CN208494556U - A kind of dredger of river course clear up recoverable metal - Google Patents
A kind of dredger of river course clear up recoverable metal Download PDFInfo
- Publication number
- CN208494556U CN208494556U CN201822224447.3U CN201822224447U CN208494556U CN 208494556 U CN208494556 U CN 208494556U CN 201822224447 U CN201822224447 U CN 201822224447U CN 208494556 U CN208494556 U CN 208494556U
- Authority
- CN
- China
- Prior art keywords
- bolted
- dredger
- hull
- dredging
- river course
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Treatment Of Sludge (AREA)
Abstract
The utility model discloses a kind of dredgers of river course clear up recoverable metal, including hull, boom has been bolted in top one end of the hull, pulley bracket has been bolted at the top of the boom, the two sides inner wall of the pulley bracket is connected with pulley by bearing, the outer circumferential walls of the pulley slidably connect steel wire, and removal of impurities pipeline has been bolted in one end of the steel wire.The utility model is provided with rotatable swing arm in the side in the hull top dredging storehouse of dredger, and the bottom of swing arm is provided with to be connected with hydraulic stem and is connected to electromagnet, metal adsorption is carried out to mud during dredging, dispel the metal impurities in mud, hull top is provided with boom, and cooperation steel wire slings the silt dredging pipeline of dredger, and motor can control its lifting, so that the dredging operation in different depth river can be used in dredger, expand the use scope of dredger.
Description
Technical field
The utility model relates to rivers to control dredging for deposit technique field more particularly to a kind of river course clear up recoverable metal
Ship.
Background technique
Dredger is just responsible for digging water channel and rivers and creeks mud clearly, so that other ships pass through.Still it blows sand and fills out sea
Sharp weapon.There are the types such as cutter suction dredger, trailing suction hopper dredger.River it is unimpeded all referring to hope in dredger.
The task of dredger is to carry out the construction of the underwater cubic metre of earth and stone, is specifically exactly: digging is deep, widens and clear up existing boat
Road and harbour;New navigation channel, harbour and canal are excavated, during dredging, due to not clearing up for a long time for river, and back and forth
Ship abandons sundries, so that metal impurities etc. are mixed in mud, if these mud for containing metal impurities are cleaned up
Do not remove, have very big harm, thus be badly in need of a kind of dredger of recoverable metal now meet a little the market demand.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of river course clear up proposed is used
The dredger of recoverable metal.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of dredger of river course clear up recoverable metal, including hull, top one end of the hull pass through bolt
It is connected with boom, pulley bracket has been bolted at the top of the boom, the two sides inner wall of the pulley bracket passes through axis
It holds and is connected with pulley, the outer circumferential walls of the pulley slidably connect steel wire, and one end of the steel wire, which has been bolted, removes
Adjustment bend pipe has been bolted in miscellaneous pipeline, one end of the removal of impurities pipeline, and one end of the adjustment bend pipe is connected by bolt
It is connected to rotary teeth head, extension tube has been bolted in the other end of the removal of impurities pipeline, and the top inner wall of the hull is another
Dredging storehouse has been bolted in end, and screen pack has been bolted at the top of one end inner wall in the dredging storehouse, described clear
Dredging pipe is bolted at the top of the one end in silt storehouse, and the circumferential inner wall of dredging pipe is equipped with strength silt-sucking machine, the ship
Rolling bearing has been bolted in the bottom end of body, and vertical support has been bolted in top one end of the hull
The top of frame, the vertical support frame is connected with swing arm by bearing, and the top other end of the hull has been bolted
Searchlight has been bolted at the top of the control tower in control tower.
Preferably, limit plate has been bolted in circumferential inner wall one end of the removal of impurities pipeline, the removal of impurities pipeline
Metal otter board has been bolted in the circumferential inner wall other end.
Preferably, hose, and one end of one end of hose and extension tube has been bolted in one end of the dredging pipe
It is connected.
Preferably, outer circumferential walls one end of the extension tube is socketed with fixed pipe sleeve, and the bottom of fixed pipe sleeve and rotation
Bearing is connected.
Preferably, horizontal steel plate has been bolted in top one end of the hull, and passes through at the top of horizontal steel plate
It has been bolted motor.
Preferably, capstan winch, and the circumferential inner wall and steel wire of capstan winch have been bolted on the output shaft of the motor
One end be connected.
Preferably, hydraulic stem has been bolted in the bottom end of the swing arm, and the bottom of hydraulic stem passes through bolt
It is connected with electromagnet.
Preferably, the bottom interior wall of the hull has been bolted controller, and controller by switch with it is electronic
Machine, hydraulic stem, electromagnet, searchlight, strength silt-sucking machine are connected.
The utility model has the following beneficial effects:
1. the utility model proposes a kind of river course clear up recoverable metal dredger, in the hull top of dredger
The side in dredging storehouse is provided with rotatable swing arm, and the bottom of swing arm is provided with to be connected with hydraulic stem and is connected to electromagnet,
Metal adsorption is carried out to mud during dredging, dispels the metal impurities in mud.
2. the utility model proposes a kind of river course clear up recoverable metal dredger, dredger dredging inhale mud
It is provided with removal of impurities pipeline among pipeline, is internally provided with limit plate and metal otter board, during dredging, to what is drunk up
Mud cleans, and the impurity somewhat greater to figure is filtered and collects, and can be carried out by disassembly removal of impurities pipeline
Cleaning.
3. the utility model proposes a kind of river course clear up recoverable metal dredger, in the hull top of dredger
Provided with boom, steel wire is cooperated to sling the silt dredging pipeline of dredger, and motor can control its lifting, so that dredger can
To use the dredging operation in different depth river, expand the use scope of dredger.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of river course clear up recoverable metal dredger side view structure section view
Figure;
Fig. 2 be the utility model proposes a kind of river course clear up recoverable metal dredger plan structure signal
Figure;
Fig. 3 be the utility model proposes a kind of river course clear up recoverable metal dredger removal of impurities pipeline section view
Figure;
Fig. 4 be the utility model proposes a kind of river course clear up recoverable metal dredger rotary teeth head vertical view
Figure.
In figure: 1 rotary teeth head, 2 adjustment bend pipes, 3 removal of impurities pipelines, 4 extension tubes, 5 steel wires, 6 booms, 7 pulleys, 8 pulley branch
Frame, 9 hoses, 10 vertical support frames, 11 swing arms, 12 dredging pipes, 13 hydraulic stems, 14 electromagnet, 15 screen packs, 16 dredging storehouses,
17 control towers, 18 searchlights, 19 hulls, 20 rolling bearings, 21 fixed pipe sleeves, 22 capstan winches, 23 motor, 24 limit plates, 25 metals
Web plate.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
Embodiment 1
Referring to Fig.1,2 and 4, a kind of dredger of river course clear up recoverable metal, including hull 19, the top of hull 19
One end has been bolted boom 6, and the top of boom 6 has been bolted pulley bracket 8, in the two sides of pulley bracket 8
Wall is connected with pulley 7 by bearing, and the outer circumferential walls of pulley 7 slidably connect steel wire 5, and one end of steel wire 5 is bolted
There is removal of impurities pipeline 3, adjustment bend pipe 2 has been bolted in one end of removal of impurities pipeline 3, and the one end for adjusting bend pipe 2 is connected by bolt
It is connected to rotary teeth head 1, extension tube 4 has been bolted in the other end of removal of impurities pipeline 3, and the top inner wall other end of hull 19 is logical
It crosses and has been bolted dredging storehouse 16, screen pack 15, dredging storehouse 16 has been bolted at the top of one end inner wall in dredging storehouse 16
One end at the top of dredging pipe 12 has been bolted, and the circumferential inner wall of dredging pipe 12 is equipped with strength silt-sucking machine, hull 19
Bottom end rolling bearing 20 has been bolted, vertical support frame has been bolted in top one end of hull 19
10, the top of vertical support frame 10 is connected with swing arm 11 by bearing, and tower has been bolted in the top other end of hull 19
Searchlight 18 has been bolted in platform 17, the top of control tower 17.
In the utility model, hose 9, and one end of hose 9 and extension tube 4 has been bolted in one end of dredging pipe 12
One end be connected, outer circumferential walls one end of extension tube 4 is socketed with fixed pipe sleeve 21, and the bottom of fixed pipe sleeve 21 and rotation axis
It holds 20 to be connected, horizontal steel plate has been bolted in top one end of hull 19, and the top of horizontal steel plate is connected by bolt
It is connected to motor 23, capstan winch 22, and the circumferential inner wall of capstan winch 22 and steel wire 5 have been bolted on the output shaft of motor 23
One end be connected, hydraulic stem 13 has been bolted in the bottom end of swing arm 11, and the bottom of hydraulic stem 13 passes through bolt
It is connected with electromagnet 14, controller has been bolted in the bottom interior wall of hull 19, and controller passes through switch and motor
23, hydraulic stem 13, electromagnet 14, searchlight 18, strength silt-sucking machine are connected.
Embodiment 2
Referring to Fig.1-4, a kind of dredger of river course clear up recoverable metal, including hull 19, the top one of hull 19
Boom 6 has been bolted in end, and pulley bracket 8, the two sides inner wall of pulley bracket 8 has been bolted in the top of boom 6
It is connected with pulley 7 by bearing, the outer circumferential walls of pulley 7 slidably connect steel wire 5, and one end of steel wire 5 has been bolted
Clean pipeline 3, and adjustment bend pipe 2 has been bolted in one end of removal of impurities pipeline 3, and one end of adjustment bend pipe 2 is bolted
There is rotary teeth head 1, extension tube 4 has been bolted in the other end of removal of impurities pipeline 3, and the top inner wall other end of hull 19 passes through
It has been bolted dredging storehouse 16, screen pack 15 has been bolted at the top of one end inner wall in dredging storehouse 16, dredging storehouse 16
Dredging pipe 12 is bolted at the top of one end, and the circumferential inner wall of dredging pipe 12 is equipped with strength silt-sucking machine, hull 19
Rolling bearing 20 has been bolted in bottom end, and vertical support frame 10 has been bolted in top one end of hull 19,
The top of vertical support frame 10 is connected with swing arm 11 by bearing, and control tower has been bolted in the top other end of hull 19
17, searchlight 18 has been bolted in the top of control tower 17, and circumferential inner wall one end of removal of impurities pipeline 3 is bolted limited
Metal otter board 25 has been bolted in the circumferential inner wall other end of position plate 24, removal of impurities pipeline 3.
In the utility model, hose 9, and one end of hose 9 and extension tube 4 has been bolted in one end of dredging pipe 12
One end be connected, outer circumferential walls one end of extension tube 4 is socketed with fixed pipe sleeve 21, and the bottom of fixed pipe sleeve 21 and rotation axis
It holds 20 to be connected, horizontal steel plate has been bolted in top one end of hull 19, and the top of horizontal steel plate is connected by bolt
It is connected to motor 23, capstan winch 22, and the circumferential inner wall of capstan winch 22 and steel wire 5 have been bolted on the output shaft of motor 23
One end be connected, hydraulic stem 13 has been bolted in the bottom end of swing arm 11, and the bottom of hydraulic stem 13 passes through bolt
It is connected with electromagnet 14, controller has been bolted in the bottom interior wall of hull 19, and controller passes through switch and motor
23, hydraulic stem 13, electromagnet 14, searchlight 18, strength silt-sucking machine are connected.
Working principle: before using the dredger, by the foot of dredging to the river for needing dredging, pass through controller control
Motor 23 processed runs the mud that the entire silt dredging pipeline of dredger is dropped to river, is inhaled strength by controller control
Silt machine is opened, and dredger starts to draw mud, and the rotation of rotary teeth head 1 of dredger is stirred excavation to mud layer, and mud passes through
When removal of impurities pipeline 3,3 pairs of the pipeline biggish sundries of cleaning that clean are filtered, and sundries are trapped in removal of impurities pipeline 3, mud
When rising to dredging storehouse 16, the screen pack 15 in dredging storehouse 16 filters mud and electromagnet 14 is cooperated to carry out metal adsorption,
The metal impurities in mud are removed, mud is filtered in dredging storehouse 16, and the mud in river is dug out collection discharge.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (7)
1. a kind of dredger of river course clear up recoverable metal, including hull (19), which is characterized in that the hull (19)
Top one end has been bolted boom (6), has been bolted pulley bracket (8) at the top of the boom (6), described
The two sides inner wall of pulley bracket (8) is connected with pulley (7) by bearing, and the outer circumferential walls of the pulley (7) slidably connect steel
Silk (5), one end of the steel wire (5) have been bolted removal of impurities pipeline (3), and one end of removal of impurities pipeline (3) passes through spiral shell
It tethers and is connected to adjustment bend pipe (2), one end of adjustment bend pipe (2) has been bolted rotary teeth head (1), the removal of impurities pipe
The other end in road (3) has been bolted extension tube (4), and the top inner wall other end of the hull (19) is bolted
Have dredging storehouse (16), screen pack (15), the dredging has been bolted at the top of one end inner wall of the dredging storehouse (16)
It has been bolted dredging pipe (12) at the top of the one end in storehouse (16), and the circumferential inner wall of dredging pipe (12) is equipped with strength silt dredging
The bottom end of machine, the hull (19) has been bolted rolling bearing (20), and top one end of the hull (19) is logical
It crosses and has been bolted vertical support frame (10), the top of the vertical support frame (10) is connected with swing arm (11), institute by bearing
The top other end for stating hull (19) has been bolted control tower (17), has been bolted at the top of the control tower (17)
Searchlight (18).
2. a kind of dredger of river course clear up recoverable metal according to claim 1, which is characterized in that the dredging
One end of pipe (12) has been bolted hose (9), and one end of hose (9) is connected with one end of extension tube (4).
3. a kind of dredger of river course clear up recoverable metal according to claim 1, which is characterized in that the extension
Outer circumferential walls one end of pipe (4) is socketed with fixed pipe sleeve (21), and the bottom of fixed pipe sleeve (21) is connected with rolling bearing (20)
It connects.
4. a kind of dredger of river course clear up recoverable metal according to claim 1, which is characterized in that the hull
(19) horizontal steel plate has been bolted in top one end, and motor has been bolted at the top of horizontal steel plate
(23).
5. a kind of dredger of river course clear up recoverable metal according to claim 4, which is characterized in that described electronic
It has been bolted on the output shaft of machine (23) capstan winch (22), and one end phase of the circumferential inner wall of capstan winch (22) and steel wire (5)
Connection.
6. a kind of dredger of river course clear up recoverable metal according to claim 1, which is characterized in that the swing arm
(11) bottom end has been bolted hydraulic stem (13), and electromagnet has been bolted in the bottom of hydraulic stem (13)
(14).
7. a kind of dredger of river course clear up recoverable metal according to claim 6, which is characterized in that the hull
(19) controller has been bolted in bottom interior wall, and controller passes through switch and motor (23), hydraulic stem (13), electricity
Magnet (14), searchlight (18), strength silt-sucking machine are connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822224447.3U CN208494556U (en) | 2018-12-28 | 2018-12-28 | A kind of dredger of river course clear up recoverable metal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822224447.3U CN208494556U (en) | 2018-12-28 | 2018-12-28 | A kind of dredger of river course clear up recoverable metal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208494556U true CN208494556U (en) | 2019-02-15 |
Family
ID=65300804
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822224447.3U Expired - Fee Related CN208494556U (en) | 2018-12-28 | 2018-12-28 | A kind of dredger of river course clear up recoverable metal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208494556U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110056034A (en) * | 2019-03-05 | 2019-07-26 | 中船第九设计研究院工程有限公司 | A kind of rake suction unit vehicle dredging tube and rake teeth bindiny mechanism |
CN110453747A (en) * | 2019-09-10 | 2019-11-15 | 毅康科技有限公司 | A kind of river course clear up recoverable metal mechanism |
-
2018
- 2018-12-28 CN CN201822224447.3U patent/CN208494556U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110056034A (en) * | 2019-03-05 | 2019-07-26 | 中船第九设计研究院工程有限公司 | A kind of rake suction unit vehicle dredging tube and rake teeth bindiny mechanism |
CN110453747A (en) * | 2019-09-10 | 2019-11-15 | 毅康科技有限公司 | A kind of river course clear up recoverable metal mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204326136U (en) | A kind of environmental protection strand inhales dredger | |
DK2281091T3 (en) | IMPROVEMENTS IN AND IN CONNECTION WITH UNDERGRADING EXCAVATOR | |
CN106638751A (en) | Riverbed sludge cutter suction dredger | |
CN208494556U (en) | A kind of dredger of river course clear up recoverable metal | |
CN205399529U (en) | Multi -functional environmental protection desilting ship of 50m3 | |
CN204279886U (en) | A kind of sieving garbage contamination removing ship | |
CN208934032U (en) | A kind of environment-friendly type water conservancy channel cleanout device | |
JP4938045B2 (en) | Acupuncture method and apparatus | |
CN201704787U (en) | Large-diameter sewage conduit dredging system | |
CN206693291U (en) | Dredging device for water conservancy projects | |
CN213143168U (en) | Soft and hard garbage isolation treatment resistance-reducing blockage-free dredging, digging and sucking integrated device | |
CN101693243B (en) | Dredging system of sewage pipeline with large-pipe diameter | |
JP4195214B2 (en) | A dredge apparatus using a pipe having an opening at a bent portion | |
KR100947078B1 (en) | Silt removal apparatus by using barge and underwater robot | |
CN111576517A (en) | Integrated high-pressure anti-blocking suction excavation dredging equipment | |
CN204080895U (en) | A kind of soil-shifting machine and be provided with the dredger of this soil-shifting machine | |
CN206888047U (en) | A kind of cutter suction dredger | |
CN110761392A (en) | Desilting device and construction method for large-diameter sewage curve pipeline in operating state | |
CN107090904B (en) | Long-distance sludge digging and transporting device | |
CN102493514A (en) | Self-stirring type dredging device for river channels | |
CN207211059U (en) | Intelligent underwater navigation channel barrier clearing device | |
CN205917751U (en) | Thick clay layer device that fetches earth | |
CN201268856Y (en) | Submersible ditch excavator | |
CN211621759U (en) | Rotation type silt collection device of silt clearance system | |
CN209596636U (en) | A kind of pipeline desilts mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190215 Termination date: 20191228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |