CN208415254U - Device for clearing barrier pile - Google Patents

Device for clearing barrier pile Download PDF

Info

Publication number
CN208415254U
CN208415254U CN201821044928.XU CN201821044928U CN208415254U CN 208415254 U CN208415254 U CN 208415254U CN 201821044928 U CN201821044928 U CN 201821044928U CN 208415254 U CN208415254 U CN 208415254U
Authority
CN
China
Prior art keywords
pile
obstacle
feeder
stake
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821044928.XU
Other languages
Chinese (zh)
Inventor
魏广秋
李延和
***
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN201821044928.XU priority Critical patent/CN208415254U/en
Application granted granted Critical
Publication of CN208415254U publication Critical patent/CN208415254U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a device for clearing barrier piles, which comprises a barrier pile, a jack, a pile feeder and a reaction frame; the barrier pile is a pile foundation affecting a subway tunnel shield, the barrier pile penetrates through a subway tunnel, the top surface of the barrier pile is provided with a pile feeder, the cross section of the pile feeder is the same as that of the barrier pile, the pile feeders are in multiple sections, the pile feeders are connected through flanges, the top end of the pile feeder is provided with a jack, a reaction frame is arranged on the jack, and the reaction frame is anchored on a ground beam of a building. The utility model discloses be exactly press into the tunnel bottom to the obstacle stake and do not influence the obstacle that the shield constructs the position that removes the shield structure machine construction to the building dead weight is the counter-force, presses the obstacle stake to subway tunnel bottom with reaction frame and dedicated pile follower and does not influence the position that the shield constructs, takes out the pile follower at last and uses soil hole sealing. The utility model has the advantages of construction period is short, the expense is low, the surrounding environment influences little and the construction degree of difficulty is low.

Description

A kind of device of removing obstacles stake
Technical field
The utility model relates to constructing metro tunnel fields, and in particular to a kind of when subway tunnel crossing Old building pile foundation The device of removing obstacles stake.
Background technique
In recent years, subway engineering was being built in numerous domestic city.Subway line route selection is often over business district and passes through Existing building, and to the building with pile foundation, also face the cleaning problem of obstacle pile.Since these obstacle piles are mostly reinforcing bar Concrete precast pile when shield machine passes through, is constructed extremely difficult, therefore in Practical Project, often using after removing obstacles stake again Carry out shield.Therefore, huge to removing obstacles stake technology development potentiality in China.To existing removing obstacles stake key technology into Row reorganizing research is particularly important and has huge Business Studies to be worth.Removing obstacles stake used at present is mostly pile pulling Method is the method that the stake of influence subway tunnel shield is extracted, and is pulled out again after existing building is needed to remove before pile pulling Original building is moved back to original place again after pile pulling, the workload thus greatly increased by stake.It and is influence with the method for piling The method for the position that the stake indentation rail base of subway tunnel shield does not influence shield does not need these complicated processes, Ke Yizhi It connects and constructs at one layer.Have that the construction period is short, expense is lower, difficulty of construction is lower, surrounding environment influence is small and the construction time Between upper floor can continue to use and the stake subdued can do the basis of subway.
Utility model content
Purpose of the utility model is to solve the obstacle pile problems encountered when subway tunnel shield, provide a kind of removing The device of obstacle pile has the advantages that the construction period is short, expense is low, surrounding environment influence is small low with difficulty of construction etc..
The technical solution adopted in the utility model is: a kind of device of removing obstacles stake, including obstacle pile, jack, send Stake device and reaction frame;
The obstacle pile is the pile foundation for influencing subway tunnel shield, and obstacle pile passes through subway tunnel, the installation of obstacle pile top surface There is Pile feeder, the cross sectional shape of Pile feeder is identical as obstacle stake cross sectional shape, and Pile feeder is more piece, uses flange between Pile feeder Connection, Pile feeder top are equipped with jack, reaction frame are equipped with above jack, and reaction frame is anchored at the ground beam of building On.
As preferred: selected Pile feeder preferably selects 2m or so.
A kind of operating method of the device of above-mentioned removing obstacles stake.The following steps are included:
1) first jack, Pile feeder and reaction frame are installed, reaction frame height is arranged according to Pile feeder height, with building Object self weight is counter-force, presses jack;Selected four side of jack is symmetrically placed, and symmetrically presses jack, to prevent stress not Uniformly obstacle pile is caused to tilt, after Pile feeder is pressed into corresponding position, accesses next Pile feeder, used between Pile feeder Flanged joint circuits sequentially;
2) after obstacle pile enters subway tunnel bottom not and influences the position of shield, stop pressing jack, pile follower Device takes out and sealing of hole.
The utility model has the advantages that the utility model construction method is simple, obstacle pile indentation tunnel bottom is not exactly influenced shield A kind of method of position releases the obstacle of shield machine construction, there is that the construction period is short, expense is lower, difficulty of construction is lower, all Collarette border, which influences small and construction period upper floor, can continue to use and the advantages that the stake subdued can do the basis of subway. The utility model is very suitable to use in practical projects.
Detailed description of the invention
Fig. 1 is the schematic device of removing obstacles stake
Fig. 2 is that obstacle pile removes front and back schematic diagram.
Specific embodiment
Specific embodiment of the present utility model is further described with reference to the accompanying drawing:
As shown in Figure 1, a kind of device of removing obstacles stake, including obstacle pile 4, jack 2, Pile feeder 3 and reaction frame 1;
The obstacle pile 4 is the pile foundation for influencing subway tunnel shield, and obstacle pile 4 passes through subway tunnel, 4 top surface of obstacle pile peace Equipped with Pile feeder 3, the cross sectional shape of Pile feeder 3 is identical as 4 cross sectional shape of obstacle pile, and Pile feeder 3 is more piece, between Pile feeder 3 Using flanged joint, 3 top of Pile feeder is equipped with jack 2, and jack 2 is equipped with reaction frame 1 above, and reaction frame 1 is anchored at On the ground beam of building.Selected Pile feeder 3 preferably selects 2m or so.
A kind of operating method of the device of above-mentioned removing obstacles stake.The following steps are included:
1) first jack, Pile feeder and reaction frame are installed, reaction frame height is arranged according to Pile feeder height, with building Object self weight is counter-force, presses jack;Selected four side of jack is symmetrically placed, and symmetrically presses jack, to prevent stress not Uniformly obstacle pile is caused to tilt, after Pile feeder is pressed into corresponding position, accesses next Pile feeder, used between Pile feeder Flanged joint circuits sequentially;
2) after obstacle pile enters subway tunnel bottom not and influences the position of shield, stop pressing jack, pile follower Device takes out and sealing of hole.
Fig. 2 show the schematic diagram that obstacle pile removes front and back, and the stake top position before obstacle pile is removed is 5, subway tunnel top It is 7 for 6, subway tunnel bottom, the stake top position after obstacle pile removing is 8, the stake bottom position before obstacle pile removing is 9 and obstacle pile Stake bottom position after removing is 10.
The reaction frame of the utility model is anchored on ground beam, then obstacle pile is pressed onto ground using reaction frame and jack Iron tunnel bottom does not influence the position of shield, and to meet for geological conditions does not influence shield obstacle pile indentation tunnel bottom The requirement of position and the bigger situation of obstacle pile length are simpler than with the method for pile pulling with the method for piling in this case Very much.
The embodiments of the present invention is described in detail in conjunction with attached drawing above, but the utility model is not limited to institute The embodiment of description.For those of ordinary skill in the art, in the range of the principles of the present invention and technical idea It is interior, a variety of variations, modification, replacement and deformation are carried out to these embodiments and still fallen in the protection scope of the utility model.

Claims (2)

1. a kind of device of removing obstacles stake, it is characterised in that: including obstacle pile, jack, Pile feeder and reaction frame;
The obstacle pile is the pile foundation for influencing subway tunnel shield, and obstacle pile passes through subway tunnel, and obstacle pile top surface, which is equipped with, to be sent Stake device, the cross sectional shape of Pile feeder is identical as obstacle stake cross sectional shape, and Pile feeder is more piece, is connected between Pile feeder using flange It connects, Pile feeder top is equipped with jack, and reaction frame is equipped with above jack, and reaction frame is anchored on the ground beam of building.
2. a kind of device of removing obstacles stake according to claim 1, it is characterised in that: selected Pile feeder selects 2m.
CN201821044928.XU 2018-07-03 2018-07-03 Device for clearing barrier pile Expired - Fee Related CN208415254U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821044928.XU CN208415254U (en) 2018-07-03 2018-07-03 Device for clearing barrier pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821044928.XU CN208415254U (en) 2018-07-03 2018-07-03 Device for clearing barrier pile

Publications (1)

Publication Number Publication Date
CN208415254U true CN208415254U (en) 2019-01-22

Family

ID=65108196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821044928.XU Expired - Fee Related CN208415254U (en) 2018-07-03 2018-07-03 Device for clearing barrier pile

Country Status (1)

Country Link
CN (1) CN208415254U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797590A (en) * 2018-07-03 2018-11-13 南京工业大学 Device for clearing barrier pile and operation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797590A (en) * 2018-07-03 2018-11-13 南京工业大学 Device for clearing barrier pile and operation method

Similar Documents

Publication Publication Date Title
CN203768912U (en) Double prestressing force high-strength concrete rectangular pile foundation ditch supporting construction
CN207092107U (en) A kind of anti-subsidence structure using diaphram wall
CN103104102B (en) Construction method for underground storey-addition reconstruction
CN105089670A (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN104234082A (en) Jump-layer reversed construction method for deep foundation pit
CN201972155U (en) Topdown-construction-method foundation pit supporting structure of steel plate pile
CN106436718A (en) Subway foundation pit large-span support system and construction method thereof
CN208415254U (en) Device for clearing barrier pile
CN205676882U (en) A kind of novel supporting construction
CN203222807U (en) Flat foundation specialized for gas film building
CN206816278U (en) Novel recoverable supporting steel arch frame for excavating transverse channel
CN204282399U (en) A kind of subway space enclosing structure
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN105821887A (en) Installing method for stand column pile constructed in pebble bed
CN108797590A (en) Device for clearing barrier pile and operation method
CN103669422A (en) Waterproof construction method of pile head of anchor rod static pressure pile
CN207419441U (en) A kind of campshed formula diaphram wall
CN111424675A (en) Construction method of ultra-large pile spacing deep foundation pit supporting system
CN207143746U (en) Support beam template system under concrete support trestle plate
CN206829147U (en) A kind of combined type shaped steel, slip casting steel pipe bearing diagonal foundation pit enclosure structure
CN205917709U (en) Integral type well dotted arranges house steward vacuum system
CN211868181U (en) Prefabricated pedestal of highway case roof beam
CN209538198U (en) Abnormity draining friction pile
CN209339172U (en) Novel pile plate composite foundation
CN107012872A (en) Construction method of sludge deep foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190122

Termination date: 20190703