CN208473919U - Circulation handling system is returned after propping up before a kind of unit rack - Google Patents

Circulation handling system is returned after propping up before a kind of unit rack Download PDF

Info

Publication number
CN208473919U
CN208473919U CN201820711916.1U CN201820711916U CN208473919U CN 208473919 U CN208473919 U CN 208473919U CN 201820711916 U CN201820711916 U CN 201820711916U CN 208473919 U CN208473919 U CN 208473919U
Authority
CN
China
Prior art keywords
track
unit rack
propping
slideway
handling system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820711916.1U
Other languages
Chinese (zh)
Inventor
翟明华
骆树斌
邓齐齐
王振朋
王雷
郑东风
周斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820711916.1U priority Critical patent/CN208473919U/en
Application granted granted Critical
Publication of CN208473919U publication Critical patent/CN208473919U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses circulation handling system is returned after propping up before a kind of unit rack, it solves the problems, such as that supporting intensity is low in the prior art, low efficiency, easily causes top plate loose damage, with avoiding supporting the destruction to top plate repeatedly, mechanization, automation effect;Its technical solution are as follows: include two columns from system, carrier and its trailer system, each unit rack is moved including several unit racks, track, column top is hinged with top beam, and column bottom end is hinged with pedestal, and vertical plate is mounted on the base portion;Track includes a section traction track and the passive track of several sections from the system of shifting, and rail base is had sleeper, reinforced between two tracks using joining beam;Slideway is equipped on the inside of track, slideway both ends are linked with sleeper or joining beam or track;There is sliding block, the sliding block on passive track slideway connects lifting jack on slideway;One end of sliding block connection lifting jack and advancing jack on traction track slideway, the other end of advancing jack connect track.

Description

Circulation handling system is returned after propping up before a kind of unit rack
Technical field
The utility model relates to circulation handling system is returned after propping up before roadway support field more particularly to a kind of unit rack.
Background technique
Coal wall crossheading advance support has steel canopy, individual prop, the hydraulic advance timbering for moving towards along tunnel supporting etc.. Steel canopy, individual prop supporting, supporting intensity is low, worker's large labor intensity, employment are more, low efficiency;The liquid of supporting is moved towards along tunnel It presses advance timbering although supporting intensity is high, supports, unloads repeatedly, especially damage the original anchor shaft anchor cable in tunnel by pressure, easily cause top Plate loose damage.
Utility model content
Circulation, which is returned, after propping up before a kind of in order to overcome the deficiencies of the prior art, the utility model provides unit rack carries system System is recycled with returning after propping up before unit rack, avoids supporting the destruction to top plate repeatedly, and unit rack is carried and switch Train is mobile and pipeline cable coils mechanization, automation, the effect of 1 people operation.
The utility model adopts the following technical solutions:
Return circulation handling system after propping up before a kind of unit rack, including several unit racks, track are from moving system, carrier And its trailer system, each unit rack include two columns, the top of column connects top beam, the bottom end of column and vertical plate installation In pedestal top;
The track includes a section traction track and the passive track of several sections from the system of shifting, is cut with scissors from beginning to end between adjacent orbit It connecing, rail base is equipped with sleeper, is reinforced between two tracks using joining beam, track and being coupled between sleeper are reinforced by joining beam, or Track and reinforcing joining beam are combined into a component;Slideway in parallel, the slideway both ends and sleeper or connection are equipped on the inside of track Bar is linked;There is the sliding block being slidably connected with it, the sliding block connects lifting jack on slideway;
Sliding block on the traction track slideway connects one end of lifting jack and advancing jack simultaneously, elapses very heavy The other end connection sleeper on top reinforces joining beam or track;Replace track and lifting jack by the lifting of lifting jack Landing, when realizing that orbit suspended time shift rail, lifting jack are hanging by the push-and-pull of advancing jack mobile lifting jack and Sliding block, pump box switch train for being coupled as one therewith etc.;Traction track drives passive track integrally to take a step to move;
The carrier is located at rail superior portion, and the front side of carrier connects trailer system.
When the advance of the face, the track that first moves forward moves system certainly, then is moved back carrier to branch by carrier trailer system At the unit rack of the rear end Hu Qu, two handling arm of carrier are stretched out, unit rack top beam is landed in the handling arm of carrier On, handling arm is withdrawn, then carrier is moved forward to by supporting area front end by carrier trailer system and is waited at supporting, stretches out and carry Arm, lifting unit bracket.
Further, the track is C-type steel track, and the opening of C-type steel track is towards roadway's sides;The wheel of carrier In the opening of C-type steel track, limitation vehicle can be played the role of and de-orbited to prevent left and right after Chinese herbaceous peony from skewing.
Further, the unit rack is made of top beam, 2 columns, pedestal and vertical plate, and the upper end of the column and top beam are cut with scissors Connect, lower end and pedestal it is hinged, vertical plate is integrated with pedestal, unit rack be equipped with hydraulic socket, it is hydraulic on carrier Being coupled between pipeline and column.
Further, the carrier includes support door frame, and support door frame top is equipped with the carrying symmetrically stretched to two sides Arm, the handling arm are connected with telescopic jack.
Further, the bottom installation wheel or piston shoes of the support door frame.
Further, the support door frame is equipped with control valve group, and handling arm is flexible and unit for controlling for control valve group The lifting of bracket.
Further, the trailer system is endless rope traction system or gear rack rails trailer system.
Further, the end of the traction track is equipped with compression leg, when the track of traction track lands resistance less than traction When power, track is increased by compression leg roof supporting and is landed resistance.
It further, further include tube cable hanger, pumping plant, switch train and coiling cable vehicle, pumping plant, switch train lead to The tube cable of working face passes through from tube cable hanger, and the coiling cable vehicle is for recycling cable.
Further, the tube cable hanger is located at track centerline, and the two sides of the tube cable hanger are equipped with hook, Side hook is linked up with for hanging cable, the other side for hanging fluid pressure line.
Compared with prior art, the utility model has the beneficial effects that
(1) the utility model has supporting intensity height, system mechanization, automation compared to steel canopy, individual prop supporting The advantages of, worker can be freed from dangerous and heavy manual labor;
(2) the utility model is compared to the hydraulic support for moving towards supporting along tunnel, and, arrangement more with supporting range column is Even feature is more able to satisfy the requirement to Roof Control, and avoids and damage the original anchor shaft anchor cable in tunnel by pressure and support, unload repeatedly To the loose damage of top plate;
(3) operating line grafting and valve group, 1 people are carried in the bracket lifting of the utility model to be easily accomplished, and simultaneously The shifting certainly of track, switch train, pipeline can be achieved;Switch train can also be made to remain closer equidistant with working face, The pipe length of cable toward working face can be greatly decreased, reduce pressure drop;Also the problems such as hanging in heaps there is no pipeline cable, Ke Yi great It is big to improve that tunnel is unimpeded and safety production environment.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows Meaning property embodiment and its explanation are not constituted an undue limitation on the present application for explaining the application.
Fig. 1 is the elevation of the utility model;
Fig. 2 is the cross-section diagram of the utility model;
Fig. 3 is the A direction view of the utility model;
Wherein, I-unit rack, I1Pedestal, I2Top beam, I3Column, I4Vertical plate;
II-track is from moving system, and II1Track, II2Sleeper, II3Joining beam, II4Sliding block, II5Slideway, II6Lifting thousand Jin top, II7Pipeline cable door frame, II8Advancing jack;
III-carrier, III1Wheel, III2Support door frame, III3-Handling arm, III4Telescopic jack, III5Control valve group;
IV-trailer system.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
As background technique is introduced, exist in the prior art low supporting intensity, worker's large labor intensity, employment it is more, Low efficiency, the deficiency for easily causing top plate loose damage, in order to solve technical problem as above, present applicant proposes a kind of unit branch Circulation handling system is returned after propping up before frame.
In a kind of typical embodiment of the application, as shown in Figure 1-Figure 3, provides and returned after propping up before a kind of unit rack Handling system is recycled, moves system II, carrier III certainly by several unit rack I, tracks along tunnel two sides supported laneway top plate And its trailer system IV, tube cable hanger, pumping plant, switch train, coiling cable vehicle composition.
When the advance of the face, the track that first moves forward moves back carrier III to branch from shifting system II, then by trailer system IV At the unit rack I of the rear end Hu Qu, III two-arm of carrier is stretched out, by the top beam I of unit rack I2Land removing in carrier III Transport arm III3On, withdraw handling arm III3, then carrier III is moved forward to by supporting area front end by trailer system IV and is waited at supporting, it stretches Handling arm III out3, lifting unit bracket I.
Each unit rack I is by pedestal I1, top beam I2, 2 columns I3, vertical plate I4Composition;Column I3One end and top beam I2 Hingedly, vertical plate I4It is fixed on pedestal I1Top, column I3Cylinder body and vertical plate I4It is connected in one, the non-supported state of column is made to stand In pedestal I1On.
Unit rack I is equipped with hydraulic socket, fluid pressure line and column I on carrier III3Between connection.
The track includes a section traction track and the passive track of several sections (track includes two rails) from system II is moved, adjacent Track II1Head and the tail are hinged, track II1Bottom install sleeper II2
The end of the traction track is equipped with compression leg, when the track of traction track lands resistance less than tractive force, passes through Compression leg roof supporting increases track and lands resistance.
The track II1Open side for C-type steel, C-type steel track has C-shaped channel;C-type steel track II1Opening towards tunnel Two help, track II1Pass through joining beam II between (two rails)3It is connected, or by sleeper II2With joining beam II3It is designed as a component;Connection Bar II3For reinforcing track II1With sleeper II2Between connection.
Track II1Inside is equipped with slideway II in parallel5, slideway II5Both ends and sleeper II2Or joining beam II3It is linked;It is sliding Road II5Top there is the sliding block II that is slidably connected with it4, sliding block II4With slideway II5Between can mutually slide.
Sliding block in the traction track on side slideway connects lifting jack II simultaneously6With one end of advancing jack, The other end connection track or sleeper or joining beam of advancing jack are coupled;Pass through lifting jack II6Lifting make track II1With Lifting jack II6It alternately lands, track II is realized by the push-and-pull of advancing jack1Hanging time shift rail, lifting jack II6 Mobile lifting jack II when hanging6And the sliding block II being coupled as one therewith4, pump box switch train etc..
The carrier III includes wheel III1, support door frame III2, handling arm III3, telescopic jack III4And control valve group Ⅲ5, support door frame III2Bottom connection wheel III1Or piston shoes, wheel III1In the C-shaped channel of C-type steel track, limit can be played Vehicle processed de-orbits II1To prevent the effect that left and right skews after Chinese herbaceous peony.
Handling arm III3At the top of support door frame and by telescopic jack III4It drives;Support door frame III2It is equipped with control valve Group III5, control valve group III5For controlling handling arm III3Flexible and unit rack I lifting.
The trailer system IV has two kinds of forms of endless rope traction system and gear rack rails trailer system;Endless rope traction system System is made of hydraulic haulage roller, wirerope or chain, guiding carrying roller, bend pulley, tensioning apparatus etc.;Gear rack rails traction system System, fluid transmission gear are fixed on carrier III, and rack rails is integrated with railway sleeper.
Pumping plant, switch train be that this system is dedicated or coal working face used in pumping plant, switch train, coal working face Pumping plant, switch train pass through towards the tube cable of working face from tube cable hanger, with coiling cable when moving outside pumping plant, switch train Line hull cable rolling line, tube cable hanger are located at track centerline, and hanger two sides are equipped with hook, and side is linked up with for hanging cable Line, the other side are linked up with for hanging fluid pressure line.
For the application relative to steel canopy, individual prop supporting, supporting intensity height, system mechanization, automation can be by workers It is freed from dangerous and heavy manual labor;Relative to the hydraulic support for moving towards supporting along tunnel, same supporting model It is more to enclose column, arrangement uniformly, is more able to satisfy the requirement to Roof Control, and avoids and damage the original anchor shaft anchor cable in tunnel and repeatedly by pressure Support is unloaded to the loose damage of top plate.
Simple unit rack supporting will be by manually moving to tunnel from roadway's sides with jack or winch gib head auxiliary Centre is dragged to except 30-100 meters with winch at a slow speed, then tunnel two is moved among tunnel with jack or winch gib head auxiliary The gib head of winch at a slow speed will be also manually dragged at bracket to be moved by side after completing bracket erection, and entire frame process of moving is along with pipe It is moved outside cable and track, generally requires 4-5 people, and worker's large labor intensity, especially for the tunnel for having bump danger, Employment is more, and the probability of casualty accident and more people's casualty accidents is high;And operating line grafting and valve are carried in the bracket lifting of the application Group, 1 people can be easily accomplished, and can realize the shifting certainly of track, switch train, pipeline simultaneously;It can also be made open using the present invention It closes train and remains closer equidistant with working face, it is possible to reduce toward the pipe length of cable of working face, reduce pressure drop;Also not There are pipeline cable it is in heaps hang across the problems such as, can substantially improve that tunnel is unimpeded and safety production environment.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.

Claims (10)

1. returning circulation handling system after propping up before a kind of unit rack, which is characterized in that be from moving including several unit racks, track System, carrier and its trailer system, each unit rack include two columns, top beam, pedestal and vertical plate, the top and top of column Beam is hinged, and the bottom end of column is hinged with pedestal, and vertical plate is mounted on the base portion;
The track includes a section traction track and the passive track of several sections from the system of shifting, and head and the tail are hinged between adjacent orbit, rail Road bottom has sleeper, is reinforced between two tracks using joining beam;Slideway in parallel, the slideway both ends are equipped on the inside of track It is linked with sleeper or joining beam or track;There is the sliding block being slidably connected with it, in the passive track on side slideway on slideway Sliding block connect lifting jack;
Sliding block in the traction track on side slideway connects one end of lifting jack and advancing jack simultaneously, elapses very heavy The other end on top connects track;
The carrier is located at rail superior portion, and carrier is connected with trailer system.
2. returning circulation handling system after propping up before a kind of unit rack according to claim 1, which is characterized in that the track For C-type steel track, the opening of C-type steel track is towards roadway's sides;The wheel of carrier is set in the opening of C-type steel track.
3. returning circulation handling system after propping up before a kind of unit rack according to claim 1, which is characterized in that the track A component can be combined into joining beam is reinforced.
4. returning circulation handling system after propping up before a kind of unit rack according to claim 1, which is characterized in that the passage The other end of jack is coupled with track or sleeper or joining beam.
5. returning circulation handling system after propping up before a kind of unit rack according to claim 1, which is characterized in that the vertical plate It is integrated with pedestal, unit rack is equipped with hydraulic socket.
6. returning circulation handling system after propping up before a kind of unit rack according to claim 1, which is characterized in that the carrying Vehicle includes support door frame, and support door frame top is equipped with the handling arm symmetrically stretched to two sides, the handling arm and telescopic jack It is connected;
The bottom installation wheel or piston shoes, carrier of the support door frame are equipped with control valve group.
7. returning circulation handling system after propping up before a kind of unit rack according to claim 1, which is characterized in that the carrying The trailer system of vehicle is endless rope traction system or gear rack rails trailer system.
8. returning circulation handling system after propping up before a kind of unit rack according to claim 1, which is characterized in that further include pipe Cable hanger, pumping plant, switch train and coiling cable vehicle, the tube cable that pumping plant, switch train lead to working face are hung from tube cable Frame passes through.
9. returning circulation handling system after propping up before a kind of unit rack according to claim 8, which is characterized in that the umbilical Line hanger is located at track centerline, and the two sides of the tube cable hanger are equipped with hook.
10. returning circulation handling system after propping up before a kind of unit rack according to claim 1, which is characterized in that described to lead The end in approach rail road is equipped with compression leg.
CN201820711916.1U 2018-05-14 2018-05-14 Circulation handling system is returned after propping up before a kind of unit rack Expired - Fee Related CN208473919U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820711916.1U CN208473919U (en) 2018-05-14 2018-05-14 Circulation handling system is returned after propping up before a kind of unit rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820711916.1U CN208473919U (en) 2018-05-14 2018-05-14 Circulation handling system is returned after propping up before a kind of unit rack

Publications (1)

Publication Number Publication Date
CN208473919U true CN208473919U (en) 2019-02-05

Family

ID=65221364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820711916.1U Expired - Fee Related CN208473919U (en) 2018-05-14 2018-05-14 Circulation handling system is returned after propping up before a kind of unit rack

Country Status (1)

Country Link
CN (1) CN208473919U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160784A (en) * 2020-08-13 2021-01-01 中国煤炭科工集团太原研究院有限公司 Transportation crossheading alternate circulation support type advance support device and support method
CN113090315A (en) * 2021-03-19 2021-07-09 宁夏天地奔牛实业集团有限公司 Rack-and-pinion rail type transportation crossheading non-repeated supporting system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160784A (en) * 2020-08-13 2021-01-01 中国煤炭科工集团太原研究院有限公司 Transportation crossheading alternate circulation support type advance support device and support method
CN113090315A (en) * 2021-03-19 2021-07-09 宁夏天地奔牛实业集团有限公司 Rack-and-pinion rail type transportation crossheading non-repeated supporting system
CN113090315B (en) * 2021-03-19 2023-03-14 宁夏天地奔牛实业集团有限公司 Rack-and-pinion rail type transportation crossheading non-repeated supporting system

Similar Documents

Publication Publication Date Title
CN103452574B (en) Auxiliary bracket moving device of circular self-moving advance support
CN104791004B (en) Mining automatically-moving equipment train capable of stepping forward along roadway
CN104533466A (en) Multifunctional flexible traction type paving rack for waterproof board
CN202966320U (en) Hydraulic traction self-advancing flat car
CN104791003A (en) Big-gradient crossheading step-forward self-moving equipment train
CN104453972A (en) Hydraulic support drawing, turning, transporting and retracting device
CN203796302U (en) Circulation self-moving type forepoling auxiliary rack moving device
CN104100288A (en) Trolley type fully-mechanized coal mining hydraulic support assembling frame
CN208473919U (en) Circulation handling system is returned after propping up before a kind of unit rack
CN101537561B (en) Lifting tool car of fully-mechanized equipment
CN103410540A (en) Loader for hydraulic supports of fully-mechanized coal mining faces of coal mines
CN107762552B (en) The rapid translation trolley and method of mating trailer after TBM
CN111622787A (en) Method for withdrawing fully-mechanized mining hydraulic support by using hauler
CN102720534A (en) Self-moving tail push unit for belt conveyor
CN101798935B (en) Transverse self-moving combined suspension hydraulic bracket
CN106050284A (en) Parallel operation type quick tunneling support system and construction method
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN207551862U (en) A kind of belt rolls up discharge mechanism
CN112049584A (en) Elevated catwalk
CN108221512A (en) Adjustable track laying machine
CN204627664U (en) A kind of colliery crossheading is taken a step from moving device train
CN104787058A (en) Coal mining working face equipment train traction device
CN204627663U (en) Heavy grade crossheading is taken a step from moving device train
CN202611759U (en) Self-moving belt conveyor tail displacement device
CN103991795A (en) Single-rail transportation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190205