CN208367111U - A kind of novel integrated energy monitoring analysis system - Google Patents

A kind of novel integrated energy monitoring analysis system Download PDF

Info

Publication number
CN208367111U
CN208367111U CN201820657529.4U CN201820657529U CN208367111U CN 208367111 U CN208367111 U CN 208367111U CN 201820657529 U CN201820657529 U CN 201820657529U CN 208367111 U CN208367111 U CN 208367111U
Authority
CN
China
Prior art keywords
wall
placement cabinet
power
equipment
shield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820657529.4U
Other languages
Chinese (zh)
Inventor
刘继兴
吴振峰
王均东
林祥伟
陈明成
陈兴旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asia Pacific Energy Technology (shenzhen) Ltd By Share Ltd
Original Assignee
Asia Pacific Energy Technology (shenzhen) Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asia Pacific Energy Technology (shenzhen) Ltd By Share Ltd filed Critical Asia Pacific Energy Technology (shenzhen) Ltd By Share Ltd
Priority to CN201820657529.4U priority Critical patent/CN208367111U/en
Application granted granted Critical
Publication of CN208367111U publication Critical patent/CN208367111U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The utility model discloses a kind of novel integrated energy monitoring analysis systems, including loading plate, the upper outer wall of the loading plate is equipped with control host, shield is installed on the right side of the control host, the upper outer wall of the shield is equipped with door, and the upper inner wall of shield is equipped with fan blowing, display screen is installed below the fan blowing, printer is installed on the right side of the shield, the equipment is provided with fan blowing and the second fan blowing, when the device is opened, two fans will start automatically, it will radiate later to equipment, it is more natural air cooled, heat dissipation effect is more preferable, and ventilating interlayer is provided in storage tank, equipment is integrally radiated in heat dissipation, its is easy to operate, amount of heat accumulation not will cause so that the normal operation of equipment is affected, so that user The case where spending substantial contribution to repair is needed, economic benefit is stronger compared with high practicability.

Description

A kind of novel integrated energy monitoring analysis system
Technical field
The utility model belongs to energy analysis equipment technical field, and in particular to a kind of novel integrated energy monitoring analysis system System.
Background technique
The device that energy monitoring analysis system as its name suggests tests and analyzes the novel integrated energy, so that the energy exists Transmission or using when whether meet specified standards, the equipment use so that the energy utilize when not will cause wasting phenomenon, Economic benefit is stronger compared with high-adaptability.
The energy monitoring analysis system common currently on the market is generally faced with often meets when people are using equipment The case where to equipment heating, especially in summer in use, because ambient temperature is higher, and equipment can also generate heat, work as heat Amount accumulation will make the normal operation of equipment be affected when more, so that user needs that substantial contribution is spent to repair, Economic benefit is lower not very practical;Its most of equipment needs circumscripted power line during installation, and some power supply line lengths compared with Situation long, that it easily causes power supply line mixed and disorderly after equipment installation, so that needing to spend a large amount of essences when user's repair apparatus Power goes to arrange power supply line, cumbersome complexity, and longer power supply line also will affect the normal work of user, so that using Person is easily tripped when walking, and protective is poor not very practical;And most of equipment needed when installing equipment by A large amount of auxiliary tool, cumbersome complexity is time-consuming and laborious, and also needs to replace ancillary equipment, economic benefit repeatedly sometimes It is lower not very practical.
Summary of the invention
The purpose of this utility model is to provide a kind of novel integrated energy monitoring analysis systems, to solve above-mentioned background skill Itd is proposed in art the case where being frequently encountered equipment heating when people are using equipment, especially in summer in use, because outer Boundary's temperature is higher, and equipment can also generate heat, when heat gathers it is more when the normal operation of equipment will be made to be affected, So that user needs that substantial contribution is spent to repair, economic benefit is lower not very practical;Its most of equipment is during installation Circumscripted power line is needed, and some power supply line lengths are longer, the situation that it easily causes power supply line mixed and disorderly after equipment installation, make It requires a high expenditure of energy when obtaining user's repair apparatus and arranges power supply line, cumbersome complexity, and longer power supply line It also will affect the normal work of user, so that user is easily tripped when walking, protective is poor not very practical; And most of equipment are needed when installing equipment by a large amount of auxiliary tool, cumbersome complexity is time-consuming and laborious, and sometimes Also need to replace ancillary equipment, the lower not very practical problem of economic benefit repeatedly.
To achieve the above object, the utility model provides the following technical solutions: a kind of novel integrated energy monitoring analysis system System, including loading plate, the upper outer wall of the loading plate are equipped with control host, are equipped with protection on the right side of the control host Cover, the upper outer wall of the shield is equipped with door, and the upper inner wall of shield is equipped with fan blowing, the blowing air Display screen is installed below fan, printer is installed on the right side of the shield, placement is installed below the loading plate Cabinet, the placement cabinet are made of left placement cabinet and right placement cabinet, and rotation door, and left placement are provided in front of the left placement cabinet Demarcation plate is installed in cabinet, the first storage tank is installed on the left of the demarcation plate, and the second storage is installed on the right side of demarcation plate Object case is equipped with limit movable block in first storage tank, and the detection of the first power quality is equipped on the limit movable block Instrument is equipped with the second power quality detector, the second power quality detection below the first power quality detector Second fan blowing is installed below instrument, power monitoring instrumentation is installed in second storage tank, the power monitoring instrumentation Lower section is equipped with control switch, and element is equipped in the right placement cabinet and places frame, the element is placed to be equipped in frame Converter is equipped with isolation board on the left of the converter, is equipped with control centre on the left of the isolation board, in the control Reservoir is installed on the left of the heart, signal projector, the top peace of the signal projector are installed above the reservoir Equipped with signal receiver, wireless network access device, the left side lower section of the left placement cabinet are installed above the signal receiver Outer wall offers power interface, and the bottom of the placement cabinet is equipped with universal wheel, the wireless network access device, signal receiver, Signal projector, reservoir, converter, control centre, control switch, power monitoring instrumentation, the first power quality detector, second Power quality detector, display screen and printer are electrically connected with control host, the control host by power interface and Extraneous power supply is electrically connected.
Preferably, there are interlayer, the lower rights of the interlayer between the inner left wall and outer wall of first storage tank Inner wall offers air intake duct, and the upper inner wall of interlayer offers intensive air hole.
Preferably, the limit movable block is made of limit fixed block, spring and limit plate, the length number of the limit plate Value is equal to the distance between the first storage tank or so two inner walls numerical value.
Preferably, the front outer wall of the demarcation plate offers winding displacement groove, in the inner left wall and right side of the winding displacement groove Wall offers power supply line embedded groove.
Preferably, the element is placed frame and is made of outer cover and super heated rubber limit plate, the height number of the outer cover Less than the height number of placement cabinet.
Compared with prior art, the utility model has the beneficial effects that the device structure is scientific and reasonable safe and convenient to use, And the equipment is provided with fan blowing and the second fan blowing, when the device is opened, two fans will start automatically, Zhi Houbian It can radiate to equipment, more natural air cooled, heat dissipation effect is more preferable, and ventilating interlayer is provided in storage tank, so that equipment It can integrally radiate in heat dissipation, it is easy to operate, it not will cause amount of heat and accumulate the normal fortune so that equipment Row is affected, so that user needs the case where spending substantial contribution to repair, economic benefit is stronger compared with high practicability; And the equipment is provided with winding displacement groove, power supply line can be embedded in winding displacement groove when user's circumscripted power line, so that power supply line It can be neatly arranged, when user's repair apparatus does not need that great effort is spent to go to arrange power supply line, easy to operate fast Victory, and arrange well laid power supply line and user will not be tripped when walking, protective is stronger compared with high practicability;And this sets It is standby to be provided with limit movable block, it can be by limit movable block directly by monitoring device card when user's equipment requiring installation Firmly, it so that it will not shake, is fixedly connected compared with using ancillary equipment, in operation more convenient and quicker, when maintenance convenient for disassembly and assembly It is more convenient, and the equipment is provided with door, protective action can be played to display screen, display screen will not be broken easily, Protective is stronger compared with high practicability.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the outside drawing of the utility model;
Fig. 3 is the first storage tank main view sectional view of the utility model;
Fig. 4 is the power monitoring instrumentation work flow diagram of the utility model;
Fig. 5 is the first power quality detector work flow diagram of the utility model;
Fig. 6 is work flow diagram when the utility model detects situation.
In figure: 1- loading plate, 2- control host, 3- shield, 4- door, 5- display screen, 6- printer, 7- placement cabinet, The first storage tank of 8-, 9- limit movable block, the second storage tank of 10-, the first power quality of 11- detector, the second power quality of 12- Detector, 13- power monitoring instrumentation, 14- control switch, the second fan blowing of 15-, 16- element place frame, 17- wireless network connects Enter device, 18- signal receiver, 19- signal projector, 20- reservoir, 21- control centre, 22- converter.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1 to Fig. 6 is please referred to, the utility model provides a kind of technical solution: a kind of novel integrated energy monitoring analysis system System, including loading plate 1, the upper outer wall of loading plate 1 are equipped with control host 2, and the right side of control host 2 is equipped with shield 3, The upper outer wall of shield 3 is equipped with door 4, and the upper inner wall of shield 3 is equipped with fan blowing, the lower section of fan blowing Display screen 5 is installed, the right side of shield 3 is equipped with printer 6, and the lower section of loading plate 1 is equipped with placement cabinet 7, placement cabinet 7 by Left placement cabinet and right placement cabinet form, and are provided with rotation door in front of left placement cabinet, and be equipped with demarcation plate in left placement cabinet, point First storage tank 8 is installed on the left of partition, and the second storage tank 10 is installed on the right side of demarcation plate, peace in the first storage tank 8 Equipped with limit movable block 9, limits and first power quality detector 11, the first power quality detector 11 are installed on movable block 9 Lower section the second power quality detector 12 is installed, the lower section of the second power quality detector 12 is equipped with the second fan blowing 15, power monitoring instrumentation 13 is installed in the second storage tank 10, the lower section of power monitoring instrumentation 13 is equipped with control switch 14, right placement Element is installed in cabinet and places frame 16, element is placed in frame 16 and is equipped with converter 22, and the left side of converter 22 is equipped with Isolation board is equipped with control centre 21 on the left of isolation board, and the left side of control centre 21 is equipped with reservoir 20, reservoir 20 Top is equipped with signal projector 19, and the top of signal projector 19 is equipped with signal receiver 18, signal receiver 18 it is upper Side is equipped with wireless network access device 17, and the left side external wall beneath of left placement cabinet offers power interface, the bottom installation of placement cabinet 7 There are universal wheel, wireless network access device 17, signal receiver 18, signal projector 19, reservoir 20, converter 22, control centre 21, control switch 14, power monitoring instrumentation 13, the first power quality detector 11, the second power quality detector 12, display screen 5 It is electrically connected with control host 2 with printer 6, control host 2 is electrically connected by power interface and extraneous power supply.
In the present embodiment, it is preferred that there are interlayer, the lower sections of interlayer between the inner left wall and outer wall of the first storage tank 8 Right side inner wall offers air intake duct, and the upper inner wall of interlayer offers intensive air hole;It is to make equipment when in use The wind that the second fan blowing 15 can be allow to blow out enters interlayer by air intake duct, later again from the air hole on interlayer inner wall It radiates to the element in storage tank, signal receiver 18 is to can receive outer signals while passing to control centre 21 to divide The equipment of analysis, signal projector 19 are that the information that control centre 21 is issued can be passed to ambient systems, wireless network access Device 17 is known as high-power wireless network interface card, wireless loiter network device.Network interface card connects computer USB interface, the automatic nothing for searching for large area nearby Gauze network realizes wireless networking.The most general standard of WLAN is the series standard that work defines, which passes through wireless network Access device 17 to realize the purpose of remote control, and does not have to that its operation is manually operated so that equipment is connect with ambient controller Convenient and efficient, power quality detector is mainly used for single-phase, three-phase power measurement, voltage event capture, harmonic measure, three-phase not Degree of balance measurement etc.;Power monitoring instrumentation 13 can directly replace conventional electric power transmitter and measuring instrumentss.As a kind of elder generation Into intelligent, digitized front-end collection element, which is widely used in various control systems.Instrument uses AC Data can measure the parameters such as electric current, voltage, power, power factor and the electric energy in power grid respectively, can pass through panel Multiplying power is arranged in thin film switch, with the functions such as RS485 communication, warning output, On-off signal/output, is provided with filter in the equipment Wave device can prevent the interference of outer signals.
In the present embodiment, it is preferred that limit movable block 9 is made of limit fixed block, spring and limit plate, the length of limit plate Degree value is equal to the distance between 8 or so two inner wall of the first storage tank numerical value, is to make equipment can be with when installing detector Limit plate is pulled open, instrument is will test later and is placed on limit plate, fixed purpose can be played by then making spring hold limit plate, And the length value of limit plate is equal to the distance between 8 or so two inner wall of the first storage tank numerical value, is that detector exists in order to prevent Once equipment generates the case where vibration will be such that detector shakes generation after installation.
In the present embodiment, it is preferred that the front outer wall of demarcation plate offers winding displacement groove, the inner left wall of winding displacement groove and right side Inner wall offers power supply line embedded groove, can be connected power supply line by power supply line embedded groove to make equipment during installation Detector is later again arranged extra power supply line by winding displacement groove, so that power supply line will not influence the normal work of user Make.
In the present embodiment, it is preferred that element is placed frame 16 and is made of outer cover and super heated rubber limit plate, the height of outer cover Numerical value be less than placement cabinet 7 height number, be in order to make equipment during installation can directly by outer cover be embedded in placement cabinet 7 in without Shaking can be generated, and it is in order to make to be spaced between each element, so that equipment is working that super heated rubber limit plate, which is arranged, When not will receive the influence of other elements, and avoid the case where mutual frictional impact of element causes equipment to be not normally functioning production It is raw.
Working principle: when the utility model is used, user installs all parts, Zhi Houzai in placement cabinet 7 first To be electrically connected between all parts by power supply line, be electrically connected later by power interface and extraneous power supply, then Can normal use, connect in use, first passing through wireless network access device 17 with extraneous terminal, reuse equipment later, when setting When power monitoring instrumentation 13 in standby detects the current or voltage in circuit, the data that can be will test are transferred in control In the heart 21, control centre 21 is again by data storage into reservoir 20 later, while importing information into converter 22, is converted to it Digital information and it will be shown on display screen 5, later when the first power quality detector 11 and the second electric power matter in equipment Detector 12 is measured, detects that the data that can be will test when the quality information of electric power are transferred to control centre 21, later by control Information is passed to reservoir 20 by the conversion of center 21, and then control centre 21 can also import converter 22, convert information into it Digital information is simultaneously shown on display screen 5, when the first power quality detector 11 and power monitoring instrumentation 13 detect electric power feelings When condition changes, control centre 21 can be imported information into, is converted later by control centre 21 and information is passed to reservoir 20, then control centre 21 can also import converter 22, so that it is converted information into digital information and be shown on display screen 5, Control centre 21 can also communicate information to signal projector 19 simultaneously, so that information can be passed through wireless network by signal projector 19 Network is transmitted to controlling terminal, and controlling terminal can issue instructions to signal receiver 18 later, when signal receiver 18 receives letter Control centre 21 can be passed to after number, control centre 21 can control the power supply of 14 closing problem route of control switch later, later User can be read out the storage information in reservoir 20, then be printed again by printer 6 by control host 2, The equipment is provided with limit movable block 9, directly can be set monitoring by limiting movable block 9 when user's equipment requiring installation It is standby to block, it so that it will not shake, is fixedly connected compared with using ancillary equipment, in operation more convenient and quicker, inspection convenient for disassembly and assembly It is more convenient when repairing.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of novel integrated energy monitoring analysis system, including loading plate (1), it is characterised in that: the loading plate (1) it is upper Square outer wall is equipped with control host (2), is equipped with shield (3) on the right side of the control host (2), the shield (3) Upper outer wall is equipped with door (4), and the upper inner wall of shield (3) is equipped with fan blowing, the lower section of the fan blowing It is equipped with display screen (5), is equipped with printer (6) on the right side of the shield (3), is equipped with below the loading plate (1) Placement cabinet (7), the placement cabinet (7) are made of left placement cabinet and right placement cabinet, are provided with rotation in front of the left placement cabinet Door, and demarcation plate is installed in left placement cabinet, it is equipped on the left of the demarcation plate the first storage tank (8), and the right side of demarcation plate Side is equipped with the second storage tank (10), and limit movable block (9), the limit movable block are equipped in first storage tank (8) (9) the first power quality detector (11) is installed on, is equipped with second below the first power quality detector (11) Power quality detector (12) is equipped with the second fan blowing (15), institute below the second power quality detector (12) It states and is equipped with power monitoring instrumentation (13) in the second storage tank (10), control switch is installed below the power monitoring instrumentation (13) (14), element is installed in the right placement cabinet and places frame (16), the element is placed in frame (16) and is equipped with converter (22), isolation board is installed on the left of the converter (22), is equipped on the left of the isolation board control centre (21), it is described It is equipped on the left of control centre (21) reservoir (20), signal projector (19) is installed above the reservoir (20), It is equipped with signal receiver (18) above the signal projector (19), nothing is installed above the signal receiver (18) Gauze access device (17), the left side external wall beneath of the left placement cabinet offer power interface, the bottom peace of the placement cabinet (7) Equipped with universal wheel, the wireless network access device (17), signal receiver (18), signal projector (19), reservoir (20), conversion Device (22), control centre (21), control switch (14), power monitoring instrumentation (13), the first power quality detector (11), the second electricity Mechanical mass detector (12), display screen (5) and printer (6) are electrically connected with control host (2), the control host (2) It is electrically connected by power interface and extraneous power supply.
2. a kind of novel integrated energy monitoring analysis system according to claim 1, it is characterised in that: first storing There are interlayer between the inner left wall and outer wall of case (8), the lower right inner wall of the interlayer offers air intake duct, and interlayer Upper inner wall offers intensive air hole.
3. a kind of novel integrated energy monitoring analysis system according to claim 1, it is characterised in that: the limit activity Block (9) is made of limit fixed block, spring and limit plate, and the length value of the limit plate is equal to the first storage tank (8) left and right The distance between two inner walls numerical value.
4. a kind of novel integrated energy monitoring analysis system according to claim 1, it is characterised in that: the demarcation plate Front outer wall offers winding displacement groove, and the inner left wall and right side inner wall of the winding displacement groove offer power supply line embedded groove.
5. a kind of novel integrated energy monitoring analysis system according to claim 1, it is characterised in that: the element is placed Frame (16) is made of outer cover and super heated rubber limit plate, and the height number of the outer cover is less than the height number of placement cabinet (7).
CN201820657529.4U 2018-05-04 2018-05-04 A kind of novel integrated energy monitoring analysis system Expired - Fee Related CN208367111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820657529.4U CN208367111U (en) 2018-05-04 2018-05-04 A kind of novel integrated energy monitoring analysis system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820657529.4U CN208367111U (en) 2018-05-04 2018-05-04 A kind of novel integrated energy monitoring analysis system

Publications (1)

Publication Number Publication Date
CN208367111U true CN208367111U (en) 2019-01-11

Family

ID=64933743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820657529.4U Expired - Fee Related CN208367111U (en) 2018-05-04 2018-05-04 A kind of novel integrated energy monitoring analysis system

Country Status (1)

Country Link
CN (1) CN208367111U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113030768A (en) * 2019-12-25 2021-06-25 昆山百德利电子有限公司 Power line interface conduction testing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113030768A (en) * 2019-12-25 2021-06-25 昆山百德利电子有限公司 Power line interface conduction testing device

Similar Documents

Publication Publication Date Title
CN102937799B (en) Data center energy saving method
CN105281582B (en) Environment control method in closed box-type water-cooled photovoltaic plant and its case
CN206041276U (en) Intelligent electric control cabinet of inverter type
CN202524702U (en) Energy-saving cooling cabinet
CN208367111U (en) A kind of novel integrated energy monitoring analysis system
CN105515183A (en) Switch cabinet intelligent control device
CN109580021A (en) Transformer low voltage conducting rod temperature measuring equipment based on induction power taking technology
CN208476300U (en) A kind of electric locomotive cooling tower detection device
CN202956200U (en) Indoor temperature collector based on temperature area method heat metering allocation device
CN209928245U (en) Energy consumption data acquisition module
CN107276234A (en) A kind of intelligent electric power DC operation power supply system
CN208226852U (en) A kind of wind power frequency converter aeration radiation system
CN108556645A (en) A kind of super capacitor energy-storage type modern times charging electric car mechanism
CN205325692U (en) Multi -functional usher's supervisory -controlled robot
CN103645718A (en) Air conditioner monitoring system based on RS-485 bus
CN208537353U (en) Open-air monitoring device
CN206906526U (en) Ring main unit shelf depreciation and temperature real time on-line monitoring system
CN103390868B (en) A kind of buried substation of safe and intelligent
CN207067242U (en) The electric energy collection device of Low-voltage Line Loss can be gathered
CN206831728U (en) A kind of low energy consumption room temp regulator
CN206640060U (en) The Intelligent metering socket of remote control can be carried out
CN106091299A (en) A kind of controlling system of central air conditioner
CN205665014U (en) Supply vehicle device of nai high temperature test
CN209447054U (en) The auxiliary temperature-reducing device of combining unit in digital intelligent substation
CN106049962A (en) Functional intelligent communication iron tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190111