CN208373931U - New Type Bending Pipe Unit - Google Patents

New Type Bending Pipe Unit Download PDF

Info

Publication number
CN208373931U
CN208373931U CN201821043403.4U CN201821043403U CN208373931U CN 208373931 U CN208373931 U CN 208373931U CN 201821043403 U CN201821043403 U CN 201821043403U CN 208373931 U CN208373931 U CN 208373931U
Authority
CN
China
Prior art keywords
alignment
fixed
deckle board
bend pipe
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821043403.4U
Other languages
Chinese (zh)
Inventor
陈秀涛
万香平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Yousheng Machinery Manufacturing Co Ltd
Original Assignee
Zhangjiagang Yousheng Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiagang Yousheng Machinery Manufacturing Co Ltd filed Critical Zhangjiagang Yousheng Machinery Manufacturing Co Ltd
Priority to CN201821043403.4U priority Critical patent/CN208373931U/en
Application granted granted Critical
Publication of CN208373931U publication Critical patent/CN208373931U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bending Of Plates, Rods, And Pipes (AREA)

Abstract

The utility model discloses a kind of New Type Bending Pipe Units, including lengthen bracket, the lower alignment deckle board for lengthening bracket front bottom and being equipped with lengthening support vertical;The lengthening bracket is fixed with upper alignment deckle board in lower alignment deckle board top surface;The upper alignment deckle board is parallel with bracket is lengthened;Alignment sliding block is movably set on the inside of the lower alignment deckle board and upper alignment deckle board;The alignment sliding block is installed by screw rod and lower alignment deckle board and upper alignment deckle board;The alignment sliding block is fixed with first group of alignment rolling wheel by more alignment wheel shafts on one side;The more straightening-wheel axis center points are in same ordinate;The lower alignment deckle board and upper alignment deckle board are fixed with second group of alignment rolling wheel in first group of alignment rolling wheel avris;The gap that first group of alignment rolling wheel described in two groups and second group of alignment rolling wheel are formed is on the same line;The New Type Bending Pipe Unit of the utility model can be straightened tubing, feeding, bend pipe positioning and bend pipe guiding.

Description

New Type Bending Pipe Unit
Technical field
The utility model relates to a kind of bending machines, and in particular to a kind of New Type Bending Pipe Unit belongs to technical field of novel machinery.
Background technique
Currently, known bending machine is mainly hand-operated lever-type bending machine and bulky and hulking single head bending machine;Hand Dynamic bending machine is needed bending pipes through the strength of people, and time-consuming and laborious and bending range is small, and bending precision is not high, bending angle Degree leans on operator's visual perception and experience accumulation entirely;Huge single head bending machine is excessively heavy, and die change is time-consuming and laborious, single head Bending cause hydraulic cylinder backhaul distance elongated, reduce working efficiency, in addition existing bending machine can only one root canal of first order buckling, it is curved Tube efficiency is not high;For this purpose, Chinese Patent Application No.: 201520467785.3, disclose a kind of bending machine, including rack and control Terminal further includes displacement sensor, hydraulic control terminal and hydraulic feed device, and hydraulic feed device includes hydraulic cylinder, and The bend pipe head being mounted on hydraulic cylinder telescopic rod, and it is located at bend pipe head front end, the steel pipe guide rail being connected with bend pipe head; The front interval setting of bend pipe head is pushed and is connect between mold and bend pipe head for axis there are two mold is pushed;Along steel pipe guide rail The direction of length is provided with steel pipe clamp, is detachable structure between steel pipe clamp and steel pipe guide rail;Hydraulic cylinder and hydraulic control System processed is connected;Bend pipe mould is provided in the rack in the front of bend pipe head motion profile;Displacement sensor is located at bend pipe The side of head, is connected with controlling terminal;The equipment uses double-headed tube bender head, compared with traditional single head bending machine, shortens The rise distance of oil cylinder improves production efficiency so as to shorten the working time;Simultaneously as using displacement sensor, it can essence Really control bending precision;But it can not be straightened to tubing and knee guiding.So needing to propose to improve.
Utility model content
The purpose of this utility model is to provide a kind of New Type Bending Pipe Units, can be straightened to tubing, and feeding, bend pipe are fixed Position and bend pipe guiding, to overcome deficiency in the prior art.
To achieve the above object, the utility model provides the following technical solutions:
The embodiment of the present application discloses a kind of New Type Bending Pipe Unit,
Including lengthening bracket, the lower alignment deckle board for lengthening bracket front bottom and being equipped with lengthening support vertical;Institute It states lengthening bracket and is fixed with upper alignment deckle board in lower alignment deckle board top surface;The upper alignment deckle board is parallel with bracket is lengthened;It is described Alignment sliding block is movably set on the inside of lower alignment deckle board and upper alignment deckle board;The alignment sliding block passes through screw rod and lower alignment deckle board It is installed with upper alignment deckle board;The alignment sliding block is fixed with first group of alignment rolling wheel by more alignment wheel shafts on one side;More institutes Straightening-wheel axis center point is stated in same ordinate;The lower alignment deckle board and upper alignment deckle board are fixed in first group of alignment rolling wheel avris There is second group of alignment rolling wheel;The gap that first group of alignment rolling wheel described in two groups and second group of alignment rolling wheel are formed is in same straight line On;Alignment sliding block can be driven to slide in lower alignment deckle board and upper alignment deckle board by screw rod;So as to adjust first group of alignment Spacing between idler wheel and second group of alignment rolling wheel installs two group first using lower alignment deckle board and upper alignment deckle board respectively Group alignment rolling wheel and second group of alignment rolling wheel, and it is vertical between lower alignment deckle board and upper alignment deckle board, to make upper and lower first Group alignment rolling wheel and second group of alignment rolling wheel are all around limited to by the tubing in its gap;To complete tubing school Directly;The lengthening bracket is fixed with feeding oil cylinder assembly at the top of upper alignment deckle board;Feeding oil cylinder assembly its telescopic end is stated to fix There is guide sleeve;The first clamping element is fixed on the guide sleeve;The guide sleeve avris is fixed with encoder seat;The encoder Big synchronous pulley and small synchronous pulley are installed on seat;The big synchronous pulley passes through synchronous band connection with small synchronous pulley;Institute It states small synchronous pulley and encoder is installed;The big synchronous pulley external engagement has rack gear;It can be to pipe by the first clamping element Material is clamped, and then, drives guide sleeve to advance by feeding oil cylinder assembly, guide sleeve drives encoder seat to advance, encoder Big synchronous pulley on seat is engaged with rack, and linear motion is converted to big synchronous pulley rotary motion, big synchronous pulley passes through Synchronous belt drive small synchronous pulley movement, small synchronous pulley rotation, drive encoder converted, thus converse traveling away from From, can send to its control cabinet of bending machine carry out travel distance control;The guide sleeve is fixed with support far from bracket side is lengthened Expect clamping seats;The second clamping element is installed on the retainer clamping seats;When needing bend pipe, the second clamping element clamps tubing; Bend pipe is carried out by head, is guaranteed more stable when tubing bend pipe;Second clamping element is fixedly arranged above head;The head It is upper that bending pipe arm is equipped with by main shaft;Mandrel is installed on the inside of the main shaft;Described mandrel one end is fixed with bend pipe cover half;It is another It is installed by actuator and dynamic retarding mechanism at end;The main shaft is equipped with double chain drum on the inside of head;The double chain drum On be engaged with double strand chain;The head bottom is fixed with two master cylinders;Two master cylinder its telescopic end respectively with double strand chain Both ends are fixed;The bending pipe arm avris face bend pipe cover half is fixed with clamping module;It can be completed by the way that two master cylinders are flexible Double strand chain movement, double strand chain can drive double chain drum to be rotated and reverse;Double strand chain dish driving shaft motion, main shaft Bending pipe arm rotation is driven, is rotated to drive and clamp module, module and bend pipe cover half is clamped and bend pipe operation is carried out to tubing, When operation, mandrel movement is driven by dynamic retarding mechanism, so that bend pipe cover half be driven to carry out rotation;It can be well to tubing It is oriented to.
As preferred embodiment, the bending pipe arm is groove body;Graphite copper sheet is installed on the inside of the groove body;The slot Internal side is equipped with the sliding block that end face is H-type between graphite copper sheet;The clamping module and sliding block activity are installed;The clamping Module includes the adjustable column fixed with sliding block;Screwing out on the adjustable column has adjusting bolt;The adjusting bolt other end clamping To clamping die sleeve;The clamping die sleeve other side snaps fit onto clamping die by clamping natch, is revolved by adjusting bolt and adjustable column Modulation section, so that adjusting bolt be made to be cased with a dilatory force to clamping die, clamping die sleeve can slide in sliding block, clamp die sleeve and drive Dynamic clamping die carries out fore-aft motion.
As preferred embodiment, the slider bottom two sides are fixed with two sliding block pin shafts;On the two sliding block pin shafts It is separately installed with the first bend pipe arm link and the second bend pipe arm link;The sliding block pin shaft is installed in the first bend pipe arm link two sides There are two orifice plates;The two orifice plates other end is installed to intermediate bend pipe arm link;The first bend pipe arm link other end is installed to First connecting rod pin shaft;The second bend pipe arm link other end is installed to second connecting rod pin shaft;Second connecting rod pin shaft both ends Groove body is installed to by graphite copper sheet;The second connecting rod pin shaft is equipped with third bending pipe arm in the second bend pipe arm link two sides Connecting rod;The third bend pipe arm link other end is installed to intermediate bend pipe arm link;It is also installed in the intermediate bend pipe arm link There is axis ear;The axis ear and its telescopic end of bending pipe arm cylinder are installed;The bending pipe arm cylinder is fixed with bending pipe arm bottom;Bending pipe arm Cylinder drives intermediate bend pipe arm link to carry out front and back push-and-pull by axis ear;Intermediate bend pipe arm link gives two orifice plates and third bending pipe arm Connecting rod push-pull effort since second connecting rod pin shaft and groove body are installed, and is driven by the first bend pipe arm link and the second bend pipe arm link Movable slider pin shaft movement, so that driving sliding block to carry out lifting clamps stabilization.
As preferred embodiment, first clamping element and the second clamping element include the clamping being fixed on guide sleeve Block and clamping cylinder;Its telescopic end of the clamping cylinder is fixed with the clamping brace block with gripping block cooperation, clamping cylinder driving The movement of clamping brace block, clamping brace block and gripping block are clamped tubing.
As preferred embodiment, gap between the gripping block and clamping brace block and first group of alignment rolling wheel and The gap that second group of alignment rolling wheel is formed is in same straight line.
As preferred embodiment, the lower alignment deckle board bottom is fixed with nylon coil.
As preferred embodiment, the head is fixed with material supporting rack below bend pipe cover half;Pacify on the material supporting rack Equipped with retainer axis;Retainer baffle is fixed on the retainer axis;Retainer shaft end portion is connected to by connecting rod send retainer oil cylinder Its telescopic end;Retainer oil cylinder is sent to be installed to the outer avris of head by fixed block;Retainer oil cylinder drive link is sent to act, connecting rod driving Retainer baffle carries out tubing and carries out retainer limit.
Compared with prior art, the New Type Bending Pipe Unit of the utility model, by clamping module and bend pipe Cover half can carry out bend pipe operation to tubing, can by two groups of first group of alignment rolling wheels and second group of alignment rolling wheel when operation Tubing is straightened, accurate feeding is able to carry out by feeding oil cylinder assembly and the first clamping element, passes through the second clamping element energy Bend pipe prelocalization is enough carried out, mandrel movement is driven by dynamic retarding mechanism, so that bend pipe cover half be driven to carry out rotation;It can be very Tubing is oriented to well.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The some embodiments recorded in application, for those of ordinary skill in the art, without creative efforts, It is also possible to obtain other drawings based on these drawings.
Fig. 1 show the structural schematic diagram of New Type Bending Pipe Unit in the utility model specific embodiment.
Fig. 2 is the lengthening bracket and alignment feature mounting structure schematic diagram of the utility model.
Fig. 3 is the bending pipe arm cylinder driving end mounting structure schematic diagram of the utility model.
Fig. 4 is the bending pipe arm and head mounting structure schematic diagram of the utility model.
Fig. 5 is the bending pipe arm and head positive structure schematic of the utility model.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Detailed description, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole implementation Example.Based on the embodiments of the present invention, those of ordinary skill in the art institute without making creative work The every other embodiment obtained, fall within the protection scope of the utility model.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
As shown in Figures 1 to 5, the auxiliary pushing-type New Type Bending Pipe Unit of the utility model, including bracket 1 is lengthened, lengthening bracket 1 just Face bottom is equipped with the lower alignment deckle board 2 with lengthening support vertical;It lengthens bracket 1 and is fixed with colonel in lower 2 top surface of alignment deckle board Straight deckle board 3;Upper alignment deckle board 3 is parallel with bracket 1 is lengthened;Alignment is movably set on the inside of lower alignment deckle board 2 and upper alignment deckle board 3 Sliding block 4;Sliding block 4 is straightened to install by screw rod 5 and lower alignment deckle board 2 and upper alignment deckle board 3;It is straightened 4 one side of sliding block and passes through more Alignment wheel shaft 6 is fixed with first group of alignment rolling wheel 7;More alignment 6 central points of wheel shaft are in same ordinate;Lower alignment deckle board 2 and upper It is straightened deckle board 3 and is fixed with second group of alignment rolling wheel 8 in first group of 7 avris of alignment rolling wheel;Two groups of first group of alignment rolling wheels 7 and second The gap that group alignment rolling wheel 8 is formed is on the same line;Alignment sliding block can be driven in lower alignment deckle board and colonel by screw rod Sliding in straight deckle board;So as to adjust the spacing between first group of alignment rolling wheel and second group of alignment rolling wheel, using lower alignment Deckle board and upper alignment deckle board install two groups of first group of alignment rolling wheels and second group of alignment rolling wheel, and lower alignment deckle board and colonel respectively It is vertical between straight deckle board, to make upper and lower first group of alignment rolling wheel and second group of alignment rolling wheel to before by the tubing in its gap Left and right is limited afterwards;To complete tubing alignment;It lengthens bracket 1 and is fixed with feeding oil cylinder assembly at the top of upper alignment deckle board 10;It states feeding oil cylinder assembly 10 its telescopic end and is fixed with guide sleeve 11;The first clamping element 12 is fixed on guide sleeve 11;Guide sleeve 11 avris are fixed with encoder seat 13;Big synchronous pulley 14 and small synchronous pulley 15 are installed on encoder seat 13;Big synchronous belt Wheel 14 passes through synchronous band connection with small synchronous pulley 15;Small synchronous pulley 15 and encoder 16 are installed;Outside big synchronous pulley 14 It is engaged with rack gear 17;Tubing can be clamped by the first clamping element, then, guide sleeve be driven by feeding oil cylinder assembly Advance, guide sleeve drives encoder seat to advance, and the big synchronous pulley on encoder seat is engaged with rack, and linear motion is converted to Big synchronous pulley rotary motion, big synchronous pulley drive small synchronous pulley to act by synchronous belt, and small synchronous pulley rotation drives Encoder is converted, to converse travel distance, can be sent to its control cabinet of bending machine and be carried out travel distance control;Guiding Set 11 is fixed with retainer clamping seats 18 far from bracket side is lengthened;Second clamping element 19 is installed on retainer clamping seats 18;When need When wanting bend pipe, the second clamping element clamps tubing;Bend pipe is carried out by head, is guaranteed more stable when tubing bend pipe;Second folder Tight part 19 is fixedly arranged above head 20;Bending pipe arm 22 is equipped with by main shaft 21 on head 20;Mandrel is installed on the inside of main shaft 21 23;23 one end of mandrel is fixed with bend pipe cover half 24;The other end is installed by actuator and dynamic retarding mechanism 25;Main shaft 21 is in machine Head inside is equipped with double chain drum 26;Double strand chain is engaged on double chain drum 26;20 bottom of head is fixed with two master cylinders 27; Two master cylinder 27 its telescopic end are fixed with double strand chain both ends respectively;22 avris face bend pipe cover half 24 of bending pipe arm is fixed with clamping Module 28;Double strand chain movement can be completed by the way that two master cylinders are flexible, double strand chain can drive double chain drum to be rotated forward And reversion;Double strand chain dish driving shaft motion, the rotation of main shaft drives bending pipe arm are rotated to drive and clamp module, are clamped Module and bend pipe cover half carry out bend pipe operation to tubing, when operation, mandrel movement are driven by dynamic retarding mechanism, to drive Bend pipe cover half carries out rotation;Tubing can be oriented to well.
Further, bending pipe arm 22 is groove body 221;Graphite copper sheet 222 is installed on the inside of groove body 221;The inside of groove body 221 in The sliding block 223 that end face is H-type is installed between graphite copper sheet 222;It clamps module 28 and 223 activity of sliding block is installed;Clamp module 28 include the adjustable column 224 fixed with sliding block;It screws out to have on adjustable column 224 and adjusts bolt 225;Adjust 225 other end card of bolt It is connected to and clamps die sleeve 226;It clamps 226 other side of die sleeve and snaps fit onto clamping die 227 by clamping natch, by adjusting bolt and adjusting Segmented column rotation is adjusted, so that adjusting bolt be made to be cased with a dilatory force to clamping die, clamping die sleeve can slide in sliding block, is clamped Die sleeve drives clamping die to carry out fore-aft motion.
Further, 223 two sides of the bottom of sliding block are fixed with two sliding block pin shafts 29;Is separately installed on two sliding block pin shafts 29 One bend pipe arm link 30 and the second bend pipe arm link 31;Sliding block pin shaft 29 is equipped with two orifice plates in 30 two sides of the first bend pipe arm link 32;Two orifice plates, 32 other end is installed to intermediate bend pipe arm link 33;First bend pipe arm link, 30 other end is installed to first connecting rod Pin shaft 34;Second bend pipe arm link, 31 other end is installed to second connecting rod pin shaft 35;35 both ends of second connecting rod pin shaft pass through stone Black copper sheet 222 is installed to groove body 221;Second connecting rod pin shaft 35 is equipped with third bending pipe arm in 31 two sides of the second bend pipe arm link and connects Bar 36;36 other end of third bend pipe arm link is installed to intermediate bend pipe arm link 33;It is also equipped in intermediate bend pipe arm link 33 Axis ear 37;Axis ear 37 and its telescopic end of bending pipe arm cylinder 38 are installed;Bending pipe arm bending pipe arm cylinder 38 is fixed with 22 bottom of bending pipe arm; Bending pipe arm cylinder drives intermediate bend pipe arm link to carry out front and back push-and-pull by axis ear;Intermediate bend pipe arm link gives two orifice plates and third Bend pipe arm link push-pull effort since second connecting rod pin shaft and groove body are installed, and passes through the first bend pipe arm link and the second bending pipe arm Connecting rod drives the movement of sliding block pin shaft, so that driving sliding block to carry out lifting clamps stabilization.
Further, the first clamping element 12 and the second clamping element 19 include the gripping block 121 being fixed on guide sleeve and folder Locking oil cylinder 122;Its telescopic end of clamping cylinder 122 is fixed with the clamping brace block 123 cooperated with gripping block 121, and clamping cylinder drives Dynamic clamping brace block movement, clamping brace block and gripping block are clamped tubing.
Further, the gap between gripping block 121 and clamping brace block 123 and first group of alignment rolling wheel 7 and second group The gap that alignment rolling wheel 8 is formed is in same straight line.
Further, lower 2 bottom of alignment deckle board is fixed with nylon coil 9.
Further, head 20 is fixed with material supporting rack 39 below bend pipe cover half;Retainer axis 40 is installed on material supporting rack 39; Retainer baffle 41 is fixed on retainer axis 40;40 end of retainer axis is connected to by connecting rod 44 send retainer oil cylinder 42 its telescopic end; Retainer oil cylinder 42 is sent to be installed to the outer avris of head 20 by fixed block 43;Retainer oil cylinder drive link is sent to act, connecting rod driving support Expect that baffle carries out tubing and carries out retainer limit.
In conclusion the New Type Bending Pipe Unit of the utility model, can carry out tubing by clamping module and bend pipe cover half Bend pipe operation, when operation, can be straightened tubing by two groups of first group of alignment rolling wheels and second group of alignment rolling wheel, pass through Feeding oil cylinder assembly and the first clamping element are able to carry out accurate feeding, are able to carry out bend pipe prelocalization by the second clamping element, lead to The driving mandrel movement of dynamic retarding mechanism is crossed, so that bend pipe cover half be driven to carry out rotation;Tubing can be oriented to well.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including element.
The above is only the specific embodiment of the application, it is noted that for the ordinary skill people of the art For member, under the premise of not departing from the application principle, several improvements and modifications can also be made, these improvements and modifications are also answered It is considered as the protection scope of the application.

Claims (7)

1. a kind of New Type Bending Pipe Unit, it is characterised in that: including lengthening bracket, the lengthening bracket front bottom is equipped with and lengthens The lower alignment deckle board of support vertical;The lengthening bracket is fixed with upper alignment deckle board in lower alignment deckle board top surface;The upper alignment Deckle board is parallel with bracket is lengthened;Alignment sliding block is movably set on the inside of the lower alignment deckle board and upper alignment deckle board;The alignment Sliding block is installed by screw rod and lower alignment deckle board and upper alignment deckle board;The alignment sliding block passes through more alignment wheel shafts on one side to be fixed There is first group of alignment rolling wheel;The more straightening-wheel axis center points are in same ordinate;The lower alignment deckle board and upper alignment deckle board Second group of alignment rolling wheel is fixed in first group of alignment rolling wheel avris;First group of alignment rolling wheel described in two groups and second group of alignment rolling Take turns the gap formed on the same line;The lengthening bracket is fixed with feeding oil cylinder assembly at the top of upper alignment deckle board;It states and send Its telescopic end of material oil cylinder assembly is fixed with guide sleeve;The first clamping element is fixed on the guide sleeve;The guide sleeve avris is solid Surely there is encoder seat;Big synchronous pulley and small synchronous pulley are installed on the encoder seat;The big synchronous pulley and small same It walks belt wheel and passes through synchronous band connection;The small synchronous pulley and encoder are installed;The big synchronous pulley external engagement has rack gear; The guide sleeve is fixed with retainer clamping seats far from bracket side is lengthened;The second clamping element is installed on the retainer clamping seats; Second clamping element is fixedly arranged above head;Bending pipe arm is equipped with by main shaft on the head;Installation on the inside of the main shaft There is mandrel;Described mandrel one end is fixed with bend pipe cover half;The other end is installed by actuator and dynamic retarding mechanism;The main shaft Double chain drum is installed on the inside of head;Double strand chain is engaged on the double chain drum;It is main that the head bottom is fixed with two Oil cylinder;Two master cylinder its telescopic end are fixed with double strand chain both ends respectively;The bending pipe arm avris face bend pipe cover half is solid Surely there is clamping module.
2. New Type Bending Pipe Unit according to claim 1, it is characterised in that: the bending pipe arm is groove body;On the inside of the groove body Graphite copper sheet is installed;The sliding block that end face is H-type is installed between graphite copper sheet on the inside of the groove body;The clamping module with Sliding block activity installation;The module that clamps includes the adjustable column fixed with sliding block;Screwing out on the adjustable column has adjusting bolt;Institute It states the adjusting bolt other end and snaps fit onto clamping die sleeve;The clamping die sleeve other side snaps fit onto clamping die by clamping natch.
3. New Type Bending Pipe Unit according to claim 2, it is characterised in that: the slider bottom two sides are fixed with two slider pins Axis;The first bend pipe arm link and the second bend pipe arm link are separately installed on the two sliding block pin shafts;The sliding block pin shaft is in One bend pipe arm link two sides is equipped with two orifice plates;The two orifice plates other end is installed to intermediate bend pipe arm link;Described first is curved The pipe arm link other end is installed to first connecting rod pin shaft;The second bend pipe arm link other end is installed to second connecting rod pin shaft; Second connecting rod pin shaft both ends pass through graphite copper sheet and are installed to groove body;The second connecting rod pin shaft is in the second bend pipe arm link Two sides is equipped with third bend pipe arm link;The third bend pipe arm link other end is installed to intermediate bend pipe arm link;In described Between be also equipped with axis ear in bend pipe arm link;The axis ear and its telescopic end of bending pipe arm cylinder are installed;The bending pipe arm cylinder with Bending pipe arm bottom is fixed.
4. New Type Bending Pipe Unit according to claim 1, it is characterised in that: first clamping element and the second clamping element include The gripping block and clamping cylinder being fixed on guide sleeve;Its telescopic end of the clamping cylinder is fixed with the clamping with gripping block cooperation Supporting block.
5. New Type Bending Pipe Unit according to claim 4, it is characterised in that: between the gripping block and clamping brace block The gap that gap and first group of alignment rolling wheel and second group of alignment rolling wheel are formed is in same straight line.
6. New Type Bending Pipe Unit according to claim 1, it is characterised in that: the lower alignment deckle board bottom is fixed with nylon ring Frame.
7. New Type Bending Pipe Unit according to claim 1, it is characterised in that: the head is fixed with support below bend pipe cover half Expect frame;Retainer axis is installed on the material supporting rack;Retainer baffle is fixed on the retainer axis;Retainer shaft end portion passes through company Bar, which is connected to, send retainer oil cylinder its telescopic end;Retainer oil cylinder is sent to be installed to the outer avris of head by fixed block.
CN201821043403.4U 2018-07-03 2018-07-03 New Type Bending Pipe Unit Expired - Fee Related CN208373931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821043403.4U CN208373931U (en) 2018-07-03 2018-07-03 New Type Bending Pipe Unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821043403.4U CN208373931U (en) 2018-07-03 2018-07-03 New Type Bending Pipe Unit

Publications (1)

Publication Number Publication Date
CN208373931U true CN208373931U (en) 2019-01-15

Family

ID=64963347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821043403.4U Expired - Fee Related CN208373931U (en) 2018-07-03 2018-07-03 New Type Bending Pipe Unit

Country Status (1)

Country Link
CN (1) CN208373931U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108672535A (en) * 2018-07-03 2018-10-19 张家港市友胜机械制造有限公司 New Type Bending Pipe Unit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108672535A (en) * 2018-07-03 2018-10-19 张家港市友胜机械制造有限公司 New Type Bending Pipe Unit
CN108672535B (en) * 2018-07-03 2024-03-26 张家港市友胜机械制造有限公司 Novel pipe bending machine

Similar Documents

Publication Publication Date Title
CN101712053B (en) Multi-straightening head-based quick straightening device and method
CN104942510B (en) Box structure plate welding tool
CN110374337A (en) A kind of construction multi-purpose clamping and fixed device
CN108746273A (en) The novel guide type head of bending machine
CN208373931U (en) New Type Bending Pipe Unit
CN102240756B (en) Reinforcing steel bar bidirectional bending machine
CN216462546U (en) Centering support device of laser pipe cutting machine
CN201385050Y (en) Plate and strip rectifying device with multiple degrees of freedom and adaptability to forward and backward operations
CN204159705U (en) A kind of bending machine
CN110102670A (en) A kind of cutting mechanism of spring processing
CN208373916U (en) Auxiliary pushing-type New Type Bending Pipe Unit
CN208373905U (en) The novel guide type head of bending machine
CN108672535A (en) New Type Bending Pipe Unit
CN217044114U (en) Rolling type cold roll forming equipment
CN206276752U (en) The clamping trip gear of metal circular tube Bending Processing
CN206011407U (en) Block machine core-pulling device
CN109746314A (en) A kind of adjustable discrete roller roller head machine
CN201603789U (en) Four-piece matching wedge-type deflection compensating device of bending machine
CN208232151U (en) A kind of shoes mould automatic mould-opening device
CN204148316U (en) Small-bend radius electric pipe bender
CN102786016B (en) Steel tube traction machine
CN205253812U (en) Reaming flanger of pneumatic actuator spring
CN110040460A (en) One kind following mould group
CN205551378U (en) High accuracy load chain inspection machine
CN104138937A (en) Light alloy section material finish stretching machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190115

Termination date: 20210703