CN208472978U - A kind of roofing of reinforced concrete roof hangs Foundation fixing device - Google Patents

A kind of roofing of reinforced concrete roof hangs Foundation fixing device Download PDF

Info

Publication number
CN208472978U
CN208472978U CN201820991171.9U CN201820991171U CN208472978U CN 208472978 U CN208472978 U CN 208472978U CN 201820991171 U CN201820991171 U CN 201820991171U CN 208472978 U CN208472978 U CN 208472978U
Authority
CN
China
Prior art keywords
steel
oeuveres
bors
roofing
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820991171.9U
Other languages
Chinese (zh)
Inventor
李�杰
任向癸
余伟伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Fifth Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority to CN201820991171.9U priority Critical patent/CN208472978U/en
Application granted granted Critical
Publication of CN208472978U publication Critical patent/CN208472978U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of roofings of reinforced concrete roof to hang Foundation fixing device, including the under(-)chassis being laid at the top of roof system, the under(-)chassis is formed by fixedly connecting by two or two or more Two bors d's oeuveres I-steel, every Two bors d's oeuveres I-steel is fixed at the top of roof system by two or more fixators, and docking pedestal is welded on Two bors d's oeuveres I-steel.The utility model hangs basis with roofing using the docking pedestal on under(-)chassis and is fixedly connected, and under(-)chassis is formed by fixedly connecting by two or two or more Two bors d's oeuveres I-steel, every Two bors d's oeuveres I-steel is fixed according to the setting position at the top of roof system using three kinds of beam retainer, floor fixator and shear wall fixator fixators, to meet floor, crossbeam and the force request of shear wall, overcome that reinforced concrete roof plate is relatively thin and the lesser problem of beam section, so that roofing hangs basic stress and meets the requirements, roofing hangs basis and roof system is reliably connected.

Description

A kind of roofing of reinforced concrete roof hangs Foundation fixing device
Technical field
The utility model relates to a kind of roofings of reinforced concrete roof to hang Foundation fixing device, belong to building construction technology Field.
Background technique
For some odd using the super high-rise building of reinforced concrete structure, long span building, outside vertical surface of building moulding Special, the narrow building in construction site, tower crane can not be removed using crane after the completion of construction or completed works reconstruction is built When can not carry out lifting construction using crane, roofing can be used and lift up into capable construction.Roofing hangs basis using steel structure base shape Steel I-beam support, generally twice steel I-beam or four steel I-beam arranged crosswises, basic steel I-beam edge can be used in formula Structural beams direction arrangement.Simultaneously roofing stress form must be checked, if meet load-bearing requirements, for roof slab it is relatively thin and The lesser building of beam section, roofing can be damaged or crack, and serious conditions may cause collapsing.It is, thus, sought for a kind of tower That hangs pedestal and reinforced concrete structure is reliably connected mode.
Utility model content
A kind of roofing of the purpose of the utility model is to provide structures simple, safe and reliable reinforced concrete roof Foundation fixing device is hung, to overcome reinforced concrete roof plate relatively thin with beam section compared with minor issue, so that roofing hangs basic stress It meets the requirements, roofing hangs basis and roof system is reliably connected.
The technical solution of the utility model includes: a kind of roofing of reinforced concrete roof hangs Foundation fixing device, including it is laid with Under(-)chassis at the top of roof system, the under(-)chassis be fixedly connected by two or two or more Two bors d's oeuveres I-steel and At every Two bors d's oeuveres I-steel is fixed at the top of roof system by two or more fixators, is welded on Two bors d's oeuveres I-steel There is docking pedestal.
Further, the under(-)chassis is to be formed by fixedly connecting T-shape by two or two or more Two bors d's oeuveres I-steel Frame, triangular framing or rectangular frame.
Further, the Two bors d's oeuveres I-steel is by two I-steel and the backing plate structure being welded between two I-steel At.
Further, the fixator is beam retainer, floor fixator or shear wall fixator.
Further, the beam retainer is identical with the structure of floor fixator, including four split bolts and is connected to I-shaped billet, spring shim and the double nut at split bolt both ends, the split bolt are arranged across floor, to drawing spiral shell The upper end of bolt connect and pass through spring shim with the I-shaped billet being pressed on Two bors d's oeuveres I-steel and double nut is fixed, split bolt Lower end connect and pass through spring shim with the I-shaped billet being pressed on crossbeam and double nut is fixed.
Further, the shear wall fixator include the patch wall steel plate for being symmetricly set on shear wall two sides, four to draw spiral shell Bolt and I-shaped billet, spring shim and the double nut for being connected to split bolt both ends, the split bolt pass through building Plate setting, the upper end of split bolt connect with the I-shaped billet being pressed on Two bors d's oeuveres I-steel and passes through spring shim and double nut Fixed, the patch wall steel plate of shear wall two sides is fixed by through-wall bolt, is horizontally welded with junction steel plate on patch wall steel plate, The two sides of junction steel plate are welded with stiffener plate, and the lower end of split bolt passes through spring shim and double nut after passing through junction steel plate It is fixed.
Due to the adoption of the above technical scheme, utility model has the advantages that the utility model is using on under(-)chassis Docking pedestal hangs basis with roofing and is fixedly connected, and under(-)chassis is fixedly connected by two or two or more Two bors d's oeuveres I-steel It forms, every Two bors d's oeuveres I-steel uses beam retainer, floor fixator and shear wall according to the setting position at the top of roof system Fixator three kinds of fixators are fixed, and to meet floor, crossbeam and the force request of shear wall, overcome reinforced concrete earth house Cover board is relatively thin and the lesser problem of beam section, so that roofing hangs basic stress and meets the requirements, roofing hangs basis and roof system reliably connects It connects.
Detailed description of the invention
Fig. 1 is the top view of the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of beam retainer;
Fig. 3 is the structural schematic diagram of floor fixator;
Fig. 4 is the structural schematic diagram of shear wall fixator;
Fig. 5 is the structural schematic diagram for pasting wall steel plate and junction steel plate;
Fig. 6 is the left view of Fig. 5;
Fig. 7 is the top view of Fig. 5.
Description of symbols: 1- Two bors d's oeuveres I-steel;2- docks pedestal;3- fixator;4- split bolt;5- I-steel pad Plate;6- double nut;7- spring shim;8- backing plate;9- pastes wall steel plate;10- junction steel plate;11- stiffener plate;12- through-wall bolt.
Specific embodiment
It is right with reference to the accompanying drawings and examples in order to keep the purpose of this utility model, technical solution and advantage clearer The utility model is described in further detail.
The embodiments of the present invention: the roofing of reinforced concrete roof hangs the structural schematic diagram of Foundation fixing device as schemed Shown in 1, including the under(-)chassis being laid at the top of roof system, the under(-)chassis is fixedly connected by two Two bors d's oeuveres I-steel 1 It forms, every Two bors d's oeuveres I-steel 1 is fixed at the top of roof system by two or more fixators 3, on Two bors d's oeuveres I-steel 1 It is welded with docking pedestal 2.The under(-)chassis is to be formed by fixedly connecting " T " by two or two or more Two bors d's oeuveres I-steel 1 Type frame.The Two bors d's oeuveres I-steel is made of two I-steel and the backing plate 8 being welded between two I-steel.It is described Fixator 3 is beam retainer, floor fixator or shear wall fixator.
Referring to fig. 2 and Fig. 3, the beam retainer is identical with the structure of floor fixator, including four split bolts 4 and It is connected to the I-shaped billet 5, spring shim 7 and double nut 6 at 4 both ends of split bolt, the split bolt 4 passes through floor Setting, the upper end of split bolt 4 connect with the I-shaped billet 5 being pressed on Two bors d's oeuveres I-steel 1 and by spring shims 7 and double spiral shells Mother 6 is fixed, and the lower end of split bolt 4 connect with the I-shaped billet 5 being pressed on crossbeam and by spring shim 7 and double nut 6 It is fixed.
Referring to fig. 4~7, the shear wall fixator include be symmetricly set on patch wall steel plate 9, four of shear wall two sides it is right The I-shaped billet 5, spring shim 7 and double nut 6 for drawing bolt 4 and being connected to 4 both ends of split bolt, it is described to drawing spiral shell Bolt 4 is arranged across floor, and the upper end of split bolt 4 connect with the I-shaped billet 5 being pressed on Two bors d's oeuveres I-steel 1 and passes through spring Gasket 7 and double nut 6 are fixed, and the patch wall steel plate 9 of shear wall two sides is fixed by through-wall bolt 12, horizontal on patch wall steel plate 9 Ground is welded with junction steel plate 10, is welded with stiffener plate 11 in the two sides of junction steel plate 10, the lower end of split bolt 4 passes through connection It is fixed by spring shim 7 and double nut 6 after steel plate 10.
The utility model hangs basis with roofing using the docking pedestal 2 on under(-)chassis and is fixedly connected, and under(-)chassis is It is formed by fixedly connecting by two or two or more Two bors d's oeuveres I-steel 1, every Two bors d's oeuveres I-steel 1 is according to the setting at the top of roof system Position use beam retainer, floor fixator with or shear wall fixator three kinds of fixators fix, with meet floor, crossbeam with And the force request of shear wall, overcome that reinforced concrete roof plate is relatively thin and the lesser problem of beam section, so that roofing hangs base Plinth stress is met the requirements, and roofing hangs basis and roof system is reliably connected.

Claims (6)

1. a kind of roofing of reinforced concrete roof hangs Foundation fixing device, including the under(-)chassis being laid at the top of roof system, Be characterized in that: the under(-)chassis is formed by fixedly connecting by two or two or more Two bors d's oeuveres I-steel (1), every Two bors d's oeuveres I-steel (1) is fixed at the top of roof system by two or more fixators (3), is welded on Two bors d's oeuveres I-steel (1) It docks pedestal (2).
2. the roofing of reinforced concrete roof according to claim 1 hangs Foundation fixing device, it is characterised in that: described Under(-)chassis is to be formed by fixedly connecting T-shape frame, triangular framing or square by two or two or more Two bors d's oeuveres I-steel (1) Shape frame.
3. the roofing of reinforced concrete roof according to claim 2 hangs Foundation fixing device, it is characterised in that: described Two bors d's oeuveres I-steel is made of two I-steel and the backing plate (8) being welded between two I-steel.
4. the roofing of reinforced concrete roof according to claim 1 hangs Foundation fixing device, it is characterised in that: described solid Determining device (3) is beam retainer, floor fixator or shear wall fixator.
5. the roofing of reinforced concrete roof according to claim 4 hangs Foundation fixing device, it is characterised in that: the beam Fixator is identical with the structure of floor fixator, including four split bolts (4) and is connected to the work at split bolt (4) both ends Word billet (5), spring shim (7) and double nut (6), the split bolt (4) are arranged across floor, split bolt (4) upper end connect with the I-shaped billet (5) being pressed on Two bors d's oeuveres I-steel (1) and by spring shim (7) and double nut (6) Fixed, the lower end of split bolt (4) connect with the I-shaped billet (5) being pressed on crossbeam and by spring shim (7) and double spiral shells Female (6) are fixed.
6. the roofing of reinforced concrete roof according to claim 4 hangs Foundation fixing device, it is characterised in that: described to cut Power wall fixator includes the patch wall steel plate (9) for being symmetricly set on shear wall two sides, four split bolts (4) and is connected to drawing I-shaped billet (5), spring shim (7) and the double nut (6) at bolt (4) both ends, the split bolt (4) pass through floor Setting, the upper end of split bolt (4) connect with the I-shaped billet (5) being pressed on Two bors d's oeuveres I-steel (1) and passes through spring shim (7) and double nut (6) is fixed, and the patch wall steel plate (9) of shear wall two sides is fixed by through-wall bolt (12), in patch wall steel plate (9) On be horizontally welded with junction steel plate (10), be welded with stiffener plate (11) in the two sides of junction steel plate (10), split bolt (4) Lower end pass through junction steel plate (10) afterwards by spring shim (7) and double nut (6) fixation.
CN201820991171.9U 2018-06-26 2018-06-26 A kind of roofing of reinforced concrete roof hangs Foundation fixing device Expired - Fee Related CN208472978U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820991171.9U CN208472978U (en) 2018-06-26 2018-06-26 A kind of roofing of reinforced concrete roof hangs Foundation fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820991171.9U CN208472978U (en) 2018-06-26 2018-06-26 A kind of roofing of reinforced concrete roof hangs Foundation fixing device

Publications (1)

Publication Number Publication Date
CN208472978U true CN208472978U (en) 2019-02-05

Family

ID=65215147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820991171.9U Expired - Fee Related CN208472978U (en) 2018-06-26 2018-06-26 A kind of roofing of reinforced concrete roof hangs Foundation fixing device

Country Status (1)

Country Link
CN (1) CN208472978U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113107224A (en) * 2021-03-31 2021-07-13 北京元亨凯瑞工程设计有限公司 Steel construction building roof beam reinforced structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113107224A (en) * 2021-03-31 2021-07-13 北京元亨凯瑞工程设计有限公司 Steel construction building roof beam reinforced structure

Similar Documents

Publication Publication Date Title
CN112878535B (en) Precast concrete wallboard connecting structure and construction method thereof
CN109184189A (en) A kind of diameter Silo conical shell silo roof construction method
CN105421748A (en) Anchoring device of cantilever scaffold
CN111188457A (en) Edge sealing beam structure of super high-rise steel structure building and construction method
CN208701698U (en) A kind of foundation pit recoverable concrete support
CN208472978U (en) A kind of roofing of reinforced concrete roof hangs Foundation fixing device
CN206345617U (en) Building tower crane attachment device is received in a kind of
CN210857253U (en) Foundation fixing node of permanent box type house
CN102359185A (en) Connecting structure of large steel structural member and concrete member and construction method
CN112049415A (en) Construction method of cornice formwork
CN218912214U (en) Overlength attaches wall conversion support
CN103485524B (en) Corbel type builder's jack and construction when setting up thereof
CN203420359U (en) Rigid connection joint connected through beam columns and capable of bearing overlarge loads in steel structure support system
CN216109354U (en) Conversion layer steel column mounting structure
CN214614236U (en) Vertical anti-pulling static load test counterforce device of concrete filling pile
CN213597442U (en) Elevator shaft template operation platform that encorbelments
CN213115585U (en) Stable form bearing structure that building engineering used
CN211735477U (en) A tower crane foundation structure for bridge tower construction
CN210482635U (en) Concrete pillar reinforcing structure at lower part of shock insulation support
CN207633583U (en) A kind of connection structure of prefabricated post and prefabricated partition wall
CN108104136B (en) Foundation pit supporting structure and construction method thereof
CN206345614U (en) A kind of attachment device of tower crane being arranged on basement roof
CN205224571U (en) Anchor of builder's jack
CN220725814U (en) Floor-free temporary support structure for floor support plate
CN215368613U (en) Shaped steel hangs outrigger external corner construction structures

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190205

CF01 Termination of patent right due to non-payment of annual fee