On preceding shelves active grab 8 for shelves before compressing.
Active grab in text is the prior art.
The specific works of the headstock frame assembling pipelining equipment of the present embodiment are as follows:
First, operated by the rear welding by leaning on shelves and pedal column after the completion of shelves and pedal column welding post, will after
By being welded as a whole for shelves and pedal column, detailed process is as follows:
1), as shown in Fig. 2, by it is rear by shelves 1a be installed to first after on the shelves locating rack first after on shelves positioning tool
(rear by shelves include shelves column 1a.1 and attachment beam 1a.2 on the rear shelves of shelves the upper end of the column after connecting two after left and right two),
In,
The top of shelves upper limit position block is leaned on after attachment beam is located at first on shelves afterwards, and leans on shelves upper limit position block after being supported on first
On;
It is corresponded after shelves column and first by shelves positioning component afterwards, rear shelves stud location is after first on shelves locating piece
First after in the shelves locating slot, leaned on shelves locating piece after rear shelves column is then pressed on first by the first pressing plate, thus
By it is rear by shelves positioning, be mounted on first after on the shelves positioning tool.
The two pedal column 1b in left and right are installed in the first pedal stud location tooling that (headstock frame includes left and right two
A pedal column, two pedal columns and the first pedal stud location component correspond), wherein
Pedal upright supports are in the upper end of the first vertical pillar of the first support column and the upper end of the first supporting block;Lateral confinement position
Block carries out side positioning to pedal column;Fabrication hole cooperation on two first vertical pedal positioning pins and pedal column is vertical to pedal
Column is positioned;
Then, pedal column is pressed in the first supporting block by pedal column active grab;Thus by pedal column
It positions, be installed in the first pedal stud location tooling.
2), by pedal column be connected by welding afterwards by shelves, thus by rear being welded as a whole by shelves and pedal column,
It is welded the semi-finished product being integrated after formation by shelves and pedal column.
Second, after shelves and pedal column welding post being leaned on to weld afterwards in the first step by headstock frame welding post
The semi-finished product being integrated that are welded by shelves with pedal column are welded and are integrated with preceding shelves and left and right two top longitudinal beams, form headstock
Frame, detailed process is as follows:
1), be installed to rear in the second rack by shelves and pedal the column semi-finished product being integrated that are welded, wherein afterwards by shelves with
Pedal column be welded rear in the semi-finished product being integrated by shelves and pedal column by second after lean on shelves positioning tool to step on second
Plate stud location tooling is positioned, is fixed, in which:
The rear attachment beam on the rear shelves of shelves in the semi-finished product being integrated is welded after second by shelves and pedal column afterwards
It is leaned on shelves upper limit position block by the top of shelves upper limit position block, and after being supported on second;
It is welded after the rear shelves column and second in the semi-finished product being integrated with pedal column by shelves by shelves positioning component one afterwards
One is corresponding, and rear shelves stud location is leaned in shelves locating slot after leaning on second on shelves locating piece after second, then passes through the second pressing plate
After rear shelves column is pressed on second on shelves locating piece;
The pedal upright supports in the semi-finished product being integrated are welded the second of the second support column by shelves and pedal column afterwards
The upper end of vertical pillar, the second vertical pedal positioning pin position pedal column with the fabrication hole cooperation on pedal column.
2), the lower edge of preceding shelves is overlapped on to the end of two pedal columns;
The handover position of shelves column and attachment beam on rear shelves, top after being leaned in shelves after the first end of top longitudinal beam is overlapped on
The top edge of shelves before the second end of stringer overlaps;
Then, by the fabrication hole of the top edge of the fabrication hole of the second end of preceding shelves spacer pin insertion top longitudinal beam and preceding shelves
It is interior, so that the lap position of second end and preceding shelves to top longitudinal beam positions;
Followed by the side of shelves before being compressed by preceding shelves active grab, so that preceding shelves be fixed;
Top longitudinal beam is compressed by top longitudinal beam active grab, so that top longitudinal beam be fixed.
3), the lower edge of preceding shelves and the end of pedal column are connected by welding;
The top edge of shelves is connected by welding before the second end of top longitudinal beam is overlapped;
By the first end of top longitudinal beam be connected by welding afterwards by shelves;
To be welded rear by the shelves semi-finished product being integrated that are welded with pedal column with preceding shelves and left and right two top longitudinal beams
It is integrated, forms headstock frame.
Claims (8)
1. a kind of headstock frame assembling pipelining equipment, characterized in that lean on shelves and pedal column welding post and headstock including rear
Frame welding post,
Include: with pedal column welding post by shelves afterwards
First rack, the first rack include first base and be arranged in first base first after by shelves locating rack;
First pedal stud location tooling, the first pedal stud location tooling are arranged in first base vertical for positioning pedal
Column;And
Shelves positioning tool is leaned on after first, is leaned on shelves locating rack after first by the setting of shelves positioning tool for leaning on after positioning after first
Shelves;
Headstock frame welding post includes:
Second rack, the second rack include existing after second base, second be arranged in second base by shelves locating rack and setting
The left and right two upper support stringers being parallel to each other on shelves locating rack top are leaned on after second;
Second pedal stud location tooling, the second pedal stud location tooling are arranged in second base vertical for positioning pedal
Column;
Shelves positioning tool is leaned on after second, is leaned on shelves locating rack after second by the setting of shelves positioning tool for leaning on after positioning after second
Shelves;
With the one-to-one top longitudinal beam fixing tool of upper support stringer, top longitudinal beam fixing tool is arranged on upper support stringer
For fixing top longitudinal beam;And
Preceding shelves fixing tool, preceding shelves fixing tool are arranged on upper support stringer for fixing correspondingly with upper support stringer
Preceding shelves.
2. headstock frame assembling pipelining equipment according to claim 1, characterized in that the first pedal stud location
Tooling includes the first pedal stud location component, and the first pedal stud location component includes that setting is used to support in first base
First support column of pedal column and the first supporting block are arranged in first base and erect for positioning two first of pedal column
To pedal positioning pin and it is arranged in first base quick for pedal column that pedal column is pressed in the first supporting block
Clamp.
3. headstock frame assembling pipelining equipment according to claim 2, characterized in that first upper end of support column is set
There is the side limited block for spacing pedal column, the first upper end of support column is equipped with the first vertical branch for being used to support pedal column
Column.
4. headstock frame assembling pipelining equipment according to claim 1, characterized in that position work by shelves after described first
Dress includes positioning after first by shelves after the first of the top of shelves locating rack by shelves upper limit position block and setting after being arranged in first
Shelves positioning component is leaned on behind two group first of left and right on frame,
After described first by shelves positioning component include it is several be successively set on first from top to bottom after on the shelves locating rack first
Afterwards by shelves locating piece, be arranged in first after on the shelves locating piece first after by shelves locating slot and with first after by shelves locating piece one
One is corresponding for sealing after screening first the first pressing plate for leaning on the notch of shelves locating slot, and the first pressing plate is fixed by shelves with after corresponding first
Position block is bolted.
5. headstock frame assembling pipelining equipment according to claim 1, characterized in that the second pedal stud location
Tooling includes the second pedal stud location component, and the second pedal stud location component includes that setting is used to support in second base
Second support column of pedal column and it is arranged in second base for positioning the second vertical pedal positioning pin of pedal column.
6. headstock frame assembling pipelining equipment according to claim 1, characterized in that position work by shelves after described second
Dress includes positioning after second by shelves after the second of the top of shelves locating rack by shelves upper limit position block and setting after being arranged in second
Shelves positioning component is leaned on behind two group second of left and right on frame,
It includes after leaning on second on shelves locating rack after being arranged in second by shelves locating piece, setting that shelves positioning component is leaned on after described second
After second on shelves locating piece second after by shelves locating slot and for seal hide second after lean on shelves locating slot notch second
Pressing plate is bolted after the second pressing plate and second by shelves locating piece.
7. headstock frame assembling pipelining equipment according to claim 1, characterized in that the top longitudinal beam fixing tool
It is arranged on upper support stringer including several for compressing the top longitudinal beam active grab of top longitudinal beam.
8. headstock frame according to claim 1 assembling pipelining equipment, characterized in that the preceding shelves fixing tool includes
The preceding shelves active grab on upper support stringer for shelves before compressing is arranged at least one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820770371.1U CN208513924U (en) | 2018-05-22 | 2018-05-22 | Pipelining equipment is used in a kind of assembling of headstock frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820770371.1U CN208513924U (en) | 2018-05-22 | 2018-05-22 | Pipelining equipment is used in a kind of assembling of headstock frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208513924U true CN208513924U (en) | 2019-02-19 |
Family
ID=65339548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820770371.1U Active CN208513924U (en) | 2018-05-22 | 2018-05-22 | Pipelining equipment is used in a kind of assembling of headstock frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208513924U (en) |
-
2018
- 2018-05-22 CN CN201820770371.1U patent/CN208513924U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104690472B (en) | Body assembly welding clamp after frame of motorcycle | |
CN103143828B (en) | Assembling and spot-welding integral tooling for side wall skeleton of track vehicle | |
CN201208690Y (en) | Automobile front axle-sequent welding clamp | |
CN104625531A (en) | Welding assembly tool and method for electric wheel dumper cargo tank | |
CN208513924U (en) | Pipelining equipment is used in a kind of assembling of headstock frame | |
CN102962620A (en) | Tool for welding side bearing air duct beam | |
CN113401226A (en) | Fender connecting piece, mounting tool and mounting method | |
CN210121748U (en) | Welding positioning frame and tool with same | |
CN207723768U (en) | A kind of fork truck gear shelf manipulator tool for welding mold | |
CN208772805U (en) | A kind of integral type headstock frame welding assembly frame | |
KR101876442B1 (en) | Jig for manufacturing roof frame assembly of automobile | |
CN208513931U (en) | A kind of headstock frame general assembly production line welding equipment | |
CN210188888U (en) | Vertical circulation type mechanical parking equipment suspender automatic welding device | |
CN208513925U (en) | A kind of headstock frame it is rear by shelves and pedal column welder | |
CN211102422U (en) | Engineering machine tool cab positioning welding tool | |
CN208496175U (en) | A kind of headstock frame pattern welding equipment | |
CN108637563B (en) | Integrated headstock frame welding equipment | |
CN105252191B (en) | Welding fixture and welding method of steel structure module house stand column | |
CN108817789B (en) | Door opening type welding equipment for headstock frame | |
CN110560897A (en) | Assembly welding method for integral side wall of plate beam of rail vehicle | |
CN105171200A (en) | Welding method for electric car frame | |
CN108015469A (en) | 10kV breaker Frame Welding frocks | |
CN108655641B (en) | Assembly line device for headstock | |
CN219189148U (en) | Welding fixture for parts of conveyor frame | |
CN213945458U (en) | Rapid splicing clamp for welding joint of front stabilizing beam of automobile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220304 Address after: 313102 No. 168, LAOHUDONG village, Lijiaxiang Town, Changxing County, Huzhou City, Zhejiang Province Patentee after: Zhejiang Hengyuan Machinery Co.,Ltd. Address before: No. 368, Punan Avenue, Shengzhou Economic Development Zone, Shaoxing City, Zhejiang Province Patentee before: SHENGZHOU HENGZHONG MACHINERY Co.,Ltd. |