CN208458333U - Refrigeration system - Google Patents

Refrigeration system Download PDF

Info

Publication number
CN208458333U
CN208458333U CN201820679088.8U CN201820679088U CN208458333U CN 208458333 U CN208458333 U CN 208458333U CN 201820679088 U CN201820679088 U CN 201820679088U CN 208458333 U CN208458333 U CN 208458333U
Authority
CN
China
Prior art keywords
water
evaporimeter
refrigerant
evaporator
refrigeration system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820679088.8U
Other languages
Chinese (zh)
Inventor
孙亮亮
诸琛
李亮
蔡海峰
唐锡峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
York Wuxi Air Conditioning and Refrigeration Co Ltd
Johnson Controls Technology Co
Original Assignee
York Wuxi Air Conditioning and Refrigeration Co Ltd
Johnson Controls Technology Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by York Wuxi Air Conditioning and Refrigeration Co Ltd, Johnson Controls Technology Co filed Critical York Wuxi Air Conditioning and Refrigeration Co Ltd
Priority to CN201820679088.8U priority Critical patent/CN208458333U/en
Application granted granted Critical
Publication of CN208458333U publication Critical patent/CN208458333U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sorption Type Refrigeration Machines (AREA)

Abstract

This application discloses a kind of refrigeration system, refrigeration system includes water evaporimeter, and water evaporimeter includes water evaporimeter entrance and water evaporimeter outlet;Saline water evaporator, saline water evaporator include saline water evaporator communication port;First adjusts pipeline, and first, which adjusts pipeline, is controllably in fluid communication saline water evaporator and water evaporimeter or disconnects, so that the refrigerant in saline water evaporator can controllably flow to water evaporimeter;Pipeline is adjusted with second, second, which adjusts pipeline, is controllably in fluid communication water evaporimeter and saline water evaporator or disconnects, so that the refrigerant in water evaporimeter can controllably flow to saline water evaporator.The application can adjust the refrigeration dose in water evaporimeter and saline water evaporator according to different mode, to guarantee the refrigerating capacity and efficiency of refrigeration system in different modes.

Description

Refrigeration system
Technical field
Invention relates generally to field of refrigeration more particularly to a kind of refrigeration systems.
Background technique
Traditional refrigeration system include compressor, condenser, throttling set and evaporator, for make refrigerant wherein into Row circulates, so that the state change by refrigerant completes refrigeration cycle.Object to be cooled is conducted through evaporator, And heat exchange is carried out with the low-temperature refrigerant in evaporator, to achieve the purpose that cooled.
In refrigeration system industry, user wishes the operation for improving the operational efficiency of refrigeration system and reducing refrigeration system Cost.
Utility model content
This application provides a kind of refrigeration system, the refrigeration system includes water evaporimeter, and the water evaporimeter includes water Evaporator inlet and water evaporimeter outlet;Saline water evaporator, the saline water evaporator include saline water evaporator communication port;First adjusts Pipeline is saved, described first, which adjusts pipeline, is controllably in fluid communication the saline water evaporator and the water evaporimeter or disconnects, with The refrigerant in the saline water evaporator is enabled controllably to flow to the water evaporimeter;Pipeline is adjusted with second, described the Two, which adjust pipeline, is controllably in fluid communication the water evaporimeter and saline water evaporator or disconnects, so that in the water evaporimeter Refrigerant can controllably flow to the saline water evaporator.
According to above-mentioned refrigeration system, the water evaporimeter includes water evaporimeter communication port;The saline water evaporator communication port It is in fluid communication with the water evaporimeter communication port.
According to above-mentioned refrigeration system, the refrigeration system further includes liquid level detection device, and the liquid level detection device is set The refrigerant level detection signal for being set to the liquid level being able to detect in the water evaporimeter and water evaporimeter being provided;The liquid level inspection Device is surveyed to be configured to the liquid level detected in the saline water evaporator and saline water evaporator level sensing signal is provided.
According to above-mentioned refrigeration system, the refrigeration system further includes control device, and the control device is configured to The refrigerant level detection signal of the water evaporimeter according to provided by the liquid level detection device and the saline water evaporator Refrigerant level detection signal come control it is described first adjusting pipeline with it is described second adjusting pipeline be connected to and disconnection.
According to above-mentioned refrigeration system, the evaporating pressure in the water evaporimeter is higher than the vapor pres- sure in the saline water evaporator Power;Described first is adjusted including pump in pipeline, and the pump includes pump intake and pump discharge, the pump intake and the salt water evaporation Device communication port is in fluid communication, and the pump discharge and the water evaporimeter entrance are in fluid communication, so that in the control device control When making the pump startup, the refrigerant in the saline water evaporator can be reduced;Described second to adjust include the in pipeline One valve, first valve include the first valve inlet and the first valve outlet, first valve inlet and the water evaporimeter entrance stream Body connection, first valve outlet and the saline water evaporator communication port are in fluid communication, so that controlling in the control device When first valve is opened, the refrigerant in the water evaporimeter can be reduced.
According to above-mentioned refrigeration system, the control device is configured as when the refrigerant level in the saline water evaporator is low When salt water safety levels, the control device stops or does not start the pump.
According to above-mentioned refrigeration system, described first is adjusted in pipeline including injector.
According to above-mentioned refrigeration system, the refrigeration system further includes compressor, the compressor include suction port of compressor and Compressor outlet;Condenser, the condenser include condenser inlet and condensator outlet, the condenser inlet and compressor Communication;First throttling device, the first throttling device include first throttling device entrance and first throttling device Outlet, the first throttling device entrance and condensator outlet are in fluid communication, and the first throttling device outlet is steamed with the water Device entrance is sent out to be in fluid communication;And second throttling device, the second throttling device include second throttling device entrance and the second section Device outlet is flowed, the second throttling device entrance and the water evaporimeter communication port are in fluid communication, the second throttling device Outlet is in fluid communication with the saline water evaporator communication port.
In the case where implementing tou power price (for example, daytime, the expensive evening electricity price of electricity price was cheap) at present, the system of the application The advantages of at least that cooling capacity can be stored using cool storage medium when electricity price is cheap, and the cold of storage is used when electricity price is more expensive Amount is freezed, to realize the purpose for saving refrigeration system operating cost.
Detailed description of the invention
Fig. 1 shows the refrigeration system of the application;
Refrigerant flows mostly to when Fig. 2A shows refrigeration system shown in FIG. 1 under salt aqueous mode;
Refrigerant flows mostly to when Fig. 2 B shows refrigeration system shown in FIG. 1 under aqueous mode;
Fig. 3 shows control unit and control connection in refrigeration system shown in FIG. 1;
Fig. 4 shows the more detailed structure of control device in Fig. 3;
Fig. 5 shows control device to the control flow of refrigeration system;
Fig. 6 shows more detailed step in step 512 shown in fig. 5;
Fig. 7 shows more detailed step in step 514 shown in fig. 5;
Fig. 8 shows more detailed step in step 516 shown in fig. 5;
Fig. 9 shows more detailed step in step 518 shown in fig. 5.
Specific embodiment
The various specific embodiments of the application are described below with reference to the attached drawing for constituting this specification a part. In the conceived case, identical or similar appended drawing reference used herein refers to identical or corresponding component.
Fig. 1 shows the refrigeration system 100 of the application.As shown in Figure 1, refrigeration system 100 mainly include compressor 102, Condenser 104, first throttling device 112, water evaporimeter 106, second throttling device 114 and saline water evaporator 108, they are by pipe Road connects into a closed system, and is filled with refrigerant in systems.Specifically, as shown in Figure 1, compressor 102 wraps Include suction port of compressor 102a and compressor outlet 102b.Condenser 104 includes condenser inlet 104a and condensator outlet 104b. First throttling device 112 includes that first throttling device entrance 112a and first throttling device export 112b.Water evaporimeter 106 includes Water evaporimeter entrance 106a, water evaporimeter export 106b and water evaporimeter communication port 106a '.Second throttling device 114 includes the Two throttling set entrance 114a and second throttling device export 114b.Saline water evaporator 108 includes saline water evaporator communication port 108a and saline water evaporator export 108b.These components are connected by pipeline as follows: compressor outlet 102b is connected to cold Condenser entrance 104a, condensator outlet 104b are connected to first throttling device entrance 112a, and first throttling device exports 112b and connects It is connected to water evaporimeter entrance 106a, water evaporimeter outlet 106b is connected to suction port of compressor 102a, water evaporimeter communication port 106a ' It is connected to second throttling device entrance 114a, second throttling device outlet 114b is connected to saline water evaporator communication port 108a, salt Water evaporimeter outlet 108b is connected to suction port of compressor 102a.Refrigeration system 100 further includes water evaporimeter valve 116 and salt water evaporation Device valve 118.Water evaporimeter valve 116 includes water evaporimeter valve inlet 116a and water evaporimeter valve outlet 116b.Saline water evaporator valve 118 include saline water evaporator valve inlet 118a and saline water evaporator valve outlet 118b.Water evaporimeter valve inlet 116a and water evaporation Device exports 106b and is in fluid communication, and water evaporimeter valve outlet 116b and suction port of compressor 102a are in fluid communication.Saline water evaporator valve enters Mouth 118a and saline water evaporator outlet 108b are in fluid communication, saline water evaporator valve outlet 118b and suction port of compressor 102a fluid company It is logical.
Fig. 2A and Fig. 2 B shows refrigeration system 100 shown in FIG. 1 in two kinds of operational modes (including aqueous mode and salt water mould Formula) under refrigerant flow graph.Fig. 2A shows the main stream of refrigeration system shown in FIG. 1 refrigerant under salt aqueous mode To, and Fig. 2 B shows refrigeration system shown in FIG. 1 refrigerant under the aqueous mode and flows mostly to.As shown in Figure 2 A, it is running Under the salt aqueous mode of state, water evaporimeter valve 116 is closed, and water evaporimeter 106 is out of service, and saline water evaporator valve 118 is opened simultaneously And saline water evaporator 108 is run.Refrigerant in refrigeration system 100 passes sequentially through compressor 102, condenser 104, first throttle Device 112, water evaporimeter 106, second throttling device 114, saline water evaporator 108 and saline water evaporator valve 118 form refrigeration and follow Ring.In process of refrigerastion, compressor 102 be discharged high temperature and high pressure gaseous refrigerant in condenser 104 with surrounding medium or load Cryogen (enter condenser 104 in Fig. 1 and indicate the trend of refrigerating medium such as cooling water from the arrow of condenser 104 out) carries out heat Exchange, releases heat and is liquefied and condenses;First throttling device 112 by by condenser 104 high pressure liquid refrigerant section Stream, makes its pressure reduction;Refrigerant passes through water evaporimeter 106;Second throttling device 114 will be from the refrigeration of water evaporimeter 106 Agent continues to throttle, its pressure is made to continue to reduce;Low pressure refrigerant (enters in saline water evaporator 108 with cooled object in Fig. 1 The arrow of saline water evaporator 108 and the arrow come out from saline water evaporator 108 indicate the trend of cooled object such as chilled brine) Heat exchange occurs, the heat for absorbing cooled object is vaporized and evaporates;The refrigerant vapour that vaporization generates passes through salt water evaporation It is sucked after device valve 118 by compressor 102, is discharged after compression with high pressure.In order to save refrigeration system operating cost, electricity price just Salt aqueous mode can be opened when preferably, under salt aqueous mode, the cooled object of the saline water evaporator 108 in refrigeration system 100 can To be set as salt water, calcium chloride solution, magnesium chloride solution, sodium chloride solution, ethylene glycol solution, glycerin solution, sodium hydroxide Cooling capacity can be stored in Ice Storage Tank (not shown) by aqueous solution etc., for using when electricity price is more expensive.Specifically, when electricity When valence is expensive, can preferentially using the cooling capacity being stored in Ice Storage Tank (not shown), if cooling capacity in Ice Storage Tank (not shown) without Method meet demand, is then turned on aqueous mode, continues to provide cooling capacity by the water evaporimeter 106 in refrigeration system 100.
It should be noted that chilled water refer to from water evaporimeter 106 flow into outflow, with water evaporimeter 106 in The water of refrigerant heat exchanger, chilled brine refer to from inflow in saline water evaporator 108 and outflow and in water evaporimeter 106 system The water of cryogen heat exchange.Chilled water and chilled brine do not represent solid water or solid salt water.
Although it should also be noted that, being lauched in salt aqueous mode, evaporator 106 is out of service, and refrigerant still is able to flow Enter water evaporimeter 106 and is flowed out from water evaporimeter 106, and water evaporimeter 106 does not occur with cooled object (such as chilled water) Heat exchange.
As shown in Figure 2 B, under the aqueous mode of operating status, saline water evaporator valve 118 is closed, and saline water evaporator 108 stops Operation, water evaporimeter valve 116 open the operation of device 106 that evaporates the water.Refrigerant in refrigeration system 100 passes sequentially through compressor 102, condenser 104, first throttling device 112, water evaporimeter 106 and water evaporimeter valve 116 form refrigeration cycle.Freezing Cheng Zhong, the high temperature and high pressure gaseous refrigerant that compressor 102 is discharged (enter condenser with surrounding medium in condenser 104 in Fig. 1 104 and from condenser 104 come out arrow indicate surrounding medium such as cooling water trend) carry out heat exchange, release heat quilt It liquefies and condenses;First throttling device 112 by by condenser 104 high pressure liquid refrigerant throttle, make its pressure reduction;It is low Compression refrigerant is in water evaporimeter 106 with cooled object (into the arrow of water evaporimeter 106 and from water evaporimeter 106 in Fig. 1 Arrow out indicates the trend of cooled object such as chilled water) heat exchange occurs, the heat for absorbing cooled object is vaporized And it evaporates;The refrigerant vapour that vaporization generates after water evaporimeter valve 116 by compressor 102 by being sucked, after compression with high pressure Discharge.When the cooling capacity in Ice Storage Tank (not shown) is unable to satisfy demand, aqueous mode can be opened, by water evaporimeter 106 after It is continuous that cooling capacity is provided.
It should be noted that, although saline water evaporator 108 is out of service under aqueous mode, but refrigerant still is able to flow into Or outflow saline water evaporator 108, and with cooled object (such as chilled brine) heat exchange does not occur for saline water evaporator 108.
It continues to refer to figure 1, refrigeration system 100 further includes that the first adjusting pipeline 142 and second adjusts pipeline 144, for adjusting Save the amount of refrigerant in saline water evaporator 108 and water evaporimeter 106.First adjusts pipeline 142 controllably by saline water evaporator 108 It is in fluid communication with water evaporimeter 106 or disconnects, so that the refrigerant in saline water evaporator 108 can controllably flows to water evaporation Device 106.Second, which adjusts pipeline 144, is controllably in fluid communication water evaporimeter 106 and saline water evaporator 108 or disconnects, so that Refrigerant in water evaporimeter 106 can controllably flow to saline water evaporator 108.
In refrigeration system 100, the evaporating pressure in water evaporimeter 106 is higher than the evaporating pressure in saline water evaporator 108, Thus the refrigerant in water evaporimeter 106 is easily accumulated in saline water evaporator 108.The application can adjust pipeline by first 142 and second adjust pipeline 144, according to different mode to the amount of refrigerant in water evaporimeter 106 and/or saline water evaporator 108 The different requirements of (i.e. refrigerant level), to adjust the amount of refrigerant in water evaporimeter 106 and saline water evaporator 108, thus Guarantee the refrigerating capacity and efficiency of refrigeration system 100 in different modes.As an example, include in the first adjusting pipeline 142 Pump 132, pump 132 include pump intake 132a and pump discharge 132b, pump intake 132a and saline water evaporator communication port 108a (i.e. second Throttling set exports 114b) it is in fluid communication, (i.e. first throttling device exports by pump discharge 132b and water evaporimeter entrance 106a 112b) it is in fluid communication, so that the first adjusting pipeline 142 is connected to, so that saline water evaporator when 132 starting of pump Refrigerant flow direction water evaporimeter 106 in 108.In addition, including in the first adjusting pipeline 142 in order to which 132 and line isolation will be pumped Isolating valve 136, isolating valve 136 are connected between 132 and water evaporimeter entrance 106a of pump (i.e. first throttling device outlet 112b). More specifically, isolating valve 136 includes isolation valve inlet 136a and isolation valve outlet 136b, and valve inlet 136a and pump discharge is isolated 132b is in fluid communication, and isolation valve outlet 136b and water evaporimeter entrance 106a (i.e. first throttling device exports 112b) fluid connect It is logical.As an example, it when needing to open pump 132, first opens isolating valve 136 and is then turned on pump 132;132 are pumped when needing to close When, it first closes pump 132 and turns off isolating valve 136, to make pump 132 shift to an earlier date with the other component in pipeline by isolating valve 136 Isolation.Second is adjusted including the first valve 134 in pipeline 144, and the first valve 134 includes the first valve inlet 134a and the first valve outlet 134b, the first valve inlet 134a and water evaporimeter entrance 106a (i.e. first throttling device exports 112b) are in fluid communication, the first valve It exports 134b and saline water evaporator communication port 108a (i.e. second throttling device exports 114b) is in fluid communication, so that the first valve When 134 opening, the second adjusting pipeline 144 is connected to, so that the refrigerant flow direction salt water evaporation in water evaporimeter 106 Device 108.It should be noted that also may include injector or other devices in the first adjusting pipeline 142, so that salt water steams Refrigerant in hair device 108 can flow to water evaporimeter 106.Second adjusting pipeline 144 in also may include check valve or its His device, so that the refrigerant in water evaporimeter 106 can flow to saline water evaporator 108.
Fig. 3 shows control unit (including control device 302) and control connection in refrigeration system 100 shown in FIG. 1. As shown in figure 3, refrigeration system 100 further includes liquid level detection device 304,306 and control device 302.304 quilt of liquid level detection device The refrigerant level being set as in detection water evaporimeter 106, and the refrigerant level for the water evaporimeter 106 that will test detects letter Number it is supplied to control device 302.Liquid level detection device 306 is arranged to detect the refrigerant level in saline water evaporator 108, and The refrigerant level detection signal for the saline water evaporator 108 that will test is supplied to control device 302.Control device 302 and liquid Level detecting apparatus 304,306, pump 132,134 communication connection of isolating valve 136 and the first valve.Control device 302 is configured to The level sensing signal of signal and saline water evaporator 108 is detected according to the refrigerant level of the water evaporimeter 106 received to control First adjusting pipeline 142 with second adjusting pipeline 144 be connected to and disconnection.As an example, control device 302 is configured as Signal can be detected according to the refrigerant level of the water evaporimeter 106 received and the refrigerant level of saline water evaporator 108 detects Signal come control pump 132 start and stop and isolating valve 136 opens or closes.Control device 302 is additionally configured to energy The refrigerant level detection of enough refrigerant level detection signals and saline water evaporator 108 according to the water evaporimeter 106 received is believed Number control opening or closing for the first valve 134.
It should be noted that control device 302 can be according to water evaporation when not only refrigeration system 100 is in operating status The refrigerant level detection signal of device 106 and the refrigerant level of saline water evaporator 108 detect signal to control the first regulation pipe Road 142 with second adjusting pipeline 144 be connected to and disconnection.When refrigeration system 100 is in standby and (does not run), control Signal also can be detected according to the refrigerant level of water evaporimeter 106 for device 302 and the refrigerant level of saline water evaporator 108 detects Signal come control the first adjusting pipeline 142 with second adjusting pipeline 144 be connected to and disconnection, to control water evaporimeter 106 and salt The height of refrigerant level in water evaporimeter 108.Specifically, when refrigeration system 100 is in standby and (does not run), Its standby mode includes water ready mode and salt water ready mode.Although refrigeration system 100 is in standby, water evaporimeter 106 and saline water evaporator 108 do not run, but can according to next time run when operating status to water evaporimeter 106 and salt Refrigerant level is adjusted in water evaporimeter 108, when in order to run next time can quick start, and no longer expend the time Refrigerant level in water evaporimeter 106 and saline water evaporator 108 is waited to restart refrigeration system 100 after reaching predetermined fluid level.
Fig. 4 shows the more detailed structure of control device 302 in Fig. 3.As shown in figure 4, control device 302 includes bus 402, processor 404, input interface 406, output interface 408 and the memory 414 with control program 416.Control device All parts in 302, including processor 404, input interface 406, output interface 408 and memory 414 and bus 402 communicate Connection, enables processor 404 to control the operation of input interface 406, output interface 408 and memory 414.Specifically It says, memory 414 is for storing program, instruction and data, and processor 404 is from 414 reading program of memory, instruction sum number According to, and data can be written to memory 414.Control defeated by executing 414 reading program of memory and instruction, processor 404 The operation of incoming interface 406 and output interface 408.
By line 418, input interface 406 is received from extraneous signal and data, including from liquid level detection device 304,306 The signal and data sent;
By line 422, output interface 408 issues control signal to outside, including to pump 132, isolating valve 136 and first Valve 134 issues control signal;
It should be noted that realizing that the program of flow chart shown in Fig. 5-Fig. 9 is stored in control in embodiments herein In the memory 414 of device 302 processed.The program for being stored in control device 302 is executed by processor 404, control device 302 is right Pump 132, isolating valve 136 and the first valve 134 are controlled.
It should also be specified that multiple setting liquid levels are also stored in the memory 414 of control device 302, for indicating The liquid level of refrigerant refrigerant in water evaporimeter 106 and saline water evaporator 108.As an example, water evaporimeter 106 In be equipped with water highest liquid level and water running liquid level, wherein water highest liquid level be higher than water running liquid level.It is equipped in saline water evaporator 108 Salt water running liquid level, salt water filling liquid level, salt water minimum liquid level and salt water safety levels, wherein salt water running liquid level is higher than salt water Liquid level is filled, salt water fills liquid level and is higher than salt water minimum liquid level, and salt water minimum liquid level is higher than salt water safety levels.In addition, this Shen Please in " water highest liquid level " refer to the highest liquid level of the refrigerant set in water evaporimeter 106;" water running liquid level " refers to water The operation liquid level of the refrigerant set in evaporator 106;" salt water running liquid level " refers to the refrigeration set in saline water evaporator 108 The operation liquid level of agent;" salt water filling liquid level " refers to the filling liquid level of the refrigerant set in saline water evaporator 108;" salt water is most Low liquid level " refers to the minimum liquid level of the refrigerant set in saline water evaporator 108;" salt water safety levels " refer to saline water evaporator The safety levels of the refrigerant set in 108.
Fig. 5 shows control device 302 to the control flow of refrigeration system 100.Wherein, there are three types of the tools of refrigeration system 100 State, i.e. operating status, standby mode and off-mode.It should be noted that standby mode and off-mode be not identical.Work as system When cooling system 100 is in standby, compressor 102, condenser 104 in refrigeration system 100, first throttling device 112, water Evaporator 106, second throttling device 114 and saline water evaporator 108 are not run, but control device 302 is still in operation shape State and instruction is waited, is throttled with controlling compressor 102, condenser 104, first throttling device 112, water evaporimeter 106, second The components such as device 114 and saline water evaporator 108 start and stop.
It should be noted that " the opening the first valve " that refers in the application refers to: when the first valve 134 is in close state When, open the first valve 134;When the first valve 134 is in the open state, the open state of the first valve 134 is kept.In the application " the opening pump and isolating valve " referred to refers to: when pumping 132 and isolating valve 136 is in close state, opening pump 132 and isolating valve 136;When pumping 132 and isolating valve 136 in the open state, the open state of pump 132 and isolating valve 136 is kept.In the application " close the first valve " that refers to refer to: when the first valve 134 is in the open state, close the first valve 134;When the first valve 134 When being in close state, the closed state of the first valve 134 is kept." the closing pump and isolating valve " that refers in the application refers to: When pumping 132 and isolating valve 136 in the open state, pump 132 and isolating valve 136 are closed;When pump 132 and isolating valve 136 are in When closed state, the closed state of pump 132 and isolating valve 136 is kept." stopping or do not start pump " for referring in the application Refer to: when pump 132 is in the open state, stopping the operation of pump 132;When pumping 132 closed state, the closing of pump 132 is kept State.
In step 502, processor 404 closes pump 132, isolating valve 136 and the first valve 134.Being followed by subsequent processing device 404 will grasp Go to step 504.
In step 504, processor 404 carries out judgement operation, according to different mode (the water moulds i.e. under operating status Formula, the salt aqueous mode under operating status, the salt water ready mode under water ready mode and standby mode under standby mode), control Process processed is gone to respectively in corresponding mode.
When the purpose of step 512 is the aqueous mode under refrigeration system 100 is in operating status, so that water evaporimeter 106 In refrigerant level not less than water running liquid level and be not higher than water highest liquid level.Because when refrigerant level is higher than water highest When liquid level, the amount of the refrigerant in water evaporimeter 106 is excessive, may cause 102 absorbing gas belt liquid of compressor, to reduce compressor 102 service life reduces operational energy efficiency;And the refrigeration when refrigerant level is lower than water running liquid level, in water evaporimeter 106 The amount of agent is very few, and it is insufficient to may cause the cooling capacity provided in water evaporimeter 106.
When the purpose of step 514 is the salt aqueous mode under refrigeration system 100 is in operating status, so that saline water evaporator Refrigerant in 108 is not higher than salt water running liquid level, to prevent the refrigerant in saline water evaporator 108 excessive, to avoid pressure 102 absorbing gas belt liquid of contracting machine, and then increase operational energy efficiency.
The purpose of step 516 is when the water ready mode that refrigeration system 100 is in the standby state, so that salt water evaporation The refrigerant level of device 108 is not higher than salt water minimum liquid level, thus in the case where saline water evaporator 108 has certain refrigeration dose Guarantee the refrigerant level in higher water evaporimeter 106, when with to run aqueous mode next time can quick start, and no longer It expends after refrigerant level in time waiting water evaporimeter 106 and saline water evaporator 108 reaches predetermined fluid level and restarts refrigeration system System 100.
The purpose of step 518 is when the salt water ready mode that refrigeration system 100 is in the standby state, so that salt water steams The refrigerant level for sending out device 108 fills liquid level not less than salt water, thus guarantee the refrigerant level in saline water evaporator 108, with When to run salt aqueous mode next time can quick start, and no longer expend the time and wait water evaporimeter 106 and saline water evaporator Refrigerant level restarts refrigeration system 100 after reaching predetermined fluid level in 108.
In step 520, processor 404 judges whether refrigeration system 100 stops working (shutting down).If refrigeration system 100 have stopped working, and processor 404 is by end operation.If refrigeration system 100 still work (it is i.e. in operating status or to Machine state), operation is gone to step 504 by processor 404.
Fig. 6 shows more detailed step in step 512 shown in fig. 5 (aqueous mode under operating status).
In step 602, processor 404 is obtained from liquid level detection device 304 in currently detected water evaporimeter 106 Refrigerant level.It is followed by subsequent processing device 404 and operation is gone into step 604.
In step 604, processor 404 by currently detected water evaporimeter 106 refrigerant level be stored in Water highest liquid level in memory 414 compares.If the refrigerant level in currently detected water evaporimeter 106 is higher than water most Operation is gone to step 606 by high liquid level, processor 404.In step 606, the first valve 134 is opened, and second adjusts pipeline 144 It is connected to, pipeline 144 is adjusted by second by the part of refrigerant of first throttling device 112 and enters saline water evaporator 108, To make the refrigerant for flowing into water evaporimeter 106 by first throttling device 112 reduce, so that the refrigeration of water evaporimeter 106 Agent liquid level reduces.It is followed by subsequent processing device 404 and operation is gone into step 602.
In step 604, if the refrigerant level in currently detected water evaporimeter 106 is not higher than water highest liquid Operation is gone to step 608 by position, processor 404.In step 608, the first valve 134 is closed, and being followed by subsequent processing device 404 will operate Go to step 610.
In step 610, processor 404 is obtained from liquid level detection device 304 in currently detected water evaporimeter 106 Refrigerant level, and obtain from liquid level detection device 306 refrigerant level in currently detected saline water evaporator 108. It is followed by subsequent processing device 404 and operation is gone into step 612.
In step 612, processor 404 by currently detected water evaporimeter 106 refrigerant level be stored in Water running liquid level in memory 414 compares, and by currently detected saline water evaporator 108 refrigerant level with deposit The salt water minimum liquid level stored up in memory 414 compares.If the refrigerant level in currently detected water evaporimeter 106 is low In water running liquid level, and the refrigerant level in currently detected saline water evaporator 108 is higher than salt water minimum liquid level, processing Operation is gone to step 614 by device 404.In step 614, pump 132 and protection valve 136 are opened, and the first adjusting pipeline 142 is connected Logical, the refrigerant in saline water evaporator 108 adjusts pipeline 142 by first and enters water evaporimeter 106, to make saline water evaporator Refrigerant in 108 is reduced, so that the refrigerant level of water evaporimeter 106 increases.It is followed by subsequent processing device 404 and operation is gone into step Rapid 612.
In step 612, if the refrigerant level in currently detected water evaporimeter 106 is not less than water running liquid Refrigerant level in position or currently detected saline water evaporator 108 is not higher than salt water minimum liquid level, and processor 404 will Operation goes to step 618.
In step 618, pump 132 and isolating valve 136 are closed.It is followed by subsequent processing device 404 and operation is gone into step 520.
Fig. 7 shows more detailed step in step 514 shown in fig. 5 (the salt aqueous mode under operating status).
In a step 702, processor 404 is obtained from liquid level detection device 306 in currently detected saline water evaporator 108 Refrigerant level.It is followed by subsequent processing device 404 and operation is gone into step 704.
In step 704, by currently detected saline water evaporator 108 refrigerant level and be stored in memory Salt water running liquid level in 414 compares.If the refrigerant level in currently detected saline water evaporator 108 is higher than salt water transport Operation is gone to step 706 by row liquid level, processor 404.In step 706, pump 132 and isolating valve 136 are opened, and first is adjusted Pipeline 142 is connected to, and is adjusted pipeline 142 by first by the part of refrigerant of second throttling device 114 and is entered water evaporation Device 106, to make the refrigerant into saline water evaporator 108 reduce, so that the refrigerant level of water evaporimeter 106 increases. It is followed by subsequent processing device 404 and operation is gone into step 702.
In step 704, if the refrigerant level in currently detected saline water evaporator 108 is not higher than salt water running Operation is gone to step 708 by liquid level, processor 404.In step 708, pump 132 and isolating valve 136 are closed, and are followed by subsequent processing device Operation is gone to step 520 by 404.
Fig. 8 shows more detailed step in step 516 shown in fig. 5 (the water ready mode under standby mode).
In step 802, processor 404 is obtained from liquid level detection device 306 in currently detected saline water evaporator 108 Refrigerant level.It is followed by subsequent processing device 404 and operation is gone into step 804.
In step 804, by currently detected saline water evaporator 108 refrigerant level and be stored in memory Salt water minimum liquid level in 414 compares.If the refrigerant level in currently detected saline water evaporator 108 is higher than salt water most Operation is gone to step 808 by low liquid level, processor 404.In step 808, pump 132 and isolating valve 136 are opened, and first is adjusted Pipeline 142 is connected to, and the refrigerant in saline water evaporator 108 adjusts pipeline 142 by first and enters water evaporimeter 106, thus Reduce the refrigerant in saline water evaporator 108, so that the refrigerant level of water evaporimeter 106 increases.It is followed by subsequent processing device 404 Operation is gone into step 802.
In step 804, if the refrigerant level in currently detected saline water evaporator 108 is minimum not higher than salt water Operation is gone to step 806 by liquid level, processor 404.In step 806, pump 132 and isolating valve 136 are closed, and are followed by subsequent processing device Operation is gone to step 520 by 404.
Fig. 9 shows more detailed step in step 518 shown in fig. 5 (the salt water ready mode under standby mode).
In step 902, processor 404 is obtained from liquid level detection device 306 in currently detected saline water evaporator 108 Refrigerant level.It is followed by subsequent processing device 404 and operation is gone into step 904.
In step 904, by currently detected saline water evaporator 108 refrigerant level and be stored in memory Salt water filling liquid level in 414 compares.If the refrigerant level in currently detected saline water evaporator 108 is filled lower than salt water Operation is gone to step 906 by fluid injection position, processor 404.In step 906, the first valve 134 is opened, and second adjusts pipeline 144 It is connected to, pipeline 144 is adjusted by second by the part of refrigerant of first throttling device 112 and enters saline water evaporator 108, To make the refrigerant for flowing into water evaporimeter 106 by first throttling device 112 reduce, so that the refrigeration of water evaporimeter 106 Agent liquid level reduces.It is followed by subsequent processing device 404 and operation is gone into step 902.
In step 904, if the refrigerant level in currently detected saline water evaporator 108 is filled not less than salt water Operation is gone to step 908 by liquid level, processor 404.In step 908, the first valve 134 is closed, and being followed by subsequent processing device 404 will grasp Go to step 520.
In addition, control device 302 is additionally configured to be stored in storage when the refrigerant level in saline water evaporator 108 is lower than When salt water safety levels in device 414, control device 302 stops or does not start pump 132, thus in saline water evaporator 108 Refrigerant level be lower than salt water safety levels when protection pump 132.
It should also be noted that, although the evaporator in the refrigeration system 100 of the application is respectively water evaporimeter 106 and salt Water evaporimeter 108, but those skilled in the art will be seen that, as long as the system with double evaporators may be by this Shen Please in the first adjusting pipeline 142 and the second adjusting pipeline 144 liquid level of solution in two evaporators is adjusted.
Although the application will be described with reference to the specific embodiment shown in attached drawing, but it is to be understood that not Under the spirit and scope and background of the application introduction, the refrigeration system of the application and method for controlling refrigeration system can With there are many versions.It is public to change the application institute that art technology those of ordinary skill will additionally appreciate different modes The CONSTRUCTED SPECIFICATION in embodiment opened, but these changes are each fallen in the application and spirit and scope of the claims.

Claims (8)

1. a kind of refrigeration system (100), comprising:
Water evaporimeter (106), the water evaporimeter (106) include water evaporimeter entrance (106a) and water evaporimeter outlet (106b);With
Saline water evaporator (108), the saline water evaporator (108) include saline water evaporator communication port (108a);
It is characterized in that, the refrigeration system (100) further include:
First adjust pipeline (142), it is described first adjust pipeline (142) controllably by the saline water evaporator (108) with it is described Water evaporimeter (106) is in fluid communication or disconnects, so that the refrigerant in the saline water evaporator (108) can be flowed to controllably The water evaporimeter (106);With
Second adjusts pipeline (144), and described second adjusts pipeline (144) controllably by the water evaporimeter (106) and the salt Water evaporimeter (108) is in fluid communication or disconnects, so that the refrigerant in the water evaporimeter (106) can controllably flow to institute State saline water evaporator (108).
2. refrigeration system (100) as described in claim 1, it is characterised in that:
The water evaporimeter (106) includes water evaporimeter communication port (106a ');
The saline water evaporator communication port (108a) and the water evaporimeter communication port (106a ') are in fluid communication.
3. refrigeration system (100) as described in claim 1, it is characterised in that: the refrigeration system (100) further includes liquid level inspection Survey device;
The liquid level detection device is configured to detect described in refrigerant level and offer in the water evaporimeter (106) The refrigerant level of water evaporimeter (106) detects signal;
The liquid level detection device is configured to the refrigerant level detected in the saline water evaporator (108) and provides institute State the refrigerant level detection signal of saline water evaporator (108).
4. refrigeration system (100) as claimed in claim 3, it is characterised in that: the refrigeration system (100) further includes control dress Set (302);
The control device (302) is configured to the water evaporimeter according to provided by the liquid level detection device (106) the refrigerant level detection signal of refrigerant level detection signal and the saline water evaporator (108) is described to control First adjust pipeline (142) and it is described second adjusting pipeline (144) be connected to and disconnection.
5. refrigeration system (100) as claimed in claim 4, it is characterised in that:
Evaporating pressure in the water evaporimeter (106) is higher than the evaporating pressure in the saline water evaporator (108);
Described first is adjusted including pump (132) in pipeline (142), and the pump (132) includes pump intake (132a) and pump discharge (132b), the pump intake (132a) and the saline water evaporator communication port (108a) are in fluid communication, the pump discharge (132b) It is in fluid communication with the water evaporimeter entrance (106a), so that controlling pump (132) starting in the control device (302) When, the refrigerant in the saline water evaporator (108) can be reduced;
Described second is adjusted including the first valve (134) in pipeline (144), and first valve (134) includes the first valve inlet (134a) and the first valve outlet (134b), first valve inlet (134a) and water evaporimeter entrance (106a) fluid connect Logical, first valve outlet (134b) and the saline water evaporator communication port (108a) are in fluid communication, so that in the control Device (302) can reduce the refrigerant in the water evaporimeter (106) when controlling first valve (134) opening.
6. refrigeration system (100) as claimed in claim 5, it is characterised in that:
The control device (302) is configured as when the refrigerant level in the saline water evaporator (108) is lower than salt water security When liquid level, the control device (302) stops or does not start the pump (132).
7. refrigeration system (100) as described in claim 1, it is characterised in that:
Described first is adjusted in pipeline (142) including injector.
8. refrigeration system (100) as claimed in claim 2, it is characterised in that: the refrigeration system (100) further include:
Compressor (102), the compressor (102) include suction port of compressor (102a) and compressor outlet (102b);
Condenser (104), the condenser (104) include condenser inlet (104a) and condensator outlet (104b), described cold Condenser entrance (104a) and the compressor outlet (102b) are in fluid communication;
First throttling device (112), the first throttling device (112) include first throttling device entrance (112a) and first segment Device outlet (112b) is flowed, the first throttling device entrance (112a) and the condensator outlet (104b) are in fluid communication, institute It states first throttling device outlet (112b) and the water evaporimeter entrance (106a) is in fluid communication;With
Second throttling device (114), the second throttling device (114) include second throttling device entrance (114a) and the second section Device outlet (114b) is flowed, the second throttling device entrance (114a) and water evaporimeter communication port (the 106a ') fluid connect Logical, the second throttling device outlet (114b) and the saline water evaporator communication port (108a) are in fluid communication.
CN201820679088.8U 2018-05-08 2018-05-08 Refrigeration system Active CN208458333U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820679088.8U CN208458333U (en) 2018-05-08 2018-05-08 Refrigeration system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820679088.8U CN208458333U (en) 2018-05-08 2018-05-08 Refrigeration system

Publications (1)

Publication Number Publication Date
CN208458333U true CN208458333U (en) 2019-02-01

Family

ID=65151263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820679088.8U Active CN208458333U (en) 2018-05-08 2018-05-08 Refrigeration system

Country Status (1)

Country Link
CN (1) CN208458333U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110425780A (en) * 2018-05-08 2019-11-08 约克(无锡)空调冷冻设备有限公司 Refrigeration system and method for controlling refrigeration system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110425780A (en) * 2018-05-08 2019-11-08 约克(无锡)空调冷冻设备有限公司 Refrigeration system and method for controlling refrigeration system

Similar Documents

Publication Publication Date Title
CN102216700B (en) Heat pump system and method of operating
CN104321598B (en) Refrigerating plant
CN108224631A (en) A kind of data center meets an urgent need refrigeration system and its control method
CN106403373A (en) Heat pump system, control method and refrigerating unit
CN103499162A (en) Low-temperature air-cooled screw cold and hot water unit
CN210801680U (en) Cold and warm dual-purpose air source heat pump system
CN104864621A (en) Four-pipe double- evaporator refrigeration system
CN208458333U (en) Refrigeration system
CN209386610U (en) A kind of thermal siphon oil cooling loop
CN201615644U (en) Air-conditioner coolant circulating unit
CN106196761B (en) Cooling cycle system and its control method
CN207797285U (en) A kind of emergent refrigeration system of data center
CN110425780A (en) Refrigeration system and method for controlling refrigeration system
CN113669784B (en) Control method for improving oil shortage of compressor during starting of waterless floor heating unit and triple co-generation system
CN106091457A (en) Refrigeration system and control method thereof and control device, refrigerator
CN110671834A (en) Heat pump system and defrosting method thereof
CN205980563U (en) Plasma quick -frozen machine refrigerating system
CN210463646U (en) Heat pump system
CN210663485U (en) Thermal fluorination defrosting system for refrigerating system and refrigerating system
CN208907690U (en) A kind of ammonia refrigeration system
CN106969520A (en) A kind of double loop handpiece Water Chilling Units and dual temperature cooling system
CN210051018U (en) Double-stage compressor refrigerating system sharing intercooler
CN209230055U (en) A kind of automatically controlled cooling-water machine of water cooling with dual-cycle plant
CN208269447U (en) A kind of carbon dioxide high/low temperature composite refrigeration system
CN206146042U (en) Heat pump system and refrigerating unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant