CN208418109U CN201821068464.6U CN201821068464U CN208418109U CN 208418109 U CN208418109 U CN 208418109U CN 201821068464 U CN201821068464 U CN 201821068464U CN 208418109 U CN208418109 U CN 208418109U
Authority
CN
China
Prior art keywords
mounting rack
trackside equipment
integration
mounting plate
fixed frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821068464.6U
Other languages
Chinese (zh)
Inventor
蒋国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority to CN201821068464.6U priority Critical patent/CN208418109U/en
Application granted granted Critical
Publication of CN208418109U publication Critical patent/CN208418109U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to a kind of integrated trackside equipment mounting rack, backboard fixed frame includes fixed transverse rod, and the both ends of fixed transverse rod and fixed vertical pole vertically connect;Framework setting is connected on fixed vertical pole top, connection framework includes connecting rod, and one end of connecting rod is connected with reinforcing bar, and the other end of connecting rod is connected with mounting rack;Mounting rack two sides are equipped with mounting plate, and the upper and lower ends of mounting plate are connected by fixed plate, and regulating tank is equipped in mounting plate, adjusting rod is equipped between the mounting plate of two sides, mounting plate is equipped with multiple connecting holes, can be realized the adjusting of mounting rack height by adjusting connecting hole.The utility model passes through the change to equipment mounting means and integrated trackside equipment mounting rack structure, realization is installed in a manner of wall-mounted, solve the problems, such as that Direction box and trackside equipment are easy the using security issues such as to be flooded, make moist when limited small space in tunnel, installation equipment and flood, are effectively reduced construction and cost of equipment maintenance.

Description

A kind of integration trackside equipment mounting rack
Technical field
The utility model belongs to communication auxiliary installing device technical field, is related to a kind of integrated trackside equipment mounting rack.
Background technique
Trackside equipment installation is a key job in railway signal work progress, due to tunnel cross-section sky in tunnel Between it is smaller, and the long-term rainfall in southern area is big, and equipment is easy dampness or is immersed in water, cause equipment failure rate higher, There are biggish security risks.
Construction method traditional at present is that Direction box is mounted on tunnel using dedicated Direction box and equipment supporter in tunnel In the cable trough of two sides, dedicated Direction box equipment unit price is higher in tunnel, and difficulty of construction is big, but usually due to dampness or water Leaching causes very big influence to equipment, and there are biggish security risks.
Utility model content
For overcome the deficiencies in the prior art, the utility model provides a kind of integrated trackside equipment mounting rack, by right The change of equipment mounting means and integrated trackside equipment mounting rack structure, realization are installed in a manner of wall-mounted, are solved in tunnel Direction box and trackside equipment are easy to be flooded, make moist etc. to make when problem and flood that small space, installation equipment are limited With safety problem, so that construction and cost of equipment maintenance be effectively reduced, structure is simple, easy to use, high-efficient, practicability compared with By force.
The utility model provides the following technical solution:
A kind of integration trackside equipment mounting rack, including backboard fixed frame, backboard fixed frame pass through connection framework and installation Frame connection;The backboard fixed frame includes fixed transverse rod, and the both ends of fixed transverse rod and fixed vertical pole vertically connect;Connection framework is set Set on fixed vertical pole top, connection framework includes connecting rod, and one end of connecting rod connect with reinforcing bar, the other end of connecting rod with Mounting rack connection;Mounting rack two sides are equipped with mounting plate, and the upper and lower ends of mounting plate are connected by fixed plate, in the mounting plate Equipped with regulating tank, be equipped with adjusting rod between the mounting plate of two sides, mounting plate is equipped with multiple connecting holes, multiple connecting holes between the upper and lower every Setting, can be realized the adjusting of mounting rack height by adjusting connecting hole.
Preferably, the integrated trackside equipment mounting rack overall structure is in H-shaped.
In any of the above-described scheme preferably, the backboard fixed frame is arranged in rectangle.
In any of the above-described scheme preferably, the height of the mounting rack is higher than the height of backboard fixed frame, connects frame One end of body is connected to the middle position of mounting rack.
In any of the above-described scheme preferably, the height of the backboard fixed frame is the 2/3 of mounting rack height.
In any of the above-described scheme preferably, the height of the backboard fixed frame is the 3/4 of mounting rack height.
In any of the above-described scheme preferably, the regulating tank is vertically arranged.
In any of the above-described scheme preferably, the connection framework is at least one in rectangular box or arc framework Kind.
In any of the above-described scheme preferably, the angle angle between the connection framework and mounting rack, backboard fixed frame Degree is 90 °.
In any of the above-described scheme preferably, the backboard fixed frame, connection framework and mounting rack are all made of L-type steel material It is made.
In any of the above-described scheme preferably, one end of the connecting rod and the mounting plate of mounting rack are detachably connected.
In any of the above-described scheme preferably, the mounting plate of one end of the connecting rod and mounting rack is connected using bolt It connects.
Beneficial effect
The utility model provides a kind of integrated trackside equipment mounting rack, including backboard fixed frame, backboard fixed frame pass through Connection framework is connected with mounting rack;The backboard fixed frame includes fixed transverse rod, and the both ends of fixed transverse rod are vertical with fixed vertical pole Connection;Framework setting is connected on fixed vertical pole top, connection framework includes connecting rod, and one end of connecting rod is connected with reinforcing bar, The other end of connecting rod is connected with mounting rack;Mounting rack two sides are equipped with mounting plate, and the upper and lower ends of mounting plate pass through fixed plate Connection, the mounting plate is interior to be equipped with regulating tank, and adjusting rod is equipped between the mounting plate of two sides, and mounting plate is equipped with multiple connecting holes, Multiple connecting holes every setting, can be realized the adjusting of mounting rack height by adjusting connecting hole between the upper and lower.The utility model passes through Change to equipment mounting means and integrated trackside equipment mounting rack structure, realization are installed in a manner of wall-mounted, solve tunnel Direction box and trackside equipment are easy to be flooded, make moist when problem and flood that interior small space, installation equipment are limited Using security issues, so that construction and cost of equipment maintenance be effectively reduced, structure is simple, easy to use, high-efficient, practicability compared with By force.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of a preferred embodiment of integrated trackside equipment mounting rack of the utility model;
Fig. 2 is the side view diagram of Fig. 1;
Fig. 3 is a partial structural diagram of Fig. 1.
Specific embodiment
In order to further appreciate that the technical characteristics of the utility model, the utility model is carried out combined with specific embodiments below It is set forth.Embodiment only has illustrative effect to the utility model, without the effect of any restrictions, ability The modification for any unsubstantiality that the technical staff in domain makes on the basis of the utility model, all should belong to the utility model Protection scope.
Embodiment 1
As shown in Figure 1-Figure 3, a kind of integrated trackside equipment mounting rack, including backboard fixed frame 1, backboard fixed frame 1 are logical Connection framework 2 and mounting rack 3 is crossed to connect, when specifically used, by by integrated trackside equipment mounting rack frame in cable trough wall On.
Backboard fixed frame 1 is arranged in rectangle.Backboard fixed frame 1 includes fixed transverse rod 4, and fixed transverse rod 4 is horizontally disposed, fixed The both ends of cross bar 4 and the vertically connection of fixed vertical pole 5.The setting of framework 2 is connected on fixed 5 top of vertical pole, connection framework 2 is rectangle frame Body.Connecting framework 2 includes connecting rod 6, and the length of connecting rod 6 is the thickness of wall, therefore can be according to installation wall Thickness is adjusted the length of connecting rod 6.One end of connecting rod 6 and reinforcing bar 7 connect, the other end and mounting rack 3 of connecting rod 6 Connection.
3 two sides of mounting rack are equipped with mounting plate 8, and mounting plate 8 is vertically arranged, and the upper and lower ends of mounting plate 8 pass through fixed plate 9 Connection.Regulating tank 10 is equipped in mounting plate 8, regulating tank 10 is vertically arranged.Regulating tank 10 is oblong through-hole, can when installing equipment To pass through 10 auxiliary adjustment height of regulating tank.Adjusting rod 11 is equipped between two sides mounting plate 8, mounting plate 8 is equipped with multiple connections Hole 12, multiple connecting holes 12 every setting, can be realized the adjusting of 3 height of mounting rack by adjusting connecting hole 12 between the upper and lower.
It is easy to be flooded for easy hair flood area tunnel inner cable slot, signal trackside equipment is passed through into the utility model Water drilling drilling cramp be mounted on cable trough outer wall, installed in a manner of wall-mounted, prevent equipment dampness phenomenon exclude security risk, avoid Easily hair flood area, tunnel inner cable slot rainy season are flooded.
When specific installation, first by accurate in-site measurement, signaling point is calculated, the physical location of cut-point determines The accurate mileage of trackside equipment installation.According to the vertical height of the cable cell wall of the accurate installed position of signalling arrangement, classification Determine the upright position of trackside equipment perforating.Different connecting holes 12 is used by adjusting connecting rod 6 and 8 junction of mounting plate, Realize the adjusting of 3 height of mounting rack.
If cable trough outer wall height is in 800mm between 840mm, eye position is away from cable trough on binary shield and Direction box Top surface 170mm;If cable trough outer wall height exceeds 840mm, it should whole to lower all of binary shield and Direction box How much eye position is higher by how many downwards in principle;If cable trough outer wall height is lower than 800mm, it should which the binary that increases overally is anti- How much all positions of shield and Direction box are higher by how many downwards in principle.When carrying out Direction box, binary shield perforating, Direction box top should be lower than rail level in principle, and binary shield cannot be less than close to line side most cocked bead away from wire center 1866mm, Direction box cannot be less than 1700mm away from wire center close to line side most cocked bead, and the eye position of cable punching hole should be away from From cable trench bottom 50mm or so.
Embodiment 2
Unlike a kind of integration trackside equipment mounting rack and embodiment 1, the integration trackside equipment mounting rack is whole Body structure is in H-shaped.
Embodiment 3
It is a kind of integration trackside equipment mounting rack and embodiment 1 unlike, the height of the mounting rack 3 is higher than One end of the height of backboard fixed frame 1, connection framework 2 is connected to the middle position of mounting rack 3.
Embodiment 4
Unlike a kind of integration trackside equipment mounting rack and embodiment 1, the height of the backboard fixed frame 1 is peace Shelve the 2/3 of 3 height.
Embodiment 5
It is a kind of integration trackside equipment mounting rack and embodiment 1 unlike, the connection framework 2 be arc framework.
Embodiment 6
Unlike a kind of integration trackside equipment mounting rack and embodiment 1, the connection framework 2 and mounting rack 3 are carried on the back Included angle between plate fixed frame 1 is 90 °.
Embodiment 7
It is a kind of integration trackside equipment mounting rack and embodiment 1 unlike, the backboard fixed frame 1, connection framework 2 L-type steel material is all made of with mounting rack 3 to be made.
Embodiment 8
It is a kind of integration trackside equipment mounting rack and embodiment 1 unlike, one end of the connecting rod 6 and mounting rack 3 Mounting plate 8 be detachably connected, i.e., realized by the connectors such as bolt.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in Change or replacement, should be covered within the scope of the utility model.

Claims (10)

1. a kind of integration trackside equipment mounting rack, it is characterised in that: including backboard fixed frame, backboard fixed frame passes through connection frame Body is connected with mounting rack;The backboard fixed frame includes fixed transverse rod, and the both ends of fixed transverse rod and fixed vertical pole vertically connect;Even Framework setting is connect on fixed vertical pole top, connection framework includes connecting rod, and one end of connecting rod is connected with reinforcing bar, connecting rod The other end is connected with mounting rack;Mounting rack two sides are equipped with mounting plate, and the upper and lower ends of mounting plate are connected by fixed plate, described It is equipped with regulating tank in mounting plate, adjusting rod is equipped between the mounting plate of two sides, mounting plate is equipped with multiple connecting holes, multiple connecting holes Between the upper and lower every setting, the adjusting of mounting rack height can be realized by adjusting connecting hole.
2. integration trackside equipment mounting rack according to claim 1, it is characterised in that: the integration trackside equipment peace Overall structure is shelved in H-shaped.
3. integration trackside equipment mounting rack according to claim 1, it is characterised in that: the backboard fixed frame is in rectangle Setting.
4. integration trackside equipment mounting rack according to claim 1, it is characterised in that: the height of the mounting rack is higher than The height of backboard fixed frame, the one end for connecting framework are connected to the middle position of mounting rack.
5. integration trackside equipment mounting rack according to claim 4, it is characterised in that: the height of the backboard fixed frame It is the 2/3 of mounting rack height.
6. integration trackside equipment mounting rack according to claim 1, it is characterised in that: the regulating tank is vertically arranged.
7. integration trackside equipment mounting rack according to claim 1, it is characterised in that: the connection framework is rectangle frame At least one of body or arc framework.
8. integration trackside equipment mounting rack according to claim 1, it is characterised in that: the connection framework and installation Included angle between frame, backboard fixed frame is 90 °.
9. integration trackside equipment mounting rack according to claim 8, it is characterised in that: the backboard fixed frame, connection Framework and mounting rack are all made of L-type steel material and are made.
10. integration trackside equipment mounting rack according to claim 1, it is characterised in that: one end of the connecting rod and The mounting plate of mounting rack is detachably connected.
CN201821068464.6U 2018-07-06 2018-07-06 A kind of integration trackside equipment mounting rack Active CN208418109U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821068464.6U CN208418109U (en) 2018-07-06 2018-07-06 A kind of integration trackside equipment mounting rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821068464.6U CN208418109U (en) 2018-07-06 2018-07-06 A kind of integration trackside equipment mounting rack

Publications (1)

Publication Number Publication Date
CN208418109U true CN208418109U (en) 2019-01-22

Family

ID=65125976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821068464.6U Active CN208418109U (en) 2018-07-06 2018-07-06 A kind of integration trackside equipment mounting rack

Country Status (1)

Country Link
CN (1) CN208418109U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241883A (en) * 2019-05-13 2019-09-17 南京天辰礼达电子科技有限公司 A kind of master control valve mounting assembly, engine installation system and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241883A (en) * 2019-05-13 2019-09-17 南京天辰礼达电子科技有限公司 A kind of master control valve mounting assembly, engine installation system and installation method
WO2020228258A1 (en) * 2019-05-13 2020-11-19 南京天辰礼达电子科技有限公司 Main control valve installation assembly, engine installation system, and installation method

Similar Documents

Publication Publication Date Title
CN206832245U (en) A kind of new hydrology measurement apparatus
CN208418109U (en) A kind of integration trackside equipment mounting rack
CN108828693B (en) Intelligent rainfall detection equipment based on computer vision
CN104404894A (en) High-speed rail bridge wind shielding structure wind shielding plate
CN112909742A (en) Lightning protection device for high-rise building
CN207159953U (en) The inspection platform of south water to north gate opening/closing electric block
CN103915807A (en) Windage-yaw-prevention flexible control device for power transmission line
CN207259975U (en) A kind of Hanging Basket is revealed all the details safeguard structure
CN205348050U (en) Novel improve railway guardrail of structure
CN209675856U (en) A kind of ladder type light-duty cable bridge
CN212098888U (en) Railway turnout guarantee device
CN210659539U (en) Novel grazing banning fence
CN207572804U (en) A kind of outdoor electrical control cabinet based on Internet of Things
CN220580182U (en) Outdoor vestibule in coast equipped with wind-resistant early warning reinforcement function
CN207110659U (en) Fence structure for electric power safety protection
CN209182534U (en) A kind of controllable floating evaporation from water surface field
CN210985181U (en) Lightning protection device for high-rise building
CN208768537U (en) A kind of plantation frame of installation easy to disassemble
CN212133776U (en) Intelligent drainage monitoring device for high-performance transformer substation
CN219691215U (en) Many installation position control pole setting
CN209509578U (en) A kind of protection canopy
CN209526676U (en) A kind of solar photovoltaic cell panel mounting rack
CN204557696U (en) A kind of limit connection device of pressure alarm fence
CN214506097U (en) Rain-proof cover structure of GIS main equipment is transporting
CN214994291U (en) Novel a catchment for civil engineering device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant