- CN208440966U CN208440966U CN201820925501.4U CN201820925501U CN208440966U CN 208440966 U CN208440966 U CN 208440966U CN 201820925501 U CN201820925501 U CN 201820925501U CN 208440966 U CN208440966 U CN 208440966U
- Authority
- CN
- China
- Prior art keywords
- guide pipe
- puts
- super
- stay cable
- cable force
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of stay cable force super to put a structure, it is characterized by: it includes that guide pipe (1) is embedded in box beam mid-board sawtooth block concrete (2), when segment inclined guy cable stretching is constructed, anchorage drum (3) protrudes into guide pipe (1), by inclined guy cable stretching power guide pipe anchor slab (4), work anchor (5) and adjusting nut (15) is close to seamless.Before suspension cable ultra stretching, whether confirmation locking device connection bolt (6) is tightened.It suspension cable ultra stretching and puts in stretching process, sets up fastener type rack platform immediately below box beam mid-board sawtooth block concrete (2), using chain block by steel support stretching bed seat (7) side and fixed on the operational platform.After installing steel support stretching bed seat (7), installation centre-hole jack (8), moveable anchor (9) and oil pump.
Description
Technical field
The utility model relates to a kind of stay cable force super to put a structure.
Background technique
The main road Zhong Tie hondo bridge is " reed-pope wind instrument " moulding cable-stayed bridge, linear and the bridge construction stage in order to preferably optimize
Upper and lower fiber stress improves bridge service life, therefore before cable-stayed bridge closure, design requirement is by every skew cables Suo Li using single top
It is first temporarily stretched to the 0.46fpk of stay cable force, puts a structure for stay cable force super using super before closure section closure
It is pulled to 0.65fpk, after full-bridge prestress system converts, continues to 0.72fpk then to use stay cable force super
It puts a structure and puts stay cable force for super and open to 0.56fpk, realize the optimization of and box beam linear to full-bridge or more fiber stress.It passes
The preceding cassette list of system, which takes out top, will realize that stay cable force super puts an adjustment, and constructing operation difficulty is big, low in economic efficiency, and
It is impaired that single top adjustment is easy to cause suspension cable PE epoxy coating strand, therefore has developed that a kind of stay cable force is super to put a structure.
Utility model content
Technical problem to be solved by the utility model is: providing a kind of stay cable force super puts a structure, comparison tradition
The method of single top adjustment Suo Li, list top adjustment Suo Li are to reach release Suo Li by torsion adjusting nut, then use single top to every
To Suo Li design value, the difficulty for reversing adjusting nut is big for tensioning one by one for steel strand wires, and adjustment progress is slow and effect is poor.This is practical new
It puts a structure and realizes the whole beam steel strand wires of suspension cable while surpassing to open and put for a kind of stay cable force of type super and open, and adjusting nut
It is easy suitable or counter-clockwise rotation, improves stay cable force adjustment progress.A kind of stay cable force of the utility model super puts
Locking device in structure solves steel strand wires either ultra stretching when still putting tensioning operating condition, the position of intermediate plate and steel strand wires
It is constant, it effectively prevent work clip sheet to crush steel strand wires.
The technical solution of the utility model is: a kind of stay cable force super puts a structure comprising guide pipe, partition wall tooth
Block concrete, anchorage drum, guide pipe anchor slab work anchor and adjusting nut, guide pipe are embedded in box beam mid-board tooth block concrete
Interior, anchorage drum is set in guide pipe, and guide pipe anchor slab, adjusting nut and work anchor, partition wall tooth are successively installed in guide pipe one end
Block concrete setting adjusting nut side fixed setting steel support stretching bed seat, steel support stretching bed seat other end connection jack, thousand
Jin top other end fastening means anchor.
The locking device is connected by connection bolt and ring flange with anchorage drum, and adjustment hole rotates upwardly and downwardly for adjusting nut
Effect.
The guide pipe meets second-order weld requirement using welding, welded seam grade.
The steel support stretching bed seat is by round upper plate, left arc panel, right circular arc panel and triangle batten plate
Composition, is separately connected left arc panel and right circular arc panel, triangle batten plate is respectively welded below round upper plate
In the junction of round upper plate and left arc panel and right circular arc panel.
The steel support stretching bed seat passes through left arc panel and right circular arc panel and box beam mid-board tooth block respectively
Concrete connection.
The steel support stretching bed seat uses Q235 steel plate to process.
The circular hole that a diameter is 20cm is arranged in the center of round upper plate in the steel support stretching bed seat.
The jack is hydraulic feed-through jack.
It in ultra stretching and puts and sets up bracket below tension structure, using the fixed ultra stretching of chain block and put tension structure dress
It sets.Jack oil the cylinder piston is stretched out at super, and adjusting nut is separated with guide pipe anchor slab, and gap becomes larger, and torsion is adjusted clockwise
Nut is saved, realizes that adjusting nut anchors suspension cable.When putting, first by suspension cable super, adjusting nut and guide pipe anchor slab point
From reversing adjusting nut counterclockwise and it become larger with guide pipe gap, jack oil the cylinder piston retraction is adjusted to putting vang force value
Afterwards, torsion adjusting nut makes it be close to realize to suspension cable anchoring with guide pipe anchor slab clockwise.
The beneficial effects of the utility model are as follows:
1, constructional device is combined into using steel support stretching bed seat, centre-hole jack, adjusting nut, work anchor and moveable anchor
Ultra stretching is carried out to suspension cable and puts tensioning cable force adjustment, single top adjustment stay cable force is avoided, turns adjusting nut difficulty
Big and adjustment Suo Li inefficiencies defects preferably ensure that suspension cable ultra stretching and put the operation safety and adjustment rope of tensioning
The accuracy of power creates good economic benefit.
2, the installation of locking device ensures the position of intermediate plate and steel strand wires when steel strand wires either ultra stretching still puts tensioning
It is absolutely constant, it prevents work clip sheet from crushing steel strand wires, the service life of steel strand wires is effectively guaranteed.
Detailed description of the invention
Fig. 1 be the utility model super put before overall schematic;
Fig. 2 is the utility model super and puts a process overall schematic;
Fig. 3 is that steel supports drawing I-I floor map of pedestal structure;
Fig. 4 is II-II plane figure;
Fig. 5 is III-III plane figure;
Fig. 6 is IV-IV sectional view;
Fig. 7 is locking device detail drawing.
Specific embodiment
A kind of stay cable force super puts a structure comprising guide pipe 1, partition wall tooth block concrete 2, anchorage drum 3, guiding
4 work anchor 5 of pipe anchor slab and adjusting nut 15, guide pipe 1 are embedded in box beam mid-board tooth block concrete 2, and anchorage drum 3 is arranged
In in guide pipe 1, guide pipe anchor slab 4, adjusting nut 15 and work anchor 5, partition wall tooth block concrete are successively installed in 1 one end of guide pipe
2 setting 15 sides of adjusting nut are fixedly installed steel and support stretching bed seat 7, and steel supports 7 other end of stretching bed seat and connects jack 8, very heavy
Push up 8 other end fastening means anchors 9;Locking device is connect with ring flange 19 with anchorage drum 3 by connection bolt 6, and adjustment hole 18 is to adjust
Section nut rotates upwardly and downwardly effect;Guide pipe 1 meets second-order weld requirement using welding, welded seam grade;The steel supports
Pedestal 7 is drawn to be made of round upper plate 10, left arc panel 11, right circular arc panel 12 and triangle batten plate 13, in circle
The lower section of upper plate 10 is separately connected left arc panel 11 and right circular arc panel 12, and triangle batten plate 13 is respectively welded at circle
The junction of shape upper plate 10 and left arc panel 11 and right circular arc panel 12;The steel support stretching bed seat 7 leads to respectively
Left arc panel 11 and right circular arc panel 12 is crossed to connect with box beam mid-board tooth block concrete 2;The steel supports stretching bed
Seat 7 is processed using Q235 steel plate;The steel support stretching bed seat 7 is arranged a diameter in the center of round upper plate and is
The circular hole 14 of 20cm;The jack 8 is hydraulic feed-through jack.
The embodiments of the present invention: guide pipe 1 is embedded in box beam mid-board tooth block concrete 2, segment suspension cable
When drawing construction, anchorage drum 3 is protruded into guide pipe 1, is made guide pipe anchor slab 4, work anchor 5 by inclined guy cable stretching power and is adjusted spiral shell
Mother 15 is close to seamless.Before suspension cable ultra stretching, whether confirmation locking device connection bolt 6 is tightened.Suspension cable ultra stretching and
It puts in stretching process, sets up rack platform immediately below box beam mid-board tooth block concrete 2, steel is supported by drawing using chain block
Side is fixed on the operational platform for pedestal 7.After installing steel support stretching bed seat 7, continue that centre-hole jack 8,9 and of moveable anchor are installed
Oil pump.Using auxiliary ceiling suspension and chain block lifting installation centre-hole jack, 8 face steel of jack must be made to support stretching bed seat
7.Jack oil the cylinder piston is stretched out at super, and adjusting nut 15 is separated with guide pipe anchor slab 4, and gap becomes larger, and is reversed clockwise
Adjusting nut 15 realizes that adjusting nut 15 anchors suspension cable.When putting, first by suspension cable super, adjusting nut 15 and guiding
Pipe anchor slab 4 separates, and reverses adjusting nut 15 counterclockwise and it becomes larger with 4 gap of guide pipe anchor slab, jack oil the cylinder piston retraction,
It adjusts to after putting vang force value, reversing adjusting nut 15 clockwise makes it be adjacent to realization to suspension cable anchor with guide pipe anchor slab 4
Gu.
Claims (8)
1. a kind of stay cable force super puts a structure, it is characterised in that: it includes guide pipe (1), partition wall tooth block concrete
(2), anchorage drum (3), guide pipe anchor slab (4), work anchor (5) and adjusting nut (15), guide pipe (1) are embedded in box beam mid-board
In tooth block concrete (2), anchorage drum (3) is set in guide pipe (1), and guide pipe anchor slab is successively installed in guide pipe (1) one end
(4), adjusting nut (15) and work anchor (5), partition wall tooth block concrete (2) are arranged adjusting nut (15) side and steel support are fixedly installed
Stretching bed seat (7), steel support stretching bed seat (7) other end connection jack (8), jack (8) other end fastening means anchor (9).
2. a kind of stay cable force according to claim 1 super puts a structure, it is characterised in that: locking device is by connecting
Bolt (6) is connect with ring flange (19) with anchorage drum (3), and adjustment hole (18) is that adjusting nut rotates upwardly and downwardly effect.
3. a kind of stay cable force according to claim 1 super puts a structure, it is characterised in that: guide pipe (1) uses
Welding, welded seam grade meet second-order weld requirement.
4. a kind of stay cable force according to claim 1 super puts a structure, it is characterised in that: the steel supports drawing
Pedestal (7) is by round upper plate (10), left arc panel (11), right circular arc panel (12) and triangle batten plate (13) group
At being separately connected left arc panel (11) and right circular arc panel (12) below round upper plate (10), triangle is sewed
Plate (13) is respectively welded at the junction of round upper plate (10) Yu left arc panel (11) and right circular arc panel (12).
5. a kind of stay cable force according to claim 4 super puts a structure, it is characterised in that: the steel supports drawing
Pedestal (7) is connected by left arc panel (11) and right circular arc panel (12) and box beam mid-board tooth block concrete (2) respectively
It connects.
6. a kind of stay cable force according to claim 1 or 4 super puts a structure, it is characterised in that: the steel support
Stretching bed seat (7) is processed using Q235 steel plate.
7. a kind of stay cable force according to claim 4 super puts a structure, it is characterised in that: the steel supports drawing
The circular hole (14) that a diameter is 20cm is arranged in the center of round upper plate in pedestal (7).
8. a kind of stay cable force according to claim 1 super puts a structure, it is characterised in that: the jack
It (8) is hydraulic feed-through jack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820925501.4U CN208440966U (en) | 2018-06-14 | 2018-06-14 | A kind of stay cable force super puts a structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820925501.4U CN208440966U (en) | 2018-06-14 | 2018-06-14 | A kind of stay cable force super puts a structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208440966U true CN208440966U (en) | 2019-01-29 |
Family
ID=65090090
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820925501.4U Expired - Fee Related CN208440966U (en) | 2018-06-14 | 2018-06-14 | A kind of stay cable force super puts a structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208440966U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108660907A (en) * | 2018-06-14 | 2018-10-16 | 中铁贵州旅游文化发展有限公司 | A kind of super open of stay cable force puts a structure |
-
2018
- 2018-06-14 CN CN201820925501.4U patent/CN208440966U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108660907A (en) * | 2018-06-14 | 2018-10-16 | 中铁贵州旅游文化发展有限公司 | A kind of super open of stay cable force puts a structure |
CN108660907B (en) * | 2018-06-14 | 2024-02-23 | 中铁贵州旅游文化发展有限公司 | Stay cable force overstretching structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101597960B (en) | Large-tonnage jack tension construction technology for non-bonded prestressed silo | |
CN112227206B (en) | Process design and construction method for ground anchor to self-anchored beam | |
CN102425261B (en) | Large-span multiunit tensile membrane structure and installation construction method thereof | |
CN110042767B (en) | Cable buckling and anchoring method of cable hoisting system | |
CN109339458A (en) | A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation | |
CN212670303U (en) | Stay cable beam end mounting structure | |
CN111924720A (en) | Wind cable anchoring system of cable crane tower and construction method | |
CN208440966U (en) | A kind of stay cable force super puts a structure | |
CN209760863U (en) | External prestress steel strand connector and matched tensioning device | |
CN106758883B (en) | The interim pocket device for hoisting of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement and its for the method for suspender replacement | |
CN210714046U (en) | Device for lifting inverted chimney steel inner cylinder by using steel twisted rope hydraulic pressure | |
CN209308433U (en) | A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation | |
CN115341701B (en) | Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate | |
CN209194361U (en) | A kind of fixed structure of suspension cable bridge section lifting hoisting platform | |
CN108660907A (en) | A kind of super open of stay cable force puts a structure | |
CN207537885U (en) | Anchoring mechanism for stay cable tension stage | |
CN110541599A (en) | Device for lifting inverted chimney steel inner cylinder by using steel twisted rope hydraulic pressure | |
CN115233824A (en) | Large-cantilever eccentric ring steel structure and construction method thereof | |
CN114104989B (en) | Cable buckle integrated tower wind cable system of large-span cable crane and construction method | |
CN209779465U (en) | main tower erects cable-stay bridge's string cable construction system that changes | |
CN109972531B (en) | External prestressing device for improving temporary support span of bailey beam | |
CN207210932U (en) | Prefabricated bridge space concrete filled steel tube truss combination beamss attachment means | |
CN112942777A (en) | Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method | |
CN220723293U (en) | A three-point hoist device for arc girder steel | |
CN219508376U (en) | Device for erecting super-long and super-heavy stay cable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190129 Termination date: 20210614 |
|
CF01 | Termination of patent right due to non-payment of annual fee |