CN208454821U - Preform sintering furnace heart pipe structure - Google Patents

Preform sintering furnace heart pipe structure Download PDF

Info

Publication number
CN208454821U
CN208454821U CN201820759127.5U CN201820759127U CN208454821U CN 208454821 U CN208454821 U CN 208454821U CN 201820759127 U CN201820759127 U CN 201820759127U CN 208454821 U CN208454821 U CN 208454821U
Authority
CN
China
Prior art keywords
furnace heart
melt pit
furnace
tube body
sealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201820759127.5U
Other languages
Chinese (zh)
Inventor
谢康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai Zhongli Optical Fiber Technology Co Ltd
Jiangsu Zhongli Group Co Ltd
Original Assignee
Qinghai Zhongli Optical Fiber Technology Co Ltd
Jiangsu Zhongli Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Zhongli Optical Fiber Technology Co Ltd, Jiangsu Zhongli Group Co Ltd filed Critical Qinghai Zhongli Optical Fiber Technology Co Ltd
Priority to CN201820759127.5U priority Critical patent/CN208454821U/en
Application granted granted Critical
Publication of CN208454821U publication Critical patent/CN208454821U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Crystals, And After-Treatments Of Crystals (AREA)

Abstract

A kind of preform sintering furnace heart pipe structure, there is the furnace heart tube body of furnace heart lumen including constituting, the top of furnace heart tube body is located in sintering furnace ontology and leans out the top of sintering furnace body, lower part probes into a melt pit equipped with melt pit sealing cover, sintering furnace body is supported on a pylon, pylon is supported on terrace in the position for the top for corresponding to melt pit, feature: the top of furnace heart lumen from furnace heart tube body is penetrated through to lower part, the lower part of the furnace heart tube body and position of lower accent for corresponding to furnace heart lumen is connected with accent sealing mechanism under furnace heart lumen, the position of the top of melt pit and the lower section corresponding to melt pit sealing cover is provided with a furnace heart tube body supporting device, the lower support of furnace heart tube body is on the furnace heart tube body supporting device.Ensure dehydration and sintering effect;Furnace heart tube body will not be undermined and be able to ensure safety;Structure is simple, easy to operate;Ensure the stability of the intraluminal process gas of the furnace heart.

Description

Preform sintering furnace heart pipe structure
Technical field
The utility model belongs to preform manufacturing facility technical field, and in particular to a kind of preform sintering Furnace heart pipe structure.
Background technique
As is known in the industry, the preparation process of preform includes loosening body deposition and loosening body sintering, the former is by two Silica (SiO2) and germanium dioxide (GeO2) powdered granule (also referred to as " dust particles ") deposition and form density usually in 0.2- 0.4g/cm3The cylindric loosening body of white.Exist due to easy fracture when cylindric loosening body above-mentioned, which rubbed, to be touched, thus by the latter The former is subjected to high temperature sintering and is used as glass preform finished product in sintering furnace, that is, forms preform finished product.
Sintering furnace above-mentioned can generate very big or even be to the quality good or not of sintering process and finished glass prefabricated rods Conclusive influence.Sintering furnace in prior art is mainly by heater (also referred to as " sintering furnace body ", the same below) and furnace heart pipe And the pylon as peripheral components forms, the function of heater is to provide thermal field condition required by technique for sintering, and furnace Heart Guan Zewei sintering provides the environment of such as relatively closed, safety, cleaning etc.Since sintering temperature is higher, usually 1400 DEG C or more, and due to containing chlorine in the process gas in sintering process, and chlorine is for hypertoxicity gas and in dehydration In can generate highly acid gas (i.e. HCl), thus the requirement of the high temperature resistance and air-tightness etc. to furnace heart pipe is extremely harsh.
The technical information of furnace heart pipe can be seen in disclosed Chinese patent literature, such as invention patent mandate notification number CN105271698B recommendation has " a kind of detachable furnace heart pipe structure of segmented for being used to prepare preform ", the patent formula It is for prior art because, service life big as cleaning difficulty existing for furnace heart pipe using whole quartz glass tube are short and dimension It protects the high problem of replacement cost and proposes, concrete scheme can be found in the 0009th and 0031 section of the patent specification.It is objective For, CN105271698B can fulfil it in the strong point of the 0017th section to 0020 section of specification three concluded aspect, but still There are following shortcoming: first, (patent is three segments, and claims " upper section stone since whole furnace heart pipe is resolved into multiple segments Ying Guan, middle section quartz ampoule and lower section quartz ampoule ") after again between upper and lower two adjacent segments pass through connector connect, Jin Er That is package nitrogen protecting cover is set outside connector, thus there is the factor attended to one thing and lose sight of another, it is so-called to care for this and refer to, it can eliminate and adopt Serve as the aforementioned shortcoming of furnace heart pipe generation with whole branch quartz glass tube, it is so-called to lose that and refer to, in order to by the furnace heart of multiple segments Pipe is connected to each other and should consider the sealing reliability of connecting portion, takes into account the convenience of connection again, thus need to connect The sealing element served as by fluorine rubber ring is set between the end face of the furnace heart pipe pipeline section of upper and lower two adjacent segment in part, therefore not only Cause connection to bother, and the manipulation strength of worker is big, and due to connection need by such as connector, sealing ring and Nitrogen protecting cover etc. is set outside connector, thus link cost is big;Second, in order to make sealing ring above-mentioned play desired sealing Effect, needs the upper surface in the lower end surface of upper section quartz ampoule, the upper surface of middle section quartz ampoule and lower end surface, lower section quartz ampoule Sealed groove (the 0036th section of specification) is opened up or is formed, sealing ring is matched with sealed groove, then to sealed groove The control precision of size must be very harsh, once because sealed groove size mismatches or sealing ring dislocation, all It will lead to seal failure;Third, as is known in the industry, during being sintered to prefabricated rods loosening body, from prefabricated rods loosening body The clast fallen can accumulate in the lumen of lower section quartz ampoule, or even can block to the air inlet on lower section quartz glass tube, Process gas is influenced to enter inside furnace heart pipe, prefabricated rods loosening body is unable to reach expected dehydration and sintering effect, and to right When the aforementioned clast accumulated in lower section quartz ampoule is cleared up, it need to successively release and unload nitrogen protecting cover and connector, Thus cleaning work is cumbersome and time-consuming and laborious;Fourth, due to prefabricated rods loosening body be sintered during unavoidably Fall stick there are prefabricated rods loosening body to fall off and/or be broken off situation, and since the bottom of the lower section quartz ampoule of the patent is envelope It closes structure (following side is equipped with air inlet), thus once falls stick or breaking releasing, then it can be by lower section quartz ampoule under inertia impact It smashes, it is necessary to get rid of the old to make way for the new, to cause significantly improving for preform preparation cost.
Invention patent mandate notification number CN105541103B be provided with " a kind of preform loosening body sintering equipment and its Assembly method ", the furnace heart pipe which provides are the quartz glass tube of monoblock type, and a stone is arranged in the lumen lower section of furnace heart pipe Cushion is arranged between quartzy inner sleeve and the lumen bottom wall of furnace heart pipe in English inner sleeve, and the small size fallen is buffered by cushion The momentum of glass preform and reduce the risk (the 0043rd section of the 4th to 5 row of specification) that furnace heart pipe is cracked.Furthermore equipped with one Lifting rod, by the lifting pike pole on lifting rod according to need to quartzy inner sleeve be removed or be returned furnace heart pipe.Although the patent formula can be The technical effect of the 0029th section of its specification record is embodied to a certain extent, but there are still following deficiencies: first, due to the furnace heart It manages relatively long, is typically prefabricated 2.5 to 3.5 times of the loose body length of stick, thus lifting hook hook is held by online assignment personnel's hand The difficulty of the quartzy inner sleeve taken is relatively large, specifically, lifting rod end, that is, lower end lifting pike pole is difficult to be aligned and be preset in Upper inner sleeve is covered in quartzy lifts hole;Second, lifting the end of pike pole due to during lifting pike pole hooks up quartzy inner sleeve End face can be scraped with furnace heart inside pipe wall, there is the anxiety to furnace heart pipe damage;Third, due to falling stick or to be broken situation aforementioned When, quartzy inner sleeve and the cushion being arranged between quartzy inner sleeve and the lumen bottom wall of furnace heart pipe are not enough to effectively keep out quartz The momentum that glass preform breaks when falling, thus furnace heart pipe can still be cracked;Fourth, since furnace heart tube temperature degree is higher and length phase To longer, furnace heart lumen can not be protruded by the limbs (i.e. hand) of online assignment personnel, thus hooks up quartzy inner sleeve using lifting hook There is great risk in actual production or even may be considered can not be operable.
Pass through the analysis to above-mentioned two patents, it is believed that: the two respectively has unique advantage, but simultaneously there is also The deficiency made up is needed, technical solution described below generates in this background.
Summary of the invention
The task of the utility model, which is to provide, a kind of to be had convenient for intraluminal from prefabricated to the furnace heart pipe of furnace heart tube body The fine-powder and particle to fall off on stick loosening body is purged and uses and avoid having an impact sintering thermal field and avoid blocking up It fills in port and uses guarantee dehydration and sintering effect, helps avoid falling off or being broken because of prefabricated rods loosening body undermining furnace heart pipe Ontology and use and save significantly on use cost and embody safety, be conducive to simplify the structure to the sealed bottom of furnace heart lumen And by facilitate operation, be beneficial to embody the ideal sealing effect to furnace heart lumen bottom and use and ensure that the furnace heart is intraluminal The preform sintering furnace heart pipe structure of the stability of process gas.
What the task of the utility model was performed by, a kind of preform sintering furnace heart pipe structure, including structure One furnace heart tube body of Cheng Youlu heart lumen, the top of the furnace heart tube body is located in a sintering furnace body simultaneously in a state of use And the top of sintering furnace body is leant out, and the lower part of furnace heart tube body probes into a melt pit equipped with melt pit sealing cover, the burning Freezing of a furnace ontology is supported on a pylon, and the pylon is supported on terrace in the position for the top for corresponding to the melt pit, feature Be that the furnace heart lumen is penetrated through from the top of the furnace heart tube body to lower part, furnace heart tube body lower part and in correspondence Accent seals under the position of the lower accent of furnace heart lumen is connected with a furnace heart lumen for applying sealing to the cavity of resorption cause for gossip Mechanism, the melt pit top and correspond to melt pit sealing cover lower section position be provided with the furnace heart tube body bearing Mechanism, the lower support of furnace heart tube body is on the furnace heart tube body supporting device.
In a specific embodiment of the utility model, the furnace heart tube body top and surround furnace heart pipe The surrounding composition of ontology has support flange on a furnace heart tube body, and support flange is supported on the burning on the furnace heart tube body The top of the freezing of a furnace ontology and position of support flange is equipped with one for the furnace heart on the corresponding furnace heart tube body Accent sealing cover on the furnace heart lumen of the upper accent sealing of lumen.
In another specific embodiment of the utility model, the lower part of the furnace heart tube body, which is constituted, a taper Mouthful, the smaller diameter end of the conical opening is towards lower and have in the port position of the smaller diameter end around the surrounding composition of smaller diameter end One sealing mechanism mounting flange, accent sealing mechanism is connect with the sealing mechanism mounting flange under the furnace heart lumen, And the conical opening is supported on the furnace heart tube body supporting device.
In another specific embodiment of the utility model, the conical opening side and corresponding to it is described The position of the top of sealing mechanism mounting flange match be connected to one communicated with the furnace heart lumen be used for draw into furnace heart lumen Enter the furnace heart lumen intake interface of process gas.
In another specific embodiment of the utility model, accent sealing mechanism includes a stone under the furnace heart lumen English sealing plate and one group of quartz sealing plate pinch, quartzy sealing plate are corresponding to the lower section of the sealing mechanism mounting flange Position and the sealing of sealing mechanism mounting flange cooperate and close to the lower accent, and one group of quartz sealing plate pinch surrounds stone English sealing plate it is multiple circumferentially spaced, which respectively has pinch opening, and close in the group quartz Lock screw is respectively arranged in the top of sealing plate pinch, and pinch opening is open towards quartzy sealing plate, lock screw corresponding to pinch, institute The edge for stating sealing mechanism mounting flange and the quartzy sealing plate is corresponding to one group of quartz sealing plate pinch Position matches with pinch opening and is locked by the lock screw.
In the utility model there are one in specific embodiment, the sealing mechanism mounting flange is towards the stone One side surface of English sealing plate is configured to frosting, and quartzy sealing plate is towards the surface of the side of sealing mechanism mounting flange It equally constitutes as frosting.
In the utility model more and in a specific embodiment, the furnace heart tube body supporting device includes sunpender Crossbeam, sunpender, graphite grillage and a pair of of graphite plate, suspender crossbeam correspond to the lower section of the melt pit sealing cover, and the sunpender For the two supports of crossbeam on the terrace on the top of the melt pit, the quantity of sunpender has the circumferentially-spaced distribution around graphite grillage One group, the middle part of the upper end of the sunpender and suspender crossbeam connects, and a pair of of graphite plate is shelved with the state for the cooperation that faces each other On graphite grillage, the aspectant side to graphite plate middle part and correspond to the conical opening position respectively open Equipped with a graphite plate conical opening bearing engagement chamber, the conical opening is supported on graphite plate conical opening bearing engagement chamber, graphite Grillage is connect together with a pair of of graphite plate with the lower end of the sunpender.
In a specific embodiment in turn of the utility model, respectively offered in the four corners of the graphite grillage One graphite grillage sunpender connecting hole, and on a pair of of graphite plate and in the position for corresponding to graphite grillage sunpender connecting hole It sets and respectively offers a pair of of sunpender relief hole, sequentially pass through sunpender relief hole and graphite grillage sunpender by the lower end of the sunpender Connecting hole and make the graphite grillage together with a pair of of graphite plate and sunpender lower end connect.
The utility model again more and in a specific embodiment, be provided in the melt pit melt pit ventilation Air inlet pipe, the melt pit ventilation air inlet pipe air inlet of the upper end of melt pit ventilation air inlet pipe extend to the top of the melt pit sealing cover And it communicates with the outside world, and the melt pit ventilation air inlet pipe gas outlet of the lower end of melt pit ventilation air inlet pipe is stretched over the lower part of melt pit, Melt pit ventilation escape pipe, the melt pit ventilation escape pipe air inlet of the lower end of melt pit ventilation escape pipe are fixed on the pylon It mouthful is stretched in melt pit by way of melt pit sealing cover, and the melt pit ventilation escape pipe gas outlet of the upper end of melt pit ventilation escape pipe and outer Boundary communicates;The bottom of melt pit is provided with a pernicious gas detection sensor, harmful gas is chlorine.
In the utility model again and then in a specific embodiment, the process gas is chlorine and helium.
One of the technical effect of technical solution provided by the utility model, due to being designed as furnace heart lumen from furnace heart pipe sheet The upper end of body is penetrated through to lower end and accent is close in the case where corresponding to the position of lower accent of furnace heart lumen and being connected with a furnace heart lumen Sealing mechanism, thus working as will the implementations such as the fine-powder to fall off from prefabricated rods loosening body intraluminal to the furnace heart and particle cleaning When, as long as accent sealing mechanism under removal furnace heart lumen, to can avoid accumulating in the intraluminal sundries of the furnace heart to sintering Thermal field has an impact and avoids blocking furnace heart lumen intake interface, ensures dehydration and sintering effect;Two, due to working as prefabricated rods When falling stick or disconnected stick, barred body, which can impact and break through accent sealing mechanism under furnace heart lumen, to be entered in melt pit, because without damaging And furnace heart tube body and be able to ensure safety;Three, since accent sealing mechanism structure is simple under furnace heart lumen, thus operate It is convenient;Four, since accent sealing mechanism can play ideal sealing function to the lower accent of furnace heart lumen under furnace heart lumen, because And it can ensure the stability of the intraluminal process gas of the furnace heart.
Detailed description of the invention
Fig. 1 is the embodiments of the present invention schematic diagram.
Fig. 2 is the detailed construction of accent sealing mechanism and furnace heart tube body supporting device under furnace heart lumen shown in FIG. 1 Figure.
Specific embodiment
In order to which the technical essence of the utility model and beneficial effect is more clearly understood, applicant is below with reality The mode for applying example elaborates, but is not limitation to the utility model, any foundation to the description of embodiment The made only formal but not substantive equivalent transformation of the utility model design is regarded as the utility model Technical solution scope.
The concept of all directionality for being related to upper, lower, left, right, front and rear or directionality is all in the following description By taking the location of Fig. 1 state as an example, thus it cannot be understood as to the special of technical solution provided by the utility model It limits.
Referring to Figure 1, the furnace heart tube body 1 for constituting and having furnace heart lumen 11 is shown, the top of the furnace heart tube body 1 exists It is located in a sintering furnace body 2 and leans out the top of sintering furnace body 2 under use state, and the lower part of furnace heart tube body 1 is visited Enter in a melt pit 3 equipped with melt pit sealing cover 31, aforementioned sintering furnace body 2 is supported on a pylon 4, and the pylon 4 is in correspondence It is supported on terrace in the position of the top of aforementioned melt pit 3.
In the present embodiment, furnace heart tube body 1 above-mentioned is that purity quartz glass pipe for high for example congratulates Li Shi quartz glass tube, thereon Portion is located at the centre of sintering furnace body 2, and sintering furnace body 2 is alternatively referred to as heater.
Technical essential as technical solution provided by the utility model: aforementioned furnace heart lumen 11 is from aforementioned furnace heart tube body 1 top penetrates through that (bottom of the furnace heart tube body 1 in prior art is closed, i.e. bottom wall and 1 structure of furnace heart tube body to lower part Become one structure), furnace heart tube body 1 lower part and be connected with one in the position of lower accent for corresponding to furnace heart lumen 11 Accent sealing mechanism 5 under furnace heart lumen for applying sealing to aforementioned cavity of resorption cause for gossip, aforementioned melt pit 3 top and in correspondence The position of the lower section of melt pit sealing cover 31 is provided with a furnace heart tube body supporting device 6, the lower support of furnace heart tube body 1 exists On the furnace heart tube body supporting device 6.
It refers to Fig. 2 and combines Fig. 1, the top in aforementioned furnace heart tube body 1 and the surrounding around furnace heart tube body 1 Composition has support flange 12 on a furnace heart tube body, and support flange 12 is supported on aforementioned sintering furnace sheet on the furnace heart tube body The top of the body 2 and position of support flange 12 is equipped with one for aforementioned furnace heart lumen on the corresponding furnace heart tube body The material of 11 upper accent sealing is preferably accent sealing cover 13 on the furnace heart lumen of quartz plate.
Constituting in the lower part of aforementioned furnace heart tube body 1 has a conical opening 14, the smaller diameter end of the conical opening 14 towards it is lower simultaneously And have a sealing mechanism mounting flange 141 around the surrounding composition of smaller diameter end in the port position of the smaller diameter end, it is aforementioned Furnace heart lumen under accent sealing mechanism 5 connect with the sealing mechanism mounting flange 141, and aforementioned conical opening 14 is supported on On furnace heart tube body supporting device 6 above-mentioned.
Aforementioned conical opening 14 side and correspond to aforementioned seal mechanism mounting flange 141 top position Be connected to one communicated with aforementioned furnace heart lumen 11 for into furnace heart lumen 11 introduce process gas furnace heart lumen intake interface 142, process gas is chlorine and helium.
Continue to see Fig. 1 and Fig. 2, accent sealing mechanism 5 preferred under aforementioned furnace heart lumen rather than the structure that is absolutely limited to are such as Under: including a quartzy sealing plate 51 and one group of quartz sealing plate pinch 52, quartzy sealing plate 51 is corresponding to aforementioned seal mechanism The position of the lower section of mounting flange 141 and the sealing of sealing mechanism mounting flange 141 cooperate and close to aforementioned lower accent, The quantity of one group of quartz sealing plate pinch 52 is three or four, and is equidistantly sowed discord around the circumferencial direction of quartzy sealing plate 51 Every distribution, which respectively has pinch opening 521, and on the top of the group quartz sealing plate pinch 52 Each that lock screw 522 is arranged, for pinch opening 521 towards quartzy sealing plate 51, lock screw 522 corresponds to pinch opening 521.Before The edge for stating sealing mechanism mounting flange 141 and aforementioned quartzy sealing plate 51 is corresponding to one group of quartz sealing plate folder The position of foot 52 matches with aforementioned pinch opening 521 and is locked by lock screw 522 above-mentioned.
Preferably, in order to promote the sealing effect between quartzy sealing plate 51 and sealing mechanism mounting flange 141, this reality It is configured to frosting with a novel side surface by aforementioned seal mechanism mounting flange 141 towards aforementioned quartzy sealing plate 51, And the surface of the side by quartzy sealing plate 51 towards sealing mechanism mounting flange 141 equally constitutes as frosting.
The structure that is preferred rather than being absolutely limited to of furnace heart tube body supporting device 6 above-mentioned is as follows: suspender crossbeam 61, sunpender 62, graphite grillage 63 and a pair of of graphite plate 64, suspender crossbeam 61 have parallel two, which corresponds to aforementioned The lower section of melt pit sealing cover 31, and the two supports of the suspender crossbeam 61 are supported on melt pit 3 on the top of aforementioned melt pit 3 Near coal-mine (can also claim cheat edge) terrace on, the quantity of sunpender 62 has one group of the circumferentially-spaced distribution around graphite grillage 63, The upper end of the sunpender 62 connect with the middle part of suspender crossbeam 61 and is locked by upper lock nut 621, and a pair of of graphite plate 64 is with that This aspectant mated condition is shelved on graphite grillage 63, the aspectant side to graphite plate 64 middle part and Position corresponding to aforementioned conical opening 14 respectively offers a graphite plate conical opening bearing engagement chamber 641, and conical opening 14 above-mentioned It holds on graphite plate conical opening bearing engagement chamber 641, lower end of the graphite grillage 63 together with a pair of of graphite plate 64 and aforementioned sunpender 62 Connection.
From the signal of Fig. 1 and Fig. 2 and in conjunction with professional general knowledge: the quantity of aforementioned sunpender 62 has four, respectively corresponds In the four corners of graphite grillage 63, and due to two (i.e. a pair of) that suspender crossbeam 61 has front and back parallel, thus every is hung Bar crossbeam 61 is assigned two sunpenders 62.
As shown in Figure 2, a graphite grillage sunpender connecting hole 631 is respectively offered in the four corners of foregoing graphites grillage 63, And a pair is offered on a pair of of graphite plate 64 above-mentioned and respectively in the position for corresponding to graphite grillage sunpender connecting hole 631 hang Bar relief hole 642 sequentially passes through sunpender relief hole 642 and graphite grillage sunpender connecting hole by the lower end of aforementioned sunpender 62 631 and connect foregoing graphites grillage 63 with the lower end of sunpender 62 together with a pair of of graphite plate 64 above-mentioned.Rotation is also shown in figure The lower lock nut 622 for being locked to graphite grillage 63 and a pair of of graphite plate 64 of lower end assigned in sunpender 62.
Preferably, be provided in melt pit 3 above-mentioned a melt pit ventilation air inlet pipe 32, the melt pit ventilate air inlet pipe 32 it is upper The melt pit ventilation air inlet pipe air inlet 321 at end extends to the top of aforementioned melt pit sealing cover 31 and communicates with the outside world, and melt pit The melt pit ventilation air inlet pipe gas outlet 322 of the lower end for air inlet pipe 32 of ventilating is stretched over the lower part of melt pit 3, on aforementioned pylon 4 with Longitudinal state is fixed with melt pit ventilation escape pipe 41, the melt pit ventilation escape pipe air inlet of the lower end of melt pit ventilation escape pipe 41 Mouth 411 is stretched in melt pit 3 by way of melt pit sealing cover 31, and the melt pit ventilation escape pipe of the upper end of melt pit ventilation escape pipe 41 goes out Port 412 communicates with the outside world;It is additionally provided with a pernicious gas detection sensor 33 in the bottom of melt pit 3, harmful gas is chlorine.
Prefabricated rods 7 are also shown in Fig. 1, which is loosening body above-mentioned, which passes through its caudal peduncle 71 hangings obtain glass fibers above-mentioned under the sintering of sintering furnace body 2 on the extension bar device 8 for being set to the top of pylon 4 Tie up prefabricated rods finished product.
There is the situation for falling powder from prefabricated rods and considering block etc. to be worth doing unavoidably during the sintering process, and the powder that falls and Bits block etc. accumulates under furnace heart lumen on the quartzy sealing plate 51 of the structural system of accent sealing mechanism 5, therefore clear when to implement When clean, then melt pit sealing cover 31 opened by operator and enter melt pit 3, pine opens lock screw 522 and removes one group of quartz sealing plate Pinch 52 in the aforementioned powder on quartzy sealing plate 51 and considers productive set to be worth doing block removing, by inverse operation sequence above-mentioned after removing Quartzy sealing plate 51 is set to be back to the sealing state in the lower accent to furnace heart lumen 11.
When prefabricated rods 7 fall stick or disconnected stick situation, then it can impact and smash quartzy sealing plate 51 falling to melt pit 3 Bottom is cheated, the prefabricated rods barred body 72 fallen is shown in phantom in Fig. 1.
In conclusion technical solution provided by the utility model compensates for the shortcoming in prior art, favorably accomplish Invention task has faithfully fulfilled the technical effect that applicant refers in technical effect column above.

Claims (10)

1. a kind of preform sintering furnace heart pipe structure has a furnace heart tube body (1) of furnace heart lumen (11) including constituting, The top of the furnace heart tube body (1) is located in a sintering furnace body (2) in a state of use and leans out sintering furnace body (2) Top, and the lower part of furnace heart tube body (1) probes into a melt pit (3) equipped with melt pit sealing cover (31), the sintering furnace body (2) it is supported on a pylon (4), and the pylon (4) is supported on terrace in the position for the top for corresponding to the melt pit (3), It is characterized in that the top of the furnace heart lumen (11) from the furnace heart tube body (1) is penetrated through to lower part, in furnace heart tube body (1) Lower part and be connected with one for applying sealing to the cavity of resorption cause for gossip in the position for the lower accent for corresponding to furnace heart lumen (11) Furnace heart lumen under accent sealing mechanism (5), the melt pit (3) top and correspond to melt pit sealing cover (31) under The position of side is provided with a furnace heart tube body supporting device (6), and the lower support of furnace heart tube body (1) is in the furnace heart tube body branch It holds on mechanism (6).
2. preform sintering furnace heart pipe structure according to claim 1, it is characterised in that in the furnace heart pipe sheet The top of body (1) and the surrounding for surrounding furnace heart tube body (1), which are constituted, support flange (12) on a furnace heart tube body, the furnace Support flange (12) is supported on the top of sintering furnace body (2) and on the corresponding furnace heart tube body on heart tube body The position of support flange (12) is equipped with a furnace heart lumen epicoele for the upper accent sealing to the furnace heart lumen (11) Mouth sealing cover (13).
3. preform sintering furnace heart pipe structure according to claim 1, it is characterised in that the furnace heart tube body (1) lower part, which is constituted, a conical opening (14), and the smaller diameter end of the conical opening (14) is towards end lower and in the smaller diameter end There are a sealing mechanism mounting flange (141), accent under the furnace heart lumen in oral area position around the surrounding composition of smaller diameter end Sealing mechanism (5) is connect with the sealing mechanism mounting flange (141), and the conical opening (14) is supported on the furnace heart On tube body supporting device (6).
4. preform sintering furnace heart pipe structure according to claim 3, it is characterised in that in the conical opening (14) side and in the position for corresponding to the top of the sealing mechanism mounting flange (141) with being connected to one and the furnace The furnace heart lumen intake interface (142) for the introducing process gas into furnace heart lumen (11) that heart lumen (11) communicates.
5. preform sintering furnace heart pipe structure according to claim 3, it is characterised in that under the furnace heart lumen Accent sealing mechanism (5) includes that a quartzy sealing plate (51) and one group of quartz sealing plate pinch (52), quartzy sealing plate (51) exist Match with sealing mechanism mounting flange (141) sealing the position of lower section corresponding to the sealing mechanism mounting flange (141) Merge and the lower accent is closed, one group of quartz sealing plate pinch (52) surrounds the circumferencial direction interval of quartzy sealing plate (51) Distribution, the group quartz sealing plate pinch (52) respectively have a pinch to be open (521), and in the group quartz sealing plate pinch (52) Top is respectively arranged lock screw (522), and pinch is open (521) towards quartzy sealing plate (51), and lock screw (522) corresponds to folder Foot is open (521), and the edge of the sealing mechanism mounting flange (141) and the quartzy sealing plate (51) is in correspondence In the position of one group of quartz sealing plate pinch (52) be open with the pinch (521) match and by the lock screw (522) it locks.
6. preform sintering furnace heart pipe structure according to claim 5, it is characterised in that the sealing mechanism connects One side surface of acting flange disk (141) towards the quartzy sealing plate (51) is configured to frosting, and quartzy sealing plate (51) court It equally constitutes to the surface of the side of sealing mechanism mounting flange (141) as frosting.
7. preform sintering furnace heart pipe structure according to claim 3, it is characterised in that the furnace heart pipe sheet Body supporting device (6) includes suspender crossbeam (61), sunpender (62), graphite grillage (63) and a pair of of graphite plate (64), suspender crossbeam (61) correspond to the lower section of the melt pit sealing cover (31), and the two supports of the suspender crossbeam (61) are in the melt pit (3) Top terrace on, the quantity of sunpender (62) have around graphite grillage (63) circumferentially-spaced distribution one group, the sunpender (62) upper end is connect with the middle part of suspender crossbeam (61), and a pair of of graphite plate (64) is shelved on the state for the cooperation that faces each other On graphite grillage (63), the aspectant side to graphite plate (64) middle part and correspond to the conical opening (14) Position respectively offer a graphite plate conical opening bearing engagement chamber (641), the conical opening (14) is supported on graphite plate taper On mouth bearing engagement chamber (641), graphite grillage (63) is connect together with a pair of of graphite plate (64) with the lower end of the sunpender (62).
8. preform sintering furnace heart pipe structure according to claim 7, it is characterised in that in the graphite grillage (63) four corners respectively offer a graphite grillage sunpender connecting hole (631), and on a pair of of graphite plate (64) simultaneously And a pair of of sunpender relief hole (642) is respectively offered in the position for corresponding to graphite grillage sunpender connecting hole (631), it is hung by described The lower end of bar (62) sequentially passes through sunpender relief hole (642) and graphite grillage sunpender connecting hole (631) and makes the graphite plate Frame (63) is connect together with a pair of of graphite plate (64) with the lower end of sunpender (62).
9. preform sintering furnace heart pipe structure according to claim 1, it is characterised in that in the melt pit (3) Inside it is provided with melt pit ventilation air inlet pipe (32), the melt pit ventilation air inlet pipe air inlet of the upper end of melt pit ventilation air inlet pipe (32) (321) it extends to the top of the melt pit sealing cover (31) and communicates with the outside world, and the lower end of melt pit ventilation air inlet pipe (32) Melt pit ventilation air inlet pipe gas outlet (322) be stretched over the lower parts of melt pit (3), it is logical that a melt pit is fixed on the pylon (4) Melt pit ventilation escape pipe air inlet (411) of gas escape pipe (41), the lower end of melt pit ventilation escape pipe (41) is close by way of melt pit Capping (31) is stretched in melt pit (3), and the melt pit of the upper end of melt pit ventilation escape pipe (41) ventilates escape pipe gas outlet (412) It communicates with the outside world;The bottom of melt pit (3) is provided with a pernicious gas detection sensor (33), harmful gas is chlorine.
10. preform sintering furnace heart pipe structure according to claim 4, it is characterised in that the process gas is Chlorine and helium.
CN201820759127.5U 2018-05-21 2018-05-21 Preform sintering furnace heart pipe structure Withdrawn - After Issue CN208454821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820759127.5U CN208454821U (en) 2018-05-21 2018-05-21 Preform sintering furnace heart pipe structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820759127.5U CN208454821U (en) 2018-05-21 2018-05-21 Preform sintering furnace heart pipe structure

Publications (1)

Publication Number Publication Date
CN208454821U true CN208454821U (en) 2019-02-01

Family

ID=65149963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820759127.5U Withdrawn - After Issue CN208454821U (en) 2018-05-21 2018-05-21 Preform sintering furnace heart pipe structure

Country Status (1)

Country Link
CN (1) CN208454821U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108409128A (en) * 2018-05-21 2018-08-17 青海中利光纤技术有限公司 Preform sintering stove heart pipe structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108409128A (en) * 2018-05-21 2018-08-17 青海中利光纤技术有限公司 Preform sintering stove heart pipe structure
CN108409128B (en) * 2018-05-21 2023-12-01 青海中利光纤技术有限公司 Furnace core tube structure for sintering optical fiber preform

Similar Documents

Publication Publication Date Title
CN208454821U (en) Preform sintering furnace heart pipe structure
CN108409128A (en) Preform sintering stove heart pipe structure
KR101937779B1 (en) Cleaning method for monocrystal pulling device, cleaning tool used for same, and production method for monocrystal
CN206526619U (en) A kind of novel intelligent pulsed jet cloth filter
CN106929987A (en) A kind of frame of textile machine
CN208193714U (en) Antimony purifies rectifier unit
CN209771638U (en) Air filtering device convenient to clean
CN102846388A (en) Plug-type retention structure of implant abutment
CN108078728A (en) A kind of auxiliary examination device for department of stomatology orthodontic
CN201463538U (en) combined crucible
CN105541103B (en) A kind of preform loosening body sintering equipment and its assembly method
CN107912553A (en) A kind of tealeaves heating and stirring type machinery rotating cylinder
CN204265883U (en) A kind of vertical pulling method single crystal preparation stove with secondary charging device
CN210987329U (en) Frame is planted to chinese-medicinal material
CN207862164U (en) A kind of glass metal discharge device of glass furnace
CN211746046U (en) Cultivate chinese rehmannia detoxification seedling and use culture medium filling device
CN208230466U (en) One kind is for clearing up furnace chamber tooling on polycrystalline furnace
CN209574647U (en) A kind of children's bronchoscope takes sputum device
CN208333653U (en) A kind of weight tray that can prevent counterweight from falling
CN211381920U (en) Cleaning frame for oral examination instrument
CN201530876U (en) Cleaning rod for auxiliary chamber of single crystal furnace
CN110016722A (en) A kind of vertical vacuum cleaning oven
CN111256447A (en) Airing rack for oral medical instruments
CN109752475B (en) Gas chromatography glass liner tube structure
CN109097822A (en) A kind of carbon content method reduced in monocrystalline crystal bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190201

Effective date of abandoning: 20231201

AV01 Patent right actively abandoned

Granted publication date: 20190201

Effective date of abandoning: 20231201

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned